RFI Log.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
W9127N26QA145 - PH2 BLADE SEALS REPLACEMENT for Bonneville Dam
Solicitation number
W9127N26QA145
Issued by

About this file

This is an RFI Log file containing a record of questions and answers submitted during the Request for Information phase of the blade seals replacement solicitation for Bonneville Dam. The log documents inquiries from potential contractors regarding the requirements, specifications, and implementation details for designing and fabricating one-piece solid seals for five-bladed Kaplan turbine runners at Powerhouse II Main Unit 16, with Unit 17 as optional. The RFI Log serves as a historical record of clarifications issued by the US Army Corps of Engineers, Portland District, to ensure all prospective bidders receive consistent and transparent information prior to formal proposal submission. Key topics addressed in the log likely include technical specifications for the seals (such as redundant sealing edges and field-molding requirements at site), installation procedures, delivery timelines, documentation requirements, and design considerations for the turbine blade seals. This document is essential for contractors to understand government responses to preliminary questions and to avoid duplicative inquiries, thereby supporting an informed and competitive bidding process for the anticipated contract award on or about September 30, 2026.

View the file

Other files

File Type Posted
RFI Log.xlsx XLSX spreadsheet
Reference Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 RFI Log for W9127N-26-Q-A145 Blade Seals Replacement at Bonneville Dam

Date:RFI No.RFP Reference (Sect/Para/Page)QUESTIONRESPONSE
9/16/261We need more time to respond especially to the installation segment and requests an extension of six weeks past the deadline.

Will our effort be accepted?

The short timeline hints to a critical or unplanned event.Bonneville PH2 is in need of urgent repairs and have confidence that vendors with experience doing this work will have no issue pricing seals for contract award. Discussions between awarded Contractor and Bonneville dam engineering will begin immediately upon award to finalize seal design and dimensions. Per the contract specifications the final seal installed will be one-piece, without any adhesives or epoxy.