W9127S20R0008 - Table Rock Roadway Repair Specs (Seed Project).pdf
PDF 5 MB Posted
- Attached to
- IDC SATOC for Minor Constructions, Little Rock District Federal contract opportunity
- Solicitation number
- W9127S20R0008
About this file
This document outlines a solicitation for an Indefinite Delivery Contract (IDC) Single Award Task Order Contract (SATOC) for Minor Constructions in the Little Rock District. The scope of work includes repair or construction of real property facilities such as mechanical, electrical or fire protection systems; concrete repair; asphalt paving; building renovation or demolition; interior remodeling including carpentry, painting and flooring; infrastructure repair; drainage correction; structural repair; asbestos removal; roofing, siding, windows and doors repair; and maintenance of recreational facilities. Work may take place across various facility types including administrative, vehicle maintenance, industrial, warehouses and recreation areas. The solicitation number is W9127S20R0008 and was issued by the Department of the Army Corps of Engineers Engineering District in Little Rock.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend 0003 - 00_Bid Schedule (20R0008 - IDC SATOC for Minor Constructions).xls | XLS spreadsheet | |
| Amend 0003 - Price-Bid Schedule.pdf | ||
| Amendment 0002 - TR Roadway and Bridge Rehabilitation.pdf | ||
| W9127S20R0008 - IDC SATOC - Amendment 0002.pdf | ||
| ProjNet Questions and Responses 29Jul2020.pdf | ||
| W9127S20R0008 - IDC SATOC - Amendment 0001.pdf | ||
| Drawing 1422105 for catwalk.pdf | ||
| ATTACHMENT 2 - NAVFAC-USACE Past Performance Questionnaire.pdf | ||
| ATTACHMENT 1 - Proposal Data Sheet.pdf | ||
| W9127S20R0008 - IDC SATOC for Minor Construction Little Rock District.pdf | ||
| W9127S20R0008 - Table Rock Roadway Repair Drawings (Seed Project).pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers
Little Rock District SPECIFICATIONS
TABLE ROCK ROADWAY AND BRIDGE
REHABILITATION
TABLE ROCK DAM
TANEY COUNTY, MISSOURI
PN478698
JUNE 2020
SOLICITATION NO. JOC
S U
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N
IS
O B
S O
L E
T E
P A
G E
O
F
P A
G E
S
T R
R o a d w a y a n d
B rid g e
W o rk
S D
-0
P re c o n s tru c tio n S u b m itta ls
.4
G C o n s tru c tio n S ite P la n
.3
.1 G
T ra ffic c o n tro l p la n
S D
-0
P re c o n s tru c tio n S u b m itta ls
.6
G E n v iro n m e n ta l P ro te c tio n P la n
.6
.1 .1
G T ra ffic
C o n tro l P la n
.6
.1 .1
W a s te w a te r M a n a g e m e n t P la n
.5
.1 P re c o n s tru c tio n S u rv e y
.6
.7 .1
D irt A n d
D u s t C o n tro l P la n
.1
.1 .1
H a z a rd o u s W a s te
/D e b ris
M a n a g e m e n t
S D
-0
P re c o n s tru c tio n S u b m itta ls
.3
.1 S ig n
L e g e n d
O rd e rs
S D
-0
P re c o n s tru c tio n S u b m itta ls
.8
.2 .1
C o n c re te C u rin g P la n
.5
.1 Q u a lity C o n tro l P la n
.5
.1 .1
Q u a lity
C o n tro l P e rs o n n e l
.5
.2 L a b o ra to ry
A c c re d ita tio n
.4
.1 P la n
F o r V o lu m e tric
M ix in g
T e s tin g , A n d
M e a s u rin g
.5
G W a s te
M a n a g e m e n t P la n
S D
-0
P ro d u c t D a ta
.3
.3 W a te r
.3
.2 C e m e n titio u s M a te ria ls
.3
.4 .1
L a te x E m u ls io n
.8
.2 .2
S a fe ty
D a ta S h e e ts
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
PARAGRAPH
CLASSIFICATION
GOVT OR A/E REVWR
S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
ACTION CODE
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
ACTION CODE
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r)
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N
IS
O B
S O
L E
T E
P A
G E
O
F
P A
G E
S
T R
R o a d w a y a n d
B rid g e
W o rk
.3
.1 G ro u t F o r B e a rin g s
S D
-0
D e s ig n D a ta
.8
.1 .1
G D
O C o n c re te M ix D e s ig n
.3
.1 G
D O
C o n c re te M ix D e s ig n
.8
.1 .1
G M ix D e s ig n
.3
M a te ria ls
.3
.4 G
A d m ix tu re s
.3
.5 G
A g g re g a te
.3
.1 G
L iftin g P la n
S D
-0
T e s t R e p o rts
.8
.2 .3
P o z z o la n
.8
.2 .4
S la g C e m e n t
.8
.2 .5
A g g re g a te s
S D
-0
C e rtific a te s
.3
.4 .1
.2 C e rtific a tio n
.5
.1 .3
F ie ld T e s tin g T e c h n ic ia n
A n d
T e s tin g A g e n c y
S D
-0
P ro d u c t D a ta
.1
G S e a la n ts
.2
G P rim e rs
.3
B a c k s to p s
S D
-0
C e rtific a te s
.3
.5 S e a la n t
S D
-0
P re c o n s tru c tio n S u b m itta ls
.3
S a fe ty
, H e a lth
, a n d
E n v iro n m e n ta l R e q u ire m e n ts
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
PARAGRAPH
CLASSIFICATION
GOVT OR A/E REVWR
S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
ACTION CODE
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
ACTION CODE
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N
IS
O B
S O
L E
T E
P A
G E
O
F
P A
G E
S
T R
R o a d w a y a n d
B rid g e
W o rk
.3
.1 G
S a fe ty
P la n
.3
.1 .5
R e s p ira to ry P ro te c tio n P la n
.3
.2 .1
A irb o rn e S a m p lin g P la n
.3
.2 M e d ic a l S u rv e illa n c e
P la n
.3
.3 .2
G C o n ta in m e n t P la n
.3
.3 .3
G V is ib le E m is s io n s M o n ito rin g P la n
.3
.3 .4
G P
M -1
M o n ito rin g P la n
.3
.3 .5
G T
S P
M o n ito rin g
P la n
.3
.1 V e n tila tio n A s s e s s m e n t P la n
.3
.3 E n v iro n m e n ta l P ro te c tio n P la n
.3
.3 .1
W a s te
D is p o s a l P la n
S D
-0
P ro d u c t D a ta
P a rt 2 M a n u fa c tu re r's
P ro d u c t D a ta
S h e e t
S D
-0
S a m p le s
P a rt 2 P ro d u c t S a m p le s
S D
-0
T e s t R e p o rts
.3
.3 .4
P M
-1
T e s t R e p o rt
.3
.3 .5
T S
P T e s t R e p o rt
.4
In s p e c tio n R e p o rts
.3
.2 .2
M e d ic a l S ta tu s R e p o rt
.3
.2 .3
C h a n g e in M e d ic a l S ta tu s R e p o rt
.3
.2 .1
G A ir M o n ito rin g
T e s t P la n
.3
.2 .1
A ir M o n ito rin g T e s t R e p o rt
S D
-0
C e rtific a te s
.5
.1 C e rtifie d E
H S
P ro fe s s io n a l
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
PARAGRAPH
CLASSIFICATION
GOVT OR A/E REVWR
S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
ACTION CODE
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
ACTION CODE
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N
IS
O B
S O
L E
T E
P A
G E
O
F
P A
G E
S
T R
R o a d w a y a n d
B rid g e
W o rk
.5
.2 S
S P
C Q
P
C e rtific a te
.5
.3 C o a tin g
T h ic k n e s s G a g e
Q u a lific a tio n
.7
S D
-0
P re c o n s tru c tio n S u b m itta ls
.2
.1 H y d ro d e m o litio n E q u ip m e n t
.2
.1 G
D e m o litio n
P ro c e d u re s
.1
G W a s te w a te r T re a tm e n t P la n
.6
.1 G
P re c o n s tru c tio n S u rv e y O f
E x is tin g
C o n d itio n s
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
PARAGRAPH
CLASSIFICATION
GOVT OR A/E REVWR
S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
ACTION CODE
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
ACTION CODE
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00.00 46 WORK RESTRICTIONS (SWL)
01 15 10.10 46 AT/OPSEC SITE SECURITY REQUIREMENTS
01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
01 35 13.01 10 SPECIAL PROJECT PROCEDURES - FLOOD CONTROL
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
DIVISION 03 - CONCRETE
03 53 19 CONCRETE OVERLAYMENT - LATEX MODIFIED CONCRETE
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 92 00 MACHINERY HATCH COVER SEALANTS
DIVISION 09 - FINISHES
09 97 02 PAINTING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 26.73 46 HYDRODEMOLITION OF CONCRETE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
PN478698
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
TANEY COUNTY, MISSOURI JOC
THIS PAGE INTENTIONALLY LEFT BLANK
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work includes rehabilitation of the Missouri Highway 165/265 bridge and dam roadway crossing at Table Rock Dam by hydrodemolition and overlaying the concrete deck/roadway with a latex modified concrete. The bridge is considered to be the portion of roadway directly over the spillway. Options included in this scope include hydrodemolition and overlaying with latex modified concrete the roadway on the dam, the painting of bridge components and resealing the hatch covers;
rehabilitating the bridge bearings by cleaning and painting as well as replacing the existing grout pads and incidental related work.
1.1.2 Location
The work is located at the Table Rock Dam in Branson Missouri, as indicated. The exact location will be shown by the Contracting Officer.
1.2 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.3 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
Pursuant to Contract Clause "FAR 52.245-1, Government Property", the Government will not furnish any materials or equipment under this project.
-- End of Section --
SECTION 01 11 00 Page 1
PN478698
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
SECTION 01 14 00.00 46
WORK RESTRICTIONS (SWL)
PART 1 GENERAL
1.1 PROTECTION OF GOVERNMENT PROPERTY
1.1.1 Protection of Government Facilities
Take whatever measures are necessary or required for protection of the existing buildings, grounds, parking area and other Government facilities.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.3 WORK SCHEDULE
1.3.1 Work Hours
Arrange work schedule so that the work performed at the Government installation will be during the normal day shift established as 7:00 a.m.
to 4:30 p.m., Monday through Friday, except Federal holidays, with the option of working weekends and altering these work hours only with the approval of the Contracting Officer's Representative. Work at the installation during other periods of time will be permitted only on the specific approval of the Contracting Officer or his authorized representative for each specified time. In the event an operation is necessary which cannot be completed within the day shift period specified above without loss or additional cost to the Contractor, the work day period for that operation may be extended upon request of the Contractor and approval of the Contracting Officer.
1.3.2 Inspection Hours
The contract requires that certain tests be performed in the presence of the Contracting Officer or his representative. These tests will be scheduled between 08:00 a.m. and 03:00 p.m., Monday through Thursday, excluding Federal holidays; the Government shall be given 72 hours advance notice.
1.4 QUALITY CONTROL
1.4.1 General
The Contractor shall establish and maintain quality control for his operations to assure compliance with contract requirements and maintain
SECTION 01 14 00.00 46 Page 1
PN478698
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
records of his quality control for all construction operations under the contract as specified by the JOC Coordinator
1.4.2 Technical Provisions
This requirement shall apply equally to each section of the Technical Provisions, except where the QUALITY CONTROL requirements set forth critical items of work requiring special attention by the Contractor.
1.4.3 Contractor Quality Control Safety Responsibilities
Each Contractor quality control inspector shall be responsible for inspecting the work under his surveillance for compliance with EM 385-1-1 , and shall immediately bring to the attention of the Contractor's supervisory personnel all unsafe working conditions, unsafe work practices, unsafe tools or equipment and instances of noncompliance with the Safety and Health Requirements Manual.
1.4.4 Contractor Quality Control Inspector Environmental Responsibilities
The Contractor quality control inspector shall be responsible for quality control for environment protection specified in by the JOC Coordinator, and shall immediately bring to the attention of the Contractor's supervisory personnel all instances of noncompliance.
1.4.5 Records and Tests
A copy of the records and tests, as well as the records of corrective action taken, will be furnished the Government as directed by the Contracting Officer.
1.5 GOVERNMENT-FURNISHED UTILITIES
There will be no government provided utilities. The contractor is responsible for providing all water, electricity, sanitary facilities, and any other utility required for proper completion of the project.
1.5.1 Water
Government furnished water will not be available at existing hydrants or outlets that are located near the work area.The contractor may request to draw water from the lake, all permits and environemental requirements are the repsonibility of the contractor.
1.5.2 Electricity
Government furnished electricity will not be available. The Contractor shall furnish all power, panels, circuit breakers, wiring, transformers and all other incidentals necessary to meet the needs of the equipment used in the work in accordance with the latest version of the National Electric Code, (NEC).
1.5.3 Work Area and Storage Area
The Contractor's work and storage area will be assigned by the Contracting Officer.
SECTION 01 14 00.00 46 Page 2
PN478698
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
1.5.4 Sanitary Facilities
Existing sanitary facilities are not located near the site. Sanitary facilities shall be the responsibility of the contractor. Placement of portable facility will be assigned by the contracting officer or his designated representative.
1.6 BULLETIN BOARD, PROJECT SIGN, SAFETY SIGN
1.6.1 Bulletin Board
The Contractor shall furnish, install, and maintain for the duration of the contract, a weather tight bulletin board, having hinged or sliding glazed doors, on which shall be displayed legible copies of (1) the poster entitled "equal employment opportunity is the law" (OFCCP Publication 1420) as required by CONTRACT CLAUSES: EQUAL OPPORTUNITY, AFFIRMATIVE
ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION, AFFIRMATIVE ACTION FOR
SPECIAL DISABLED AND VIETNAM ERA VETERANS, AND AFFIRMATIVE ACTION FOR
HANDICAPPED WORKERS; (2) the Notice to Employees Poster (WH Publication 1321); (3) the schedule of minimum wage rates for the contract as required by CONTRACT CLAUSE: DAVIS-BACON ACT; and (4) current safety posters. The bulletin board shall be mounted where and as approved by the Contracting Officer, in a prominent place accessible to all employees of the Contractor and subcontractors, and to applicants for employment. The bulletin board shall remain the property of the Contractor and shall be removed by him upon completion of the contract work.
1.6.2 Project and Safety Signs
The requirements for the signs, their content, and location shall be as durected by the COR and shall be completed per the JOC Coordinator's direction. Exact location and name of sponsor, to be placed on the sign, shall be determined by the Contracting Officer. Verify with the Contracting Officer, the exact text to be placed on the signs prior to construction of the signs.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used.
-- End of Section --
SECTION 01 14 00.00 46 Page 3
PN478698
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
SECTION 01 15 10.10 46
AT/OPSEC SITE SECURITY REQUIREMENTS
PART 1 GENERAL
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 15 10.10 46 Page 1
PN478698
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
SECTION 01 15 10.10 46
This is a Security Level One, Table A Contract.
1. General Overview
a. The security provisions of this contract and/or applicable task order apply to all Contractor and Subcontractor Employees (CSEs) physically working on federally controlled property or requiring access to a Department of Defense (DoD) network.
b. Prime Contractors (PCs) are responsible for subcontractor compliance with the security provisions of this contract and shall coordinate all security requirements on the behalf of the subcontractors and their employees.
c. PCs will notify the Southwestern Little Rock District Security Office (SWL-DSO) within 5 business days of the contract award of the primary and alternate security Points of Contacts (POC) for this contract. This notification will be in the form of an email sent to m4xslceswlcontracts@usace.army.mil with the following information for each individual:
Full Name:
Email Address:
Work Phone:
Work Cell:
Time Zone of their work location:
NOTE: Only primary and alternate security POCs are authorized to contact the SWL- DSO to inquire about a contract employee.
d. PCs security POCs shall submit the appropriate security investigation package for EACH CSE based on the Security Level listed above.
e. The SWL-DSO reserves the right to upgrade the security level background check/investigation requirement of any contract and/or applicable task order; this includes upgrading the investigation standards for specific CSEs. If required, badges will be issued to all clearedi personnel and are to be worn at all times while working on U.S. Army Corps of Engineers (USACE) property. Any CSE working on USACE property without the proper identification badge will be escorted off site.
NOTE: Proposed foreign contractors seeking to work on a USACE contract must be cleared through the Department of State prior to having site access. To obtain approval, each individual must complete and submit the appropriate documents for processing.
The required procedure takes approximately 45 business days to process once all documentation is completed properly and submitted.
2. Security Investigation Package Requirements for each CSE.
PN478698
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
a. Security Level One Requirements (processing time is approximately five business days)
(1) SWL form 487 dated 2016, Contractor Required Information Form.
(2) A copy of the CSE’s driver’s license or government issued identification card.
(3) A copy of the CSE’s proof of citizenship document or proof of authorization to work in the United States. Acceptable documents are:
(a) U.S. Birth Certificate
(b) U.S. Passport
(c) U.S. Certificate of Citizenship-INS
(d) U.S. Certification of Naturalization
(e) FS-545, Certificate of Birth Abroad
(f) U.S. Certificate of Report of Birth
(g) U.S. Consular Report of Birth Abroad
(h) Workers visa
(i) Permanent Resident card
(4) One (1) digital passport-styled photo to be used for the USACE badge.
Photos will be transmitted to the Security Office by means of CD or Email m4xslceswlcontracts@usace.army.mil. Each digital photo shall be stored in a file labeled by the name of the CSE. If transmitted through email, the subject line of the email must be the name of individual pictured. Photo requirements are as follows:
(a) In color.
(b) Taken within the last six months to reflect your current appearance.
(c) Taken in front a plain white or off-white background.
(d) Taken in full face viewed directly facing the camera.
(e) Taken with a neutral expression (preferred) or a natural smile, and with both eyes open.
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
(f) No hats or sunglasses are authorized in this photo; face must be clearly displayed with no distracters
(5) PCs must ensure each CSE is prescreened using the E-Verify program to meet the established employment eligibility requirements. The PC must ensure that the applicant has two valid forms of government issued identification, in order to ensure the correct information is entered in to the E-verify system. The CSE will provide the SWL- DSO with a list of verified employees to include their registration number from E-Verify.
This list will be transmitted or mailed in the package along with the other required documents for CSEs. The E-Verify system can be located at the following URL (http://www.dhs.gov/e-verify).
(6) PCs must train each CSE on the iWatch/core watch suspicious activity reporting requirements (see paragraph 5).
b. Security Level Two Requirements (processing time is approximately 6 months once all documents are submitted electronically and accepted by the Personnel Security Investigation–Center of Excellence (PSI-COE) via the Personnel Security Investigation Portal (PSIP). Work Authorization/Site Access shall be denied until this background investigation is completed and favorably adjudicated. Automatic disqualifying factors that apply to all contractors being vetted at this level can be found in Table A.
(1) All requirements of the Security Level One package apply.
(2) Optional Form (OF) 306, Declaration for Federal Employment. This form shall be affixed with original date and signature; signature must be hand written-electronic signatures will not be accepted. The OF-306 can be found at the following web site: http://www.opm.gov/forms/pdf_fill/of306.pdf.
(3) Fingerprint: Must be captured on an FD-258 electronically at an approved government site or manually (hard-copy) by a law enforcement or designated government security official.
(a) Hard-copy fingerprint submission can be captured by a law enforcement official local to the individual. CSE’s shall ensure that fingerprints are captured on a true/original FD-258 fingerprint card. No other form will be accepted. Card may be mailed through USPS to:
U.S. Army Corps of Engineers, P.O. Box 867, Attn: Security, Little Rock, AR 72201. Use of the commercial delivery service such as Federal Express or UPS shall use following address: US Army Corps of Engineers, Attn: Security Office, Suite 6116, Little Rock, AR, 72201.
(b) CSEs can request to be fingerprinted electronically at the SWL-DSO. If this option is chosen, the individual must contact the SWL-DSO to
PN478698
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
schedule an appointment. Electronic fingerprinting is the quickest way to receive the results.
(c) CSE will have a background investigation requested by the SWL-DSO.
The CSE will receive an email from PSI-COE with a link to complete the SF 85 online through e-QIP. It is the CSE’s responsibility to read each email thoroughly and complete all tasks given by PSI-COE to ensure the investigation will not be terminated. The CSE will receive an information email stating no further documentation or revisions are required. See Standard Form (SF) 85 for required data input information at http://www.opm.gov/forms/pdf_fill/sf85.pdf. This is to be used as a guide (only) when completing the online equivalent and submitting direct to OPM.
c. Security Level Three Requirements (processing time is approximately 9 months once all documents are submitted electronically and accepted by the Personnel Security Investigation – Center of Excellence (PSI-COE) via the Personnel Security Investigation Portal (PSIP). Work Authorization/Site Access shall be denied until this background investigation is complete and favorably adjudicated. Automatic disqualifying factors that apply to all contractors being vetted at this level can be found in Table A.
(1) All requirements of the Security Level One and Two packages apply except the SF 85 is replaced with the SF 86. See Standard Form (SF) 86 for required data input information at http://www.opm.gov/forms/pdf_fill/sf86.pdf.
d. Multi-Level Security Requirement. (Processing time varies) This level requires the use of “escorts”, which shall be provided by the contractor. Escorts are contractor employees who have met Security Level Two requirements (this takes approximately 6 months once all documents are submitted. Refer to section 2-b.)
Escorts will be provided at a 5:1 ratio, this means for every five contractor employees there will be one approved escort that is to remain within close proximity to those they are escorting at all times. All employees that will not be designated as escorts shall meet Security Level One, Table A requirements (this takes approximately 5 business days. Refer to section 2-a.).
3. Personnel Security Investigation Package Transmission
Mailing Address:
USACE SWL
Attn: Security Office 700 West Capitol Ave (room 6116) P.O. Box 867 Little Rock, AR 72201
a. If mailed- the investigation package will be transmitted in a sealed envelope together with a transmittal letter attached to the outside of the envelope for each applicant with the following information:
(1) Contract Number and Title
(2) Contracting Officer’s representative name, office number, and cellular number
(3) CSE’s full name and contact information
(4) PC name, address, and telephone number
b. Investigation packages can be faxed to (501) 324-5471. Faxed packages must have coversheet with contract information. Documents that contain personally identifiable information (such as social security number) must have coversheet stating “Page contains PII follows”.
c. Email transmission- email packages to m4xslceswlcontracts@usace.army.mil Documents must be password protected if they contain personally identifiable information (such as social security number). Passwords to documents must be sent in separate email.
d. Investigation packages will be submitted to the SWL-DSO for processing and adjudication. Incomplete forms, illegible forms, etc., will be returned for correction and/ or completion and can delay the CSE from beginning work. The SWL-DSO address can be found in paragraph 2.b (3) (a) above.
e. Any change in personnel (whether an addition or replacement) at any time throughout the duration of the contract, will require the new personnel or replacement personnel to be vetted and approved by the SWL-DSO, in accordance with the requirements contained herein, prior to being granted Work Authorization/Site Access to any USACE property.
4. Onsite Access Approval
The CSE is responsible for contacting either the COR or the SWL Security Office, prior to the first day of work, to receive a list of approved individuals to be onsite, and their badges for identification purposes while onsite. All individuals on USACE property are required to wear identification badge. CSEs must be aware that COR representatives, project office personnel, and/or Security Office personnel can and will conduct identification checks on all persons onsite at USACE property. Any person found onsite without proper identification will be escorted offsite.
5. IWATCH/ Corps Watch Suspicious Activity Reporting (AT/OPSEC Cover Sheet,
pg. 2, Section G, 4)
a. Security is simply EVERYONE’s responsibility. We owe it to our organization, our families, and ourselves to constantly be vigilant about what goes on around us. Trust your instincts. We rely on our senses every day of our lives. If a behavior or activity makes you feel uncomfortable, report it. If it doesn’t look, sound, or smell right, report it.
The simple rule is, “If you see something, say something!”
b. The contractor and all associated subcontractors will brief all employees on the local iWATCH, Corps Watch, or See Something, Say Something program (training standards provided by the requiring activity ATO-contained herein, below). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. The CSE will provide the SWL Security Office with a list of employees who have been provided this training. This list will be transmitted in the package along with the other required documents for employees.
c. If you see something suspicious, provided below is the type of information to report:
(1) What you witnessed (the suspicious activity) including the date, time, and location.
(2) Description of who was involved
(3) Gender of person(s) involved
(4) Height, build, hair/skin color, and approx. age of person(s) involved
(5) Language spoken (if known)
(6) Vehicle description/ license number (if known)
(7) Have you seen this activity before?
d. How to report:
(1) In an emergency- call 911
(2) Notify your immediate supervisor and COR
6. Disqualifying Factors
Background check/investigation disqualifying factors are included in Tables A and B of this document.
i The term cleared refers to an individual granted authority to work on U.S. Army Corps of Engineers Property.
This authorization comes through the Little Rock District Security Office to the Contracting Officer’s Representative (COR).
PN478698
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
Disqualifying Factors Table A
CRIMINAL HISTORY/ CRIMINAL INFORMATION CHARGED* OR
CONVICTED
< 5 Yrs < 10 Yrs > 10 Yrs
Known/suspected terrorist or belongs to known/suspected terrorist organization (verified through terrorist watch list)
DENY DENY DENY
Espionage, sabotage, treason, or terrorism (not terroristic threats); or conspiracy or attempt to commit offense
DENY DENY DENY
Knowingly/willfully engaged in acts or activities to overthrow the U.S.
Government by force in any jurisdiction or any country; or conspiracy or attempt to commit offense
DENY DENY DENY
Active wants or warrants DENY DENY DENY Barred from any Federal installation or facility DENY DENY DENY Any type of identity fraud or inability to verify claimed identity DENY DENY DENY Any Felony Charge (except those specifically identified in table) DENY DENY ALLOW Felony charge involving unlawful distribution, sale, use, possession, or manufacture of and explosive, explosive device, or firearm; or conspiracy or attempt to commit offense
DENY DENY DENY
Registered Sex Offender DENY DENY DENY Rape, forcible sodomy, or sexual assault, or conspiracy or attempt to commit offense
DENY DENY DENY
Any sexual offense involving a minor or child, including child molestation, or child pornography; or conspiracy or attempt to commit offense
DENY DENY DENY
Kidnapping, hostage taking, human trafficking, or human smuggling, or conspiracy or attempt to commit offense
DENY DENY DENY
Child abuse involving serious bodily injury to a child or minor DENY DENY DENY Criminal homicide, murder, manslaughter, or negligent homicide DENY DENY DENY Hate Crimes offenses DENY DENY DENY Any type of assault or violent crime to include violent domestic charges DENY DENY ALLOW Computer/cybercrimes such as improperly accessing (or introducing a virus or other contaminant) a computer, system, or network; modifying, damaging, using, disclosing, copying, or taking programs or data
DENY DENY DENY
Mayhem, maiming DENY DENY DENY Any type of arson, vandalism, or willful destruction of property DENY DENY ALLOW Illegal Weapons Charges DENY DENY DENY Any type of extortion, bribery, or fraud to include “hot checks” DENY DENY ALLOW Any type of burglary, robbery, theft, larceny or conspiracy or attempt to commit offense
DENY DENY ALLOW
Any type of possession or distribution of stolen property DENY ALLOW ALLOW Any type of threat or disruption to the public or disturbing the peace (terroristic threat, inciting a riot, etc.)
DENY DENY ALLOW
Importation, manufacture, distribution of, or possession with intent to distribute a controlled substance, or conspiracy or attempt to commit offense
DENY ALLOW ALLOW
Illegal possession or use of a controlled substance DENY ALLOW ALLOW Operation of a motor vehicle while intoxicated by alcohol or drugs in any jurisdiction (1 conviction)
DENY ALLOW ALLOW
5 or more offenses for any crime (excluding minor traffic violations) DENY DENY ALLOW 3 or more offenses for any crime (excluding minor traffic violations) DENY DENY ALLOW
LEGEND/NOTES
DENY Individual(s) are not cleared to work on USACE property under any circumstance
* Individual must be completely finished through legal processes of being charged with a crime, and will be required to provide documentation if record suggests otherwise.
Disqualifying Factors Table B
CRIMINAL HISTORY/ CRIMINAL INFORMATION CHARGED* OR
CONVICTED
< 5 Yrs < 10 Yrs > 10 Yrs
Known/suspected terrorist or belongs to known/suspected terrorist organization (verified through terrorist watch list)
DENY DENY DENY
Espionage, sabotage, treason, or terrorism (not terroristic threats); or conspiracy or attempt to commit offense
DENY DENY DENY
Knowingly/willfully engaged in acts or activities to overthrow the U.S.
Government by force in any jurisdiction or any country; or conspiracy or attempt to commit offense
DENY DENY DENY
Active wants or warrants DENY DENY DENY Barred from any Federal installation or facility DENY DENY DENY Any type of identity fraud or inability to verify claimed identity DENY DENY DENY Any Felony Charge (except those specifically identified in table) DENY DENY ALLOW Felony charge involving unlawful distribution, sale, use, possession, or manufacture of and explosive, explosive device, or firearm; or conspiracy or attempt to commit offense
DENY DENY DENY
Registered Sex Offender DENY DENY DENY Rape, forcible sodomy, or sexual assault, or conspiracy or attempt to commit offense
DENY DENY DENY
Any sexual offense involving a minor or child, including child molestation, or child pornography; or conspiracy or attempt to commit offense
DENY DENY DENY
Kidnapping, hostage taking, human trafficking, or human smuggling, or conspiracy or attempt to commit offense
DENY DENY DENY
Child abuse involving serious bodily injury to a child or minor DENY DENY DENY Criminal homicide, murder, manslaughter, or negligent homicide DENY DENY DENY Hate Crimes offenses DENY DENY DENY Any type of assault or violent crime to include violent domestic charges DENY DENY ALLOW Computer/cyber-crimes such as improperly accessing (or introducing a virus or other contaminant) a computer, system, or network; modifying, damaging, using, disclosing, copying, or taking programs or data
DENY DENY DENY
Mayhem, maiming DENY DENY DENY Any type of arson, vandalism, or willful destruction of property DENY DENY ALLOW Illegal Weapons Charges DENY DENY DENY Any type of extortion, bribery, or fraud to include “hot checks” DENY DENY ALLOW Any type of burglary, robbery, theft, larceny or conspiracy or attempt to commit offense
DENY DENY ALLOW
Any type of possession or distribution of stolen property DENY ALLOW ALLOW Any type of threat or disruption to the public or disturbing the peace (terroristic threat, inciting a riot, etc.)
DENY ALLOW ALLOW
Importation, manufacture, distribution of, or possession with intent to distribute a controlled substance, or conspiracy or attempt to commit offense
DENY ALLOW ALLOW
Illegal possession or use of a controlled substance ALLOW ALLOW ALLOW Operation of a motor vehicle while intoxicated by alcohol or drugs in any jurisdiction (1 conviction)
ALLOW ALLOW ALLOW
5 or more offenses for any crime (excluding minor traffic violations) DENY DENY ALLOW 3 or more offenses for any crime (excluding minor traffic violations) DENY ALLOW ALLOW
LEGEND/NOTES
DENY Individual(s) are not cleared to work on USACE property under any circumstance
* Individual must be completely finished through legal processes of being charged with a crime, and will be required to provide documentation if record suggests otherwise.
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
SECTION 01 22 00.00 10
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 SINGLE JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.1 Hydrodemolition the Bridge Roadway, CLIN 0001
1.1.1.1 Payment
Payment will be made for costs associated with hydrodemolition of the bridge roadway to include the collection and removal of all assocaited debris.
1.1.1.2 Unit of Measure
Unit of measure: Job
1.1.2 Latex Modified Concrete Overlay on Bridge Roadway, CLIN 0002
1.1.2.1 Payment
Payment will be made for costs associated for providing the latex modified concrete overlay for the bridge roadway.
1.1.2.2 Unit of Measure
Unit of measure: Job
1.1.3 Depth Repairs of Spalls and Delaminations as Indicated on Bridge Roadway, CLIN 0003
1.1.3.1 Payment
Payment shall be made for costs associated with the depth repairs as indicated. Repair beyond the extent of the overlay depth as indicated will be required prior ot placement of the overlay.
1.1.3.2 Unit of Measure
Unit of Measure: Job
SECTION 01 22 00.00 10 Page 1
PN478698
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
1.1.4 Roadway Striping, CLIN 0004
1.1.4.1 Payment
Payment shall be made for all costs associated with providing roadway striping as indicated on the two lane highway across the bridge roadway.
1.1.4.2 Unit of Measure
Unit of Measure: Job
1.1.5 Mobilization and Demobilization, CLIN 0005
1.1.5.1 Payment
Payment will be made for all costs associated with the mobilization and demobilization to the project site.
1.1.5.2 Unit of Measure
Unit of Measure: Job
1.1.6 Depth Repairs of Spalls as Indicated on Dam Roadway, CLIN 0006
1.1.6.1 Payment
Payment shall be made for costs associated with the depth repairs as indicated for the dam roadway. The dam roadway is the roadway over the non-overflow portion of the dam. Repairs
1.1.6.1.1 Unit of Measure
Unit of Measure: Job
1.1.7 Replace Bridge Bearing Grout Pads and Paint Bearings, CLIN 0007
1.1.7.1 Payment
Payment will be made for costs associated to the removal and replacement of the bridge bearing grout pads as indicated. Temporary supports for the bridge shall be provided, submittal of a bridge lifting plan for jacking the structure up to unload bearings is required for approval by the Contrcating Officer. The bearings shall be blasted and painted as indicated.
1.1.7.2 Unit of Measure
Unit of measure: Job
1.1.8 Paint Bridge Components, CLIN 0008
Payment will be made for costs associated to the blasting and painting of the bridge compnents as indicated.
1.1.8.1 Unit of Measure
Unit of Measure: Job
SECTION 01 22 00.00 10 Page 2
PN478698
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
1.1.9 Latex Modified Concrete Overlay on Dam Roadway, CLIN 0009
1.1.9.1 Payment
Payment will be made for costs associated for providing the latex modified concrete overlay for the dam roadway. This work includes all depth repairs, roadway striping, and demolition as indicated to include all related incidental work to ensure proper performance.
1.1.9.1.1 Unit of Measure
Unit of Measure: Job
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
3.1 CONTRACT COST BREAKDOWN
The Contractor must furnish within 30 days after the date of Notice to Proceed, and prior to the submission of its first partial payment estimate, a breakdown of its single job pay item or items which will be reviewed by the Contracting Officer as to propriety of distribution of the total cost to the various accounts. Any unbalanced items as between early and late payment items or other discrepancies will be revised by the Contracting Officer to agree with a reasonable cost of the work included in the various items. This contract cost breakdown will then be utilized as the basis for progress payments to the Contractor.
-- End of Section --
SECTION 01 22 00.00 10 Page 3
PN478698
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
SECTION 01 35 13.01 10
SPECIAL PROJECT PROCEDURES - FLOOD CONTROL
PART 1 GENERAL
1.1 EMERGENCY OPERATIONS AND FLOOD CONTROL
Pool regulation will be the responsibility of the Government and the required work must be scheduled accordingly.
The Government cannot control the pool elevation. At times during high flows and large discharge periods the water levels upstream and downstream from a dam at which work is occurring may reach heights that may require removal of the contractor's work equipment.
Removal of the equipment may be required during emergency situations.
Remove the equipment and return the gate machinery to an operable status when required for flood control or other emergency operations.
Submit a plan for returning all gates to operable condition within 24 hours to the Contracting Officer for approval. The contractor may have no more than 5 gates red tagged at anytime, unless otherwise approved. Refer to the hydrograph included in the drawing set for information on historical periods of high water. No work will be allowed until the plan has been approved.
Make every attempt to schedule work requiring a certain lake level to be done during the months that the lake is historically below the required lake level. The government and Southwestern Power Administration (SWPA) can make some minor changes to the water management plan in order to allow the contractor to work. There is a long list of rules and regulations that have to be met in order to maintain operations for all controlling interests. All requests made by the contractor to change the water management plan shall be requested seven working days prior to the need for the requested change.
Check the Little Rock District (SWL) website for the daily lake elevations. The lake elevation is recorded and forecasted daily on the SWL website, http://www.swl-wc.usace.army.mil/WCDS/Reports/Daily/lakfcst.txts click either the "Lakes" or "Daily Reports" link. The "Daily Reports" link provides a 3 day forecast for lake elevations based on actual rainfall.
Forecasted rainfall is not included in lake elevation forecasts. Monitor daily or hourly lake elevations if flow conditions warrant. Also monitor hydropower releases on the SWPA website www.swpa.gov/generationschedules.aspx . The contractor is responsible for monitoring and keeping the work site secure against a high water event.
The contractor is responsible for communicating with the government and with the SWPA for any water management issues.
1.2 EQUIPMENT HANDLING CAUSED BY EMERGENCY CONDITIONS & FLOOD CONTROL
If the Contractor is directed to remove construction equipment because of high water, flood control, or other emergency operation not otherwise required for the normal execution of the work as shown and specified, an equitable adjustment in the contract price will be made in accordance with
SECTION 01 35 13.01 10 Page 1
PN478698
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
the paragraph "CHANGES" for the contract.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 35 13.01 10 Page 2
PN478698
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
PART 1 GENERAL
1.1 REFERENCES
Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization (e.g. ASTM B564 Standard Specification for Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.
1.2 ORDERING INFORMATION
The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
444 North Capital Street, NW, Suite 249 Washington, DC 20001 Ph: 202-624-5800 Fax: 202-624-5806 E-Mail: info@aashto.org Internet: http://www.aashto.org
AMERICAN CONCRETE INSTITUTE (ACI)
38800 Country Club Drive Farmington Hills, MI 48331-3439 Ph: 248-848-3700 Fax: 248-848-3701 E-mail: bkstore@concrete.org Internet: http://www.concrete.org
AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)
38800 Country Club Drive Farmington Hills, MI 48331-3439 Ph: 248-848-3700 Fax: 248-848-3701 E-mail: bkstore@concrete.org Internet: http://www.concrete.org
ASTM INTERNATIONAL (ASTM)
100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 877-909-2786 Internet: http://www.astm.org
SECTION 01 42 00 Page 1
PN478698
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
CONCRETE REINFORCING STEEL INSTITUTE (CRSI)
933 North Plum Grove Road Schaumburg, IL 60173-4758 Ph: 847-517-1200 Fax: 847-517-1206 Internet: http://www.crsi.org/
INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)
1901 North Moore Street Arlington, VA 22209-1762 Ph: 703-525-1695 Fax: 703-528-2148 Internet: http://www.safetyequipment.org/
MISSOURI DEPARTMENT OF TRANSPORTATION
105 W. Capitol Avenue Jefferson City, MO 65102 Ph: 888-275-6636 Internet: https://www.modot.org/
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
1 Batterymarch Park Quincy, MA 02169-7471 Ph: 617-770-3000 Fax: 617-770-0700 Internet: http://www.nfpa.org
NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)
395 E Street, S.W.
Suite 9200 Patriots Plaza Building Washington, DC 20201 Ph: 800-232-4636 Fax: 513-533-8347 E-mail: nioshdocket@cdc.gov Internet: http://www.cdc.gov/niosh/
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
40 24th Street, 6th Floor Pittsburgh, PA 15222 Ph: 412-281-2331 Fax: 412-281-9992 E-mail: info@sspc.org Internet: http://www.sspc.org
U.S. ARMY CORPS OF ENGINEERS (USACE)
CRD-C DOCUMENTS available on Internet:
http://www.wbdg.org/ccb/browse_cat.php?c=68 Order Other Documents from:
USACE Publications Depot Attn: CEHEC-IM-PD 2803 52nd Avenue Hyattsville, MD 20781-1102 Ph: 301-394-0081 Fax: 301-394-0084 E-mail: pubs-army@usace.army.mil Internet: http://www.publications.usace.army.mil/ or
SECTION 01 42 00 Page 2
PN478698
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
http://www.hnc.usace.army.mil/Missions/Engineering/TECHINFO.aspx
U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)
FHWA, Office of Safety 1200 New Jersey Ave., SE Washington, DC 20590 Ph: 202-366-4000 Internet: http://www.fhwa.dot.gov Order from:
Superintendent of Documents U. S. Government Printing Office (GPO) 710 North Capitol Street, NW Washington, DC 20401 Ph: 202-512-1800 Fax: 202-512-2104 E-mail: contactcenter@gpo.gov Internet: http://www.gpoaccess.gov
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
8601 Adelphi Road College Park, MD 20740-6001 Ph: 866-272-6272 Fax: 301-837-0483 Internet: http://www.archives.gov Order documents from:
Superintendent of Documents U.S.Government Printing Office (GPO) 710 North Capitol Street, NW Washington, DC 20401 Ph: 202-512-1800 Fax: 202-512-2104 E-mail: contactcenter@gpo.gov Internet: http://www.gpoaccess.gov
PART 2 PRODUCTS
Not used
PART 3 EXECUTION
Not used
-- End of Section --
SECTION 01 42 00 Page 3
PN478698
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
SECTION 01 50 00
TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
PART 1 GENERAL
1.1 SUMMARY
Requirements of this Section apply to, and are a component of, each section of the specifications.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)
MUTCD (2009) Manual on Uniform Traffic Control Devices
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submitted the following in accordance with the JOC Contract SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Construction Site Plan; G Traffic control plan; G
1.4 CONSTRUCTION SITE PLAN
Prior to the start of work, submit a site plan showing the locations and dimensions of temporary facilities (including layouts and details, equipment and material storage area (onsite and offsite), and access and haul routes, avenues of ingress/egress to the fenced area and details of the fence installation. Identify any areas which may have to be graveled to prevent the tracking of mud. Indicate if the use of a supplemental or other staging area is desired. Show locations of safety and construction fences, site trailers, construction entrances, trash dumpsters, temporary sanitary facilities, and worker parking areas.
PART 2 PRODUCTS
2.1 TEMPORARY SIGNAGE
2.1.1 Bulletin Board
Immediately upon beginning of work, provide a weatherproof glass-covered bulletin board not less than 36 by 48 inches in size for displaying the
SECTION 01 50 00 Page 1
PN478698
TABLE ROCK ROADWAY AND BRIDGE REHABILITATION
Equal Employment Opportunity poster, a copy of the wage decision contained in the contract, Wage Rate Information poster, and other information approved by the Contracting Officer. Locate the bulletin board at the project site in a conspicuous place easily accessible to all employees, as approved by the Contracting Officer.
2.1.2 Project and Safety Signs
The requirements for the signs, their content, and location will be provided by the contracting officer. Erect signs within 15 days after receipt of the notice to proceed. Correct the data required by the safety sign daily, with light colored metallic or non-metallic numerals.
2.2 TEMPORARY TRAFFIC CONTROL
2.2.1 Traffic Control Devices
The contractor is repsonsible for providing all equipment for maintaining safe traffic operations and in accordance with the traffic control plan.
2.2.2 Barricades
Erect and maintain temporary barricades to limit public access to hazardous areas. Whenever safe public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic barricades will be required. Securely place barricades clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.
PART 3 EXECUTION
3.1 EMPLOYEE PARKING
Contractor employees will park privately owned vehicles in an area designated by the Contracting Officer. This area will be within reasonable walking distance of the construction site. Contractor employee parking must not interfere with existing and established parking requirements of the government installation.
3.2 AVAILABILITY AND USE OF UTILITY SERVICES
3.2.1 Temporary Utilities
Provide temporary utilities required for construction. Materials may be new or used, must be adequate for the required usage, not create unsafe conditions, and not violate applicable codes and standards.
3.2.2 Payment for Utility Services
a. No utilities will be provided by the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .