Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.07.23_Conformed_RFQ_W9127S18Q0011.pdf | ||
| Attachement_B_Outage_Schedule.pdf | ||
| All_Security_Requirements_2_mwd.docx | DOCX document | |
| A.01.30_PWS_Including_All_Technical_Exhibits_Updated_Amendment_0001.pdf | ||
| QA_NERC.docx | DOCX document | |
| A.01.30_PWS_Including_All_Technical_Exhibits.pdf | ||
| A.07.23_RFP_W9127S18Q0011.pdf | ||
| A.04.36_Wage_Rates.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this modification is to update the Performance Work Statement (PWS) and CLIN structure to reflect mobilization costs separately from NERC certification of pow er generation units.
A. The PWS has been updated w ith the 25 Jan 2018 version.
B. CLINs 0028 thru 0041 have been added to separate mobilization/demobilization costs from w ork accomplished under CLINs 0001 thru 0027
C. All other terms and condtiions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jan-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127S18Q0011
X 9B. DATED (SEE ITEM 11)
04-Jan-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jan-2018
CODE
CONTRACTING DIVISION
USACE, LITTLE ROCK (W9127S)
700 W. CAPITOL AVE, RM 7315
LITTLE ROCK AR 72201-3225
W9127S 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127S18Q0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 25-Jan-2018 12:00 PM to 01-Feb-
2018 12:00 AM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
Beaver Power Generation Unit 1 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite and offsite work. Performance IAW PWS and contract requirements.
To:
Beaver Power Generation Unit 1 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work exclusive of mobilization and de-mobilization cost. Performance IAW PWS and contract requirements.
CLIN 0002
Bull Shoals Power Generation Unit 1 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite and offsite work. Performance IAW PWS and contract requirements.
Bull Shoals Power Generation Unit 1 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work exclusive of mobilization and de-mobilization cost. Performance IAW PWS and contract requirements.
CLIN 0003
Bull Shoals Power Generation Unit 5 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete
Bull Shoals Power Generation Unit 5 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work exclusive of mobilization and de-mobilization cost. Performance IAW PWS and contract requirements.
CLIN 0004
Dardanelle Power Generation Unit 1 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite
Dardanelle Power Generation Unit 1 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work
CLIN 0005
Greers Ferry Power Generation Unit 1 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete
Greers Ferry Power Generation Unit 1 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work exclusive of mobilization and de-mobilization cost. Performance IAW PWS and contract requirements.
CLIN 0006
Norfork Power Generation Unit 1 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite
Norfork Power Generation Unit 1 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work
CLIN 0007
Ozark Power Generation Unit 1 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite
Ozark Power Generation Unit 1 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work
CLIN 0008
Table Rock Power Generation Unit 1 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete
Table Rock Power Generation Unit 1 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work exclusive of mobilization and de-mobilization cost. Performance IAW PWS and contract requirements.
CLIN 0009
Beaver Power Generation Unit 2 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite
Beaver Power Generation Unit 2 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work
CLIN 0010
Bull Shoals Generation Unit 2 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite
Bull Shoals Generation Unit 2 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work
CLIN 0011
Bull Shoals Generation Unit 3 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite
Bull Shoals Generation Unit 3 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work
CLIN 0012
Bull Shoals Generation Unit 4 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite
Bull Shoals Generation Unit 4 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work
CLIN 0013
Bull Shoals Generation Unit 6 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite
Bull Shoals Generation Unit 6 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work
CLIN 0014
Bull Shoals Generation Unit 7 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite
Bull Shoals Generation Unit 7 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work
CLIN 0015
Bull Shoals Generation Unit 8 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite
Bull Shoals Generation Unit 8 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work
CLIN 0016
Dardanelle Power Generation Unit 2 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite
Dardanelle Power Generation Unit 2 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work
CLIN 0017
Dardanelle Power Generation Unit 3 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite
Dardanelle Power Generation Unit 3 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work
CLIN 0018
Dardanelle Power Generation Unit 4 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite
Dardanelle Power Generation Unit 4 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work
CLIN 0019
Greers Ferry Power Generation Unit 2 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete
Greers Ferry Power Generation Unit 2 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work exclusive of mobilization and de-mobilization cost. Performance IAW PWS and contract requirements.
CLIN 0020
Norfork Power Generation Unit 2 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite
Norfork Power Generation Unit 2 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work
CLIN 0021
Ozark Power Generation Unit 2 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite
Ozark Power Generation Unit 2 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work
CLIN 0022
Ozark Power Generation Unit 3 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite
Ozark Power Generation Unit 3 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work
CLIN 0023
Ozark Power Generation Unit 4 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite
Ozark Power Generation Unit 4 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work
CLIN 0024
Ozark Power Generation Unit 5 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete for onsite
Ozark Power Generation Unit 5 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work
CLIN 0025
Table Rock Power Generation Unit 2 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete
Table Rock Power Generation Unit 2 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work exclusive of mobilization and de-mobilization cost. Performance IAW PWS and contract requirements.
CLIN 0026
Table Rock Power Generation Unit 3 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete
Table Rock Power Generation Unit 3 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work exclusive of mobilization and de-mobilization cost. Performance IAW PWS and contract requirements.
CLIN 0027
Table Rock Power Generation Unit 4 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all costs complete
Table Rock Power Generation Unit 4 Plant Model testing work complete. The contractor shall provide all personnel, equipment, supplies, travel, facilities, transportation, tools, materials, supervision, and any other items and non-personal services necessary to perform the work required. The contractor shall include all on site and off site work exclusive of mobilization and de-mobilization cost. Performance IAW PWS and contract requirements.
CLIN 0028 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0028 1 Job Mobilization/Demobilization Cost Beaver
FFP
All costs associated with mobilization and demobilization to the Power Plant FOB: Destination
NET AMT
CLIN 0029 is added as follows:
0029 1 Job Mobilization/Demobilization Cost Bull Sh
FFP
Mobilization/Demobilization Cost Bull Shoals, All costs associated with mobilization and demobilization to the Power Plant
CLIN 0030 is added as follows:
0030 1 Job Mobilization/Demobilization Cost Dardane
FFP
Mobilization/Demobilization Cost Dardanelle, All costs associated with
CLIN 0031 is added as follows:
0031 1 Job Mobilization/Demobilization Cost Greers
FFP
Mobilization/Demobilization Cost Greers Ferry, All costs associated with
CLIN 0032 is added as follows:
0032 1 Job Mobilization/Demobilization Cost Norfor
FFP
Mobilization/Demobilization Cost Norfork, All costs associated with mobilization and demobilization to the Power Plant
CLIN 0033 is added as follows:
0033 1 Job Mobilization/Demobilization Cost Ozark
FFP
CLIN 0034 is added as follows:
0034 1 Job Mobilization/Demobilization Cost Table R
FFP
Mobilization/Demobilization Cost Table Rock, All costs associated with
CLIN 0035 is added as follows:
0035 1 Job Mobilization/Demobilization Cost Beaver
FFP
CLIN 0036 is added as follows:
0036 1 Job Mobilization/Demobilization Cost Bull Sh
FFP
Mobilization/Demobilization Cost Bull Shoals, All costs associated with
CLIN 0037 is added as follows:
0037 1 Job Mobilization/Demobilization Cost Dardane
FFP
Mobilization/Demobilization Cost Dardanelle, All costs associated with
CLIN 0038 is added as follows:
0038 1 Job Mobilization/Demobilization Cost Greers
FFP
Mobilization/Demobilization Cost Greers Ferry, All costs associated with
CLIN 0039 is added as follows:
0039 1 Job Mobilization/Demobilization Cost Norfor
FFP
Mobilization/Demobilization Cost Norfork, All costs associated with mobilization and demobilization to the Power Plant
CLIN 0040 is added as follows:
0040 1 Job Mobilization/Demobilization Cost Ozark
FFP
CLIN 0041 is added as follows:
0041 1 Job Mobilization/Demobilization Cost Table R
FFP
Mobilization/Demobilization Cost Table Rock, All costs associated with
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0028:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
The following Acceptance/Inspection Schedule was added for CLIN 0029:
The following Acceptance/Inspection Schedule was added for CLIN 0030:
The following Acceptance/Inspection Schedule was added for CLIN 0031:
The following Acceptance/Inspection Schedule was added for CLIN 0032:
The following Acceptance/Inspection Schedule was added for CLIN 0033:
The following Acceptance/Inspection Schedule was added for CLIN 0034:
The following Acceptance/Inspection Schedule was added for CLIN 0035:
The following Acceptance/Inspection Schedule was added for CLIN 0036:
The following Acceptance/Inspection Schedule was added for CLIN 0037:
The following Acceptance/Inspection Schedule was added for CLIN 0038:
The following Acceptance/Inspection Schedule was added for CLIN 0039:
The following Acceptance/Inspection Schedule was added for CLIN 0040:
The following Acceptance/Inspection Schedule was added for CLIN 0041:
(End of Summary of Changes)