The document is a detailed site layout plan for the Dalles Dam transformer repair project, showing specific areas designated for contractor parking, project work, and equipment placement. The images provide aerial and ground-level views of the project site, highlighting key locations such as transformer positions (T9, T10, T11), contractor parking zones, and restricted areas.

The site plan indicates multiple project-specific details, including an Intake Crane Project Work Area scheduled for September FY 2024, a possible transformer repair trailer location with 480v 60A power access, and designated parking areas for contractors. The layout also identifies potential interference zones for an AWS project in FY 2026 and specifies areas for additional contractor parking, with clear demarcations for no-parking zones and existing project spaces. The images show the complex's infrastructure, including electrical equipment, concrete structures, and the surrounding Columbia River landscape.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THE DALLES DAM

ENTRANCE

HWY 84

OREGON

White Text – Entrance Points Orange Text – Possible Contractor trailer location, power available, no contractor vehicles Yellow text – Available space for transformer repair contractor vehicles Red Text – No transformer repair contracting parking/idling Blue Text – Space designated for existing projects

AWS PROJECT

LOCATION –

POSSIBLE

INTERFERENCE

– FY 2026

POSSIBLE

TRANSFORMER

REPAIR TRAILER

– 480v 60A

ACCESS

CONTRACTOR

PARKING

NO ACCESS – FUEL

STATION

ADDITIONAL

CONTRACTOR

PARKING

OTHER PROJECT

PARKING

NO CONTRATOR

PARKING

INTAKE CRANE PROJECT

WORK AREA SEPT. FY

PICTURE ONE

LOCATION

PICTURE TWO

LOCATION

T11 TRANSFORMER

T10 TRANSFORMER

T9 TRANSFORMER

INTAKE CRANE PROJECT WORK

AREA – SEPT. FY 2024

PICTURE ONE LOCATION PICTURE TWO LOCATION

PACUC(0PACUC(1

Slide 4

PACUC(0 Left picture is showing the space between T8 and the Bay 15 Elevator.

Perry, Anthony CIV USARMY CENWP, 2024-08-21T17:19:18.849

PACUC(1 The right picture is showing the space between the TDE transformer container and T7A Perry, Anthony CIV USARMY CENWP, 2024-08-21T17:22:06.675