Amendment_2.pdf
PDF 154 KB Posted
- Attached to
- Army Mechanical MATOC Federal contract opportunity
- Solicitation number
- W9127S18R6029
About this file
This document is an amendment to a solicitation for an Army Mechanical Mechanical-As-A-Service (MATOC) contract. The solicitation seeks to establish multiple-award IDIQ contracts to provide mechanical services at Army installations, with a total ceiling value of $45 million. Eligible projects include mechanical systems and plumbing systems. The amendment provides answers to questions submitted by prospective offerors. It clarifies that for factor 2 specialized experience, one project must have a value over $1.5 million, to match the revised requirement in factor 4 for past performance. It also addresses questions on proposal submission requirements and the level of detail required for past performance projects under factor 4.
Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0001.pdf | ||
| Solicitation.pdf | ||
| Proposal_Data_Sheet_W9127S18R6029.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Army Mechanical MATOC
The purpose of this solicitation amendment is to document the final eight questions and answ ers from ProjNet.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Mar-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127S18R6029
X 9B. DATED (SEE ITEM 11)
14-Feb-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Mar-2018
CODE
CONTRACTING DIVISION
USACE, LITTLE ROCK (W9127S)
700 W. CAPITOL AVE, RM 7315
LITTLE ROCK AR 72201-3225
W9127S 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127S18R6029
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF30 - CONTINUATION PAGE
The following have been added by full text:
PROJNET Q&A 3-7-2018
Bid Inquiry Contracting Officers Report Closed Inquiries
Project: MEDCOM Mechanical MATOC - Step 1 Review: RFI Review (00001) (sorted by CommentID ) Displaying 8 inquiries.
Id Discipline Sheet Detail Spec
7348298 General Factor 4: Past Performance
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm our interpretation of the RFP that the projects submitted for Factor 4: Past Performance do not need to be the same as those submitted for Factor 2: Specialized Experience.
1-1 Government Response. The Factor 4 projects do not need to be the same as those submitted for Factor 2. SWL Contracting Division; On: Mar 05 2018
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7348325 General Factor 4: Past Performance
Amendment 1 adjusts the value for in Factor 2: Specialized Experience from "one project must be in value in excess of $2M" to "one project must be in value in excess of $1.5M".
Factor 4 has a similar requirement: "at least one completed project over $2M". Is it the government's intent to also adjust this requirement to "at least one completed project over $1.5M"?
1-1 Government Response. All references to $2M project values shall now be at the $1.5M value. By: SWL Contracting Division; On: Mar 05 2018
7350724 Construction Management
Phase 1 Submission original hard copy in a binder and five (5) electronic copies (CDs) are requested.
question: should the CD copies be placed inside the original binder in an envelope or please state where we should place the five CD only copies
Question: please confirm the only one (1) hard copy is requested (original)?
1-1 Government Response. Only one hard copy required. The CDs can be placed anywhere inside the package being shipped. By: SWL Contracting Division; On: Mar 06 2018
7351618 Construction Management
Mechanical Engineer
Will Task Orders be more focused on Mechanical systems or Plumbing systems?
1-1 Government Response. At this point, there is no way of knowing which specific type of projects will be required of the selected MATOC contractors.
By: SWL Contracting Division; On: Mar 06 2018
7351776 Construction Management
Proposal Data Sheet
Where are we supposed to include: Attachments: 1 – Proposal Data Sheet?
1-2 Government Response. Please include the Proposal Data Sheet with the hard copy that is being sent. And, include the information on the CDs.
By: SWL Contracting Division; On: Mar 06 2018
7351778 Construction Management
Solicitation
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Q Are the (4) projects listed here required to match those outlined in Tab B - Factor 2:
Specialized Experience?
Q: What exactly does the Government want to see in Tab D - Factor 4 - Past Performance that is different from the information provided in Factor 2? A completed CPARS?
1-1 Government Response. Four projects required for Factor 4 are not required to match the four projects of Factor 2.
Information to be presented for Factor 4 is noted in the factor description.
By: SWL Contracting Division; On: Mar 07 2018
7351779 Construction Management
Past Performance
Are projects to be completed within the last five (5) years or six (6)?
1-1 Government Response. Projects presented for Factor 4 Past Performance are to have been completed within the past five (5) years. By: SWL Contracting Division; On: Mar 07 2018
7352493 Special Projects Solicitation 16 of
Factor
Projects
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Would Vivarium and/or Medical Research Laboratory Projects in a health care campus be acceptable as a health care facility past performance?
1-1 Government Response. Include the projects that best fit the information requested in the solicitation. By: SWL Contracting Division; On: Mar 06
Report Complete
(End of Summary of Changes)
File details come from the government source that posted it. Updated .