A.01.30_PWS_Attachment_2_-_PRS.pdf
PDF 202 KB Posted
- Attached to
- Liquid Waste Removal (Table Rock, MO) Federal contract opportunity
- Solicitation number
- W9127S17Q0032
About this file
PWS Attachment 2 - PRS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.01.30_PWS_Attachment_3_-_QASP.pdf | ||
| A.01.30_PWS_Attachment_4_-_Table_Rock_Mileage_Chart.pdf | ||
| A.04.36_Wage_Rates.pdf | ||
| A.01.30_PWS_Attachment_5_-_Facilities_List.pdf | ||
| A.01.30_PWS.pdf | ||
| A.01.30_PWS_Attachment_1_-_Security_Requirements.pdf | ||
| A.01.30_PWS_Attachment_6_-_Sewage_Facility_Sampling_Schedule.pdf | ||
| A.02.01_Combined_Synopsis_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
PERFORMANCE REQUIREMENTS SUMMARY
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective (The Service required—usually a shall statement)
Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)
Method of Surveillance
PRS # 1. The contractor shall perform pumping and wash down operations at vault toilets. (Service Calls)
Work will be performed according to section 5.1 of the PWS.
Zero deviation from standard. Payment will not be made for the specific service call if there is any deviation from the standard.
Periodic Surveillance
Validated Complaints
PRS # 2 The contractor shall perform pumping and cleaning operations at all other tanks. (Service Calls)
Work will be performed according to section 5.2 of the PWS.
Zero deviation from standard. Payment will not be made for the specific service call if there is any deviation from the standard.
Periodic Surveillance
Validated Complaints
PRS # 3 The contractor shall perform disposal of sewage and the required record keeping and documentation.
Disposal and documentation must be performed according to section 5.3 of the
PWS.
Zero deviation from standard. Payment for pump outs will not be made unless the disposal is done correctly and all documentation is provided with the invoices.
Periodic Surveillance
Validated Complaints
PRS # 4 The contractor shall perform all work according to the response time set forth in the contract.
All response times will meet specifications outlined in section 5.3.6 of the PWS.
Zero deviation from standard. Payment will not be made for pump outs or service calls if the response time is not met.
Periodic Surveillance
Validated Complaints
PRS # 5 The contractor shall take, route, and administer all samples as required by the contract.
All samples will be handled according to local, state, and federal regulations.
Zero deviation from standard. Payment will not be made for mishandled samples.
Periodic Surveillance
Validated Complaints
PRS # 6 The contractor shall perform inspections of the permitted systems.
All inspections will be performed and administered to ensure the safe and efficient operation of the systems.
Zero deviation from standard. Payment will not be made for incomplete inspections.
Periodic Surveillance
Validated Complaints
File details come from the government source that posted it. Updated .