| Grounds Maintenance Services Summary | ||
| Service Code: 404 | ||
| This sheet is filled out automatically as other sheets are completed | ||
| CLIN | TOTAL | |
| 0009 | Base Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 0010 | Base Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | -- |
| 0010AA | AR065 | $0.00 |
| 0010AB | AR067 | $0.00 |
| 0010AC | AR068 | $0.00 |
| 0010AD | AR072 | $0.00 |
| 0010AE | AR074 | $0.00 |
| 0010AF | OK056 | $0.00 |
| 0010AG | OK063 | $0.00 |
| 0010AH | OK064 | $0.00 |
| 0010AJ | OK067 | $0.00 |
| 0010AK | OK069 | $0.00 |
| 0010AL | OK071 | $0.00 |
| 0010AM | OK073 | $0.00 |
| 0011 | Base Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 0012 | Base Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | -- |
| 0012AA | AR065 | $0.00 |
| 0012AB | AR067 | $0.00 |
| 0012AC | AR068 | $0.00 |
| 0012AD | AR072 | $0.00 |
| 0012AE | AR074 | $0.00 |
| 0012AF | OK056 | $0.00 |
| 0012AG | OK063 | $0.00 |
| 0012AH | OK064 | $0.00 |
| 0012AJ | OK067 | $0.00 |
| 0012AK | OK069 | $0.00 |
| 0012AL | OK071 | $0.00 |
| 0012AM | OK073 | $0.00 |
| 0013 | Base Period Indefinite Quantity | $70,000.00 |
| 1009 | First Option Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 1010 | First Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | -- |
| 1010AA | AR065 | $0.00 |
| 1010AB | AR067 | $0.00 |
| 1010AC | AR068 | $0.00 |
| 1010AD | AR072 | $0.00 |
| 1010AE | AR074 | $0.00 |
| 1010AF | OK056 | $0.00 |
| 1010AG | OK063 | $0.00 |
| 1010AH | OK064 | $0.00 |
| 1010AJ | OK067 | $0.00 |
| 1010AK | OK069 | $0.00 |
| 1010AL | OK071 | $0.00 |
| 1010AM | OK073 | $0.00 |
| 1011 | First Option Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 1012 | First Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | -- |
| 1012AA | AR065 | $0.00 |
| 1012AB | AR067 | $0.00 |
| 1012AC | AR068 | $0.00 |
| 1012AD | AR072 | $0.00 |
| 1012AE | AR074 | $0.00 |
| 1012AF | OK056 | $0.00 |
| 1012AG | OK063 | $0.00 |
| 1012AH | OK064 | $0.00 |
| 1012AJ | OK067 | $0.00 |
| 1012AK | OK069 | $0.00 |
| 1012AL | OK071 | $0.00 |
| 1012AM | OK073 | $0.00 |
| 1013 | First Option Period Indefinite Quantity | $70,000.00 |
| 2009 | Second Option Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 2010 | Second Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | -- |
| 2010AA | AR065 | $0.00 |
| 2010AB | AR067 | $0.00 |
| 2010AC | AR068 | $0.00 |
| 2010AD | AR072 | $0.00 |
| 2010AE | AR074 | $0.00 |
| 2010AF | OK056 | $0.00 |
| 2010AG | OK063 | $0.00 |
| 2010AH | OK064 | $0.00 |
| 2010AJ | OK067 | $0.00 |
| 2010AK | OK069 | $0.00 |
| 2010AL | OK071 | $0.00 |
| 2010AM | OK073 | $0.00 |
| 2011 | Second Option Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 2012 | Second Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | -- |
| 2012AA | AR065 | $0.00 |
| 2012AB | AR067 | $0.00 |
| 2012AC | AR068 | $0.00 |
| 2012AD | AR072 | $0.00 |
| 2012AE | AR074 | $0.00 |
| 2012AF | OK056 | $0.00 |
| 2012AG | OK063 | $0.00 |
| 2012AH | OK064 | $0.00 |
| 2012AJ | OK067 | $0.00 |
| 2012AK | OK069 | $0.00 |
| 2012AL | OK071 | $0.00 |
| 2012AM | OK073 | $0.00 |
| 2013 | Second Option Period Indefinite Quantity | $70,000.00 |
| $210,000.00 | |
| Note: Either CLIN 0009 or CLIN 0011 (but not both) will be awarded for fixed-price grounds maintenance services, at the discretion of the Contracting Officer. |
&F
&A &P of &N
Site Summary Sheet
GROUNDS MAINTENANCE (1503050)
| This sheet is filled out automatically as other sheets are completed | |||
| CLIN / SUBCLIN | FAC ID | ELINS | Total Price |
| 0009 | Base Period Firm Fixed-Price - High Service Level 1 (Green) | ||
| 0009AA | AR002 | (Items A001 Through A002) | $0.00 |
| 0009AB | AR019 | (Items A003 Through A005) | $0.00 |
| 0009AC | AR024 | (Items A006 Through A008) | $0.00 |
| 0009AD | AR025 | (Items A009 Through A010) | $0.00 |
| 0009AE | AR032 | (Items A011 Through A013) | $0.00 |
| 0009AF | AR047 | (Items A014 Through A015) | $0.00 |
| 0009AG | AR064 | (Items A016 Through A018) | $0.00 |
| 0009AH | AR066 | (Items A019 Through A020) | $0.00 |
| 0009AJ | AR069 | (Items A021 Through A023) | $0.00 |
| 0009AK | AR071 | (Items A024 Through A025) | $0.00 |
| 0009AL | OK001 | (Items A026 Through A027) | $0.00 |
| 0009AM | OK003 | (Items A028 Through A029) | $0.00 |
| 0009AN | OK004 | (Items A030 Through A031) | $0.00 |
| 0009AP | OK016 | (Items A032 Through A033) | $0.00 |
| 0009AQ | OK026 | (Items A034 Through A035) | $0.00 |
| 0009AR | OK028 | (Items A036 Through A037) | $0.00 |
| 0009AS | OK031 | (Items A038 Through A039) | $0.00 |
| $0.00 | |||
| 0010 | Base Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | ||
| 0010AA | AR065 | (Items A001 Through A003) | $0.00 |
| 0010AB | AR067 | (Item A004) | $0.00 |
| 0010AC | AR068 | (Items A005 Through A006) | $0.00 |
| 0010AD | AR072 | (Items A007 Through A008) | $0.00 |
| 0010AE | AR074 | (Items A009 Through A010) | $0.00 |
| 0010AF | OK056 | (Item A011) | $0.00 |
| 0010AG | OK063 | (Item A012) | $0.00 |
| 0010AH | OK064 | (Items A013 Through A014) | $0.00 |
| 0010AJ | OK067 | (Items A015 Through A016) | $0.00 |
| 0010AK | OK069 | (Items A017 Through A018) | $0.00 |
| 0010AL | OK071 | (Item A019) | $0.00 |
| 0010AM | OK073 | (Item A020) | $0.00 |
| $0.00 | |||
| 0011 | Base Period Firm Fixed-Price - Medium Service Level 2 (Amber) | ||
| 0011AA | AR002 | (Items A101 Through A102) | $0.00 |
| 0011AB | AR019 | (Items A103 Through A105) | $0.00 |
| 0011AC | AR024 | (Items A106 Through A108) | $0.00 |
| 0011AD | AR025 | (Items A109 Through A110) | $0.00 |
| 0011AE | AR032 | (Items A111 Through A113) | $0.00 |
| 0011AF | AR047 | (Items A114 Through A115) | $0.00 |
| 0011AG | AR064 | (Items A116 Through A118) | $0.00 |
| 0011AH | AR066 | (Items A119 Through A120) | $0.00 |
| 0011AJ | AR069 | (Items A121 Through A123) | $0.00 |
| 0011AK | AR071 | (Items A124 Through A125) | $0.00 |
| 0011AL | OK001 | (Items A126 Through A127) | $0.00 |
| 0011AM | OK003 | (Items A128 Through A129) | $0.00 |
| 0011AN | OK004 | (Items A130 Through A131) | $0.00 |
| 0011AP | OK016 | (Items A132 Through A133) | $0.00 |
| 0011AQ | OK026 | (Items A134 Through A135) | $0.00 |
| 0011AR | OK028 | (Items A136 Through A137) | $0.00 |
| 0011AS | OK031 | (Items A138 Through A139) | $0.00 |
| $0.00 | |||
| 0012 | Base Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | ||
| 0012AA | AR065 | (Items A101 Through A103) | $0.00 |
| 0012AB | AR067 | (Item A104) | $0.00 |
| 0012AC | AR068 | (Items A105 Through A106) | $0.00 |
| 0012AD | AR072 | (Items A107 Through A108) | $0.00 |
| 0012AE | AR074 | (Items A109 Through A110) | $0.00 |
| 0012AF | OK056 | (Item A111) | $0.00 |
| 0012AG | OK063 | (Item A112) | $0.00 |
| 0012AH | OK064 | (Items A113 Through A114) | $0.00 |
| 0012AJ | OK067 | (Items A115 Through A116) | $0.00 |
| 0012AK | OK069 | (Items A117 Through A118) | $0.00 |
| 0012AL | OK071 | (Item A119) | $0.00 |
| 0012AM | OK073 | (Item A120) | $0.00 |
| $0.00 | |||
| 0013 | Base Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - A701 THROUGH A756 | $70,000.00 |
| 1009 | First Option Period Firm Fixed-Price - High Service Level 1 (Green) | ||
| 1009AA | AR002 | (Items B001 Through B002) | $0.00 |
| 1009AB | AR019 | (Items B003 Through B005) | $0.00 |
| 1009AC | AR024 | (Items B006 Through B008) | $0.00 |
| 1009AD | AR025 | (Items B009 Through B010) | $0.00 |
| 1009AE | AR032 | (Items B011 Through B013) | $0.00 |
| 1009AF | AR047 | (Items B014 Through B015) | $0.00 |
| 1009AG | AR064 | (Items B016 Through B018) | $0.00 |
| 1009AH | AR066 | (Items B019 Through B020) | $0.00 |
| 1009AJ | AR069 | (Items B021 Through B023) | $0.00 |
| 1009AK | AR071 | (Items B024 Through B025) | $0.00 |
| 1009AL | OK001 | (Items B026 Through B027) | $0.00 |
| 1009AM | OK003 | (Items B028 Through B029) | $0.00 |
| 1009AN | OK004 | (Items B030 Through B031) | $0.00 |
| 1009AP | OK016 | (Items B032 Through B033) | $0.00 |
| 1009AQ | OK026 | (Items B034 Through B035) | $0.00 |
| 1009AR | OK028 | (Items B036 Through B037) | $0.00 |
| 1009AS | OK031 | (Items B038 Through B039) | $0.00 |
| $0.00 | |||
| 1010 | First Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | ||
| 1010AA | AR065 | (Items B001 Through B003) | $0.00 |
| 1010AB | AR067 | (Item B004) | $0.00 |
| 1010AC | AR068 | (Items B005 Through B006) | $0.00 |
| 1010AD | AR072 | (Items B007 Through B008) | $0.00 |
| 1010AE | AR074 | (Items B009 Through B010) | $0.00 |
| 1010AF | OK056 | (Item B011) | $0.00 |
| 1010AG | OK063 | (Item B012) | $0.00 |
| 1010AH | OK064 | (Items B013 Through B014) | $0.00 |
| 1010AJ | OK067 | (Items B015 Through B016) | $0.00 |
| 1010AK | OK069 | (Items B017 Through B018) | $0.00 |
| 1010AL | OK071 | (Item B019) | $0.00 |
| 1010AM | OK073 | (Item B020) | $0.00 |
| $0.00 | |||
| 1011 | First Option Period Firm Fixed-Price - Medium Service Level 2 (Amber) | ||
| 1011AA | AR002 | (Items B101 Through B102) | $0.00 |
| 1011AB | AR019 | (Items B103 Through B105) | $0.00 |
| 1011AC | AR024 | (Items B106 Through B108) | $0.00 |
| 1011AD | AR025 | (Items B109 Through B110) | $0.00 |
| 1011AE | AR032 | (Items B111 Through B113) | $0.00 |
| 1011AF | AR047 | (Items B114 Through B115) | $0.00 |
| 1011AG | AR064 | (Items B116 Through B118) | $0.00 |
| 1011AH | AR066 | (Items B119 Through B120) | $0.00 |
| 1011AJ | AR069 | (Items B121 Through B123) | $0.00 |
| 1011AK | AR071 | (Items B124 Through B125) | $0.00 |
| 1011AL | OK001 | (Items B126 Through B127) | $0.00 |
| 1011AM | OK003 | (Items B128 Through B129) | $0.00 |
| 1011AN | OK004 | (Items B130 Through B131) | $0.00 |
| 1011AP | OK016 | (Items B132 Through B133) | $0.00 |
| 1011AQ | OK026 | (Items B134 Through B135) | $0.00 |
| 1011AR | OK028 | (Items B136 Through B137) | $0.00 |
| 1011AS | OK031 | (Items B138 Through B139) | $0.00 |
| $0.00 | |||
| 1012 | First Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | ||
| 1012AA | AR065 | (Items B101 Through B103) | $0.00 |
| 1012AB | AR067 | (Item B104) | $0.00 |
| 1012AC | AR068 | (Items B105 Through B106) | $0.00 |
| 1012AD | AR072 | (Items B107 Through B108) | $0.00 |
| 1012AE | AR074 | (Items B109 Through B110) | $0.00 |
| 1012AF | OK056 | (Item B111) | $0.00 |
| 1012AG | OK063 | (Item B112) | $0.00 |
| 1012AH | OK064 | (Items B113 Through B114) | $0.00 |
| 1012AJ | OK067 | (Items B115 Through B116) | $0.00 |
| 1012AK | OK069 | (Items B117 Through B118) | $0.00 |
| 1012AL | OK071 | (Item B119) | $0.00 |
| 1012AM | OK073 | (Item B120) | $0.00 |
| $0.00 | |||
| 1013 | First Option Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - B701 THROUGH B756 | $70,000.00 |
| 2009 | Second Option Period Firm Fixed-Price - High Service Level 1 (Green) | ||
| 2009AA | AR002 | (Items C001 Through C002) | $0.00 |
| 2009AB | AR019 | (Items C003 Through C005) | $0.00 |
| 2009AC | AR024 | (Items C006 Through C008) | $0.00 |
| 2009AD | AR025 | (Items C009 Through C010) | $0.00 |
| 2009AE | AR032 | (Items C011 Through C013) | $0.00 |
| 2009AF | AR047 | (Items C014 Through C015) | $0.00 |
| 2009AG | AR064 | (Items C016 Through C018) | $0.00 |
| 2009AH | AR066 | (Items C019 Through C020) | $0.00 |
| 2009AJ | AR069 | (Items C021 Through C023) | $0.00 |
| 2009AK | AR071 | (Items C024 Through C025) | $0.00 |
| 2009AL | OK001 | (Items C026 Through C027) | $0.00 |
| 2009AM | OK003 | (Items C028 Through C029) | $0.00 |
| 2009AN | OK004 | (Items C030 Through C031) | $0.00 |
| 2009AP | OK016 | (Items C032 Through C033) | $0.00 |
| 2009AQ | OK026 | (Items C034 Through C035) | $0.00 |
| 2009AR | OK028 | (Items C036 Through C037) | $0.00 |
| 2009AS | OK031 | (Items C038 Through C039) | $0.00 |
| $0.00 | |||
| 2010 | Second Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | ||
| 2010AA | AR065 | (Items C001 Through C003) | $0.00 |
| 2010AB | AR067 | (Item C004) | $0.00 |
| 2010AC | AR068 | (Items C005 Through C006) | $0.00 |
| 2010AD | AR072 | (Items C007 Through C008) | $0.00 |
| 2010AE | AR074 | (Items C009 Through C010) | $0.00 |
| 2010AF | OK056 | (Item C011) | $0.00 |
| 2010AG | OK063 | (Item C012) | $0.00 |
| 2010AH | OK064 | (Items C013 Through C014) | $0.00 |
| 2010AJ | OK067 | (Items C015 Through C016) | $0.00 |
| 2010AK | OK069 | (Items C017 Through C018) | $0.00 |
| 2010AL | OK071 | (Item C019) | $0.00 |
| 2010AM | OK073 | (Item C020) | $0.00 |
| $0.00 | |||
| 2011 | Second Option Period Firm Fixed-Price - Medium Service Level 2 (Amber) | ||
| 2011AA | AR002 | (Items C101 Through C102) | $0.00 |
| 2011AB | AR019 | (Items C103 Through C105) | $0.00 |
| 2011AC | AR024 | (Items C106 Through C108) | $0.00 |
| 2011AD | AR025 | (Items C109 Through C110) | $0.00 |
| 2011AE | AR032 | (Items C111 Through C113) | $0.00 |
| 2011AF | AR047 | (Items C114 Through C115) | $0.00 |
| 2011AG | AR064 | (Items C116 Through C118) | $0.00 |
| 2011AH | AR066 | (Items C119 Through C120) | $0.00 |
| 2011AJ | AR069 | (Items C121 Through C123) | $0.00 |
| 2011AK | AR071 | (Items C124 Through C125) | $0.00 |
| 2011AL | OK001 | (Items C126 Through C127) | $0.00 |
| 2011AM | OK003 | (Items C128 Through C129) | $0.00 |
| 2011AN | OK004 | (Items C130 Through C131) | $0.00 |
| 2011AP | OK016 | (Items C132 Through C133) | $0.00 |
| 2011AQ | OK026 | (Items C134 Through C135) | $0.00 |
| 2011AR | OK028 | (Items C136 Through C137) | $0.00 |
| 2011AS | OK031 | (Items C138 Through C139) | $0.00 |
| $0.00 | |||
| 2012 | Second Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | ||
| 2012AA | AR065 | (Items C101 Through C103) | $0.00 |
| 2012AB | AR067 | (Item C104) | $0.00 |
| 2012AC | AR068 | (Items C105 Through C106) | $0.00 |
| 2012AD | AR072 | (Items C107 Through C108) | $0.00 |
| 2012AE | AR074 | (Items C109 Through C110) | $0.00 |
| 2012AF | OK056 | (Item C111) | $0.00 |
| 2012AG | OK063 | (Item C112) | $0.00 |
| 2012AH | OK064 | (Items C113 Through C114) | $0.00 |
| 2012AJ | OK067 | (Items C115 Through C116) | $0.00 |
| 2012AK | OK069 | (Items C117 Through C118) | $0.00 |
| 2012AL | OK071 | (Item C119) | $0.00 |
| 2012AM | OK073 | (Item C120) | $0.00 |
| $0.00 | |||
| 2013 | Second Option Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - C701 THROUGH C756 | $70,000.00 |
&F
&P of &N
ELINS BASE PERIOD FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS A001 - A139 |
| CLIN 0009 - Base Period - Firm Fixed-Price Work - High Service Level (Green) |
| FACID | SITE NAME | SITE CODE | |||
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| AR002 | BG William O. Darby USARC | 05310 | |||
| Firm Fixed-Price Work | |||||
| A001 | Improved Grounds (Spec Item C, 3.1) | 9.5 | Month | $ - 0 | $ - 0 |
| A002 | Storm Drainage Systems (Spec Item 3.3) | 9.5 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AA (Items A001 Through A002) | $0.00 |
| AR019 | Charles L. Gillihan USARC | 05345 | |||
| Firm Fixed-Price Work | |||||
| A003 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A004 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A005 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AB (Items A003 Through A005) | $0.00 |
| AR024 | Maurice L. Britt USARC | 05265 | |||
| Firm Fixed-Price Work | |||||
| A006 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A007 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A008 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AC (Items A006 Through A008) | $0.00 |
| AR025 | Oscar C. Finkbeiner USARC | 05255 | |||
| Firm Fixed-Price Work | |||||
| A009 | Improved Grounds (Spec Item C, 3.1) | 8.0 | Month | $ - 0 | $ - 0 |
| A010 | Storm Drainage Systems (Spec Item 3.3) | 8.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AD (Items A009 Through A010) | $0.00 |
| AR032 | Russellville USARC | 05861 | |||
| Firm Fixed-Price Work | |||||
| A011 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A012 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A013 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AE (Items A011 Through A013) | $0.00 |
| AR047 | Eldridge-Harrington USARC | 05862 | |||
| Firm Fixed-Price Work | |||||
| A014 | Improved Grounds (Spec Item C, 3.1) | 5.5 | Month | $ - 0 | $ - 0 |
| A015 | Storm Drainage Systems (Spec Item 3.3) | 5.5 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AF (Items A014 Through A015) | $0.00 |
| AR064 | Arkadelphia AFRC | 05047 | |||
| Firm Fixed-Price Work | |||||
| A016 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A017 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A018 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AG (Items A016 Through A018) | $0.00 |
| AR066 | El Dorado ARFC | 05201 | ||||
| Firm Fixed-Price Work | ||||||
| A019 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 | Total CLIN 0009AA (Items A001 Through A003) |
| A020 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 | Total CLIN 0009AB (Items A004 Through A006) |
| Total CLIN 0009AH (Items A019 Through A020) | $0.00 | Total CLIN 0009AC (Items A007 Through A009) | ||||
| Total CLIN 0009AD (Items A010 Through A012) | ||||||
| AR069 | Jonathan M. Cheatham AFRC | 05519 | Total CLIN 0009AE (Items A013 Through A015) | |||
| Firm Fixed-Price Work | Total CLIN 0009AF (Items A016 Through A017) | |||||
| A021 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 | |
| A022 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 | Total CLIN 0009AH (Items A021 Through A023) |
| A023 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 | Total CLIN 0009AJ (Items A024 Through A026) |
| Total CLIN 0009AJ (Items A021 Through A023) | $0.00 |
| AR071 | Jonesboro AFRC | 05001 | |||||
| Firm Fixed-Price Work | Total CLIN 0009AA | (Items A001 Through A003) | |||||
| A024 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 | Total CLIN 0009AB | (Items A004 Through A006) |
| A025 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 | Total CLIN 0009AD | (Items A010 Through A012) |
| Total CLIN 0009AK (Items A024 Through A025) | $0.00 | Total CLIN 0009AE | (Items A013 Through A015) | ||||
| Total CLIN 0009AF | (Items A016 Through A017) | ||||||
| OK001 | Edward D. Watson USARC | 40805 | Total CLIN 0009AG | (Items A018 Through A020) | |||
| Firm Fixed-Price Work | Total CLIN 0009AH | (Items A021 Through A023) | |||||
| A026 | Improved Grounds (Spec Item C, 3.1) | 7.5 | Month | $ - 0 | $ - 0 | ||
| A027 | Storm Drainage Systems (Spec Item 3.3) | 7.5 | Month | $ - 0 | $ - 0 | ||
| Total CLIN 0009AL (Items A026 Through A027) | $0.00 |
| OK003 | Horace H. Sayre USARC | 40830 | |||
| Firm Fixed-Price Work | |||||
| A028 | Improved Grounds (Spec Item C, 3.1) | 10.0 | Month | $ - 0 | $ - 0 |
| A029 | Storm Drainage Systems (Spec Item 3.3) | 10.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AM (Items A028 Through A029) | $0.00 |
| OK004 | Earnest L. Ripley USARC | 40835 | |||
| Firm Fixed-Price Work | |||||
| A030 | Improved Grounds (Spec Item C, 3.1) | 10.5 | Month | $ - 0 | $ - 0 |
| A031 | Storm Drainage Systems (Spec Item 3.3) | 10.5 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AN (Items A030 Through A031) | $0.00 |
| OK016 | Franklin L. Weeks USARC | 40885 | |||
| Firm Fixed-Price Work | |||||
| A032 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A033 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AP (Items A032 Through A033) | $0.00 |
| OK026 | George D. Swanson USARC | 40926 | |||
| Firm Fixed-Price Work | |||||
| A034 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A035 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AQ (Items A034 Through A035) | $0.00 |
| OK028 | Tracy W. Young USARC | 40935 | |||
| Firm Fixed-Price Work | |||||
| A036 | Improved Grounds (Spec Item C, 3.1) | 10.5 | Month | $ - 0 | $ - 0 |
| A037 | Storm Drainage Systems (Spec Item 3.3) | 10.5 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AR (Items A036 Through A037) | $0.00 |
| OK031 | Cleo O. Payne USARC | 40965 | |||
| Firm Fixed-Price Work | |||||
| A038 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A039 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AS (Items A038 Through A039) | $0.00 |
TOTAL FFP LINE ITEMS - A001 THROUGH A039 $0.00
CLIN 0011 - Base Period - Firm Fixed-Price Work - Medium Service Level (Amber)
| AR002 | BG William O. Darby USARC | 05310 | |||
| Firm Fixed-Price Work | |||||
| A101 | Improved Grounds (Spec Item C, 3.1) | 9.5 | Month | $ - 0 | $ - 0 |
| A102 | Storm Drainage Systems (Spec Item 3.3) | 9.5 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AA (Items A101 Through A102) | $0.00 |
| AR019 | Charles L. Gillihan USARC | 05345 | |||
| Firm Fixed-Price Work | |||||
| A103 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A104 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A105 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AB (Items A103 Through A105) | $0.00 |
| AR024 | Maurice L. Britt USARC | 05265 | |||
| Firm Fixed-Price Work | |||||
| A106 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A107 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A108 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AC (Items A106 Through A108) | $0.00 |
| AR025 | Oscar C. Finkbeiner USARC | 05255 | |||
| Firm Fixed-Price Work | |||||
| A109 | Improved Grounds (Spec Item C, 3.1) | 8.0 | Month | $ - 0 | $ - 0 |
| A110 | Storm Drainage Systems (Spec Item 3.3) | 8.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AD (Items A109 Through A110) | $0.00 |
| AR032 | Russellville USARC | 05861 | |||
| Firm Fixed-Price Work | |||||
| A111 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A112 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A113 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AE (Items A111 Through A113) | $0.00 |
| AR047 | Eldridge-Harrington USARC | 05862 | |||
| Firm Fixed-Price Work | |||||
| A114 | Improved Grounds (Spec Item C, 3.1) | 5.5 | Month | $ - 0 | $ - 0 |
| A115 | Storm Drainage Systems (Spec Item 3.3) | 5.5 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AF (Items A114 Through A115) | $0.00 |
| AR064 | Arkadelphia AFRC | 05047 | |||
| Firm Fixed-Price Work | |||||
| A116 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A117 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A118 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AG (Items A116 Through A118) | $0.00 |
| AR066 | El Dorado ARFC | 05201 | |||
| Firm Fixed-Price Work | |||||
| A119 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A120 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AH (Items A119 Through A120) | $0.00 |
| AR069 | Jonathan M. Cheatham AFRC | 05519 | |||
| Firm Fixed-Price Work | |||||
| A121 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A122 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A123 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AJ (Items A121 Through A123) | $0.00 |
| AR071 | Jonesboro AFRC | 05001 | |||
| Firm Fixed-Price Work | |||||
| A124 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A125 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AK (Items A124 Through A125) | $0.00 |
| OK001 | Edward D. Watson USARC | 40805 | |||
| Firm Fixed-Price Work | |||||
| A126 | Improved Grounds (Spec Item C, 3.1) | 7.5 | Month | $ - 0 | $ - 0 |
| A127 | Storm Drainage Systems (Spec Item 3.3) | 7.5 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AL (Items A126 Through A127) | $0.00 |
| OK003 | Horace H. Sayre USARC | 40830 | |||
| Firm Fixed-Price Work | |||||
| A128 | Improved Grounds (Spec Item C, 3.1) | 10.0 | Month | $ - 0 | $ - 0 |
| A129 | Storm Drainage Systems (Spec Item 3.3) | 10.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AM (Items A128 Through A129) | $0.00 |
| OK004 | Earnest L. Ripley USARC | 40835 | |||
| Firm Fixed-Price Work | |||||
| A130 | Improved Grounds (Spec Item C, 3.1) | 10.5 | Month | $ - 0 | $ - 0 |
| A131 | Storm Drainage Systems (Spec Item 3.3) | 10.5 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AN (Items A130 Through A131) | $0.00 |
| OK016 | Franklin L. Weeks USARC | 40885 | |||
| Firm Fixed-Price Work | |||||
| A132 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A133 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AP (Items A132 Through A133) | $0.00 |
| OK026 | George D. Swanson USARC | 40926 | |||
| Firm Fixed-Price Work | |||||
| A134 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A135 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AQ (Items A134 Through A135) | $0.00 |
| OK028 | Tracy W. Young USARC | 40935 | |||
| Firm Fixed-Price Work | |||||
| A136 | Improved Grounds (Spec Item C, 3.1) | 10.5 | Month | $ - 0 | $ - 0 |
| A137 | Storm Drainage Systems (Spec Item 3.3) | 10.5 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AR (Items A136 Through A137) | $0.00 |
| OK031 | Cleo O. Payne USARC | 40965 | |||
| Firm Fixed-Price Work | |||||
| A138 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A139 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AS (Items A138 Through A139) | $0.00 |
TOTAL FFP LINE ITEMS - A101 THROUGH A139 $0.00
&F
&P of &N
ELINS BASE PERIOD FFP (OPTNL)
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH Spec Item C, SPEC ITEM 3 ELINS A001 - A120 |
| CLIN 0010 - Base Period - Firm Fixed-Price Work - High Service Level (Green), OPTIONAL |
| FACID | SITE NAME | SITE CODE | |||
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| AR065 | Camden AFRC | 05A55 | |||
| Firm Fixed-Price Work | |||||
| A001 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A002 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A003 | Storm Drainage Systems (Spec Item C, 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AA (Items A001 Through A003) | $0.00 |
| AR067 | NW Arkansas AFRC | 05450 | |||
| Firm Fixed-Price Work | |||||
| A004 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AB (Item A004) | $0.00 |
| AR068 | Fort Chaffee Maint. Facility/ECS #15 | 05401 | |||
| Firm Fixed-Price Work | |||||
| A005 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A006 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AC (Items A005 Through A006) | $0.00 |
| AR072 | Pine Bluff ARSL AFRC | 05087 | |||
| Firm Fixed-Price Work | |||||
| A007 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A008 | Storm Drainage Systems (Spec Item C, 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AD (Items A007 Through A008) | $0.00 |
| AR074 | Barling AFRC | ||||
| Firm Fixed-Price Work | |||||
| A009 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A010 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AE (Items A009 Through A010) | $0.00 |
| OK056 | Sand Springs AFRC | 4076A | |||
| Firm Fixed-Price Work | |||||
| A011 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AF (Item A011) | $0.00 |
| OK063 | Norman AFRC/FMS | 40C90 | |||
| Firm Fixed-Price Work | |||||
| A012 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AG (Item A012) | $0.00 |
| OK064 | Broken Arrow AFRC | 40824 | |||
| Firm Fixed-Price Work | |||||
| A013 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A014 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AH (Items A013 Through A014) | $0.00 |
| OK067 | Vance AFB AFRC | OK067 | |||
| Firm Fixed-Price Work | |||||
| A015 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A016 | Storm Drainage Systems (Spec Item C, 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AJ (Items A015 Through A016) | $0.00 |
| OK069 | McAlester AAP AFRC | OK069 | |||
| Firm Fixed-Price Work | |||||
| A017 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A018 | Storm Drainage Systems (Spec Item C, 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AK (Items A017 Through A018) | $0.00 |
| OK071 | Muskogee AFRC | 40C76 | |||
| Firm Fixed-Price Work | |||||
| A019 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AL (Item A019) | $0.00 |
| OK073 | WOKC AFRC | 40C78 | |||
| Firm Fixed-Price Work | |||||
| A020 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AB (Item A020) | $0.00 |
TOTAL FFP LINE ITEMS - A001 THROUGH A020 $0.00
CLIN 0012 - Base Period - Firm Fixed-Price Work - Medium Service Level (Amber), OPTIONAL
| AR065 | Camden AFRC | 05A55 | |||
| Firm Fixed-Price Work | |||||
| A101 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A102 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A103 | Storm Drainage Systems (Spec Item C, 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0012AA (Items A101 Through A103) | $0.00 |
| AR067 | NW Arkansas AFRC | 05450 | |||
| Firm Fixed-Price Work | |||||
| A104 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0012AB (Item A104) | $0.00 |
| AR068 | Fort Chaffee Maint. Facility/ECS #15 | 05401 | |||
| Firm Fixed-Price Work | |||||
| A105 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A106 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0012AC (Items A105 Through A106) | $0.00 |
| AR072 | Pine Bluff ARSL AFRC | 05087 | |||
| Firm Fixed-Price Work | |||||
| A107 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A108 | Storm Drainage Systems (Spec Item C, 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0012AD (Items A107 Through A108) | $0.00 |
| AR074 | Barling AFRC | ||||
| Firm Fixed-Price Work | |||||
| A109 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A110 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0012AE (Items A109 Through A110) | $0.00 |
| OK056 | Sand Springs AFRC | 4076A | |||
| Firm Fixed-Price Work | |||||
| A111 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0012AF (Item A111) | $0.00 |
| OK063 | Norman AFRC/FMS | 40C90 | |||
| Firm Fixed-Price Work | |||||
| A112 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0012AG (Item A112) | $0.00 |
| OK064 | Broken Arrow AFRC | 40824 | |||
| Firm Fixed-Price Work | |||||
| A113 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A114 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0012AH (Items A113 Through A114) | $0.00 |
| OK067 | Vance AFB AFRC | OK067 | |||
| Firm Fixed-Price Work | |||||
| A115 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A116 | Storm Drainage Systems (Spec Item C, 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0012AJ (Items A115 Through A116) | $0.00 |
| OK069 | McAlester AAP AFRC | OK069 | |||
| Firm Fixed-Price Work | |||||
| A117 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A118 | Storm Drainage Systems (Spec Item C, 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0012AK (Items A117 Through A118) | $0.00 |
| OK071 | Muskogee AFRC | 40C76 | |||
| Firm Fixed-Price Work | |||||
| A119 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0012AL (Item A119) | $0.00 |
| OK073 | WOKC AFRC | 40C78 | |||
| Firm Fixed-Price Work | |||||
| A120 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0012AB (Item A120) | $0.00 |
TOTAL FFP LINE ITEMS - A101 THROUGH A120 $0.00
&F
&P of &N
ELINS BASE PERIOD IQ
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE UNIT PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS A701 - A756 |
| CLIN 0013 - Base Period - Indefinite Quantity Work |
| UNIT | UNIT OF | MIN. ORDER | |||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | PRICE | ISSUE | QTY |
| A701 | Tree and Stump Removal | |
| Large 18.1” DBH and above Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 10 calendar days. | $ - 0 | Each | 1 |
| A702 | Tree and Stump Removal | ||
| Medium 6.1" DBH up to 18" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | $ - 0 | Each | 1 |
| A703 | Tree and Stump Removal | ||
| Small up to 6" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| A704 | Shrub and Stump Removal | ||
| Large 15-gallon and above, 48.1” and above Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| A705 | Shrub and Stump Removal | ||
| Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| A706 | Shrub and Stump Removal | ||
| Small Up to 5-gallon, up to 18” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 3 calendar days. | $ - 0 | Each | 1 |
| A707 | Complete Tree Pruning | ||
| Small - below and including 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 1 calendar day. | $ - 0 | Each | 1 |
| A708 | Complete Tree Pruning | ||
| Large - above 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 2 calendar days. | $ - 0 | Each | 1 | |||
| A709 | Soil Analysis | Perform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations. | $ - 0 | Each | 1 | |
| A710 | Grassing | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. |
| Seed species will be identified in the task order. | $ - 0 | SF | 50 |
| A711 | Tree Planting | All trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| A712 | Shrub Planting (1-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| A713 | Shrub Planting (5-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 | |||
| A714 | Bedding/Ornamental Plants (4" pot size) | All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 10 | |
| A715 | Sodding | Sod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | $ - 0 | SF | 50 |
| A716 | Sprigging | Sprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | $ - 0 | SF | 50 | |||
| A717 | Fertilize | Vegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days. | $ - 0 | SF | 100 | |
| A718 | Dethatch & Aerate | Services shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance. | ||||
| Work shall be completed within 14 calendar days. | $ - 0 | SF | 100 | |||
| A719 | Aerate | Grass shall be aerated to promote health and growth. |
| Work shall be completed within 10 calendar days. | $ - 0 | SF | 100 |
| A720 | Shrub Pruning (Stand-alone plants) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | $ - 0 | Each | 5 |
| A721 | Hedge Pruning (Continuous Hedging) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | $ - 0 | L.F. | 100 | |||
| A722 | Erosion Control | Soil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days. | $ - 0 | SF | 50 | |
| A723 | Underbrushing | All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days. | $ - 0 | SF | 100 | |
| A724 | Field Mowing | Vegetation shall be mowed to a height of 6". All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days. | $ - 0 | SF | 5,000 | |
| A725 | Control Undesired Vegetation | Remove vegetation along fence lines (20' on both sides of fence) and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP). | ||||
| Work shall be completed within 10 calendar days. | $ - 0 | LF | 100 | |||
| A726 | Debris Removal | Remove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris. |
| Work shall be completed within 10 calendar days. | $ - 0 | SF | 50 | |||
| Special Event Grass Cutting at the following sites: | Services to be provided in improved grounds areas. Grass shall be mowed and trimmed to a uniform height of 2 inches. Edging to provide a uniform edged cut. Raking and removal of leaves, pine straw and pine cones, limbs, and other debris from the area. All clippings and debris shall be removed. Work to be completed in 3 calendar days. Provide a price to provide services at each site. | |||||
| A727 | AR002 | $ - 0 | Each | 1 | ||
| A728 | AR019 | $ - 0 | Each | 1 | ||
| A729 | AR024 | $ - 0 | Each | 1 | ||
| A730 | AR025 | $ - 0 | Each | 1 | ||
| A731 | AR032 | $ - 0 | Each | 1 | ||
| A732 | AR047 | $ - 0 | Each | 1 | ||
| A733 | AR064 | $ - 0 | Each | 1 | ||
| A734 | AR065 | $ - 0 | Each | 1 | ||
| A735 | AR066 | $ - 0 | Each | 1 | ||
| A736 | AR067 | $ - 0 | Each | 1 | ||
| A737 | AR068 | $ - 0 | Each | 1 | ||
| A738 | AR069 | $ - 0 | Each | 1 | ||
| A739 | AR071 | $ - 0 | Each | 1 | ||
| A740 | AR072 | $ - 0 | Each | 1 | ||
| A741 | AR074 | $ - 0 | Each | 1 | ||
| A742 | OK001 | $ - 0 | Each | 1 | ||
| A743 | OK003 | $ - 0 | Each | 1 | ||
| A744 | OK004 | $ - 0 | Each | 1 | ||
| A745 | OK016 | $ - 0 | Each | 1 | ||
| A746 | OK026 | $ - 0 | Each | 1 | ||
| A747 | OK028 | $ - 0 | Each | 1 | ||
| A748 | OK031 | $ - 0 | Each | 1 | ||
| A749 | OK056 | $ - 0 | Each | 1 | ||
| A750 | OK063 | $ - 0 | Each | 1 | ||
| A751 | OK064 | $ - 0 | Each | 1 | ||
| A752 | OK067 | $ - 0 | Each | 1 | ||
| A753 | OK069 | $ - 0 | Each | 1 | ||
| A754 | OK071 | $ - 0 | Each | 1 | ||
| A755 | OK073 | $ - 0 | Each | 1 | ||
| A756 | Plant Native Vegetation | All native plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Indigenous plants, and low maintenance plants are tolerant of site's existing soils and climate without supplemental irrigation or fertilization once established. This line item may be used in conjunction with line items above to convert existing landscape to xeriscape. |
Plants established shall be 5-gallon size. Native plants shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. $ - 0 Each 10
TOTAL IQ CAPACITY FOR LINE ITEMS - A701 THROUGH A756 $70,000.00
&F
&P of &N
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELINS FIRST PERIOD FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS B001 - B139 |
| CLIN 1009 - First Option Period - Firm Fixed-Price Work - High Service Level (Green) |
| FACID | SITE NAME | SITE CODE | |||
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| AR002 | BG William O. Darby USARC | 05310 | |||
| Firm Fixed-Price Work | |||||
| B001 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .