AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment: 1) Form: Appendix B - Quote Data Sheet 2) Projnet Responses 3) Site Visit Attendance Sheet 4) Site Visit Slides 5) Removal the last paragraph of select CLINS dealing w ith a co-efficient. 6) Removal of "Section 1502000 block 1.1" Located at Page 11 of 216.

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Dec-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127S23R6011

X 9B. DATED (SEE ITEM 11)

10-Nov-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Dec-2022

CODE

CONTRACTING DIVISION

USACE, LITTLE ROCK (W9127S)

700 W. CAPITOL AVE, RM 7315

LITTLE ROCK AR 72201-3225

W9127S 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127S23R6011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

The Contractor shall furnish all labor to include but not limited to; supervision,management, incidental engineering.

All materials and other items necessary to provide Facility Investment Services in Region 3 locations outlined and described in the most current associated Performance Work Statement (PWS). Pricing is established using the current RS Means book for the year in which the order is placed. The base year is 11 months due to the first month being the Pre Work Submittals (see CLIN 0009). A co-efficient (set on the base contract) will be applied to the price for both the labor and materials established in RS Means for the final price paid to the contractor. NOTE: The RS Means co-efficient will not be used or applied.

To:

The Contractor shall furnish all labor to include but not limited to; supervision, management, incidental engineering.

All materials and other items necessary to provide Facility Investment Services in Region 3 locations outlined and described in the most current associated Performance Work Statement (PWS). Pricing is established using the current RS Means book for the year in which the order is placed. The base year is 11 months due to the first month being designated for Pre Work Submittals (see CLIN 0009).

CLIN 0004

This CLIN is for items not covered in CLINS 0001 - 0003. The Contractor shallfurnish all labor to include but not limited to; supervision, management, incidental engineering. All materials and other items necessary to provide Facility Investment Services in Region 3 locations outlined and described in the most current associated Performance Work Statement (PWS).

This CLIN is for items not covered in CLINS 0001 - 0003. The Contractor shall furnish all labor to include but not limited to; supervision, management, incidental engineering. All materials and other items necessary to provide Facility Investment Services in Region 3 locations outlined and described in the most current associated

CLIN 1001

The Contractor shall furnish all labor to include but not limited to; supervision,management, incidental engineering.

All materials and other items necessary to provide Facility Investment Services in Region 3 locations outlined and described in the most current associated Performance Work Statement (PWS). Pricing is established using the current RS Means book for the year in which the order is placed. A co-efficient (set on the base contract) will be applied to the price for both the labor and materials established in RS Means for the final price paid to the contractor. NOTE: The RS Means co-efficient will not be used or applied.

The Contractor shall furnish all labor to include but not limited to; supervision, management, incidental engineering.

All materials and other items necessary to provide Facility Investment Services in Region 3 locations outlined and described in the most current associated Performance Work Statement (PWS). Pricing is established using the current RS Means book for the year in which the order is placed.

CLIN 1004

This CLIN is for items not covered in CLINS 1001 - 1003. The Contractor shallfurnish all labor to include but not limited to; supervision, management, incidental engineering. All materials and other items necessary to provide Facility Investment Services in Region 3 locations outlined and described in the most current associated

This CLIN is for items not covered in CLINS 1001 - 1003. The Contractor shall furnish all labor to include but not limited to; supervision, management, incidental engineering. All materials and other items necessary to provide Facility Investment Services in Region 3 locations outlined and described in the most current associated

CLIN 2001

The Contractor shall furnish all labor to include but not limited to; supervision,management, incidental engineering.

All materials and other items necessary to provide Facility Investment Services in Region 3 locations outlined and described in the most current associated Performance Work Statement (PWS). Pricing is established using the current RS Means book for the year in which the order is placed. A co-efficient (set on the base contract) will be applied to the price for both the labor and materials established in RS Means for the final price paid to the

The Contractor shall furnish all labor to include but not limited to; supervision, management, incidental engineering.

All materials and other items necessary to provide Facility Investment Services in Region 3 locations outlined and described in the most current associated Performance Work Statement (PWS). Pricing is established using the

CLIN 3001

The Contractor shall furnish all labor to include but not limited to; supervision,management, incidental engineering.

All materials and other items necessary to provide Facility Investment Services in Region 3 locations outlined and described in the most current associated Performance Work Statement (PWS). Pricing is established using the current RS Means book for the year in which the order is placed. A co-efficient (set on the base contract) will be applied to the price for both the labor and materials established in RS Means for the final price paid to the

The Contractor shall furnish all labor to include but not limited to; supervision,management, incidental engineering.

All materials and other items necessary to provide Facility Investment Services in Region 3 locations outlined and described in the most current associated Performance Work Statement (PWS). Pricing is established using the

CLIN 4001

The Contractor shall furnish all labor to include but not limited to; supervision,management, incidental engineering.

All materials and other items necessary to provide Facility Investment Services in Region 3 locations outlined and described in the most current associated Performance Work Statement (PWS). Pricing is established using the current RS Means book for the year in which the order is placed. A co-efficient (set on the base contract) will be applied to the price for both the labor and materials established in RS Means for the final price paid to the

The Contractor shall furnish all labor to include but not limited to; supervision,management, incidental engineering.

All materials and other items necessary to provide Facility Investment Services in Region 3 locations outlined and described in the most current associated Performance Work Statement (PWS). Pricing is established using the

CLIN 5001

The Contractor shall furnish all labor to include but not limited to; supervision,management, incidental engineering.

All materials and other items necessary to provide Facility Investment Services in Region 3 locations outlined and described in the most current associated Performance Work Statement (PWS). Pricing is established using the current RS Means book for the year in which the order is placed. A co-efficient (set on the base contract) will be applied to the price for both the labor and materials established in RS Means for the final price paid to the

The Contractor shall furnish all labor to include but not limited to; supervision,management, incidental engineering.

All materials and other items necessary to provide Facility Investment Services in Region 3 locations outlined and described in the most current associated Performance Work Statement (PWS). Pricing is established using the current RS Means book for the year in which the order is placed.

(End of Summary of Changes)