Attachment_1_-_Responsibility_Matrix.pdf

PDF 148 KB Posted

Attached to
Portsmouth Naval Shipyard Medical & Dental Clinic Initial Outfitting
Solicitation number
W9127S-16-R-6035
Issued by

About this file

Attachment 1

View the file

Other files

File Type Posted
E1500.pdf PDF
A0905_SR371.pdf PDF
M4100_Sphygmomanometer Aneroid Wall Mtd Adult.pdf PDF
M0515_SR449.pdf PDF
F0205.pdf PDF
E0222_Worksurface Computer OH Cab 48in W_DRAWING.pdf PDF
F2005_Basket Wastepaper Executive Wood.pdf PDF
Projnet_Final.pdf PDF
M1410.pdf PDF
A0912.pdf PDF
L1502.pdf PDF
M0430.pdf PDF
R6200_Refrigerator UC or FS 5 Cu Ft.pdf PDF
F2540_0ZBU9_A1.pdf PDF
M0755.pdf PDF
A5107A_Dispenser Glove 3 Tier Covered.pdf PDF
M0507.pdf PDF
F0465.pdf PDF
L8520.pdf PDF
F2105_7R579.pdf PDF
E0123_Workstation Straight Free Standing 72in W_DRAWING.pdf PDF
M1830_Printer Label Pharmacy.pdf PDF
E0948.pdf PDF
F3235.pdf PDF
E0123.pdf PDF
F0275.pdf PDF
F0725_Table Occasional Executive Wood.pdf PDF
F2010_Basket Wastepaper Step-On.pdf PDF
Amendment_01.pdf PDF
M1400.pdf PDF
F3070_Case Display.pdf PDF
F2485.pdf PDF
M7905.pdf PDF
A1132_28713_A1.pdf PDF
F0740_Table Occasional Lamp.pdf PDF
F0230_0ZBU9_A1.pdf PDF
F0355_13180.pdf PDF
M2600.pdf PDF
F8010.pdf PDF
L0990.pdf PDF
Attachment_3_-_Portsmouth_Bid_Schedule.xlsx XLSX spreadsheet
K4665.pdf PDF
L1080_Redacted.pdf PDF
A6030_AM094.pdf PDF
F0420_0TH68_A1.pdf PDF
F0210.pdf PDF
F2300_09130_A1_Redacted.pdf PDF
F0340_4M773_A1.pdf PDF
M1110_Resuscitator Bag-Mask Hand Op Infant.pdf PDF
F3200_Clock Battery 12in Diameter.pdf PDF
Show 40 more

Latest 50 of 92 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Responsibility Matrix (FFE)

# COMMODITY

RESPONSIBILITY

Codes

BASIS OF BID

%New vs.

%Reuse

1 ARTWORK

2 Donated Art C 100%/0%

3 Recognition Walls C 100%/0%

4 Purchased Art C 100%/0%

5 Commissioned Art C 100%/0%

6 Installation/Security C 100%/0%

7 Matting/Framing C 100%/0%

8 FURNITURE & FURNISHINGS

9 outdoor C 100%/0%

10 storage/carts C 100%/0%

11 modular furniture C 100%/0%

12 executive case goods C 100%/0%

13 bulk shelving C 100%/0%

14 task seating C 100%/0%

15 side seating C 100%/0%

16 wait seating C 100%/0%

17 conferencing C 100%/0%

18 tables C 100%/0%

19 task lighting C 100%/0%

20 breakroom C 100%/0%

21 misc furnishings c 100%/0%

22 high density shelving C 100%/0%

23 cubicle curtains/rods C 100%/0%

24 window treatments/rods C 100%/0%

25 MEDICAL EQUIPMENT

26 Free standing medical equipment C 100%/0%

27 Water purification systems A 100%/0%

28 Fume Hoods A 100%/0%

29 UPS (hardwired that support medical equipment) A 100%/0%

30 Hard wired/plumbed/structurally supported equipment A 100%/0%

RESPONSIBILITY

Codes

BASIS OF BID

%New vs.

%Reuse

31 MOVABLE WALL/FLOOR SYSTEMS

32 raised flooring A 100%/0%

33 floor‐to‐ceiling wall partitions A 100%/0%

CLINICAL CASEGOODS (all casegood shall be modular except where noted)

35 Reception Counters (custom millwork/GC provided) A 100%/0%

36 ancillary (lab/pharmacy/radiology/central sterile) A 100%/0%

37 nurses stations N/A N/A

38 information/automated checkin stations A 100%/0%

39 break rooms/lounge A 100%/0%

40 soil/clean utility A 100%/0%

41 conference & training A 100%/0%

43 SIGNAGE/WAYFINDING

44 Electronic Directional/Wayfinding C 100%/0%

45 Exterior Signage (lighted/unlighted) C 100%/0%

46 Life Safety/Emergency Signage C 100%/0%

47 Way Finding/Architectural Graphics (dimensional lettering) C 100%/0%

48 Directional C 100%/0%

49 Room‐by‐Room Signage C 100%/0%

50 Departmental/Room Signage C 100%/0%

51 Environment of Care Signage C 100%/0%

52 Electronic Queuing (Pharmacy & Lab only) C 100%/0%

53 Maintenance/Legacy Nos/Facility Man Door Tag C 100%/0%

54 RESOURCE PROTECTION & COMMUNICATION

55 see IO‐C (Low Voltage)

RESPONSIBILITY

Codes

BASIS OF BID

%New vs.

%Reuse

56 INFORMATION TECHNOLOGY

57 televisions C 100%/0%

58 computers C / R

59 fax machines C / R

60 printers C / R

61 DVD C 100%/0%

62 see IO‐C (Low Voltage)

63 RELATED COMMODITY SERVICES

64 Procure all new commodities C

65 Delivery/Installation + Taxes C

66 Training/Testing/Certification C

67 O&M Manuals C

68 Warehousing/Storage (CAT A, B; NEW, REUSE & EXCESS ITEMS) C

69 Disposal/Disposition/Excessing C

70 Cleaning C

71 Security n/a

72 DMLSS Data/Support/BMET C

73 QUALITY CONTROL

74 Quality Control Plan C

75 Quality Control Management C

Responsibility Matrix (Low Voltage)

# SYSTEM

RESPONSIBILITY

US Codes

CRITERIA

REFERENCE

RESOURCE PROTECTION

Conduit, backboxes and cable tray Complete

A See UFC 4‐510‐

Copper/Fiber

A See UFC 4‐510‐

Anti‐Terroism and Force Protection

A See UFC 4‐510‐

Access Control

C

UFC 4‐510‐01

Section 10‐17.3

Infant Security

N/A

UFC 4‐510‐01

Section 10‐17.4

Intrusion Detection

C

UFC 4‐510‐01

Section 10‐17.1

Closed Circuit Television

C

UFC 4‐510‐01

Section 10‐17.2

Refrigerator/Freezers Alarms

C

UFC 4‐510‐01 10‐

9 UPS A

10 COMMUNICATIONS

11 Conduit, backboxes and cable tray Complete A

UFC 4‐510‐01

Section 10‐ 4.2.1 and 10‐6

Provide an Intrusion Detection System in accordance with UFC 4‐510‐01 Section 10‐17.1 and cited references. Note that this system will be provided complete, as described, including active components and devices, not just conduit and boxes. THE SYSTEM SHALL

COMMUNICATE WITH NAVY BASE/DOD INSTALLATION'S SYSTEM AND SHALL BE FULLY

CERTIFIABLE.

Provide a CCTV Surveillance System in accordance with UFC 4‐510‐01 Section 10‐17.2 and cited references. Note that this system will be provided complete at all suggested locations, as described, including active components and devices, all conduit, cable and boxes.

Locations identified in the UFC and refer/freezer requirements under the Master Room

Contents List

Provide cable conduit, backboxes and cable tray in accordance with UFC 4‐510‐01 Section

10‐4.2.1 and 10‐6, and cited references, referenced drawings and room templates.

PLANNING INSTRUCTIONS

Any dedicated copper and fiber and all conduit and boxes are provided and installed as part of the Intrusion Detection System.

Any dedicated copper and fiber and all conduit and boxes are provided and installed as part of the Intrusion Detection System.

see Architectural & MEP & UFC 4010‐01

Provide a Door Access System complete with all interfaces in accordance with UFC 4‐510‐01

Section 10‐17.3 and cited references at the required locations. The system shall include the capability to manufacture cards, alter access permits of specific users, and generate reports of system activity. Associated door hardware latching and position sensor requirements shall be coordinated by the CSE with the A‐E architectural designer.

RESPONSIBILITY

US Codes

CRITERIA

REFERENCE

PLANNING INSTRUCTIONS

12 Copper/Fiber A See UFC 4‐510‐

13 Telephone System (to include handsets) C

UFC 4‐510‐01

Section 10‐5

14 Installation‐Wide Area Network A

UFC 4‐510 01

Section 10‐4

15 Audio Visual System n/a

Premise Distribution System ‐ N/A n/a

UFC 4‐510‐01

Section 10‐6

Public Address & Paging System (w/ music)

C

UFC 4‐510‐01

Section 10‐12

Nurse Call System

C

UFC 4‐510‐01

Section 10

Intercom System (via phone)

C

UFC 4‐510‐01

10.5.4

Must be networked into the MTF computer system; Audio Visual System shall be part of the entertainment & Training TV System

N/A

Provide a Public Address and Program Distribution System in accordance with UFC 4‐510‐01

Section 10‐12, Table 10‐3 and all cited references. Zone selection and telephone interface equipment shall be part of the PA system and not the telephone system. The use of trunk circuits is recommended. Provide any system interface as may be required for connection to the Mass Notification System as indicated under Fire Protection.

Provide a Tone Visual Nurse Call System in accordance with UFC 4‐510‐01 Section 10‐10 and all cited references. The system shall be a computer controlled and provide for easy expansion for the addition of new call stations. The system shall provide for swing capability if desired by the using Service.

All intercom requirements shall be provided via the telephone system.

All copper and fiber is provided and installed as part of the Telecommunications Infrastructure System.

Telephone service will be provided for this facility from the DCO in accordance with UFC 4‐

510‐01 Section 10‐5. Contractor is to provide a Telephone Station Requirements Matrix listing each outlet assembly in the facility, the type of telephone instrument assigned to that outlet in accordance with Section 10‐5.6 and 10‐5.7, and any intercom requirements as defined in 10‐5.4.

Provide Installation Communications Distribution Facilities (Outside Cable Plant) in accordance with UFC 4‐510‐01 Section 10‐4. 400 pr copper cable and 12 strand fiber optic cable will be provided to access point indicated in the drawings. BDF shall be sized to accommodate 5000 pair copper. FBDF shall be sized to accommodate 148 strand fiber cable.

RESPONSIBILITY

US Codes

CRITERIA

REFERENCE

PLANNING INSTRUCTIONS

Duress System

N/A

Radio Paging System

A

UFC 4‐510‐01

Section 10‐13

Entertainment & Training Television System ‐

NA

N/A

UFC 4‐510‐01

Section 10.8

EMS Radio System

N/A

UFC 4‐510‐01

Section 10‐14

EMS Recorder System

N/A

UFC 4‐510‐01

Section 10‐18

Radio Transponder System

N/A

UFC 4‐510‐01

Section 10.9

Communication Rooms

A

UFC 4‐510‐01

Section 4.2.2 through 4.2.5

Communication Electronics ‐ N/A

N/A

Mass Notification Complete

A

LAN System/Electronics

A

Master Clock Systems (hard wired) ‐ NA

N/A

Sound Masking ‐ N/A

N/A

32 OTHER

Fire Alarm System via Radio Transmitting

A

Video Teleconferencing System

C

N/A

See Fire Protection section.

Provide a Radio Paging System in accordance with UFC 4‐510‐01 Section 10‐13 and all cited references.

Installed by GC, Part of Fire Alarm System

Installed by GC

Provide a Radio Frequency Distribution System in accordance with UFC 4‐510‐01 Section 10‐

9 and all cited references.

Provide and outfit Communications Rooms in accordance with UFC 4‐510‐01 Section 10‐

4.2.2. through 4.2.5 and all cited references as indicated in the drawings; racks for all electronics to be included as Cat A

N/A

See Fire Protection section

All components and software specified by Information Systems. Racks and environment provided in Construction Contract by Telephone Rooms and PDS System. This includes network electronics only (switches/RPS/power supply to support network electronics only);

racks for all electronics to be included as Cat A

N/A

N/A

RESPONSIBILITY

US Codes

CRITERIA

REFERENCE

PLANNING INSTRUCTIONS

Non Proprietary Analog and Digital Cellular

Signal Amplification System A

Document Imaging and Archiving Services ‐ NA n/a

Cable Antenna Television System CATV

A

Wired/Wireless Local and Wide Area

Communication Network – NETWORK n/a

Television Equipment with Rebroadcasting ‐ NA n/a

Video Monitoring System n/a

Environmental Control Monitoring and Remote

Programming A

Data Facsimile Services

A

Intranet and Internet Communications

Network Services – DATA STORAGE/SERVERS, ETC.

A

Radio Frequency Identification System

N/A

See Radio Transponder System

N/A

N/A

Part of MEP systems.

Part of Telephone System by Criteria

ATTACHMENT 01. DELIVERABLES

INITIAL OUTFITTING RESPONSIBILITY MATRIX (FFE)

IN

V

EN

TO

R Y

D

ESIG

N

D

EV

ELO

P M

EN

T

C O N

STR

U C

TIO

C O O R D

IN

A

TIO

N

W A R

EH

O U

SIN

G

(A /re u se

TR

A N

SITIO

N / M

O V E

P

LA

N N

IN

G

P U R C H A

SIN

G O F

C O M M O D

ITY

M O V E

W A R

EH

O U

SIN

G (N

EW

D

ELIV

ER

Y

IN

STA

LLA

TIO

N

EX

TEN

ED

IN

STA

LLA

TIO

N

TR

A

IN

IN

G

/TESTIN

G

C

ER

TIFIC

A

TIO

N

W A R R A N

TY

EX

C

ESSIN

G

A

New Product. General Contractor funded, procured and installed. Funded w/ plan‐construction funds at the time of project award.

General Contractor

(Design‐Construction

Funds)

NA DOR GC GC GC GC GC GC GC GC GC GC NA

B New Product. IO Contractor planned and procured.

Installed by GC. Funded with IO Funds.

Government/Agency

(IO Funds)

NA IO KTR IO KTR IO KTR IO KTR IO KTR IO KTR IO KTR GC GC IO KTR IO KTR NA

C New Product. Agency funded (non plan‐construction funds). IO Contractor planned, procured & Installed.

Government/Agency

(IO Funds)

NA

DOR ‐

preaward

IO KTR‐

postaward

IO KTR IO KTR IO KTR IO KTR IO KTR IO KTR IO KTR

GC (via

IO

Team)

IO KTR IO KTR IO KTR

D DRMO. IO Contractor inventoried/moved/excessed

(turned in). NA IO KTR IO KTR IO KTR IO KTR IO KTR NA IO KTR IO KTR IO KTR NA NA NA IO KTR

F New Product. Procured by GC, installed by IO KTR.

Government/Agency

(Construction Funds)

NA GC GC/IO KTR IO KTR IO KTR GC IO KTR IO KTR IO KTR IO KTR IO KTR GC NA

R

Reuse Items. IO Contractor inventoried/moved/space planned/installed. Funded w/ IO funds. (Includes interim/swing space moves)

Government/Agency

(IO Funds)

IO KTR IO KTR IO KTR IO KTR IO KTR NA IO KTR IO KTR IO KTR IO KTR NA NA NA

LEGEND:

DOR = Designer of Record

GC = General Contractor

IO = Inititial Outfitting

IO KTR = IO Contractor

LOG CAT = Logistical Category

RESPONSIBILITY ( US LOG CAT CODE) FUNDING SOURCE

STEP 1: IO‐TRANSITION (IO‐T) "Plan

Development" STEP 2: IO‐COMMODITIES (IO‐C) "Commodity Buy/Install"

Tab 4 of 5

ATTACHMENT 01. INITIAL OUTFITTING RESPONSIBILITY MATRIX (LOW VOLTAGE)

P

LA

N N

IN

G

EV

ELO

P M

EN

T

C O N

STR

U C

TIO

C O O R D

IN

A

TIO

N

TR

A N

SITIO

N / M

O V E

P

LA

N N

IN

G

P U R C H A

SIN

G

IN

STA

LLA

TIO

N

TR

A

IN

IN

G

C

ER

TIFIC

A

TIO

N

W A R R A N

TY

A

New Product. General Contractor funded, procured and installed. Funded w/ plan‐construction funds at the time of project award.

General Contractor

(Design‐Construction

Funds)

GC GC GC GC GC GC GC

B

New Product. IO Contractor planned and procured. Installed by GC. Funded with IO Funds.

Government/Agency (IO

Funds)

IO KTR

IO KTR THRU

USACE PM

IO KTR IO KTR GC IO KTR IO KTR

C

New Product. Agency funded (non design‐construction funds). IO

Contractor planned, procured &

Installed.

Government/Agency (IO

Funds)

IO KTR IO KTR IO KTR IO KTR IO‐KTR IO‐KTR IO‐KTR

F

New Product. Procured by GC, installed by IO KTR.

Government/Agency

(Construction Funds)

GC GC/IO KTR IO KTR GC IO KTR IO KTR GC

LEGEND:

DOR = Designer of Record

GC = General Contractor

IO = Inititial Outfitting

IO KTR = 3rd Party IO Contractor

LOG CAT = Logistical Category

FUNDING SOURCE RESPONSIBILITY (LOG CAT CODE)

STEP 1: SYSTEM DESIGN

STEP 2: SYSTEM

BUY/INSTALLATION