Questions & Answers Version 1

View the file

Other files for this federal contract opportunity

Other files attached to STX Wrought Iron Fence Project, newest first.
File Type Posted
bid_opening_OP1419.pdf PDF
SCOPE_OF_WORK_-_Bethlehem_fence_5_SEP_18.pdf PDF
W9127P-18-B-0002-0001_-_STX_Fence_Project.pdf PDF
Q-A_V-4.pdf PDF
Q-A_V-4.pdf PDF
Q-A_V-3.pdf PDF
Q-A_V-2.pdf PDF
Pre-proposal_Conference_Minutes.pdf PDF
site_visit_attendance_-_STX_fence.pdf PDF
W9127P-18-B-0002_-_STX_Fence_Project.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

27 AUG 2018

W9127P-18-B-0002 – STX Fencing Project Q-A V-1

1. Does a temporary fence need to be installed during the project duration to provide site ecurity?

THE COMPOUND NEEDS TO BE SECURED TO OR BETTER THAN WHAT IT IS SECURED AT

CURRENTLY. THERE IS PROBABLY ENOUGH ROOM TO LEAVE THE CURRENT FENCE IN PLACE

WHILE BUILDING THE NEW FENCE AND THEN JUST DEMOLISH THE OLD FENCE. METHOD WILL

BE LEFT UP TO CONTRACTOR.

2. Must subcontractors go through the vetting / clearance projects and / or be escorted?

I'M NOT REALLY SURE WHAT THEY MEAN BY THIS. I THOUGHT ALL OF THESE TYPES OF

REQUIREMENTS WERE OUTLINED IN THE SOLICITATION.

3. Can the gate operator be supplied with solar power?

I DON'T SEE WHY NOT, BUT IT WOULD HAVE TO BE A FAIL SECURE TYPE OF SETTING. WHERE IF

THE SOLAR PANELS ARE DAMAGED THE GATE CANNOT BE PUSHED OPEN.

4. What access control system will be associated with the gate operator?

ACCESS FOR THE GATE WILL BE REGULATED BY THE GUARD AT THE GUARD BOOTH

5. Please provide information regarding selection of fence color.

MATCH EXISTING WROUGHT IRON FENCE

6. Please provide specs on concrete, or is the bidder to specify based on professional experience?

PLEASE REFER TO DRAWING THAT WAS INCLUDED IN THE SOLICITATION

7. Is it possible for us to obtain clearer drawings for gate location?

NO

8. Will we be allowed to re-visit the site before quotes are due?

YES

9. Will a storage / lay down area be provided on the facility?

YES