Questions & Answers Version 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| bid_opening_OP1419.pdf | ||
| SCOPE_OF_WORK_-_Bethlehem_fence_5_SEP_18.pdf | ||
| W9127P-18-B-0002-0001_-_STX_Fence_Project.pdf | ||
| Q-A_V-4.pdf | ||
| Q-A_V-4.pdf | ||
| Q-A_V-3.pdf | ||
| Q-A_V-2.pdf | ||
| Pre-proposal_Conference_Minutes.pdf | ||
| site_visit_attendance_-_STX_fence.pdf | ||
| W9127P-18-B-0002_-_STX_Fence_Project.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
27 AUG 2018
W9127P-18-B-0002 – STX Fencing Project Q-A V-1
1. Does a temporary fence need to be installed during the project duration to provide site ecurity?
THE COMPOUND NEEDS TO BE SECURED TO OR BETTER THAN WHAT IT IS SECURED AT
CURRENTLY. THERE IS PROBABLY ENOUGH ROOM TO LEAVE THE CURRENT FENCE IN PLACE
WHILE BUILDING THE NEW FENCE AND THEN JUST DEMOLISH THE OLD FENCE. METHOD WILL
BE LEFT UP TO CONTRACTOR.
2. Must subcontractors go through the vetting / clearance projects and / or be escorted?
I'M NOT REALLY SURE WHAT THEY MEAN BY THIS. I THOUGHT ALL OF THESE TYPES OF
REQUIREMENTS WERE OUTLINED IN THE SOLICITATION.
3. Can the gate operator be supplied with solar power?
I DON'T SEE WHY NOT, BUT IT WOULD HAVE TO BE A FAIL SECURE TYPE OF SETTING. WHERE IF
THE SOLAR PANELS ARE DAMAGED THE GATE CANNOT BE PUSHED OPEN.
4. What access control system will be associated with the gate operator?
ACCESS FOR THE GATE WILL BE REGULATED BY THE GUARD AT THE GUARD BOOTH
5. Please provide information regarding selection of fence color.
MATCH EXISTING WROUGHT IRON FENCE
6. Please provide specs on concrete, or is the bidder to specify based on professional experience?
PLEASE REFER TO DRAWING THAT WAS INCLUDED IN THE SOLICITATION
7. Is it possible for us to obtain clearer drawings for gate location?
NO
8. Will we be allowed to re-visit the site before quotes are due?
YES
9. Will a storage / lay down area be provided on the facility?
YES