This document provides a presolicitation notice for an indefinite delivery, indefinite quantity multiple award task order contract to support the United States Air Force Medical Service healthcare facilities modernization program. The Army Corps of Engineers intends to award a target of five contracts under an 8(a) small business set-aside with a total estimated capacity of $240 million over a five-year base period. The scope of work includes infrastructure restoration, repair, and replacement projects for building envelopes, mechanical systems including HVAC, medical gases and plumbing, and electrical systems. Task order sizes are estimated to range from $100,000 to $12 million on average. Offerors will submit proposals in two phases for evaluation, with phase one determining contractor qualifications and phase two including pricing for an initial seed project. The estimated solicitation issue date is June 26, 2018, with phase one proposals due July 27, 2018.

Solicitation

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A five-year Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Aw ard Task Order Contract (MATOC) aw ard in support of Air Force Medical

Services Agency (AFMS Agency) Engineering Infrastructure Repair (EIR).

This requirement is Set-Aside for 8(a) Small Business and is issued in accordance w ith FAR Part 15.

Phase 1 proposal are due on 23 Jul 2018 at 2:00 PM Central Time and in accordance w ith Section 00 22 10.

Requests for information should be submitted in ProjNet in accordance w ith Section 00 21 00 - Bidder Inquiry Key is: G55RC8-XH9J5Q.

w ebsite https://w w w .projnet.org/

This solicitation is for the Continental United States (CONUS) and AK, HI and U.S. territories for the Air Force Medical Services Agency

(AFMSA) and and other customers of the USACE Southw estern Division (CESWD).

Magnitude of Construction in betw een $100,000.00 and $250,000,000.00.

NICOLE A ANDERSON 501.340.1261

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

22-Jun-2018

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________5 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________23 Jul 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

USACE, LITTLE ROCK (W9127S)

700 W. CAPITOL AVE, RM 7315

LITTLE ROCK AR 72201-3225

W9127S

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

(501) 324-5196FAX:TEL: (501) 340-5720 TEL: FAX:

W9127S18R6000 93

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W9127S18R6000

Section 00 01 10 - Table of Contents

SECTION

Section 00 01 10 – Table of Contents

Section 00 11 00 - CLIN Schedule

Section 00 21 00 - Instructions, Conditions, and Notices to Offerors

Section 00 22 10 - Phase 1 Proposal Submission Requirements, Evaluation Criteria and Selection Criteria

Section 00 22 20 - Phase 2 Proposal Submission Requirements, Evaluation Criteria and Basis of Award

Section 00 45 00 - Representations and Certifications

Section 00 72 00 - Contract Clauses

Section 00 73 10 - Supplemental Contract Requirements

Section 00 73 46 - Wage Determination Schedule

Section 01 10 00 - Statement of Work

Attachments:

1 – Proposal Data Sheet

2 – AFMSA Quality Standards and Design Principles (Rev 9.0 - 01Nov17)

3 – Past Performance Questionnaire (Form PPQ-0)

Section 00 11 00 - SF1442 and CLIN Schedule

SECTION 00 11 00

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Base Period MATOC

FFP

Work multiple building infrastructure restoration, repair and replacement projects concurrently in existing Air Force Medical facilities in CONUS (including Alaska, Hawaii, and US Territories & Possessions), efficiently and complete these projects on schedule. Work may include restoration and/or modernization of HVAC, medical gas, plumbing, electrical, elevators, building envelope, fire protection, interior renovation, terrorism/force protection, and exterior site and systems work such as utilities infrastructure, roadways, sidewalks, parking lots, landscaping, irrigation, etc. Period of Performance for the base period is 60 months.

FOB: Destination

NET AMT

Section 00 21 00 - Instructions, Conditions & Notices to Offerors

SECTION 00 21 00

1.0 DESCRIPTION OF THE PROGRAM

2.0 GENERAL PROCEDURES/REQUIREMENTS

3.0 INTRODUCTION NOTICE TO OFFERORS

4.0 PREPARING PROPOSALS

5.0 GENERAL INSTRUCTIONS

1.0 Description of the Program

The Air Force Medical Support Agency (AFMSA) is responsible for managing the programming, planning, design, construction, outfitting and sustainment for the Air Force Surgeon General’s health facilities program.

AFMSA/Health Facilities Division relies on the support of the US Army Corps of Engineers – Little Rock District

(CESWL) to execute its health facilities program. A means to manage this program is via Indefinite

Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC). The Health Facilities

Division of AFMSA provides sustainment, repair and modernization support to facility physical plant and infrastructure systems that are installed in Air Force medical treatment facilities worldwide. The physical plant is best defined as any and all major building system(s) that provide a safe, comfortable interior environment conducive to healing. Typically, there are three predominant infrastructure systems which comprise the facility physical plant;

the Building Envelope, the Mechanical Infrastructure and the Electrical Infrastructure. In order to ensure the United

States’ military men and women, and their families, receive healthcare in properly-maintained buildings that meet all healthcare requirements, and Federal, State and Local laws the AFMSA requires experienced contractors that are dedicated and able to fulfill fast-tracked timelines. Timely, swift completion of upgrades and renovations is paramount to maintain quality, safe, infection-free facilities. Work may also include restoration, initial outfitting and/or modernization of HVAC, medical gas, plumbing, electrical, elevators, building envelope, fire protection, interior renovation, terrorism/force protection, and exterior site and systems work such as utilities infrastructure, roadways, sidewalks, parking lots, landscaping, irrigation, etc.

This acquisition will be a firm-fixed price (FFP), indefinite delivery/indefinite quantity (IDIQ), multiple award task order contract (MATOC) utilizing a competitive (8a) set-aside. The estimated dollar amount of the MATOC is

$240,000,000 for a base ordering period of 5 years and no option years.

This is a Two-Phase acquisition. A target pool of five (5) contractors will be selected to provide project support for

EIR healthcare projects.

It is anticipated that on average thirteen (13) task orders will be awarded during the fiscal year. The minimum task order amount is proposed at $100,000.00. The maximum task order is projected at $12,000,000.00. The guaranteed minimum is $10,000.00 per contractor if no task order is awarded within one year.

The proposed contracts will be competitive firm-fixed-price contracts procured in accordance with FAR 15, Negotiated Procurement using the Best Value Trade-Off process. There will be no public bid opening. The

Government will evaluate and select for contract qualified offerors whose proposals are determined to be the most beneficial to the Government, with consideration given to both the technical approach and price. Subsequent task orders will be awarded pursuant to FAR 16.505 - Ordering, and in accordance with the task order terms and conditions including the designated Statement of Work.

In accordance with FAR 36.3, Two-Phase Design-Build Selection Procedures, a two-phase source selection process will be used to evaluate the offerors for award.

In Phase 1, interested firms or joint venture entities (referred to as "offerors") may submit proposals in accordance with Section 00 22 10. The Government will evaluate the performance capability in accordance with the criteria described in Section 00 22 10. Those offerors who are considered the most highly qualified during Phase 1 target pool of five (5) will be requested to submit the proposal requirements for Phase 2.

In Phase 2, the selected offerors will submit proposals in accordance with Section 00 22 20. The Government will evaluate the Phase 2 proposals in accordance with the criteria described in Section 00 22 20, and award to the responsible offerors, whose proposals conform with all the terms and conditions of the solicitation and whose proposals are determined to represent the overall best value to the Government.

Each contractor under the MATOC is afforded fair opportunity for all task order(s) in accordance with FAR

16.505(b)(1) unless excepted by FAR subpart 16.505(b)(2). The request for proposal will identify the requirement of each task order:

2.0 General Procedures

Preliminary Review:

The proposal shall describe the capability of the offeror to perform the program requirements. The proposal should be specific and complete in every detail; and should be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the requirements. The proposal should be practical, legible, clear, and coherent.

In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government. Proposal clarity, organization, and cross-referencing are mandatory. Failure to submit and organize proposals as requested may adversely affect an offeror's evaluation.

Technical proposals shall not include any cost information and shall not exceed the page limits described and provide all information in tabbed sections. Neither appendices nor attachments are permitted and will not be evaluated.

The program requirements reflect the disciplines that are historically common in projects throughout the EIR program but vary from project to project.

No technical designs, prices/costs or detailed technical illustrations are required or requested and will not be

3.0 Introduction Notice to Offerors

This section is designed to provide the offeror with instructions to complete and deliver a complete competitive proposal in response to this request for proposals (RFP). Oral proposals are not solicited for Phase 1. The selection procedures to be used will be a two-phase approach IAW FAR Subpart 36.3. The two-phase selection procedure authorized under 10 U.S.C. 2305a allows offerors to submit information related to specialized experience, technical competence, capability to perform, past performance, teaming arrangements and/or other information requested in

Phase 1.

Based on information submitted in Phase 1, the Source Selection Authority (SSA) will select a target pool of five (5) contractors of the most qualified offerors to advance onto Phase 2 in the competition and are subsequently invited to submit technical design products as part of the technical proposals for evaluation during Phase 2. All proposals must be complete and timely to be considered.

Acquisition Method:

The method of acquisition for this procurement considers the “Best Value” continuum, wherein a Best Value source selection process will be utilized in accordance with the Federal Acquisition Regulation (FAR) Subpart 15.101.

Award will be made to the proposal that represents the best value to the Government as determined by the Source

Selection Official. The proposal determined to be the Best Value may not be the lowest price or the highest technically rated proposal. The decision will involve a comparison and trade-off analysis of the combination of non-cost strengths, weaknesses, and risks, and the evaluated price offered in each proposal. As a result, offerors must provide their best proposal with all required information in the required format. Information provided must be complete, clear and legible to obtain the best evaluation rating possible.

Contract Cost Ceiling Limitation for Design and Construction Costs:

The design and construction costs will be subject to the funds available for each Task Order. The current capacity for the design and construction cost for this five (5) year base MATOC is $240M.

The total MATOC award shall not exceed the anticipated capacity amount of $240M for this contract. Offerors are notified that they are under no obligation to approach this ceiling. The Government will track capacity availability in order not to exceed the $240M.

The solicitation process is known as the “Request for Proposals” or the acronym: “RFP”. Interested firms or joint venture entities (referred to as “offerors”) may submit certain specified performance capability proposals, demonstrating their capability to successfully execute the contract resulting from this solicitation. The Government will evaluate the performance capability proposals in accordance with the criteria described herein.

Oral Presentations:

The Government may conduct oral presentations after selection of Phase 2 offerors. Location, assigned dates and times for each potential offeror will be provided at a later date if it is determined oral presentations are necessary.

Offerors will not be participating in a sealed bid procurement process under this acquisition method. Issuance of this

Request for Proposal does not constitute an award commitment on the part of the Government.

Contract Type:

An award of a firm-fixed-price design-build construction contract requiring delivery and installation is contemplated for this acquisition.

4.0 Preparing Proposals

Proposal submittal information is located in each phase section (00 22 10 & 00 22 20).

5.0 General Instructions

Submit proposals initially on the most favorable terms from a price and technical standpoint. Do not assume that firms will be contacted or afforded an opportunity to clarify, discuss or revise their proposals. Submit proposals in

CDs. Note that the Government will not evaluate any material that exceeds the page limits, where indicated below.

PAST PERFORMANCE QUESTIONNAIRES are to be sent as identified below:

U.S. Army Corps of Engineers (USACE)

Email: CESWL-Eir-Matoc@usace.army.mil

Address: P.O. Box 867, Room 7315, Little Rock, AR 72203-0867

FAX: 501-324-5196

BIDDER INQUIRIES: Offerors may submit written bidder inquiries in the web-based system ProjNet. Formal responses to ProjNet will be provided in the form of an amendment. Any question or response not answered in the form of an amendment is not considered part of the contract. The Bidder Inquiry Key is: GS5RC8-XH9J5Q.

BID GUARANTEE: The provision at FAR 52.228-1 does not apply to the submission of Phase 1 Proposals. Bid guarantees will only be required of those most highly qualified firms submitting Phase 2 Proposals.

SITE VISIT: A formal site visit will be scheduled and communicated to those most highly qualified offerors selected to submit Phase 2 Proposals.

EVALUATION OF CONTRACTOR PERFORMANCE: In accordance with the provisions of Subpart

36.201(Evaluation of Contractor Performance) of the Federal Acquisition Regulation (FAR), construction contractor’s performance shall be evaluated throughout the performance of the contract. The United States Army

Corps of Engineers (USACE) follows the procedures outlined in Engineering Regulation 415-1-17 to fulfill this

FAR requirement for construction contracts awarded at or above $700,000.00, the USACE Contracting Officer

Representative (COR) will evaluate contractor’s performance and prepare a performance report using the Contractor

Performance Assessment Reporting System (CPARS). After an evaluation (interim or final) is written up by the mailto:CESWL-Eir-Matoc@usace.army.mil

USACE COR the contractor will have the ability to access, review and comment on the evaluation for a period of 60 days. Accessing and using CPARS requires specific software, called PKI certification, which is installed on the user’s computer. The certification is a Department of Defense requirement and was implemented to provide security in electronic transactions. The certification software could cost approximately $110 - $125 per certificate per year and is purchased from an External Certificate Authorities (ECA) vendor. Current information about the PKI certification process and for contacting vendors can be found on the website: http://www.cpars.navy.mil/. If the

Contractor wishes to participate in the performance evaluation process, access to CPARS and PKI certification is the sole responsibility of the Contractor.

CONTRACT OMBUDSMAN: In accordance with FAR 16.505(b)(6) and AFARS 5116.505(b)(6) the following is identified as Task Order Ombudsman:

Ms. Paige H. Blechinger

Acquisition Support Division

U.S. Army Corps of Engineers

7701 Telegraph Road, Casey Building, Room 2115 Alexandria, VA 22315

Phone: 703-428-6323

Email: paige.h.blechinger@usace.army.mil

SBA INFORMATION

The assigned SBA Requirement Number is 0669/18/802355/01.

SBA has determined that competition will be restricted to all eligible 8(a) firms and those 8(a) firms with a bona-fide office located within the geographical area. All other 8(a) firms outside this geographical area will be deemed ineligible to submit offers.

Interested 8(a) firms must provide the name of their servicing district office, address, city/state as well as the name of their Business Opportunity Specialist.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government http://www.cpars.navy.mil/ mailto:paige.h.blechinger@usace.army.mil

Section 00 22 10 - Phase 1 of a 2 Phase Design Build Selection Process

PHASE 1

Phase 1 Proposal Submission Requirements, Evaluation Criteria and Selection Criteria

PHASE 1 - SUBMISSION FORMAT

COVER SHEET & TABLE OF CONTENTS. Phase 1 Proposals shall consist of one CD. A cover sheet identifying the offeror (name, address, point of contact) and solicitation number shall be provided. The second sheet shall be a table of contents. The proposals shall contain a detailed table of contents. Offers that violate these rules unnecessarily delay the evaluation process and may be rejected by the Government after the initial evaluation without receiving any further consideration. Neither the cover sheet nor the table of contents count toward the page limitations.

TABS. Proposal materials shall be submitted in CDs. Proposals shall be tabbed and labeled as specified in a manner to afford easy identification from a Table of Contents.

FONT SIZE. Shall not be less than 10 point.

PAGE SIZE. Shall be 8-1/2 inches x 11 inches; however, if drawings, charts, or other graphics are submitted, sheets no larger than 11 inches x 17 inches shall be used. Sheets that are 11 x 17 inches will be counted as two 8-1/2 inch x 11-inch sheets. All sheets shall be dated and numbered.

PAGE LIMITS. PAGES WILL BE DOUBLE SIDED and each page side shall be identified with the appropriate page number centered at the bottom of the page.

The proposal shall not exceed the specified page limits. The Government may not review any information in excess of the page limits or information submitted in an appendix or attachment to the proposal. The offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers that do not meet these requirements may be subject to rejection.

NUMBER OF COPIES. Offerors shall submit six (6) copies of their proposal in CD format.

PHASE 1 - GENERAL REQUIREMENTS

The Air Force Medical Support Agency (AFMSA) is responsible for managing the programming, planning, design, construction, outfitting and sustainment for the Air Force Surgeon General’s health facility program.

AFMSA/Health Facilities Division relies on the support of the US Army Corps of Engineers – Little Rock District

(CESWL) to execute its health facility program. A means to manage this program is via Indefinite

Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC). The Health Facilities

Division of AFMSA provides sustainment, repair and modernization support to facility physical plant and infrastructure systems that are installed in Air Force medical treatment facilities worldwide. The physical plant is best defined as any and all major building system(s) that provide a safe, comfortable interior environment conducive to healing. Typically, there are three predominant infrastructure systems which comprise the facility physical plant;

the Building Envelope, the Mechanical Infrastructure and the Electrical Infrastructure. In order to ensure the United

States’ military men and women, and their families, receive healthcare in properly-maintained buildings that meet all healthcare requirements, and Federal, State and Local laws the AFMSA requires experienced contractors that are dedicated and able to fulfill fast-tracked timelines. Timely, swift completion of upgrades and renovations is paramount to maintain quality, safe, infection-free facilities. Work may also include restoration, initial outfitting and/or modernization of HVAC, medical gas, plumbing, electrical, elevators, building envelope, fire protection, interior renovation, terrorism/force protection, and exterior site and systems work such as utilities infrastructure, roadways, sidewalks, parking lots, landscaping, irrigation, etc.

This acquisition will be a firm-fixed price (FFP), indefinite delivery/indefinite quantity (IDIQ), multiple award task order contract (MATOC) utilizing a competitive (8a) set-aside. The estimated dollar amount of the MATOC is

$240,000,000 for a base ordering period of 5 years and no option years.

This is a Two-Phase acquisition. A target pool of five (5) contractors will be selected to provide project support for

EIR healthcare projects.

It is anticipated that on average thirteen (13) task orders will be awarded during the fiscal year. The minimum task order amount is proposed at $100,000. The maximum task order is projected at $12,000,000.00. The guaranteed minimum is $10,000.00 per contractor if no task order is awarded within one year.

Preliminary Review:

The proposal shall describe the capability of the offeror to perform the program requirements. The proposal should be specific and complete in every detail; and should be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the requirements. The proposal should be practical, legible, clear, and coherent.

In order to effectively and equitably evaluate all proposals, the contracting officer must receive information containing sufficient detail to allow review and evaluation by the Government. Proposal clarity, organization, and cross-referencing are mandatory. Failure to submit and organize proposals as requested may adversely affect an offeror's evaluation.

Technical proposals shall not include any cost information and shall not exceed the page limits described and provide all information in tabbed sections. Neither appendices nor attachments are permitted and will not be

The program requirements reflect the disciplines that are historically common in projects throughout the EIR program but vary from project to project.

No technical designs, prices/costs or detailed technical illustrations are required or requested and will not be

Phase 1 - Technical Proposal

Volume 1 - FACTOR 1: Management Approach

Volume 1 - FACTOR 2: Technical Qualifications

Volume 1 - FACTOR 3: Past Performance

Factor 1: Management Approach

Offeror’s Submission Requirements: Total max of six (6) double sided pages for all information provided in this factor. This maximum includes photos, drawings, schematics, and narrative. Half-size, fold-in drawings are allowed but single-side only and counts as one double sided page.

Management Plan - The offeror will demonstrate the approach to managing the EIR design-build program

CONUS-wide to include, AK, HI and the U.S. territories. The narrative will describe how your company will manage multiple subcontractors/consultants/projects at various geographically separate/remote locations, concurrently issued under the contract. The narrative shall include a description of the team’s structure to include organizational flow chart, responsibilities and lines of authority established for the contract and how the design and construction process and quality control shall be managed including the coordination of trade subcontractors and construction personnel. Considerations may include, construction schedule, cost control, administrative processes and risk management.

Evaluation Criteria – This factor will be evaluated to determine the extent to which it:

a) Demonstrates the offeror’s understanding of team structure and approach required for management and execution of infrastructure renovations/repairs in active healthcare facilities during continuous hospital/clinical operations.

b) Demonstrates the ability to effectively manage multiple projects with multiple subcontractors/ consultants at various geographically separate/remote locations, simultaneously.

c) Describes risks within the offeror’s control and the plan for mitigating each risk which may include cost control and administrative processes.

d) Demonstrates scheduling capabilities which allows start of construction at 65% design.

e) Demonstrates understanding of required lines of authority and responsibilities for quality control personnel.

Factor 2: Technical Qualifications

Offeror’s Submission Requirements: Total max of fifteen (15) - double sided pages for all information provided in this factor. This maximum includes photos, drawings, schematics, and narrative. Half-size, fold-in drawings are allowed but single-side only and counts as one double sided page. Offerors representing the combining of two or more companies for the purpose of this RFP must describe the nature of the association; indicate whether the firms have experience working together in design-build-outfitting ventures, including how long and how many projects. If the Joint Venture (JV), or teaming arrangement, has little or no recent and/or relevant projects performed, then each member of the teaming arrangement and/or JV may provide a combined total of four (4) projects. Experience by other corporate entities or JVs not named on the Standard Form (SF) 1442 is prohibited and will not be evaluated.

Subfactor 1, Offeror’s Experience - SUBMISSION REQUIREMENT: Typically, there are three predominant infrastructure systems which comprise the facility physical plant; 1) the Building Envelope, 2) the Mechanical

Infrastructure and 3) the Electrical Infrastructure. Provide a narrative of four (4) projects completed within the last four (4) years with a value of at least $4 million. Information can include narratives, drawings, photos etc. Each project narrative should include at minimum:

1. Location

2. Description

3. Owner contact information

4. Project cost and scope

5. Contract award amount and final price

6. Major departments affected by renovation

7. A listing of the team members who worked on the project to include a description of their overall role and responsibility for each project.

Additionally, the following experience must be demonstrated:

1. Each of the predominant infrastructure systems must be represented in at least 1 of the 4 submitted projects.

2. Experience in active healthcare facilities during continuous hospital/clinical operations of similar size and complexity to those which will be performed under this contract.

Evaluation Criteria:

The proposal will be evaluated for the overall team’s specialized experience. The offeror shall demonstrate:

a) Team’s experience in performing the three (3) predominant infrastructure systems: 1) the Building

Envelope, 2) the Mechanical Infrastructure and 3) the Electrical Infrastructure as defined in Phase 1 –

General Requirements above

b) Team’s experience in active healthcare facilities during continuous hospital/clinical operations of similar size and complexity to those which will be performed under this contract.

Subfactor 2, Key Personnel - SUBMISSION REQUIREMENT: Provide a narrative listing of key personnel and key subcontractors/team arrangements required for a typical project and why they are qualified to manage the program. The proposal shall include the information below. Provide a resume (no more than a one (1) page each, no Architect-Engineering Qualifications SF330s required) for the following key personnel:

1. Program Manager

2. Project Managers (provide a resume for two (2) project managers)

3. Architect of Record

4. Electrical Engineer

5. Mechanical Engineer

6. Fire Protection Engineer

Resume must include the following information:

a) Name and title of key personnel/sub-contractor key personnel (include firm’s name)

b) Number of years with this firm/with other firms (including specific title and role)

c) Specialized experience

d) Active registration: number/state/year registered

e) List three (3) completed projects and include project title, POC, dates, location, specific role and responsibilities for the infrastructure renovations/repairs in active healthcare facilities.

The proposal will be evaluated to determine the extent to which Key Personnel meet or exceed the minimum requirements outlined in the Program Requirements.

Factor 3: Past Performance

Offeror’s Submission Requirements: Total max of twelve (12) - double sided pages for all information provided in this factor. This maximum includes photos, drawings, schematics, and narrative. Half-size, fold-in drawings are allowed but single-side only and counts as one double sided page.

a) For the projects submitted in Factor 2, Subfactor 1, Offeror’s experience, submit project information for four (4) projects of at least $4M each all completed within the last six (6) years. Typically, there are three predominant infrastructure systems which comprise the facility physical plant; 1) the

Building Envelope, 2) the Mechanical Infrastructure and 3) the Electrical Infrastructure. Each infrastructure system must be represented in one of the four completed projects submitted. Information can include narratives, drawings, photos etc. All projects referenced shall provide location and description, owner contact information, project cost, scope, award amount and final price, and major departments affected by the renovation.

Offerors may provide details on past performance problems and corrective actions taken as a part of the proposal. When an Offeror’s firm is divided into severable segments (e.g., division, group, unit) the Government will evaluate only the past performance of those segments of the firm that will actually perform the work.

b) Past Performance References: For the projects submitted in Factor 3, paragraph a), the government will query the Contractor Performance Assessment Reporting System (CPARS) to validate past performance ratings. For each project that does not have a final CPARS evaluation, offerors shall provide a NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0) to the point of contact, clearly identifying the project to be evaluated. A NAVFAC/USACE Past Performance Questionnaire

(Form PPQ-0) is included at the end of the RFP. When completed, these forms shall be mailed, faxed or emailed to the Little Rock District Contract Specialist identified in the RFP. It is the contractor’s responsibility to ensure that the reference documentation is provided as the Government may not make additional requests for past performance information from the references. Past performance questionnaires must reflect contracts that were 100% completed and at least $4M each in value.

c) Other Sources: The Government may contact sources other than those provided by the offeror for information with respect to past performance on projects completed, or at least 50% complete. These other sources may include, but are not limited to CPARS, telephone interviews with organizations familiar with the offeror’s performance, and Government personnel with personal knowledge of the offeror’s performance capability. The Government may be unable to obtain any qualitative information under subcontracts due to the Government’s lack of privity with subcontractors. Unless otherwise requested by the subcontractor, adverse subcontractor performance information will be provided to the offeror if discussions are held and/or during a requested debriefing.

The Government will evaluate how well the contractor performed on these contracts (See Performance

Confidence Assessment below).

Rating Performance Confidence Assessments

Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort.

Neutral Confidence

No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

See Performance Relevancy Rating definitions below.

Past Performance Relevancy Rating Definitions In performing the past performance factor evaluation, evaluators will apply the following relevance levels to assess the relevance of the prior contract effort(s) of offerors.

Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present /past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Section 00 22 20 - Phase 2 Proposal Submission Requirements, Evaluation Criteria and Basis of Award

COVER PAGE & TABLE OF CONTENTS.

Phase 2 Proposals shall consist of two (2) volumes.

VOLUME 1 – Price/Cost Proposal and VOLUME 2 – Technical Proposal and shall be prepared as follows.

A cover sheet page identifying the offeror (name, address, point of contact), project description, and solicitation number shall be provided. The second sheet shall be a table of contents. The proposals shall contain a detailed table of contents. If more than one binder is used, the complete table of contents shall be included in each. Offers that violate these rules unnecessarily delay the evaluation process and may be rejected by the Government after the initial evaluation without receiving any further consideration. Neither the cover sheet nor the table of contents count toward the page limitations.

DEVIATIONS. Any proposed exceptions/deviations to statement of work, codes, criteria and standards shall be clearly identified. Enumerate as separate and distinct page(s) in the proposal and reference in the table of contents.

FONT SIZE. Shall not be less than 10 point.

PAGE SIZE. Shall be 8-1/2 inches x 11 inches; however, if drawings, charts, or other graphics are submitted, sheets no larger than 11 inches x 17 inches and folded to 8-1/2 inches x 11 inches shall be used. Sheets that are 11 x

17 inch will be counted as two 8-1/2 inch x 11-inch sheets. Presentation boards when provided shall not exceed 20 inches x 30 inches. All sheets shall be dated and numbered.

PAGE LIMITS. Pages will be double-sided and each page shall be identified with the appropriate page number centered at the bottom of the page.

The proposal shall not exceed the specified page limits. The Government may not review any information in excess of the page limits or information submitted in an appendix or attachment to the proposal. The offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers that do not meet these requirements may be subject to rejection.

NUMBER OF COPIES. Offerors shall submit six (6) copies of their proposal in CD format.

VOLUME 1 – Phase 2 PRICE Proposal

Volume 1 - Price Schedule

Volume 1 - Bid Guarantee

Volume 1 - Representations and Certifications

PRICE SCHEDULE (VOL 1)

Submission Requirement: Submit the properly filled out and executed SF 1442 along with the CLIN schedule for the Seed Project containing the proposed line item and total pricing along with the pricing support schedules. See instructions in Section 00 21 00, Instructions to offerors. All elements of the offeror’s technical proposal shall be included in the total price for the seed project.

Evaluation Criteria: Price will be analyzed using the price proposal submitted for the project. The Government will perform a price analysis after completion of technical evaluations. Price analysis will be performed in accordance with FAR 15.404-1, to determine completeness, reasonableness, and understanding of the work. The evaluation will determine the adequacy of the offer in fulfilling the requirements of the proposal. Completeness addresses the extent to which the elements of the price proposal are consistent with the requirements of the RFP.

Reasonableness will be established using historical price information, price competition information, the IGE, and any other pricing tools necessary. Understanding of the work will be established on the basis of the quality of the offeror’s technical submission as relative to the price submitted and as it relates to completeness and reasonableness.

Prices will be checked for the appearance of unbalanced pricing. The government may reject an offer as non-responsive for an appearance of unbalanced pricing. The government may request a price breakdown at any time during the evaluation process.

Price will not be rated, but will be a factor in making the final best value determination for award.

BID GUARANTEE (VOL 1)

Submission Requirement: Submit Standard Form 24 for Phase 2 Proposals. The provision at FAR 52.228-1 does not apply to the submission of Phase 1 Proposals. Bid guarantees will only be required of those most highly qualified firms submitting Phase 2 Proposals.

Evaluation Criteria: This item is not rated. The Government will review the Bid Guarantee for legal sufficiency.

The Bid Guarantee must be legally sufficient. Failure to submit a bid guarantee may make the offeror’s proposal ineligible for award.

REPRESENTATIONS AND CERTIFICATIONS (VOL 1)

Submission Requirement: Confirm that the offeror’s Representations and Certifications have been completed in the System for Award Management (SAM). Submit the Representations and Certifications not covered by SAM in

Section 00 45 00 of this solicitation.

VOLUME 2 – Technical Proposal

Volume 2 – FACTOR 4: Technical Solution

Volume 2 - FACTOR 5: Key Personnel

FACTOR 4: Technical Solution

Offeror’s Submission Requirements: Total maximum of ten (10) double sided pages for all information provided in this factor. This maximum includes photos, drawings, schematics, and narrative. Half-size, fold-in drawings are allowed but single-side only and counts as one double sided page.

Provide a narrative describing the technical solution using the initial task order project SOW. The contractor’s seed project task order proposal shall include:

1) Clear insight into the method of execution;

2) An understanding of the risks associated and to be encountered with the effort;

3) Actions that will be employed to mitigate those risks;

4) Strategies to minimize impact to the mission;

5) Major equipment selections; and

6) Design assumptions and engineering calculations that support those assumptions.

Considerations may include staffing, phasing/scheduling, coordination, and project completion. The government will evaluate the offeror's approach to providing quality control. Offeror shall provide a narrative describing a general project Quality Control Plan (QCP) which specifically addresses how quality will be assured on this project during construction. The narrative shall describe the personnel proposed to implement the QCP. The narrative should describe the team's quality control approach, corporate systems and capabilities to maintain quality control of the construction. Include a description or flow chart showing lines of authority and responsibilities for each position indicated. There is no need to submit a quality control plan as the successful offeror will provide the QCP after award.

Evaluation Criteria – The proposal will be evaluated to determine the extent to which it:

a) The offeror has complied with the six (6) mandatory requirements listed above.

b) Demonstrates the offeror has applied the right skill sets at the right sequence of construction and meets the requirements outlined in the SOW.

c) Demonstrates how the contractor will approach the work and the description of the "mechanics" associated with the work effort to include the submission of required drawings, submittals, as-built drawings, commissioning, and task order completion documents.

d) Demonstrates the offeror’s ability to perform in an active healthcare facility during continuous hospital/clinical operations. Facilities are always occupied and must continue operations in all departments during all phases of the project. Describe these risks and the plan for mitigating each risk.

e) Demonstrates a clear understanding of the information provided in the initial task order project SOW, to include an approach which allows start of construction at 65% design that will result in timely completion of the project with the least impact to facility operations.

f) The Government will review the required narrative and, if submitted, the flow chart, for the evaluation of this factor.

FACTOR 5: Key Personnel

Offeror’s Submission Requirements: Total max of ten (10) - double sided pages for all information provided in this factor. This maximum includes photos, drawings, schematics, and narrative. Half-size, fold-in drawings are allowed but single-side only and counts as one double sided page.

Key Personnel – Submission Requirement: Provide a narrative listing of key personnel and key subcontractors/team arrangements required for the initial task order seed project SOW and why they are qualified to manage the project. The proposal shall include the information below. All engineering disciplines may not be required for this task order. Provide a resume for the key personnel:

1. Program Manager

2. Project Manager

3. Architect of Record

4. Electrical Engineer

5. Mechanical Engineer

6. Fire Protection Engineer

7. Project Site Superintendent

8. Structural Engineer

9. Civil Engineer

10. Construction Management/Field Support Staff

11. Quality Control Representative

12. Safety Representative aka Site Safety Health Officer

13. Project Scheduler

14. Commissioning Team members

- Electrical and Fire Protection Lead/Master Technicians

- Lead/Master Medical Gas Technicians

Resume must include the following information:

a) Name and title of key personnel/sub-contractor key personnel (include firm’s name)

b) Number of years with this firm/with other firms (including specific title and role)

c) Specialized experience

d) Active registration: number/state/year of

e) List three (3) completed projects and include project title, POC, dates, location and specific roles and responsibilities of infrastructure renovations/repairs in active healthcare facilities.

Evaluation Criteria: The proposal will be evaluated to determine the extent to which key personnel meet or exceed the minimum requirements outlined in the initial task order SOW.

Technical Evaluation Weights

For the purpose of this evaluation, the following terms will be used to establish the relative importance of the technical factors.

□ More Important: The criterion is greater in value than another criterion.

□ Equal: The criterion is of the same value or nearly the same as another criterion.

□ Less: The criterion is less in value than another criterion.

Weight among technical factors for both Phase 1 and 2:

WEIGHT AMONG TECHNICAL FACTORS FOR BOTH PHASE 1 AND PHASE 2

PHASE 1 EQUALLY

IMPORTANT TO

MORE IMPORTANT

THAN

LESS IMPORTANT

THAN

Factor 1: Management

Approach

Factor 2 Factor 3

Factor 2: Technical

Qualifications

Factor 1 Factor 3

Factor 3: Past

Performance

Factor 1

Factor 2

PHASE 2 EQUALLY

IMPORTANT TO

MORE IMPORTANT

THAN

LESS IMPORTANT

THAN

Factor 1: Management

Approach

Factor 2 Factor 3 Factor 4

Factor 5

Factor 2: Technical

Qualifications

Factor 1 Factor 3 Factor 4

Factor 5

Factor 3: Past

Performance

Factor 1

Factor 2

Factor 4

Factor 5

Factor 4: Technical

Solution

Factor 1

Factor 2

Factor 3

Factor 5

Factor 5: Key Personnel Factor 1

Factor 2

Factor 3

Factor 4

Phase 1:

FACTOR 1: Management Approach.

FACTOR 2: Technical Qualifications.

FACTOR 3: Past Performance.

Phase 2:

FACTOR 4: Technical Solution.

FACTOR 5: Key Personnel.

PROPOSAL EVALUATION

Each member of the Source Selection Evaluation Board will independently consider all information provided in the technical proposal.

Once the individual analyses are completed, the team will meet and determine a rating for each of the evaluation factors by consensus decision.

The evaluation team will document strengths (e.g., advantages), weaknesses (e.g., disadvantages), and other comments (e.g., deficiency and/or clarification) to support the rating for each factor. Documentation and comments are required for all ratings.

The consensus rating and any minority opinions will be provided to the Source Selection Authority for selection and award. The ratings for Technical Factors will be expressed in an adjectival assessment of Outstanding, Good, Acceptable, Marginal and Unacceptable.

ADJECTIVE DEFINITION AND CRITERIA

Outstanding

Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.

Good

Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.

Acceptable

Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.

Marginal

Proposal does not clearly meet requirements and has not demonstrated an adequate approach and…