PREPROPOSAL CONFERENCE MINUTES 20210827.pdf

PDF 1 MB Posted

Attached to
MATOC IDIQ for Construction Services-MS National Guard
Solicitation number
W9127Q-21-R-0005
Issued by

About this file

This document contains minutes from a pre-proposal conference for a multiple award task order contract (MATOC) for construction services with the Mississippi Army National Guard. The MATOC will have a total value of $40 million shared across multiple awardees, and individual task orders will range from $2,000 to $5 million. Work will include maintenance, repair, and construction at various National Guard facilities across Mississippi over a five-year ordering period. The conference included questions on bonding requirements, proposal submission procedures, and clarification on evaluation criteria. Proposals are due September 30, 2021, and awards are expected in early November 2021. This is a total small business set-aside, and the primary NAICS code is 236220 with a $39.5 million size standard.

View the file

Other files

File Type Posted
W9127Q-21-R-0005-0003 AMENDMENT to SOLICITATION for MATOC CONSTR SVS.pdf PDF
RFI 04 QA 20210922 - W9127Q-21-R-0005 MATOC IDIQ Construction .pdf PDF
RFI 03 Q-20 and 21 Spec. 08 43 13 BSD-Aluminum-Framed Storefronts.pdf PDF
RFI 03 QA 20210907 - W9127Q-21-R-0005 MATOC IDIQ Construction .pdf PDF
W9127Q-21-R-0005-0002 AMENDMENT to SOLICITATION for MATOC CONSTR SVS.pdf PDF
RFI 02 QA 20210901 - W9127Q-21-R-0005 MATOC IDIQ Construction .pdf PDF
RFI 01 QA 20210826 - W9127Q-21-R-0005 MATOC IDIQ Construction .pdf PDF
POWERPOINT for MATOC IDIQ Construction Svs - PreProposal Conference 8-2021.ppt PPT presentation
W9127Q-21-R-0005-0001 AMENDMENT to SOLICITATION for MATOC CONSTR SVS.pdf PDF
ATTACHMENT 01 Wage Determination MS20210048 20210402-CSJFTC 172nd Forrest Co.pdf PDF
Attachment 1 - Prototypical Proj. Statement of Work (REV)-AOG Facility B104.pdf PDF
ATTACHMENT 05 Wage Determination MS20210047 20210402-186th Lauderdale Co.pdf PDF
ATTACHMENT 02 Wage Determination MS20210046 20210604-CMTC Grenada Co.pdf PDF
Exhibit B-Subcontractor Information and Consent Form 20210225 MS MATOC.pdf PDF
ATTACHMENT 03 Wage Determination MS20210053 20210402-172nd PFO Rankin Co.pdf PDF
ATTACHMENT 04 Wage Determination MS20210051 20210402-172nd JFH Hinds Co.pdf PDF
W9127Q-21-R-0005 SOLICITATION for MATOC CONSTRUCTION SVS.pdf PDF
ATTACHMENT 06 Wage Determination MS20210050 20210402-CRTC Harrison Co.pdf PDF
Exhibit A-Performance Relevancy Questionnaire 20210225 MS MATOC.pdf PDF
Exhibit C-Past Performance Reference Questionnaire 20210225 MS MATOC.pdf PDF
Exhibit D-RFP for Prototypical Project 20210225 MS MATOC (REV) .pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-PROPOSAL MINUTES

Time and Date: Thursday, August 26, 2021; 9:00 AM (CST).

Place: MS ANG 172nd Front of Building 129/DFAC, 141 Military Drive; Flowood, MS 39047

Contract Officer (KO): David Oglesby Contract Specialist (CS): Lisa Anguizola

Project: W9127Q-21-R-0005 MATOC IDIQ for CONSTRUCTION SERVICES Proposal Due Date 09/30/2021 PoP: 5-YEAR ORDERING PERIOD

A. Introductions and General Outline.

Introduction of attendees Roster

B. Meeting progressed according to the Slides provided. Questions were handled as we moved along. These are reviewed below. Subjects below are included in the slides, but summarized here. Overall, meeting went smoothly. Should anything mentioned not covered here or not sufficiently detailed, please advise.

C. Bonds Requirements – Will be required as follows

See FAR 52.228-1 and 28-101-1. Bid Guarantee is required when payment and performance bonds are necessary. Our Prototypical Project is not to be awarded, thus does not require payment nor performance bonds and NO BID BONDS

Future Task order sill require payment &/or Bonds and if greater than $150,000 shall require Bid Bonds.

D. Request for Information/Questions:

All RFI requests must be in WRITING and sent only to the Contracting Officer/Oglesby Contracting Specialist/Anguizola

Be sure email subject lines clearly identifies which project the questions are concerning.

RFI - W9127Q-10-R-0005 RFI – MATOC IDIQ for Construction Services

DO NOT send RFIs to technicians, A&Es, COR or any other parties that may be involved in these projects. Questions sent to other than Contracting personnel identified, may go unanswered.

E. Award for this contract is anticipated the first week of November 2021.

F. Q/A – Discussions

1. Will the contract exceed the 5-year option period?

Contract shall not exceed 5 years. This has a 5-Year Ordering period; unlike previous MATOC this effort will not carry options. Award will be made and maintained thru the course of 5-years

2. Does “Best Value AWARD” applies to Task Orders?

Yes, it applies to all Task Orders; Lowest Price Technically Acceptable is no longer used for selection basis for construction contracts. Construction contract award is based on Best Value for a negotiated effort

3. Can a new construction building be awarded or will it just be renovation?

Yes, new construction could be awarded provided the value is less than the task order ceiling of $5MIL

4. Do you need to schedule an appointment to hand-deliver our proposal to the USPFO?

No appointment is necessary, access to the USPFO building is not as restrictive as for the 172nd. You will be able to turn in proposal package with the guard at the front door.

Still plan ahead so you are not behind the proverbial 8-ball.

5. Does this require “Bid Bond”?

The MATOC effort does not require a Bid Bond Not for MATOC. See FAR 52.228-1 and 28-101-1. Bid Guarantee is required when payment and performance bonds are necessary. Our Prototypical Project does not require payment nor performance bonds since it will not be awarded.

G. Q/A – REGARDING SLIDES

1. Slide 16 says to include Exhibit E in Volume 1, I do not see Exhibit E in the Solicitation nor on Sam.gov. Please advise.

This should have read Exhibit D. There is not an Exhibit E

2. Slide 17, says that Exhibit D needs to be completed for Volume 2 Part 1, but I thought Exhibit D was the prototypical project pricing sheet and needs to be in Volume 1 with the Project Pricing and Pro Forma Documents.

This should have read Solicitation:

Technical information is recorded in Volume 2, Part I Past Performance information is recorded in Volume 2, Part II

You are correct, Exhibit D- prototypical project pricing sheet belongs in Volume 1 with other pro forma documentation.

SLIDE 16

SLIDE 17

<< THE END >>

File details come from the government source that posted it. Updated .