ProjNet_Report.PDF

PDF 132 KB Posted

Attached to
Lakehurst NHC Initial Outfitting Project Federal contract opportunity
Solicitation number
W9127S19Q6008
Issued by
Department of the Army Corps of Engineers Engineering District Little Rock

View the file

Other files for this federal contract opportunity

Other files attached to Lakehurst NHC Initial Outfitting Project, newest first.
File Type Posted
Attachment_1_-_BID_SCHEDULE.XLSX XLSX spreadsheet
Attachment_2b_-_Earle_Combined_Cutsheets.pdf PDF
Attachment_6b_-_Site-Visit_sign-in_sheet.pdf PDF
Attach_3_-_Site_Photos..pdf PDF
Attachment_4_-_Drawing.PDF PDF
Attachment_6a_-_Site-Visit_minutes.pdf PDF
Attachment_5_-_Past_Performance_Questionnaire.pdf PDF
Attachment_2a_-_Lakeurst_Combined_Cutsheets.pdf PDF
W9127S19Q6008_Amendment_0001.pdf PDF
W9127S19Q6008_Combined_Synopsis_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR[8/27/2019 2:30:40 PM]

Bid Inquiry Contracting Officers Report All Inquiries

Project: NAVY19I Naval Base Health Clinic (NBHC) Lakehurst, NJ Review: Bidder Inquiry (00001) (sorted by CommentID ) Displaying 15 inquiries.

Id Discipline Sheet Detail Spec

8129454 IO

Transition/Phasing/Security/Warehousing/DRMO DRAFT - Attachment 1 - BID

SCHEDULE.XLSX

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) File "DRAFT - Attachment 1 - BID SCHEDULE.XLSX" Tab LogCat R lists 4 items. When combined with Tabs CAT C Bldg 483 and Tac Cat C Earle, much of the FF&E needed to outfit these two buildings is missing. Please provide comprehensive FF&E CAT C and CAT R lists so a accurate price can be provided for procurement of new commodities, installation of reuse commodities and DRMO of commodities not used.

By: Mark Dias; Cazador; (8087789578). On: Aug 07 2019. Forward request by email.

1-0 Evaluation Concurred. See Solicitation, SOW para 1.2.1 & 1.2.2, FF&E lists are comprehensive needs. Earle is a functioning clinic and is currently equipped. Commodity requirements are additional FF&E needs. Cat R does not include medical equipment that the local command will move. By: Billy Ruhland; SWL - Navy IO Branch; (501-340-1261) On:

Aug 08 2019

1-1 Government Response. Please see solicitation.

SOW para 1.2.1 & 1.2.2, FF&E lists are comprehensive needs. Earle is a functioning clinic and is currently equipped.

Commodity requirements are additional FF&E needs. Cat R does not include medical equipment that the local command will move. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Aug 19 2019

Current Request Status: Request Closed Information for this report is procurement sensitive.

8132823 IO Casegoods / Casework DRAFT Attachment 2a - Lakeurst Combined Cutsheets.pdf

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) The cutsheet for JSN E0571 shows a Fisher Hamilton sink with specified parts which one would often find in a medical lab. On the Bid Schedule this item is being shown to reside in a Toilet/Shower, Staff. Please clarify if the sink or room is incorrect or if it is the government's intention to have a lab sink installed into a restroom.

By: Mark Dias; Cazador; (8087789578). On: Aug 09 2019. Forward request by email.

1-0 Evaluation Concurred. The intention is to have a lab grade sink in those staff bathrooms because of the unique mission set. By: Billy Ruhland; SWL - Navy IO Branch; (501-340-1261) On: Aug 13 2019 1-1 Government Response. Please see the solicitation.

The intention is to have a lab grade sink in those staff bathrooms because of the unique mission set. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Aug 19 2019

Current Request Status: Request Closed Information for this report is procurement sensitive.

8132829 IO Medical Equipment, non OP DRAFT Attachment 2b - Earle Combined Cutsheets.pdf

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) On the Fluke cutsheets for JSNs T0005, T8030, T8045 and U0001 there is nothing marked indicating that any of the optional accessories are desired. Are we to take from this that only the base model of each of these items is to be priced.

By: Mark Dias; Cazador; (8087789578). On: Aug 09 2019. Forward request by email.

1-0 Evaluation Concurred. Item specifics will be updated on cutsheets in official solicitation. By: Billy Ruhland; SWL -

Navy IO Branch; (501-340-1261) On: Aug 13 2019 1-1 Government Response. Please see solicitation attachments for details. By: Timothy Pighee; SWL Contracting

Division; (5013401270) On: Aug 19 2019 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8138748 IO Medical Equipment, non OP A1132 Rail

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) JSN A1132 Rail, Accessory Mounting, Length As Required has a spec sheet but does not indicate what length rail is desired. Please provide length of rail.

By: Sidney Bonser; Strategic Initial Outfitting Transition Solutions (SIOTS) - Charleston, SC; (8472267737). On: Aug 13 2019.

Forward request by email.

1-0 Evaluation Concurred. Item specifics will be updated on cutsheets in solicitation. By: Billy Ruhland; SWL - Navy

IO Branch; (501-340-1261) On: Aug 13 2019

ProjNet Report

UNCLASSIFIED\\FOR OFFICIAL USE ONLY | AGENCY: USACE-ProjNet https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=CommentID https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=Discipline https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=Sheet https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=Detail https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=SpecText mailto:mark.dias@cazador.biz https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8129454 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8129454 mailto:billy.j.ruhland@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mark.dias@cazador.biz https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8132823 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8132823 mailto:billy.j.ruhland@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mark.dias@cazador.biz https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8132829 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8132829 mailto:billy.j.ruhland@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:sidney.bonser@siots.biz https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8138748 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8138748 mailto:billy.j.ruhland@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR[8/27/2019 2:30:40 PM]

1-1 Government Response. Please see solicitation attachments for details. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Aug 19 2019

Current Request Status: Request Closed Information for this report is procurement sensitive.

8138749 IO Medical Equipment, non OP A1132 Rail Mounting Bracket

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) JSN A1132 Rail, Accessory Mounting, Length As Required indicates equipment mounting brackets, P/N 178198, on the provided spec sheet, however no quantity of equipment mounting brackets is noted. Please provide quantity of equipment mounting brackets, P/N 178198, desired.

By: Sidney Bonser; Strategic Initial Outfitting Transition Solutions (SIOTS) - Charleston, SC; (8472267737). On: Aug 13 2019.

Forward request by email.

1-0 Evaluation Concurred. Item specifics will be updated on cutsheets in solicitation. By: Billy Ruhland; SWL - Navy

IO Branch; (501-340-1261) On: Aug 13 2019 1-1 Government Response. Please see solicitation attachments for details. By: Timothy Pighee; SWL Contracting

Division; (5013401270) On: Aug 19 2019 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8142350 IO

Transition/Phasing/Security/Warehousing/DRMO DRMO

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Based on the site walk, It was indicated that several items from Earle will need to be taken to DRMO. Please provide a list of these items.

By: Mark Dias; Cazador; (8087789578). On: Aug 15 2019. Forward request by email.

1-0 Evaluation Concurred. No items at Earle will be disposed of as part of this solicitation. By: Billy Ruhland; SWL -

Navy IO Branch; (501-340-1261) On: Aug 15 2019 1-1 Government Response. Please see the solicitation for details.

No items at Earle will be disposed of as part of this solicitation. By: Timothy Pighee; SWL Contracting Division;

(5013401270) On: Aug 19 2019

Current Request Status: Request Closed Information for this report is procurement sensitive.

8152775 IO

Transition/Phasing/Security/Warehousing/DRMO Sec 1.2.1c Pg 2 of 82

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Sec 1.2.1c states: "IO Contractor PM and Transition Planner shall be onsite full time 2 weeks prior to BOD PM and Transition Planner shall remain onsite until OFB."

Since the Gov already has a Transition Plan for this project, would the Gov reconsider the requirement to have the Transition Planner onsite full-time 2 weeks prior to BOD and remain onsite until OFB?

By: Mercedes Ramcharan; Indatatech - San Antonio, TX; (2103440012). On: Aug 21 2019. Forward request by email.

1-0 Evaluation Concurred. Please do not deviate from this requirement. By: Billy Ruhland; SWL - Navy IO Branch;

(501-340-1261) On: Aug 22 2019 1-1 Government Response. Please do not deviate from this requirement. By: Timothy Pighee; SWL Contracting

Division; (5013401270) On: Aug 27 2019 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8154370 IO

Transition/Phasing/Security/Warehousing/DRMO Pg 1 of 82

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) If a contractor does not have NAICS "Furniture and Related Product Manufacturing/337127 -- Institutional Furniture Manufacturing " does this disqualify them from bidding on this work?

By: Claire Hayes Watson; Visionary Consulting Partners, LLC; (5719994723). On: Aug 22 2019. Forward request by email.

1-0 Evaluation Concurred. All contractors must have the required NAICS code. By: Timothy Pighee; SWL Contracting

Division; (5013401270) On: Aug 27 2019 1-1 Government Response. All contractors must have the required NAICS code. By: Timothy Pighee; SWL Contracting

Division; (5013401270) On: Aug 27 2019 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8156352 IO

Transition/Phasing/Security/Warehousing/DRMO

Solicitation Section 1.2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Are new commodity and reuse items for Earle able to be installed at Earle prior to BOD of Bldg. 483?

By: Emily Toussaint; Strategic Initial Outfitting Transition Solutions (SIOTS) - Charleston, SC; (719-358-2020). On: Aug 23 2019. Forward request by email.

mailto:timothy.a.pighee@usace.army.mil mailto:sidney.bonser@siots.biz https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8138749 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8138749 mailto:billy.j.ruhland@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mark.dias@cazador.biz https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8142350 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8142350 mailto:billy.j.ruhland@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:mramcharan@indatatech.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8152775 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8152775 mailto:billy.j.ruhland@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:chayes@vcp-llc.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8154370 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8154370 mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:emily.toussaint@siots.biz https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8156352 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8156352 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR[8/27/2019 2:30:40 PM]

1-0 Evaluation Concurred. Yes. By: Billy Ruhland; SWL - Navy IO Branch; (501-340-1261) On: Aug 26 2019 1-1 Government Response. Are new commodity and reuse items for Earle able to be installed at Earle prior to BOD of

Bldg. 483? By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Aug 27 2019 1-2 Government Response. The text below appends or clarifies ALL previous replies.

Yes. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Aug 27 2019 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8156353 IO Medical Equipment, non OP Solicitation Section 1.2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Regarding the reuse Central Vacuum Pump and Medical Air Compressor going to the basement at Earle, do the utilities currently exist that these will tie into at placement location?

By: Emily Toussaint; Strategic Initial Outfitting Transition Solutions (SIOTS) - Charleston, SC; (719-358-2020). On: Aug 23 2019. Forward request by email.

1-0 Evaluation Concurred. For the Medical Air Compressor, yes utilities are present, a diverter valve will need to be installed and compressor connected with existing compressor. [Basically a manual valve to switch between the two machines]. The Central Vacuum Pump just needs to be properly placed near by the existing pump. No need to install that one to existing plumbing. By: Billy Ruhland; SWL - Navy IO Branch; (501-340-1261) On: Aug 27 2019

1-1 Government Response. For the Medical Air Compressor, yes utilities are present, a diverter valve will need to be installed and compressor connected with existing compressor. [Basically a manual valve to switch between the two machines].

The Central Vacuum Pump just needs to be properly placed near by the existing pump. No need to install that one to existing plumbing. By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Aug 27 2019

Current Request Status: Request Closed Information for this report is procurement sensitive.

8156354 IO

Transition/Phasing/Security/Warehousing/DRMO

Solicitation Section 1.2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Can the removal of excess in Bldg. 39 start before BOD of Bldg. 483?

By: Emily Toussaint; Strategic Initial Outfitting Transition Solutions (SIOTS) - Charleston, SC; (719-358-2020). On: Aug 23 2019. Forward request by email.

1-0 Evaluation Concurred. Yes, all except the 6 personnel's work areas that are currently working in Bldg 39. They will not move out of Bldg 39 to Bldg 483 until the OFB. By: Billy Ruhland; SWL - Navy IO Branch; (501-340-1261) On:

Aug 26 2019

1-1 Government Response. Yes, all except the 6 personnel's work areas that are currently working in Bldg 39. They will not move out of Bldg 39 to Bldg 483 until the OFB. By: Timothy Pighee; SWL Contracting Division; (5013401270) On:

Aug 27 2019

Current Request Status: Request Closed Information for this report is procurement sensitive.

8156358 IO

Transition/Phasing/Security/Warehousing/DRMO

Solicitation Section 1.2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Are any non-medical FFE items remaining in Bldg. 39 after excess removal, such as the large safe in basement, lockers, VTC, Televisions, etc.?

By: Emily Toussaint; Strategic Initial Outfitting Transition Solutions (SIOTS) - Charleston, SC; (719-358-2020). On: Aug 23 2019. Forward request by email.

1-0 Evaluation Concurred. Any non-medical FFE items remaining in Bldg. 39 at time of award will be part of this conract disposal. This does not include casework or anything built in (i.e. lockers). By: Billy Ruhland; SWL - Navy IO Branch; (501-340-1261) On: Aug 26 2019

1-1 Government Response. Any non-medical FFE items remaining in Bldg. 39 at time of award will be part of this conract disposal. This does not include casework or anything built in (i.e. lockers). By: Timothy Pighee; SWL Contracting Division; (5013401270) On: Aug 27 2019

Current Request Status: Request Closed Information for this report is procurement sensitive.

8156363 IO

Transition/Phasing/Security/Warehousing/DRMO

Solicitation Section 1.2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Will current FFE items at Bldg. C-3 being replaced with new/reuse require the IO contractor to move old items elsewhere prior to placing new/reuse FFE?

By: Emily Toussaint; Strategic Initial Outfitting Transition Solutions (SIOTS) - Charleston, SC; (719-358-2020). On: Aug 23 2019. Forward request by email.

1-0 Evaluation Concurred. No. The local command will move/dispose of reuse FFE at Earle (Bldg C-3). By: Billy

Ruhland; SWL - Navy IO Branch; (501-340-1261) On: Aug 26 2019 1-1 Government Response. No. The local command will move/dispose of reuse FFE at Earle (Bldg C-3). By: Timothy

Pighee; SWL Contracting Division; (5013401270) On: Aug 27 2019 Current Request Status: Request Closed mailto:billy.j.ruhland@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:emily.toussaint@siots.biz https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8156353 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8156353 mailto:billy.j.ruhland@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:emily.toussaint@siots.biz https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8156354 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8156354 mailto:billy.j.ruhland@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:emily.toussaint@siots.biz https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8156358 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8156358 mailto:billy.j.ruhland@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:emily.toussaint@siots.biz https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8156363 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8156363 mailto:billy.j.ruhland@usace.army.mil mailto:billy.j.ruhland@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:timothy.a.pighee@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR[8/27/2019 2:30:40 PM]

Classified information is NOT permitted on this site. Do NOT share your ProjNet password.

Questions and comments to Call Center staff@projnet.info, 1-217-367-3273 or 1-800-428-HELP (4357) Patent 11/892,984 ProjNet property of ERDC since 2004.

Information for this report is procurement sensitive.

8156367 IO Project Management Solicitation Section 2.7.8

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Will the IO Submittal (& Corrected Final) Review Meetings be onsite or telephonic?

By: Emily Toussaint; Strategic Initial Outfitting Transition Solutions (SIOTS) - Charleston, SC; (719-358-2020). On: Aug 23 2019. Forward request by email.

1-0 Evaluation Concurred. IO Submittal Review meetings will be telephonic. By: Billy Ruhland; SWL - Navy IO

Branch; (501-340-1261) On: Aug 26 2019 1-1 Government Response. IO Submittal Review meetings will be telephonic. By: Timothy Pighee; SWL Contracting

Division; (5013401270) On: Aug 27 2019 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8156977 IO CID: Furniture/Furnishings Solicitiation, Section 2.7.6

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Interior Designer is not listed as key personnel. However, there appears to be a requirement for design activities as part of the SOW. Should the Interior Designer be added to key personnel and a resume included?

By: Emily Toussaint; Strategic Initial Outfitting Transition Solutions (SIOTS) - Charleston, SC; (719-358-2020). On: Aug 23 2019. Forward request by email.

1-0 Evaluation Concurred. No. Due to the small nature of the projects, ID is not a significate part of this project.

interior designer is not a key personnel in this requirement. By: Billy Ruhland; SWL - Navy IO Branch; (501-340- 1261) On: Aug 26 2019

1-1 Government Response. No. Due to the small nature of the projects, ID is not a significate part of this project.

interior designer is not a key personnel in this requirement. By: Timothy Pighee; SWL Contracting Division;

(5013401270) On: Aug 27 2019

Current Request Status: Request Closed Information for this report is procurement sensitive.

Report Complete mailto:staff@projnet.info http://projnet.com/index.php mailto:emily.toussaint@siots.biz https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8156367 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8156367 mailto:billy.j.ruhland@usace.army.mil mailto:timothy.a.pighee@usace.army.mil mailto:emily.toussaint@siots.biz https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8156977 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=8156977 mailto:billy.j.ruhland@usace.army.mil mailto:timothy.a.pighee@usace.army.mil