Attachment_6a_-_Site-Visit_minutes.pdf
PDF 19 KB Posted
- Attached to
- Lakehurst NHC Initial Outfitting Project Federal contract opportunity
- Solicitation number
- W9127S19Q6008
About this file
Attachment 6a
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_2b_-_Earle_Combined_Cutsheets.pdf | ||
| Attachment_1_-_BID_SCHEDULE.XLSX | XLSX spreadsheet | |
| Attachment_6b_-_Site-Visit_sign-in_sheet.pdf | ||
| Attach_3_-_Site_Photos..pdf | ||
| Attachment_4_-_Drawing.PDF | ||
| Attachment_5_-_Past_Performance_Questionnaire.pdf | ||
| Attachment_2a_-_Lakeurst_Combined_Cutsheets.pdf | ||
| W9127S19Q6008_Amendment_0001.pdf | ||
| ProjNet_Report.PDF | ||
| W9127S19Q6008_Combined_Synopsis_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9127S19Q6008 Lakehurst Naval Health Clinic IO Project
Site-Visit Minutes
Introduction of Government and Contractors present
Brief overview of the project was given by USACE
Walk-thru was conducted at Lakehurst locations (Building 39 and Building 483)
Walk-thru was conducted at Naval Base Health Clinic Earle location, 87th MDG
Walk-thru wrap-up
Site-Visit Discussions:
1. The Kick-Off Meeting, User Meetings, and Site Verification shall all be conducted during the Kick-Off Meeting
2. The suction pump and air compressor will be relocated and installed. Both pieces of equipment shall be fully functional after installation.
3. Various entrances and exits were discussed. Also, Building 39 has an old ambulance dock that can be used as a loading/unloading dock at Building 39
File details come from the government source that posted it.