A.03 SIG - BON PRQ Contract Drawings.pdf

PDF 28 MB Posted

Attached to
BRADFORD ISLAND SERVICE BUILDING PRQ SWITCHGEAR UPGRADE
Solicitation number
W9127N24R0012
Issued by

About this file

The provided document appears to be a set of contract drawings related to a federal solicitation for the "BRADFORD ISLAND SERVICE BUILDING PRQ SWITCHGEAR UPGRADE" project. The solicitation, issued by the Department of the Army Corps of Engineers Engineering District Portland, seeks to replace the existing 480V switchboard and station service transformers located in the Bradford Island Service Building, relocate the new transformer disconnect switches and 1,500 kVA transformers outside the existing electrical room, house the new 480V switchgear and associated equipment in the existing electrical room, provide an exhaust fan or AC system to cool the electrical room, and address life safety code compliance requirements. The project objective is to meet the criteria and constraints defined in the Phase 1A Report. The solicitation number is W9127N24R0012.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A D

V E

R T

IS

E

A D

V E

R T

IS

E

BONNEVILLE LOCK AND DAM

PRQ SWITCHGEAR UPGRADE

BRADFORD ISLAND

CHIEF, DESIGN BRANCH CHIEF, ENGINEERING & CONSTRUCTION DIVISION

SOLICITATION NUMBER: W9127N23R0011

DATE:

DISTRICT COMMANDER

COLONEL, CORPS OF ENGINEERS

RYAN D. SOUDERS, P.E. PATRICK L. DUYCK, P.E.

LARRY D. CASWELL, JR., P.E., PMP

US Army Corps of Engineers Portland District

EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.

PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR

DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE

THE INITIALS OR SIGNATURES AND REGISTRATION

DISTRICT OF THE U.S. ARMY CORPS OF ENGINEERS.

THIS PROJECT WAS DESIGNED BY THE PORTLAND

01 FEBRUARY 2024

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

IC

T

PORTLAND DISTRICT

W

F O

R T

U N

Y

P .E

A N

S I

E

/0

/2

G

E C

D S

E G

S G

R

IF

F

IN

P

.E

G E

C D

E B

R

B R

E V

IA

T

IO

N

S A

N D

L E

G E

N D

G-002

:1

A D

V E

R T

IS

E

P

Q S

W

IT

C H

G E

A R

U P

G R

A D

E B

R A

D F

O R

D I

S L

A N

D W

N

R

O

N N

E V

IL

L

E L

O C

K A

N D

D A

M

B D

P

.1

G -0

X X

X .d g n

NUMBER

DETAIL IDENTIFICATION

DETAIL APPEARS*

SHEET NUMBER ON WHICH

NUMBER

DETAIL IDENTIFICATION

DETAIL SCALE

LETTER

SECTION IDENTIFICATION

SECTION APPEARS*

SHEET NUMBER ON WHICH

SECTION CUT FLAG

LETTER

SECTION IDENTIFICATION

SECTION SCALE

VIEW DIRECTIONLETTER

VIEW IDENTIFICATION

SECTION DIRECTION

VIEW APPEARS*

SHEET NUMBER ON WHICH

LETTER

VIEW IDENTIFICATION

VIEW SCALE

D

C

A

B

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S I Z

E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E P

L O

T D

A T

E

C O

N T

R A

C T

N O

IDENTIFICATION

SHEET

1 2 3 4 5 6

E

D E

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

D R

A W

N B

Y

C H

E C

K E

D B

Y

5. FILE NAME CONVENTION SHALL BE INTERPRETED AS SHOWN BELOW:

USER DEFINED (USE XXX AS PLACE HOLDER)

SHEET IDENTIFICATION NUMBER

DRAWING SERIES NUMBER (CHARACTERS 4-9)

USER DEFINED (CHARACTERS 10-20)

(ENDS WITH AN UNDERSCORE SEPARATOR)

PROJECT CODE IDENTIFIER (CHARACTERS 1-3)

* WHEN SHEET NUMBER

EQUALS "-", DETAIL APPEARS

ON THE SAME SHEET AS IT

WAS TAKEN

2. SECTIONING CONVENTION SHALL BE INTERPRETED AS SHOWN BELOW:

SHEET SEQUENCE NUMBER

SHEET TYPE DESIGNATORS (1=PLANS)

DISCIPLINE DESIGNATOR (S=STRUCTURAL)

FILE EXTENSION

THE DRAWINGS IN THIS VOLUME

THE FOLLOWING ABBREVIATIONS MAY BE USED ON

1. DETAILING CONVENTION SHALL BE INTERPRETED AS SHOWN BELOW:

WWF

WCJ

WSE

W.S.

WP

WL

W/

VERT.

VC

VBS

V

U/S

UNO

TYP.

T.S.

TOW

TOS

TOF

TOC

T.O.

T.L.

T.J.

T.F.

T.B.D.

T & B

SYM

STC

STA.

S.S.

SQ

SPS

SHLDR

S.F.

STL.

STIR.

STD

STAG. SPL.

SIM

SHT

SCH

S.B.

STR

RT

R.O.

REQ'D

REINF.

REF

R.H.

RAD.

PVI

PVC

PTFE

PRQ

PNT

PT

PSPD

PSIG

PSI

PSF

PRE-FAB

P/N

PLF

PL

PERF

PCF

PC

O TO O

OSAY

OS

OPP

O.L.

OF

O.D.

O.C.

O.A.L.

NTS

NPT

NPS

NOM

NO.

NF

N.C.

NAT.

MSE

MK

MECH.

M.B.

MIN

MAX.

LP

LONG.

LTH

LT

LG.

LF.

LD

LBF

L

KSI

JT.

JFR

IWRC

ISO JT

IS

INFO

IN.

I.L.

IF

IE

ID

HOR.

HSS

H.M.

H.D.

H

GV

GALV.

GAC

GA.

FWS

F.W.

FT.

FLG

F.H.

FG

F.F.

F.D.

F.B.

EXIST.

EXAM.

E.W.

EQ. SP.

E.J.

ELEV

EL

EF

EA.

DWL'S

DWG

D/S

DIP

DI

DIA.

D&G

DET.

CU

C.T.C.

CSK

CSP

CRES

CP

C.M.P.

JT.

CONT.

CONT

CONN

CONC.

CLR

CL2

CJP

C.J.

CI

CF

CBORE

C/E JT

C TO C

C

B TO B

BRG

BLDG.

B.L.

B.H.C.

BG

B.F.

B.C.

AWS

ARV

ARCH.

APPROX.

AC

A.B.

ANCH.

= MAXIMUM

= LOW POINT

= LONGITUDINAL

= LENGTH

= LEFT

= LONG

= LINEAR FEET

= LIQUIDATED DAMAGES

= POUNDS FORCE

= ANGLE

= KIPS PER SQUARE INCH

= JOINT

= JUVENILE FISH RETURN

= INDEPENDENT WIRE ROPE CORE

= ISOLATION JOINT

= INSIDE

= INFORMATION

= INCH, INCHES

= INSIDE LAYER

= INSIDE FACE

= INVERT ELEVATION

= INSIDE DIAMETER

= HORIZONTAL

SECTION/SHAPE

= HOLLOW STRUCTURAL

= HOLLOW METAL

= HEAVY DUTY

= HORIZONTAL

= GATE VALVE

= GALVANIZED

CARBON

= GRANULATED ACTIVATED

= GAUGE

= FACILITY WATER SUPPLY

= FLAT WASHER

= FOOT, FEET

= FLANGE

= FLAT HEAD

= FINISH GRADE

= FAR FACE

= FLOOR DRAIN

= FLAT BAR

= EXISTING

= EXAMINATION

= EACH WAY

= EQUALLY SPACED

= EXPANSION JOINT

= ELEVATION

= EACH LAYER

= EACH FACE

= EACH

= DOWELS

= DRAWING

= DOWNSTREAM

= DUCTILE IRON PIPE

= DUCTILE IRON

= DIAMETER

= DRILL & GROUT

= DETAIL

= COPPER

= CENTER TO CENTER

= COUNTERSINK

= CORNER SUPPORT PIECE

= CORROSION RESISTING STEEL

= COMPLETE PENETRATION

= CORRUGATED METAL PIPE

= CONTRACTION JOINT

= CONTINUOUS

= CONNECTION

= CONCRETE

= CLEAR

= CHLORINE

= CENTERLINE

= COMPLETE JOINT PENETRATION

= CONSTRUCTION JOINT

= CAST IRON

= CUBIC FEET

= COUNTERBORE

JOINT

= CONTRACTION JOINT/EXPANSION

= CENTER TO CENTER

= CHANNEL

= BACK TO BACK

= BEARING

= BUILDING

= BOTTOM LAYER

= BOLT HOLE CIRCLE

= BACK GOUGE

= BOTTOM FACE

= BOLT CENTERS

= ATTRACTION WATER SUPPLY

= AIR RELEASE VALVE

= ARCHITECTURAL

= APPROXIMATE

= ASPHALT CONCRETE

= ANCHOR BOLT

= ANCHOR

= WELDED WIRE FABRIC

= WALL CONSTRUCTION JOINT

= WATER SURFACE ELEVATION

= WATERSTOP

= WORK POINT

= WATERLINE

= WITH

= VERTICAL

= VERTICAL CURVE

= VERTICAL BARRIER SCREEN

= VERTICAL

= UPSTREAM

= UNLESS NOTED OTHERWISE

= TYPICAL

= TUBULAR STEEL

= TOP OF WALL

= TOP OF SLAB

= TOP OF FOOTING

= TOP OF CONCRETE

= TOP OF

= TOP LAYER

= TROWELED JOINT

= TOP FACE

= TO BE DETERMINED

= TOP AND BOTTOM

= SYMMETRICAL

= STEEL TROWELED CONCRETE

= STATION

= STAINLESS STEEL

= SQUARE

= SPACES

= SHOULDER

= SQUARE FOOT

= STEEL

= STIRRUP

= STANDARD

= STAGGER SPLICE

= SIMILAR

= SHEET

= SCHEDULE

= STRUCTURAL BOLT

= STRUCTURAL

= RIGHT

= ROUGH OPENING

= REQUIRED

= REINFORCEMENT

= REFERENCE

= ROUND HEAD

= RADIUS

= POINT OF VERTICAL INTERSECTION

= POLYVINYL CHLORIDE

= POLYTETRAFLOUROETHYLENE (TEFLON)

= PROJECT BUILDING 480V SWITCHGEAR

= POINT

= POINT OF TANGENCY (CIVIL SHEETS)

= POST SORT POOL DRAIN

= POUNDS PER SQUARE INCH, GAGE

= POUNDS PER SQUARE INCH

= POUNDS PER SQUARE FOOT

= PREVIOUSLY FABRICATED

= PART NUMBER

= POUNDS PER LINEAR FOOT

= PLATE

= PERFORATED

= POUNDS PER CUBIC FOOT

= POINT OF CURVATURE

= OUT TO OUT

= OUTSIDE STEM AND YOKE (VALVES)

= OUTSIDE

= OPPOSITE

= OUTSIDE LAYER

= OUTSIDE FACE

= OUTSIDE DIAMETER

= ON CENTER

= OVERALL LENGTH

= NOT TO SCALE

= NATIONAL PIPE THREAD

= NOMINAL PIPE SIZE

= NOMINAL

= NUMBER

= NEAR FACE

= NO CHAMFER

= NATURAL

= MECHANICALLY STABILIZED EARTH

= MARK

= MECHANICAL

= MACHINE BOLT

= MINIMUM

LEGEND

* WHEN SHEET NUMBER

EQUALS "-", SECTION APPEARS

ON THE SAME SHEET AS IT

WAS TAKEN

(NOTE: IF DASH "-" USED INDICATES ALL OF THAT DISCIPLINE)

LEVEL 2 DISCIPLINE DESIGNATOR (D=DEMOLITION)

SD101

BDP1.146_SD101XXX.DGN

3. VIEW CONVENTION SHALL BE INTERPRETED AS SHOWN BELOW:

SEQUENCE UNDER CERTAIN CONDITIONS. SEE ERDC/ITL TR-19-7 P. 25; 2.4.4)

ALLOW THE ADDITION OR 1 EXTRA LETTER TO BE ADDED AT THE END OF THE

(USE 5 CHARACTERS WHENEVER POSSIBLE. HOWEVER THE A/E/C STANDARDS DOES

4. SHEET IDENTIFICATION CONVENTION SHALL BE INTERPRETED AS SHOWN BELOW:

ANY SECOND LEVEL DESIGNATORS NOT LISTED IN ERDC/ITL TR-19-7 P. 19-23 NEED TO BE NOTED HERE

DEMODENOTESD

GENERAL FEATURESDENOTES-

EXAMPLES BELOW:

ERDC/ITL TR-19-7 P. 19-23

6. AREA FEATURE DESIGNATOR FOR ALL SHEETS SHALL BE AS PER A/E/C CADD STANDARDS

DETAIL

1"=1" FULL SIZESCALE:

A

SECTION

1"=1" FULL SIZESCALE:

A

SECTION

1"=1" FULL SIZESCALE:

SDXXX

A

SDXXX

SDXXX

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

IC

F O

R T

U N

Y

P .E

A N

S I

E

/0

/2

G

E C

D S

E G

S G

R

IF

F

IN

P

.E

G E

C D

E

A W

IN

G

I N

D E

X

G-003

:1

A D

V E

R T

Q S

W

IT

C H

G E

A R

U P

G R

A D

E B

R A

D F

O R

D I

S L

A N

D W

N

R

N N

E V

IL

L

E L

O C

K A

N D

D A

M

B D

P

.1

G -0

X X

X .d g n

D

C

A

B

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S I Z

E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E P

L O

T D

A T

E

C O

N T

R A

C T

N O

IDENTIFICATION

SHEET

1 2 3 4 5 6

E

D E

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

D R

A W

N B

Y

C H

E C

K E

D B

Y

INDEX OF REFERENCE DRAWINGS

INDEX OF CONTRACT DRAWINGS

3 85 ' -0 " S 4 1.7 17 9 ° E

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

IC

F O

R T

U N

Y

P .E

A N

S I

E

/0

/2

G

E C

D S

E G

S G

R

IF

F

IN

P

.E

G E

C D

E

O J E

C T

L O

C A

T

IO

N M

A P

S

G-101

:1

A D

V E

R T

Q S

W

IT

C H

G E

A R

U P

G R

A D

E B

R A

D F

O R

D I

S L

A N

D W

N

R

N N

E V

IL

L

E L

O C

K A

N D

D A

M

B D

P

.1

G -1

X X

X .d g n

LOCATION

PROJECT

LOCATION

PROJECT

LOCATION

PROJECT WORK

D

C

A

B

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S I Z

E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E P

L O

T D

A T

E

C O

N T

R A

C T

N O

IDENTIFICATION

SHEET

1 2 3 4 5 6

E

D E

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

D R

A W

N B

Y

C H

E C

K E

D B

Y

INTERSTATE

INTERSTATE

INTERSTATE

W I L

L A

M E

T T

E

REV

I

R

COLUMBIA RIVER

MILES

0 10 20 30 40 50

LONGVIEW

PORTLAND

VANCOUVER

SALEM

WASHINGTON

OREGON

HOOD RIVER

THE DALLES

L O

C K

A N

D D

A M

JO

H

N D

A Y

L O

C K

A N

D D

A M

T H

E D

A L

L E

S

L O

C K

A N

D D

A M

B O

N N

E V

IL

L

E

WEIR

M u lt n o m a h

C o u n ty

S k a m a n ia u n ty

W A

S H I N

G T

O N

O R

E G

O N

D R

A

IN

DRAI

N

TOP RIP RAP

RUNGE

BRIDGE

D itc h

D itc h

D it c h

D i t c h

S L

O T

2" S

LOT

KNOLL

-10

-16

-10010 a i l r o a d

Sk am an ia

Cou nt y

(Buildings Removed) Area Office Site of Bonneville

Powerhouse

Second

B u r l i n g t o n N o r t h e r n R

X

X X X X X X X X

City Well

S h a d y k

L

L o o k -I n e

L a k e s id e

W a y t

H o t

S p r i n g s a d

Powerhouse

First

B u r l i n g t

N r t h e r i l r o a d

-10

-10

X X X X

X X

X X

X X

X X

-16

-10010

X

X

X

X

X

X

X

X X X X X X X

X

X

X X

X

X X X X X X

X

X X X X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X top o f w all el ev

X

X

X

X

X

X

New Nav iga tio n Lock

Old Navigation Lock

X

X

X

X

X

X

X

X

X

X

LAUNCH

BOAT

BPA Substation

Plant

Treatment

Sewage

D r .

l a

S h a h a l

F o t i n s

C h i n o o k

Y e h u h

C e l i l o

S u n

T i l l i c u m

H a l a k o

C a s c a d e D r .

C a s c a d e i v e

G r e e n l e a f

M o f f e

B u r l i n g t r t h e i l r o a d

-10

-16

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

U n i c i f i c i l r o a d i v e

B o t u n c e a d

NORTH

P i o n e

W a c o m a c

C h e n o w u t h

G a r r i s o n

S h a h

T a l e m a

C a s c a d e

D r

E v e r g r

W h i s k e y

F la t

M

N

C

U

T

F

H K

Y

WEIR 5

WEIR 5

WEIR 5

WEIR 5

WEIR 4

WEIR 48

WEIR 47

WEIR 46

WEIR 45

WEIR 44

WEIR 43

WEIR 42

WEIR 41

WEIR 40

WEIR 39

WEIR 38

WEIR 37

WEIR 36

WEIR 35

WEIR 34

WEIR 33

WEIR 32

WEIR 31

WEIR 30

WEIR 29

WEIR 28

WEIR 27

WEIR 26

WEIR 25

WEIR 24

WEIR 23

WEIR 22

WEIR 21

WEIR 20

WEIR 19

WEIR 18

WEIR 17

WEIR 16

WEIR 15

WEIR 14

WEIR 13

WEIR 12

WEIR 11

WEIR 10

WEIR 9

WEIR 5

WEIR 5

WEIR

WEIR

WEIR

WEIR

WEIR

WEIR

WEIR

WEIR

WEIR

WEIR

WEIR

WEIR

5"F.

8"F.

20"F.

12"F.

14"F.

10"F.

12'F.

14"F.

6"F.

10"F.

14"F.

6"F.

12"F.

20"M.

15"F.

8"F.

6"F.

6"F.

6"F.

28"F.

10"F.

8"F.

18"F.

18"F.

8"F.

12'F.

10"T.

6"T.

6"T.

12'F.

5"T.

10"F.

6"F.

8"F.

6"F.

16'F.

18"F.

14'F.

12'F. 8"F.

14'F.

16"F.

14"F.

18"F.

15"F.

18"F.

10"F.

15"F.

6"F.

12'F.

12"F.

12'F.

10"F.

12"F.

12'A.

14"F. 14"F.

12"F.

12"A.

8"F.

10"F.

10"A.

15"A.

8"M.

20"M.

30"F.

10"F.

8"M.

14"M.

10"F.

10"A.

6"A. 6"A.

15"T. 10'T.

13"A.

3"F.

13"A.

12"F.

12"T.

14"T.

15'T.

12"T.

12'F.

10"M.

10"F.

8'F.

6"F.

6"T.

5"F.

5"F.6"F.

8'F.

8"F.

6'T.

12"T.

18"P.

TREE

STUMP

14"P.

TREE

STUMP

TREE

STUMP

18"CE.

18"P.

18"CE.

12'T.

14"T.

14"T.

18"P.

20"P.

14'CE.

15"T.

14"P.

STUMP

TREE

4"T.

12"T.

8"T.

10"F.

8"T.

6"T.

6"T.

20"T.

8"T.

6"T.

8"T.

24"T.

12"T.

6"F.

6"F.

10"F.

24"T.

A S P H A L T

G

R

A

V

E

L

R O A D

G R A V E

L

R O A D

G R A V E L

R O A D

G R A V E L R O A D

G R A V E L

R O A D

A S P H A L T

E D G E

O F

A S P H A L T

E D G E

O F

A

S

P

H

A

L

T

EDGE OF

ASPHALT

ASPHALT

A S

P H

A L

T

A S

P H

A L

T

A S P H A L T

A

S

P

H

A

L

T

A

S

P

H

A

L

T

MH.

BOLL.

GATE

C K

W A L L

T

R O C

K

H I G H

FENCE

BOULDER

(TYPICAL)

W.V.

CONCRETE

CURB

7' HIGH C-L FENCE

EDGE OF ASPHALT

A S P H A L T

BOX

BOX

MH.

I

N C

R E

M

H

R

P28 DRAIN

C.B.

VAULT

CONC.

CONC.

VAULTS

R

E

T

E

C

O

N

C

R

E

T

E

M.L.P.

H A

N D

R A I L

M E T

A T E

METAL GRATE

C O

N C

6" CONC.

WALL

N C

R E

M

H

R

CONC.

VAULT

VAULT

CONC.

RAISED CONC.

AIR VENT

BOLL. BOLL.

BOLL.

BOLL.GATE

MH.

CONC.

SLAB

ANCHOR

WOOD

L.P.

7' HIGH

C-L FC.

L

F

C

7' HIGH C-L FC.

N C R E

L L

12" C

ONCRETE WALL

12" C

ONCRETE WALL

BOXES

1.0' WIDE CONCRETE

WALL W/M.H.R.

CONCRETE

ATCH

C

O

N

C

R

E

T

E

ELEC.

BOX MH.

3'DIA. HOLE

DRAIN

BOXES

UTILITY

UTILITY

7' HIGH C-L FC.

ELEC. BOX

ELEC. VAULT

12" C

ONCRETE WALL

DRAIN

RAISED AIR

VENT

C.B.

ELEC. MH.

C.B.

SIGN

W.V.

UTILITY

M.L.P.

SIGN

M.L.P.

MH.

WATER VAULT

SIGN

SIGN

DRIVEWAY C

UT

ASPHALT

DRIVE

M.L.P.

DRAIN

WCR.

12" C

ONC. WALL W/M.H.R.

D R I V E W A Y

C U T CONCRETE

M.H.R.

M.H.R.

SIGN

METAL LID

OVER SPIGOT

C O N C R E T E

C U

R B

CONCRETE

C U R B

BORING

NO. DH-2539

BORING

NO. DH-2538

3' WIDE

PEDESTRIAN

GRAVEL PATH

B R I

C

K METAL STEPS

CONC. UNDER

STEPS

F.H.

W.V.

WOOD BENCH

WOOD

BENCHES

WOOD BENCH

1.0'

WIDE ROCK WALL

7'

HI

GH

C L

F

ENCE

W.V.

C O N C R E T E

W A

M

H R

CONCRETE

SI

DEWALK

EDGE

OF

CONCRETE

C O

N C

R E

T E

C U R B

1' WIDE CONCRETE WALL W/M.H.R.

1' WIDE CONCRETE WALL

METAL LI

D

C

O

N

C R E T E

C U R B

CHAIN

W O O D P O S T S

SIGN

30" C.M.P.

G U A R D R A I L

SIGN

BOULDER

8" CONC. WALL

CONCRETE

BRI

DGE

ABUTMENT

E D

G E

O F

R O

C K S

SIGN

30" C.M.P.

SIGN

SIGN

B

O

U

L

D

E

R

S

C O N C

MH.

BOULDERS

1' WIDE

WOOD BENCHES

1' WIDE

WOOD BENCH

BOULDERS

EDGE

OF

ASPHALT

1' WIDE

WOOD BENCH

EDGE

OF

CONCRETE

R.

R.

T

IE

HEADER

W I

N

N C

R E

M

H

R

N C

R E

M

H

R

CONC. PAD

SIGN

BORING

FPH.FPH.

FPH.

FPH.

FPH.

FPH.FPH.

D E

C

O N C R E

M

H R

D E

C

O N C R E

M

H R

8"

WI

DE

WOOD

CURB

HANDRAI

L

ROCK

WALL

EDGE OF

ROCKS

ELEC. CONDUIT

ON WALL

4"DIA. AIR

VENT ON WALL

METAL LID

RAISED CONC. VAULT

W/STEEL GRATE

M

H

R

C O

N C

R E

T E

B R I

D G

E

A B

U T

M E

N T

UTILITY

E D

N C

R E

T E

R A I L R O

A C K S

R A I L R O A D

T R A C K S

R A I L R O A D

T R A C K S

K

L L

ROCK

WALL

8" WIDE

16" WIDE ROCK WALL

REST

ROOMS

A S P H A L T

BUILDING

C O

N C

R E

T E

S

T E P

N D I

N G

42"

WIDE CONC. WALL

CONCRETE

ROCKS

CONC.

8" CONC. BLOCK WALL

CONC.

NOTE:

BLDG UNDER

DECK

CONC.

W.V.

P O W E R H O U S E

M

H

R

M

H

R

C O

N C

R E

T E

N

L L

W A L

K

BRI

CK

H A

N D

R A I

L

DRAIN

ASPHALT

WALK

R.D.

RET.

WALL

ASPHALT

WALK

C O N C R E

T E

ASPHALT

WALK

C O N C R

E T E

C O

N C R E

K

V E R

F I S

H

L

A D

D E R S

N O T E

P I P E

R

U

O

I S

E

D

B R I

D G E

P30

P29

M.L.P.

TRAFFIC MIRROR

R.

R.

T

IES

CONCRETE

P2

ASPHALT

WALK

CONC. BLOCK

G A T E

PLACED RI

P - R

AP

F I S H

L A D D E R S

A S

P H

A

A

A S P

H A

L T

C O

N

R B

W A

L K

FISHING

DECK

NOTE:

EDGE OF ASPHALT

HAS CONC. BUMPERS

M.H.R.

G H

C L

F

T I L I T Y

P I P E S

E D

P H A

I V E

H I G H

H A N D R A

T I L I T Y

P I P E S

CONC.

B

RI

DGE

SUPPORT

CONC.

B

RI

DGE

SUPPORT

V A L

V E

P

O S I T I

T

O R

A

S

P

H

A

O O R

C O N D I T I O N

RAISED

ELEC. BOX

RAISED WATER

SPIGOT

42"DIA.

TANK

MH.

8" CONCRETE WALL

G U

A R

D R

A I L

ASPHALTPARKING

CONCRETE SLAB

R I

R A P

24"DIA. PIPE

SUPPORT COLUMN

48"DIA.

STEEL PIPE

EDGE

OF

A S P H A L T

R O

A D

D E

C O N C

C A T

W A L K

T Y P I C A L

EDGE OF CONCRETE

UPSTREAM EDGE

FISH CAPTURE

NETFRAME

APPROXIMATE

END OF PRC

DISCHARGE PIPE

B I

C

H O R S

B I

C H O R S

B I

C H O R S

V A L V E

P O S I T I

T O R

V A L

V E

P

O S I T I

T

O R

TOP OF

PIPE

PIPE

TOP OF

C

O

N

C

R

E

T

E

C

O

N

C

R

E

T

E

ANCHOR

ANCHOR

WATER

TOE OF SLOPE

TOP

OF

LOPE

T O P

O F

S L O P E

T O P

S L O P E

O F

T

O

E

O

F

S L

O P

E

TOP

OF SLOPE

T O P

O P E

TOP

OF

S L

O P

E

TOP

OF

RIP -R

A P

U N IO N

P A CIFIC R A IL R O A D

and Spillway

Bonneville Dam

WEIR 54

WEIR 55

WEIR 56

WEIR 57

WEIR 58

WEIR 59

WEIR 60

WEIR 61

WEIR 62

WEIR 63

WEIR 64

WEIR 65

WEIR 66

WEIR 67

WEIR 68

WEIR 69

WEIR 70

WEIR 71

WEIR 72

WEIR 73

WEIR 74

WEIR 75

WEIR 76

WEIR 77

WEIR 78

WEIR 79

WEIR 80

WEIR 81

WEIR 82

Dit ch

Dit ch

DISTRICT BOUNDARY MAP

N

LOCAL VICINITY MAP

PROJECT PHOTO

N

BYPASS OUTFALLS

JUVENILE FISH

W A S

H

IN

G T

O N

O R

E G

O N

SITE

HISTORIC

NATIONAL

CASCADE

FORT

BONNEVILLE

NORTH

PROJECT SITE MAP

SCALE: 1" = 500'

I-84 EXIT #40

(4

M I)

PO

RTL

AN

D

INTERSTATE

RAILROAD

UNION PACIFIC

OREGON

COLUMBIA RIVER

ISLAND

BRADFORD

POWERHOUSE

FIRST

ISLAND

CASCADES

FLOW

POWERHOUSE

SECOND

BURLI

NG

TO

N

NO

RTHERN

RAI

LR

O

AD

WASHINGTON

INTERSTATE

M U

LT

N O

M

AH

C

O U

N

TY

SKAM

AN

IA

C

O U

TY

L1

L2

L3

L4

L5

L6

C1

C

C

C1

L1

L2

L3

L4

L5

L6

4.0 0'

(T

YP)

DUCT BANK COORDINATE TABLE: LINES

Line #

L1

L2

L3

L4

L5

L6

Length

52'

65'

49'

28'

12'

37'

Direction

N54° 40' 41.84"W

N52° 46' 50.82"W

N49° 47' 34.73"W

N46° 38' 16.17"W

N21° 36' 03.11"W

N02° 56' 08.11"E

Start Point

E: 7833795 N: 723370

E: 7833753 N: 723400

E: 7833701 N: 723439

E: 7833664 N: 723471

E: 7833587 N: 723568

E: 7833574 N: 723625

End Point

E: 7833753 N: 723400

E: 7833701 N: 723439

E: 7833664 N: 723471

E: 7833643 N: 723490

E: 7833583 N: 723579

E: 7833576 N: 723663

DUCT BANK COORDINATE TABLE: CURVES

Curve #

C1

C2

Radius

Length

96'

48'

Chord Direction

N35° 47' 05.18"W

N10° 38' 32.24"W

Start Point

E: 7833643 N: 723490

E: 7833583 N: 723579

End Point

E: 7833587 N: 723568

E: 7833574 N: 723625

G 2E

N C

JD

C

Fi le

L as t S av ed B y:

SITE PLAN

EXISTING CABLE VAULT CV-4

SPILLWAY SOUTH TOWER

N

BRADFORD ISLAND

SERVICE BUILDING

LIMITS OF DISTURBANCE

(SEE NOTE 1)

CONTRACTOR

STAGING AREA

1/ 9/

SCALE: 1"= 20'

20' 0 20'

1. THE CONSTRUCTION LIMITS OF DISTURBANCE SHOWN ON THIS DRAWING INCLUDE THE EXISTING ELECTRICAL DUCT BANK FROM THE BRADFORD ISLAND SERVICE BUILDING TO CABLE VAULT CV-4. WORK IN THIS AREA FALLS UNDER OPTIONAL CLIN #1 AND WILL ONLY BE COMPLETED IF OPTIONAL CLIN #1 IS

EXECUTED. REFER TO ELECTRICAL SHEET E-101.

2. SOIL SAMPLING AREAS ARE IDENTIFIED LOCATIONS OF SOIL DISTURBANCE THAT CONTAIN POTENTIALLY

CONTAMINATED PROPERTY. REFER TO SPEC 02 32 10.00 25 SAMPLING AND DISPOSAL FOR

REQUIREMENTS.

3. EXCAVATED MATERIALS MAY BE STORED IN THE PAVED AREA INDICATED ON THIS SHEET AS NECESSARY TO MEET SAMPLING REQUIREMENTS IN SPEC 02 32 10.00 25 SAMPLING AND DISPOSAL. REFER TO SPEC 31 00 00.00 25 EARTHWORK FOR REQUIREMENTS OF TEMPORARY STORAGE OF EXCAVATED MATERIALS.

NOTES:

C-101

BO

N

N

EV

IL

LE

L O

C K

AN

D

D

AM

BR

AD

FO

R

D

IS

LA

N

D

PR

Q S

W

IT

C H

G

EA

R U

PG

R

AD

E

SI

TE

P

LA

N

JE

R

R Y

D . C

AR

R

O

LL

, P .E

/0 1/

M

AT

TI

SO

N

BE

C

KE

R W

N

R

D

ER

EK

R

. M C

C U

R D

Y, P

.E

AD

VE

R

TI

SE

PORTLAND DISTRICT

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

PO

R

TL

AN

D D

IS

TR

IC

T

PO

R

TL

AN

D , O

R

EG

O N

AN

SI

E

1:

BD

P-

1.

2_ C

-1

_A N

SI

E

.d w g

D

C

A

B

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N

AM

E:

D

ES

IG

N

ED

B

Y:

D

AT

E:

FI

LE

N U

M

BE

R

SI

ZE

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

PL

O

T D

AT

E:

C O

N

TR

AC

T

N O

SHEET

IDENTIFICATION

1 2 3 4 5 6

E

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

AP

PR

US Army Corps of Engineers ®

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

TEMPORARY

STORAGE OF

EXCAVATED

MATERIALS

(SEE NOTE 3)

SAMPLING

AREA 1

(SEE NOTE 2)

SAMPLING

AREA 3

(SEE NOTE 2)

SCALE: NTS

SAMPLE EXCAVATION PRISM

SUBSURFACE

SAMPLE

INCREMENT 1

(<=100 FT³)

SUBSURFACE

SAMPLE

INCREMENT 2

(<=100 FT³)

SUBSURFACE

SAMPLE

INCREMENT 3

(<=100 FT³)

SUBSURFACE

SAMPLE

INCREMENT 4

(<=100 FT³)

SUBSURFACE

SAMPLE

INCREMENT 5

(<=100 FT³)

SURFACE

SAMPLE

INCREMENT 1

(<=100 FT³)

SURFACE

SAMPLE

INCREMENT 2

(<=100 FT³)

SURFACE

SAMPLE

INCREMENT 3

(<=100 FT³)

SURFACE

SAMPLE

INCREMENT 4

(<=100 FT³)

SURFACE

SAMPLE

INCREMENT 5

(<=100 FT³)

DEPTH>1FT

1FT

DEPTH

SUBSURFACE SAMPLE

PLOT (<=500 FT³)

SURFACE SAMPLE

PLOT (<=500 FT³)

1. ISOMETRIC SKETCH OF EXCAVATION PRISM FOR INFORMATION

ONLY AND IS INTENDED TO SERVE AS A VISUAL REPRESENTATION

OF A POTENTIAL SAMPLE PLOT IN AN UNSPECIFIED SAMPLE AREA.

CONTRACTOR TO SUBMIT SAMPLING PLANS FOR EACH INDIVIDUAL

SAMPLING AREA. REFER TO SPEC 02 32 10.00 25 SAMPLING AND

DISPOSAL FOR REQUIREMENTS.

NOTES:

SAMPLING

AREA 2

(SEE NOTE 2)

DUCT BANK LOCATION REPRESENTED ON CIVIL SHEETS BASED ON

AS BUILT DRAWING BDG-6-7/25. LINE AND CURVE DATA IS

PROVIDED FOR REFERENCE AND TO ASSIST LOCATING THE DUCT

BANK IN THE FIELD. CONTRACTOR IS RESPONSIBLE FOR

VERIFYING LOCATION OF EXISTING DUCT BANK PRIOR TO

EXCAVATION.

NOTE:

G 2E

N C

JD

C

Fi le

L as t S av ed B y:

ENLARGED SITE PLAN

CONNECT TO EXISTING BURIED, CONCRETE

ENCASED ELECTRICAL DUCT BANK.

REFER TO ELECTRICAL SHEET E-102

CONSTRUCT CONCRETE FOUNDATION

FOR TRANSFORMER (SEE NOTE 1)

CONSTRUCT CONCRETE FOUNDATION

FOR TRANSFORMER (SEE NOTE 1)

FURNISH AND INSTALL

NON-REMOVABLE

VEHICLE BOLLARD

PER ODOT STD. DET.

RD130 (TYP)

FURNISH AND INSTALL

REMOVABLE VEHICLE

BOLLARD PER ODOT

STD. DET. RD130

EXISTING SANITARY

SEWER SERVICE LINE

EXISTING DOMESTIC

WATER LINE

EXISTING FIRE LINE

EXISTING ROOF DRAIN

N

NOTES:

1. CONTRACTOR TO PLACE FINISHED GRADE OF SLAB 4" TO 6" ABOVE EXISTING ASPHALT PAVEMENT.

MAINTAIN EXISTING DRAINAGE CONDITIONS AND DO NOT CAUSE PONDING. REFER TO SHEET S-101 FOR

FOUNDATION DETAILS AND SPEC 31 00 00 EARTHWORK FOR FOUNDATION PREPARATION.

2. CONTRACTOR TO VERIFY LOCATION AND INVERT OF EXISTING UTILITIES. UTILITIES TO BE RELOCATED AS REQUIRED FOR CONSTRUCTION OF CONCRETE FOUNDATIONS. AS-BUILT SITE UTILITIES CAN BE FOUND

ON INFORMATIONAL DRAWING BDG-7-15/3 R7.

3. CONTRACTOR TO SAWCUT AND REPLACE EXISTING ASPHALT PAVEMENT AS REQUIRED.

4. EXISTING TRAILERS TO BE RELOCATED BY GOVERNMENT PRIOR TO CONSTRUCTION.

CONCRETE FOUNDATION POINT TABLE

POINT ID

NORTHING EASTING

(FT) (FT)

1 723381.7 7833797.5

2 723369.3 7833793.9

3 723360.4 7833793.5

4 723361.1 7833776.7

5 723370.0 7833777.1

6 723349.8 7833793.1

7 723340.9 7833792.7

8 723341.6 7833775.9

9 723350.5 7833776.2

BRADFORD ISLAND

SERVICE BUILDING

EXISTING SANITARY

SEWER CLEAN OUT

ABANDON-IN-PLACE REMAINING CONCRETE

DUCT BANK FROM PROPOSED CONNECTION

TO BUILDING (SEE E-101)

16'-10"

8' -1

0"

'-7

4'-0"

4' -0

4'-0"

1' -9

1' -1

0" 3'-1"

'-9

5'-5"

FURNISH AND INSTALL

NON-REMOVABLE

VEHICLE BOLLARD

PER ODOT STD. DET.

RD130 (TYP)

PROPOSED HVAC

UNIT REFER TO

MECHANICAL

3'-3"

'-8

4' -0

12" 0 5'

SCALE: 14"= 1'-0"

D

C

A

B

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N

AM

E:

D

ES

IG

N

ED

B

Y:

D

AT

E:

FI

LE

N U

M

BE

R

SI

ZE

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

PL

O

T D

AT

E:

C O

N

TR

AC

T

N O

SHEET

IDENTIFICATION

1 2 3 4 5 6

E

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

AP

PR

US Army Corps of Engineers ®

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

1/ 9/

C-102

BO

N

N

EV

IL

LE

L O

C K

AN

D

D

AM

BR

AD

FO

R

D

IS

LA

N

D

PR

Q S

W

IT

C H

G

EA

R U

PG

R

AD

E

EN

LA

R G

ED

S

IT

E

PL

AN

JE

R

R Y

D . C

AR

R

O

LL

, P .E

/0 1/

M

AT

TI

SO

N

BE

C

KE

R W

N

R

D

ER

EK

R

. M C

C U

R D

Y, P

.E

AD

VE

R

TI

SE

PORTLAND DISTRICT

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

PO

R

TL

AN

D D

IS

TR

IC

T

PO

R

TL

AN

D , O

R

EG

O N

AN

SI

E

1:

BD

P-

1.

2_ C

-1

_A N

SI

E

.d w g

1" = 4'-0"

TRANSFORMER, SEE

ELECTRICAL PLAN

TRANSFORMER, SEE

ELECTRICAL PLAN 3'

-0

3' -0

5'-6"

EXISTING TRAILERS

(SEE NOTE 4)

AutoCAD SHX Text S

AutoCAD SHX Text

2E

N C

JD

C

Fi le

L as t S av ed B y:

STRIPING PLAN

OBLITERATE

EXISTING STRIPING

(SEE NOTE 1)

N

1. REMOVE EXISTING PAVEMENT MARKINGS WITHIN THE LIMITS OF DISTURBANCE SHOWN ON THIS SHEET PRIOR TO INSTALLING NEW PAVEMENT MARKINGS. EXACT LOCATIONS TO BE FIELD VERIFIED BY THE

CONTRACTOR. REFER TO SPEC 32 17 23.00 25 PAVEMENT MARKING FOR ACCEPTABLE REMOVAL

METHODS.

2. THE CONSTRUCTION LIMITS OF DISTURBANCE SHOWN ON THIS DRAWING INCLUDE THE EXISTING ELECTRICAL DUCT BANK FROM THE BRADFORD ISLAND SERVICE BUILDING TO CABLE VAULT CV-4. WORK IN THIS AREA FALLS UNDER OPTIONAL CLIN #1 AND WILL ONLY BE COMPLETED IF OPTIONAL CLIN #1 IS

EXECUTED. REFER TO ELECTRICAL SHEET E-101.

BRADFORD ISLAND

SERVICE BUILDING

SCALE: 1"= 10'

10' 0 10'

6' -0

2'-0"

PROVIDE NEW

4" SOLID WHITE

LINE (TYP)

FURNISH AND

INSTALL NEW 6"

PRECAST

CONCRETE WHEEL

STOP PER DET. A

SHEET C-501 (TYP)

20'-0"

5'-0"

LIMITS OF

DISTURBANCE

NOTES:

20'-0"

9' -0

5'-0"

9' -0

TY

P.

D

C

A

B

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N

AM

E:

D

ES

IG

N

ED

B

Y:

D

AT

E:

FI

LE

N U

M

BE

R

SI

ZE

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

PL

O

T D

AT

E:

C O

N

TR

AC

T

N O

SHEET

IDENTIFICATION

1 2 3 4 5 6

E

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

AP

PR

US Army Corps of Engineers ®

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

C-103

BO

N

N

EV

IL

LE

L O

C K

AN

D

D

AM

BR

AD

FO

R

D

IS

LA

N

D

PR

Q S

W

IT

C H

G

EA

R U

PG

R

AD

E

ST

R

IP

IN

G P

LA

N

JE

R

R Y

D . C

AR

R

O

LL

, P .E

/0 1/

M

AT

TI

SO

N

BE

C

KE

R W

N

R

D

ER

EK

R

. M C

C U

R D

Y, P

.E

AD

VE

R

TI

SE

PORTLAND DISTRICT

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

PO

R

TL

AN

D D

IS

TR

IC

T

PO

R

TL

AN

D , O

R

EG

O N

AN

SI

E

1:

BD

P-

1.

2_ C

-1

_A N

SI

E

.d w g

1/ 9/

'-9

1' -9

.5

4' -1

0.

5"

'-0

2E

N C

JD

C

Fi le

L as t S av ed B y:

SCALE: 4"=1'

PRECAST WHEEL STOPA

7.5"

6'-0"

2"

6.5"

4" 4"

6.3"

6"

2"

3"

NOTES:

1. DIMENSIONAL AND REINFORCEMENT CHANGES WILL BE PERMITTED UPON PRIOR WRITTEN APPROVAL OF

THE CONTRACTING OFFICER AND CIVIL ENGINEER.

2. USE 3000 PSI CONCRETE MINIMUM.

3. PRIME AND PAINT CONCRETE WHEEL STOPS SAFETY YELLOW AFTER FABRICATION.

4. PRECAST CURB INSTALLED ON PORTLAND CEMENT CONCRETE OR ASPHALT CONCRETE SURFACES

SHALL BE BEDDED IN A CONTINUOUS LAYER OF MASTIC CEMENT UNDER ITS COMPLETE BASE AREA AND

SECURED WITH A MINIMUM OF TWO STEEL PINS DRIVEN THROUGH THE WHEEL STOP.

5. PRE-DRILL HOLES FOR PINS IN EXISTING PAVEMENT TO PREVENT CRACKING. INSTALL STEEL PINS TO EXTEND A MINIMUM 18-INCHES INTO THE SUB-SURFACE. THE TOP OF EACH PIN WILL BE FLUSH WITH THE

TOP OF EACH WHEEL STOP WHEN INSTALLED.

8" HOLE FOR 12" DIA. PIN, 24" LONG, HOT ROLLED STEEL

RADIUS 34" MIN-1" MAX

NO. 3 REINFORCING

BAR, 69" LONG

D

C

A

B

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N

AM

E:

D

ES

IG

N

ED

B

Y:

D

AT

E:

FI

LE

N U

M

BE

R

SI

ZE

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

PL

O

T D

AT

E:

C O

N

TR

AC

T

N O

SHEET

IDENTIFICATION

1 2 3 4 5 6

E

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

AP

PR

US Army Corps of Engineers ®

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

C-501

BO

N

N

EV

IL

LE

L O

C K

AN

D

D

AM

BR

AD

FO

R

D

IS

LA

N

D

PR

Q S

W

IT

C H

G

EA

R U

PG

R

AD

E

D

ET

AI

LS

JE

R

R Y

D . C

AR

R

O

LL

, P .E

/0 1/

M

AT

TI

SO

N

BE

C

KE

R W

N

R

D

ER

EK

R

. M C

C U

R D

Y, P

.E

AD

VE

R

TI

SE

PORTLAND DISTRICT

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

PO

R

TL

AN

D D

IS

TR

IC

T

PO

R

TL

AN

D , O

R

EG

O N

AN

SI

E

1:

BD

P-

1.

2_ C

-5

_A N

SI

E

.d w g

1/ 9/

Q S

W

IT

C H

G E

A R

U P

G R

A

/0

/2

A D

V E

R T

IS

E

B D

P

.1

S -0

X X

X

.D G

N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

IC

T

PORTLAND DISTRICT

A N

S I

E

G

E C

D T

R S

S-001

:1

B R

A D

F O

R D

I S

L A

N D

B O

N N

E V

IL

L

E L

O C

K A

N D

D A

M

S T

R U

C T

U R

A L

N O

T E

S

M A

T T

H E

W D

H

A N

S O

N

P .E

N O

R B

E R

T H

M A

R T

IC

O

R E

B R

E V

IA

T

IO

N

A N

D L

E G

E N

D

D

C

A

B

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S I Z

E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E P

L O

T D

A T

E

C O

N T

R A

C T

N O

IDENTIFICATION

SHEET

1 2 3 4 5 6

E

D E

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

D R

A W

N B

Y

C H

E C

K E

D B

Y

DENOTES NEW CONCRETE

1. MATERIAL PATTERNS SHALL BE AS SHOWN BELOW:

NUMBER

BAR SIZE

f'c=4,000 psi

MINIMUM SPLICE AND EMBEDMENT LENGTHS (IN.)

TABLE 1

LENGTH

EMBEDMENT

TOP BAR

LENGTH

EMBEDMENT

OTHER BAR

LENGTH

EMBEDMENT

HOOK

MINIMUM

LENGTH

SPLICE

TOP BAR

LENGTH

SPLICE

OTHER BAR

WELDED WIRE FABRIC=

WALL CONSTRUCTION JOINT=

WATERSTOP=

WORK POINT=

WELD PLATE=

VERTICAL BARRIER SCREEN=

UPSTREAM=

UNLESS NOTED OTHERWISE=

UPSTREAM MIGRANT TRANSPORTATION CHANNEL=

TYPICAL=

TUBULAR REBAR=

TOP OF WALL=

TOP OF SLAB=

TOP OF FOOTING=

TOP OF CONCRETE=

TOP OF=

TROWELED JOINT=

TOP AND BOTTOM=

SYMMETRICAL=

SUBMERGED TRAVELLING SCREEN=

REBAR TROWELED CONCRETE=

STATION=

STAINLESS REBAR=

SQUARE FOOT=

STANDARD=

SIMILAR=

SHEET=

SCHEDULE=

ROUGH OPENING=

REQUIRED=

ROUND HEAD=

RADIUS=

POLYVINYL CHLORIDE=

PLATE=

PLUS OR MINUS=

PERFORATED=

OUTSIDE=

OPPOSITE=

OUTSIDE DIAMETER=

ON CENTER EACH WAY=

ON CENTER=

NOT TO SCALE=

NOMINAL=

NUMBER=

NO CHAMFER=

NATURAL=

WWF

WCJ

W.S.

W.P.

WP

VBS

U/S U.N.O.

UMT

TYP.

T.S.

TOW

TOS

TOF

TOC

TO

T.J.

T.& B.

SYMM.

STS

STC

STA.

S.S.

S.F.

STD

SIM

SHT

SCHED., SCH

R.O.

REQ'D

R.H.

RAD.

PVC

},PL

PERF.

OS

OPP

O.D.

O.C.E.W.

O.C.

NTS

NOM

NO.

N.C.

NAT.

MK

MECH.

M.B.

MAX.,MIN.

L.P.

LONGIT.,LONG.

LTH

LG.

LF.

L

IS

I.E.

I.D.

HOR.

H.M.

GALV.

GA.

F.W.

FT.

F.H.

F.D.

F.B.

EXIST.

E.W.

EXAM.

EXP. JT.

E.J., EL.,ELEV.

EA.

DWG

D/S

DIA.,~

DET.

CSK

CRES

CP

C.M.P.

CONTR. JT.

C.J.

CONC.

C TO C

C

BRG

BLDG.

B.C.

ARCH.

APPROX.

A.B.

MARK=

MECHANICAL=

MACHINE BOLT=

MAXIMUM, MINIMUM=

LOW POINT=

LONGITUDINAL=

LENGTH=

LONG=

LINEAR FEET=

ANGLE=

INSIDE=

INVERT ELEVATION=

INSIDE DIAMETER=

HORIZONTAL=

HOLLOW METAL=

GALVANIZED=

GAUGE=

FLAT WASHER=

FEET=

FLAT HEAD=

FLOOR DRAIN=

FLAT BAR=

EXISTING=

EACH WAY=

EXAMINATION=

EXPANSION JOINT=

ELEVATION=

EACH=

DRAWING=

DOWNSTREAM=

DIAMETER=

DETAIL=

COUNTERSINK=

CORROSION RESISTING REBAR=

COMPLETE PENETRATION=

CORRUGATED METAL PIPE=

CONTRACTION JOINT=

CONSTRUCTION JOINT=

CONCRETE=

CENTER TO CENTER=

CENTERLINE=

CHANNEL=

BEARING=

BUILDING=

BOLT CENTERS=

ARCHITECTURAL=

APPROXIMATE=

ANCHOR BOLT=

GENERAL STRUCTURAL NOTES: ABBREVIATIONS:

REINFORCEMENT ABBREVIATIONS:

STRUCTURAL LEGEND:

DRAWINGS FOR APPROVAL.

PLACED CONCRETE. ALL REINFORCING NOT SHOWN MUST BE CLOUDED ON SHOP

PREVENT THE BREAKING OF BOND BETWEEN THE REINFORCING BARS AND FRESHLY

VERTICAL REINFORCEMENT PROJECTING ABOVE THE FORMS MUST BE SUPPORTED TO 5.8.

JOINT.

REINFORCING BARS MUST NOT CONTINUE ACROSS AN EXPANSION OR CONTRACTION 5.7.

ALL BARS MUST BE SPACED AS SHOWN ON THE DRAWINGS.5.6.

AND SHOWN IN TABLE 1.

CONTRACT SHALL BE AS DESCRIBED IN ACI 318-14 UNLESS NOTED OTHERWISE

DEVELOPMENT AND SPLICE LENGTHS FOR REINFORCING BARS USED ON THIS 5.5.

BAR SPACING DIMENSIONS ARE MEASURED TO THE CENTERS OF BARS.5.4.

ACI 318-14.

UNLESS NOTED OTHERWISE, ALL HOOKS SHALL BE STANDARD HOOKS AS DEFINED BY 5.3.

REQUIREMENTS.

ALL REINFORCEMENT REBAR SHALL CONFORM TO ASTM A615 GRADE 60 5.2.

ACCORDANCE WITH THE MOST RECENT EDITION OF ACI SP-66, “ACI DETAILING MANUAL”.

PREPARATION FOR PLACING DRAWINGS AND BAR BENDING SCHEDULES SHALL BE IN 5.1.

REINFORCEMENT5.

TO PLACEMENT OF SUBSEQUENT LIFTS.

" AMPLITUDE PRIOR4

14.2 ALL CONCRETE SHALL BE ROUGHENED TO A MINIMUM OF

SHALL BE THE CLEAR DISTANCE FROM THE EDGE OF THE CONCRETE.

ACI 318-14 FOR NONPRESTRESSED CAST IN PLACE CONCRETE. THE MINIMUM COVER

UNLESS NOTED OTHERWISE, THE MINIMUM COVER SHALL BE IN ACCORDANCE WITH 4.1.

CONCRETE COVER4.

REQUIRED CONCRETE FINISHES ARE DESCRIBED IN THE SPECIFICATION.3.1.

CONCRETE FINISHING3.

ADJOINING MEMBER OR AS NOTED OTHERWISE.

WALL AND FLOOR SURFACES WHERE FILLET IS NOT CAST SIMULTANEOUSLY WITH

ALL RE-ENTRANT CORNERS SHALL HAVE 1½” FILLETS EXCEPT AT THE JUNCTION OF 2.3.

OTHERWISE NOTED.

ALL EXPOSED EDGES AND CORNERS OF CONCRETE SHALL HAVE ¾” CHAMFERS UNLESS 2.2.

STRENGTH (f'c) FOR THE CAST-IN-PLACE CONCRETE SHALL BE 4000 PSI.

SECTION 03 30 00.00 25 IN THE SPECIFICATION. THE 28-DAY COMPRESSIVE

THE CONTRACTOR SHALL DEVELOP AND SUBMIT THE CONCRETE MIX ACCORDING TO2.1.

CONCRETE2.

THESE NOTES ARE TYPICAL UNLESS NOTED OR DETAILED OTHERWISE ON DRAWINGS.1.2.

SUBSTATION SWITCHBOARD UPGRADE.

BONNEVILLE POWERHOUSE 2 ISLAND BRADFORD ISLAND SERVICE BUILDING PQR

THESE GENERAL STRUCTURAL NOTES COVER ALL STRUCTURAL FEATURES OF THE 1.1.

SCOPE1.

= SIMILARSIM.

= TO BE DETERMINEDT.B.D.

= TOP FACET.F.

= STIRRUPSTIR.

STAG. SPL. = STAGGER SPLICE

= REINFORCEMENT REINF.

= OUTSIDE LAYERO.L.

= OUTSIDE FACEO.F

= NEAR FACEN.F

= INSIDE FACEI.F.

= FAR FACEF.F.

= EACH WAYE.W.

= EQUALLY SPACEDEQ. SP.

= EACH FACEE.F.

= DOWELSDWL'S

= DRILL & GROUTD.& G.

= CLEARCLR.

= BOTTOM FACEB.F.

DENOTES DISTURB EARTH

DENOTES AGGREGATE GRAVEL

A

B

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S I Z

E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E P

L O

T D

A T

E

C O

N T

R A

C T

N O

IDENTIFICATION

SHEET

1 2 3 4 5 6

E

D E

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

D R

A W

N B

Y

C H

E C

K E

D B

Y

GENERAL NOTES

12"

SCALE: 1"= 1'-0"

6" 0 1'

SEE CIVIL C-102 FOR LOCATION

TOP OF SLAB

T Y

P

GRADE

GRADE

SEE CIVIL C-102 FOR LOCATION

TOP OF SLAB

T Y

P

SLOPE SLAB 1/8"=1'-0" SEE CIVIL

AT EACH END

TOP AND BOT @ 12" OC

#5 BAR EACH WAY

AT EACH END

TOP AND BOT @ 12" OC

#5 BAR EACH WAY

CONC. COVER

2" MIN

2" MIN

CONC. COVER

16'-10"

TYP.

P R

Q S

W

IT

C H

G E

A R

U P

G R

A D

E

/0

/2

A D

V E

R T

IS

E

B D

P .1

-S

-1 X

X X

.D

G N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

IC

T

PORTLAND DISTRICT

A N

S I

E

G

E C

D T

R S

S-101

:1

B R

A D

F O

R D

I S

L A

N D

B O

N N

E V

IL

L

E L

O C

K A

N D

D A

M

P L

A N

A N

D S

E C

T

IO

N S

M A

T T

H E

W D

H

A N

S O

N

P .E

N O

R B

E R

T H

M A

R T

IC

O

R E

N A

REFER TO SPECIFICATION 31 00 00 00 25, 3.2.3 FOUNDATION PREPARATION

FOR INFORMATION REGARDING EXCAVATION AND COMPACTED GRAVEL 3.

REQUIREMENTS.

SEE C-102 FOR FOUNDATION CONTROL POINTS AND DRAINAGE2.

SEE G-101 FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS.1.

S-101

S-101

SECTION

SCALE: 12"=1'-0"

SECTION

SCALE: 12" = 1'-0"

FOUNDATION PLAN

SCALE: 12" = 1'-0" (SEE NOTE 2)

200'-0"

24'-0"

P A

Y N

E P

.E

CONDENSATE DRAIN

LINES

REFRIGERANT

D A

N

IE

L M

J E

N S

E N

P .E

S

IT

E M

E C

H A

N

IC

A L

P L

A N

IN

S

T A

L L

A T

IO

N

/0

/2

B D

P .1

M

-1 X

X X

.D G

N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

IC

T

PORTLAND DISTRICT

A N

S I

E

B F

IL

A

N

M-101

:1

B O

N N

E V

IL

L

E L

O C

K A

N D

D A

M

R

P A

Y N

E

P R

Q S

W

IT

C H

G E

A R

U P

G R

A D

E B

R A

D F

O R

D I

S L

A N

D

CU-01 CONDENSING UNIT

ALTERNATE DRAIN LOCATION

(EVAPORATOR)

EU-01 HEAD UNIT

UNIT POSITION

ALTERNATE HEAD

49'-10"24'-2"

A D

V E

R T

IS

E

SPECIFICATIONS

WITH MANUFACTURERS

PAD IN ACCORDANCE

UNIT TO BE PLACED ON A

D

C

A

B

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S I Z

E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E P

L O

T D

A T

E

C O

N T

R A

C T

N O

IDENTIFICATION

SHEET

1 2 3 4 5 6

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

DRAWING PLOT SIZE: $BORDER$ DATE AND TIME PLOTTED: $$$DATE$$$$ $TIME BY USERNAME: $USER$ SHEET NAME: $SHEETN$

D E

S

IG

N F

IL

E

P

W D

IR

BORDER VERSION UPDATE [08-2013]

D R

A W

N B

Y

C H

E C

K E

D B

Y

STRUCTURAL LINE

STRUCTURAL LINE

LINE

STRUCTURAL

BOOTH

PAINT

OFF. 4

FOREMAN

ROOM

CREW

MEN-2

WO. 2

ENTRY

ROOM

ELECTRICAL

SLAB

MECH. EQUIP.

STORAGE

PAINT EQUIP.

STORAGE

PAINT

CL.

MECH

PAINT SHOP

AND DRYING ROOM

PAINT SPRAYING

(SEE SHEET M-14)

(SEE SHEET M16)

ROOM

COMPRESSOR

BLAST AREA

JAN

WASH AREA

GENERAL NOTES

REFERENCE DRAWINGS

1. ITEMS SHOWN IN RED ARE NEW OR MODIFIED.

FLOOR PLAN - ARCHITECTURALBDG-2-22 _01_R2

KEYED NOTES

8'0 4' 16'

N

A3

SHOPS

NORTH

SHOPS

SOUTH

MEZZANINE

N

WEST SHOPS & OFFICES

3. SEE SPECIFICATION 23 81 00.00 25 FOR MORE INFORMATION.

IN THE COMPRESSOR ROOM.

2. DO NOT ROUTE REFRIGERATION LINES ABOVE PRQ5 OR TR4

RECOMMENDATIONS AND SITE CONDITIONS.

1. MOUNT TO THE WALL ACCORDING TO MANUFACTURER'S

A3

INSTALLATION - MECHANICAL SITE PLAN

3/16" = 1'-0"

P

A Y

N E

P .E

FIRE EXTINGUISHER

FIRE EXTINGUISHER

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

IC

T

PORTLAND DISTRICT

A N

S I

E

M-102

:1

B O

N N

E V

IL

L

E L

O C

K A

N D

D A

M

IN

S

T A

L L

A T

IO

N

D A

N

IE

L M

J E

N S

E N

P .E

S

IT

E F

IR

E

P R

O T

E C

T

IO

N P

L A

N B

D P

.1

M

-1 X

X X

.D G

N

B F

IL

A

N

/0

/2

R

P A

Y N

E B

R A

D F

O R

D I

S L

A N

D P

R Q

S W

IT

C

H G

E A

R U

P G

R A

D E

A D

V E

R T

IS

E

D

C

A

B

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S I Z

E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E P

L O

T D

A T

E

C O

N T

R A

C T

N O

IDENTIFICATION

SHEET

1 2 3 4 5 6

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

DRAWING PLOT SIZE: $BORDER$ DATE AND TIME PLOTTED: $$$DATE$$$$ $TIME BY USERNAME: $USER$ SHEET NAME: $SHEETN$

D E

S

IG

N F

IL

E

P

W D

IR

BORDER VERSION UPDATE [08-2013]

D R

A W

N B

Y

C H

E C

K E

D B

Y

STRUCTURAL LINE

BOOTH

PAINT

ROOM

ELECTRICAL

STORAGE

PAINT EQUIP.

PAINT SHOP

(SEE SHEET M16)

ROOM

COMPRESSOR

BLAST AREA

GENERAL NOTES

REFERENCE DRAWINGS

A3

SHOPS

NORTH

SHOPS

SOUTH

MEZZANINE

N

A4

WEST SHOPS & OFFICES

N

0 4' 8'2'

SEE SPECIFICATION 10 44 16.00 25 FOR MORE INFORMATION2.

1. ITEMS SHOWN IN RED ARE NEW OR MODIFIED.

BDG-2-22_01_R2 FLOOR PLAN - ARCHITECTURAL

A3

INSTALLATION - FIRE PROTECTION SITE PLAN

SCALE 1/4" = 1'-0"

CONTROL ABBREVIATIONS

W

M

OR

OL OL

OR

B

A

E-01

E-02

E-05

J

X X/M

GRAPHIC SYMBOLS

SUA-q1-CQA3, 2"

3#1/0, 1#8 EGC

SUA-q1-CQA3

(WITHIN BOXES, ENCLOSURES, AND PANELS)

MUTLI-CONDUCTOR CABLES AND BUNDLES

EXPOSED CONDUITS

BLACK LAZER ENGRAVED LETTERING

3.5" L x 0.53" H WITH 1/4" (MIN)

STAINLESS STEEL PLATE

(SEE NOMENCLATURE, THIS SHEET)

CONDUIT I.D AND SIZE

SECURE TO CONDUIT WITH EITHER ALUMINUM OR NYLON STRAPS

OR CABLE

NUMBER & SIZE OF CONDUCTORS

(SEE NOMENCLATURE, THIS SHEET)

CIRCUIT I.D.

CONDUIT AND CABLE I.D. (SEE NOTE 2)

REQUIRED WIRE LABELING

PCC/BB-8

PCC

PCC

PCC/SJ2/A-1

PCC/AK-6

TERMINAL NUMBER

SIGNAL OR WIRE NUMBER

(DEVICE-TERM.)

ADDRESS OF OTHER END OF THIS WIRE

AS SHOWN ON DRAWING

CABLE

WIRE LABEL TERMINAL BLOCK WIRE LABEL

TO A PANEL DO NOT INCLUDE THE PANEL IN PARENTHESIS.

THE JUMPERS ARE ENTIRELY VISIBLE ARENOT REQUIRED TO BE LABELED. WIRES INTERNAL

FORMAT: WIRE NAME/DEVICE OR TERMINAL BLOCK-TERMINAL(PANEL). SHORT JUMPERS WHERE

D. FIBER OPTIC CABLE IDENTIFICATION

PP1-4/f-MM-XX

MM FOR MULTI-MODE)

MODE (SM FOR SINGLE MODE,

ORIGIN

NO. OF FIBERS

F. CONTROL WIRE IDENTIFICATION.

ASP1/SJ3/CA-1

DESTINATION DEVICE OR EQUIPMENT

SIGNAL OR WIRE NUMBER

SWITCHGEAR PANEL (CABINET) NUMBER

TERMINAL POINT NUMBER AT DESTINATION

G. PLC CARD WIRE IDENTIFICATION.

SWITCHGEAR PANEL (CABINET) NUMBER

NKA-4/SC15/I:4/11

CARD & BIT NUMBER

TERMINAL POINT NUMBER

E. WIRE COLOR CODE

DESTINATION (XX = # OF THE PANEL)

DISCONNECT SWITCH

POWER TRANSFORMER (ONE LINE DIAGRAM)

OVERLOAD RELAY

FUSE

1. SWITCHBOARDS AND SWITCHGEAR

-LSQ

CQ -

480V (POWERHOUSE)

B -

BATTERY

CT CURRENT TRANSFORMER

M MOTOR

T TRANSFORMER (POWER)

X BREAKER (ADD VOLTAGE LETTER)

Z DISC. SWITCH (ADD VOLTAGE LETTER)

1. AS AN AID TO FURTHER IDENTIFICATION OF

-J

Q

R

- 120/240 (120/208)

N -

POWER CIRCUIT, 480VAC

POWER CIRCUIT (LIGHTING) 120/240 OR 120/208 VAC

- SPARE CONDUIT

- ALARM CIRCUITS, ANNUNCIATOR CIRCUITS,

SELF-SYNCHRONOUS INDICATING CIRCUITS, RTD

AND TRANSDUCER OUTPUT CIRCUITS, RECORDER,

OTHER LOW-LEVEL SIGNAL CIRCUITS.

u s r q j c -

NOMENCLATURE

VOLTAGE CLASS AND LOCATION OF THE

EQUIPMENT, THE FOLLOWING ARE APPLIED TO

SEPARATELY MOUNTED BREAKERS, DISCONNECT-

ING MOUNTED BREAKERS, DISCONNECTING

SWITCHES, CURRENT TRANSFORMER AND

VOLTAGE TRANSFORMERS.

13.8kV

480V

-MCC MOTOR CONTROL CENTER

SJ

LOCKL

CONTROL CIRCUITS

VOLTAGE OR CONTROL TRANSFORMER

-D

F

SQ -

-TR TRANSFORMER (LIGHTING)

480V SWITCHBOARD (MAIN UNITS)

NON-OVERFLOW DAM

FCQ

480V SWITCHGEAR (POWERHOUSE)

480V SWITCHGEAR (NAV LOCK)

13.8kV SWITCHGEAR (STATION SERVICE)

SU

-SUA 480V SWITCHBOARD (FISHWATER UNITS)

NEUTRAL (i.e. GN1,TN1)

P - 5kV

2. SERVICE CODE OR VOLTAGE CLASS

START OF RUN END OF RUN

CIRCUIT NUMBER

SUA-q1-CQA3

IDENTIFIED AS FOLLOWS:

1. ELECTRICAL CIRCUITS AND CONDUITS ARE

A THREE PART NUMBER IS USED.

A. BETWEEN MAJOR ITEMS OF EQUIPMENT,

VOLTAGE CLASS

SERVICE CODE OR

CQA3-q1.

CIRCUIT; e.g. CQA3-c1 WOULD CONTROL

THE NUMBER OF THE CONTROLLED POWER

C. CONTROL CIRCUIT NUMBERS CORRESPOND TO

THE CIRCUIT CONTAINED WITHIN THE CONDUIT.

D. CONDUIT NUMBERS ARE GENERALLY IDENTICAL TO

480V (FISH RELATED

FISH RELATED

-IOR REMOTE PLC INPUT/OUTPUT RACK

METAL-CLAD, VACUUM CIRCUIT BREAKER

ELECTRICALLY-OPERATED, DRAWOUT TYPE,

INDICATES TRIP RATING IN AMPERES

METAL ENCLOSED AIR CIRCUIT, NUMBER

ELECTRICALLY-OPERATED, DRAWOUT TYPE,

NUMBER INDICATES SHEET REFERENCED

LETTER INDICATES ELEVATION

ELEVATION REFERENCE

NUMBER INDICATES SHEET REFERENCED

LETTER INDICATES SECTION

SECTION REFERENCE

SHEET REFERENCED

BOTTOM NUMBER INDICATES

TOP NUMBER INDICATES DETAIL

DETAIL REFERENCE

-L LIGHTING

JUNCTION BOX

-tn

POWER CIRCUIT, 13.8kVAC

-tt

-T1 DEDICATED T1 CIRCUITS

LOCAL AREA NETWORK (LAN) CIRCUITS

TELEPHONE/PBX CIRCUITS, COMMUNICATION CIRCUITS

tv - CLOSED CIRCUIT TELEVISION (CCTV) VIDEO CIRCUITS

XX/M MAG ONLY RATING SHOWN

OR MOTOR CIRCUIT PROTECTOR

XXXA CURRENT RATING NOTED

CIRCUIT BREAKER

A. TERMINAL EQUIPMENT

B. MODIFYING TERMS FOR TERMINAL EQUIPMENT

2. LOAD CENTERS

3. APPARATUS

ELECTRICAL ABBREVIATIONS

- 480V (DAM LIGHTING)DCR1

(MCC, PANELBOARD, ETC)

MAJOR ELECTRICAL EQUIPMENT

CONNECTION TO GROUND BUS

OF THE LOWEST VALUE

WHICH THEY RESPOND ARE

OR WHEN QUANTITIES TO

IN DE-ENERGIZED POSITION

OR KW RATING

MOTOR, NUMBER INDICATES APPROXIMATE HP

Y=YELLOW, ETC.)

(A=AMBER,G=GREEN,R=RED, W=WHITE,

(NORMALLY CLOSE)

CONTACTS

(NORMALLY OPEN)

CONTACTS

PRESS TO TEST INDICATING LIGHT,

-p POWER CIRCUIT, 4160VAC

SAMPLE DEVICE FUNCTIONS

CIRCUITS; I.E., THE END OF RUN IS OMITTED.

LIGHTING AND SOME POWER DISTRIBUTION

B. A TWO-PART NUMBER IS USED FOR MOST

C. CIRCUIT AND ROUTING IDENTIFICATION

-d 0-48V AC/DC

TRANS. OIL PUMP 4C1).

(i.e. CQ24-q1-4C1 IS A CIRCUIT GOING TO

THE DESIGNATION ASSIGNED TO THE DEVICE

TO SEPARATELY MOUNTED DEVICES RECEIVE

COULD BE DESIGNATED SU1-q1-XJ1). CIRCUITS

CIRCUIT TO CT'S IN CIRCUIT BREAKER XJ1

TERMINAL EQUIPMENT DESIGNATION (e.g. THE

PART OF TERMINAL EQUIPMENT RECEIVE THE

E. CIRCUITS TO DEVICES FORMING AN INTEGRAL

3 INDICATES THREE CONDUCTORS.

THREE-CONDUCTOR CABLE WHILE A NUMERAL

BY SUFFIX "C"; i.e., 3/C INDICATES A

2. MULTI-CONDUCTOR CABLES ARE IDENTIFIED

TB1

PCC

PCC BB-8

AK-6SJ2/A-1 (R)

WIRE COLOR DESIGNATION

(CABINET/DEVICE-TERM.)

ADDRESS OF OTHER END OF THIS WIRE

GREEN

GRAY

BROWN

BLUE

BLACK

WHITE

YELLOW

RED

ORANGE

G

GY

BR

BL

BK

W

Y

R

O

BLACK LETTERING

2" L X 0.5" H WITH 1/4" (MIN.)

WHITE SELF-LAMINATING VINYL TAG

DSJ 13.8KV SWITCHGEAR (NON-OVERFLOW DAM)

DSQ 480V SWITCHGEAR (NON-OVERFLOW DAM)

-DQ1 480V SWITCHBORAD (NON-OVERFLOW DAM)

V

480V RECEPTACLE

NON-FUSED HP RATED DISCONNECT SWITCH

SURGE ARRESTER

TELEPHONE DATA FLOOR RECEPTACLE

DATACOMM WALL RECEPTACLE

N.O. PUSH BUTTON

N.C. PUSH BUTTON

INTEGRAL MOTOR STARTER

VFD

(NUMBER INDICATES NEMA SIZE RATING)

COMBINATION MOTOR STARTER

FUSED HP RATED DISCONNECT SWITCH

SINGLE POLE SNAP SWITCH, 125V, 20A

125V, 20A DUPLEX RECEPTACLE

240V RECEPTACLE

50KW

WALL MOUNTED EXTERIOR AREA LED LIGHT FIXTURE

125V, 20A QUADPLEX RECEPTACLE

TS

MOTOR OPERATED VALVE

RESISTIVE LOAD BANK

DIGITAL MULTI-METER

MR

DM

MULTI-FUNCTION SOLID-STATE RELAY

TEST SWITCH

RESISTOR

SURGE CAPACITOR

FIXTURE

SURFACE MOUNTED INDUSTRIAL STRIP LED LIGHT

POSITION SWITCH

AC CONTACTOR

MANUAL TRANSFER DEVICE

OR RATE-OF-RISE RELAY

INSTANTANEOUS OVERCURRENT

THERMOSTAT

UNDERVOLTAGE

TRANSFORMER TEMPERATURE

CONTACTOR (OPERATING COIL)

OVERCURRENT - NEUTRAL/GROUND

AUTOMATIC TRANSFER RELAY

CONDUIT AND GROUNDING

CONDUIT CAPPED BELOW FIN. GRADE

GROUND INSERT IN FLOOR

(SIZE AS INDICATED).

EMBEDDED GROUND CONDUCTOR

CONDUIT EXPOSED

CONDUIT EMBEDDED IN FLOOR OR WALL

CONDUIT TURNING TOWARD OBSERVER.

CONDUIT TURNING AWAY FROM OBSERVER.

G.I.

LIMIT SWITCH (N.C.)

(N.O., CLOSES ON DROPPING TEMPERATURE)

TEMPERATURE SWITCH

LIMIT SWITCH (N.O.)

G

SPD

GENERATOR

SURGE PROTECTION DEVICE

T

M

T

M

CCTV CAMERA, FIXED

CCTV CAMERA, PTZ (PAN, TILT, ZOOM)

K KIRK-KEY BREAKER INTERLOCK DEVICE

IN PLC INPUT

51N

PER CABLE SCHEDULE

NEW POWER OR CONTROL CIRCUIT IDENTIFICATION

NEW CONDUIT IDENTIFICATION PER CONDUIT SCHEDULEXYZ

XX

PLC OUTPUT

XFMR

W/

WT

WP

W

VS

VM

VFD/VSD

VAM

V

UPS

U/S

UH

UG

TYP

TR

TOC

TC

TB

SV

STB

SSCP

SS

SPST

SPDT

SPD

S/N

SM

SG

SF

SA

RN

RGS

REF

RCPT

Q

PWWC

PVC

PTT

PSS

PSF

PS

PR

PNL

PH

PDB

PC

PB

PART

OTS

OL

NP

NO

NC

NA

N

(N)

MPC

MS

MLO

MH

MD

MCP

MCC

MCB

M/MTR

L/R

LR

LTR

LTG

LT-FLEX

LGR

LC

J/JB

IPS

INST

INCAND

IG

HTR

HRG

HID

HH

GI

GFE

GFCI

GALV

G/GND

GAM

FVR

FVNR

F/O

FTLDP

FLUOR

FLR

FDR

FCSP

FCB

F,FU

EXST

EMC

EM

EL

EGAM

EF

EGC

D/S

DIV

DGAM

CV

CT

CS

CRT

CPU

CPT

CPMP

CGB

CKT

CB

C

BK

BCG

AWG

ATS

AT

ARMS

AL

AIR

AIC

AFG

AFF

AF

A

TRANSFORMER

WITH

WATERTIGHT

WEATHERPROOF

WATT

VOLTMETER SWITCH

VOLTMETER

VARIABLE FREQUENCY DRIVE

VALVE ACTUATOR MOTOR

VOLTS

UNINTERRUPTIBLE POWER SUPPLY

UPSTREAM

UNIT HEATER

UNDERGROUND

TYPICAL

TRIAD

TRUCK OPERATED CONTACT

TERMINAL CABINET

TERMINAL BLOCK

SOLENOID VALVE

SHORTING TERMINAL BLOCK

SANITARY SEWER CONTROL PANEL

STAINLESS STEEL / SOFT STARTER

SINGLE-POLE SINGLE-THROW

SINGLE-POLE DOUBLE-THROW

SURGE PROTECTION DEVICE

SOLID NEUTRAL

SINGLE MODE (FIBER)

SWITCHGATE

SUPPLY FAN

SURGE ARRESTOR

RUN

RIGID GALVANIZED STEEL CONDUIT

REFERENCE INFORMATION

RECEPTACLE

QUARTS LIGHTING

POTABLE WATER WELL CONTROLLER

POLYVINYL CHLORIDE CONDUIT

PUSH TO TEST

PRE-SORT SUPPLY

PRE-SORT FLUME

PRESSURE SWITCH

PAIR

PANEL

PHASE

POWER DISTRIBUTION BLOCK

PHOTOCELL

PULL BOX

PARTIAL

BELL ALARM CONTACT

OVERLOAD RELAY

NAMEPLATE

NORMALLY OPEN

NORMALLY CLOSED

NON-AUTOMATIC

NEUTRAL

NEW

MINI-POWER CENTER (XFMR AND PNL)

MOTOR STARTER

MAIN LUGS ONLY

MANHOLE / METAL HALIDE

MOTION DETECTOR

MOTOR CIRCUIT PROTECTOR

MOTOR CONTROL CENTER

MAIN CIRCUIT BREAKER

MOTOR

LOCAL/REMOTE

LATCHING RELAY

LIGHTING TRANSFORMER

LIGHTING

LIQUID TIGHT FLEX CONDUIT

LIGHTING RECEPTACLE

LIGHT CONTACTOR

JUNCTION BOX

INTAKE AND PUMP STRUCTURE

INSTANTANEOUS

INCANDESCENT

ISOLATED GROUND

HEATER

HIGH RESISTANCE GROUND

HIGH INTENSITY DISCHARGE

HAND HOLE

GROUND INSERT

GOV'T FURNISHED EQUIPMENT

GND, FAULT CIRCUIT INTERRUPTER

GALVANIZED

GROUND

GATE ACTUATOR MOTOR

FULL VOLTAGE REVERSING

FULL VOLTAGE NON-REVERSING

FIBER OPTIC

FUEL TANK LEAK DETECTION PANEL

FLUORESCENT LIGHTING

FLOOR

FEEDER

FUEL CLEANING SYSTEM PANEL

FEEDER CIRCUIT BREAKER

FUSE

EXISTING

ELECTROMAGNETIC COMPATIBILITY

EMERGENCY

ELEVATION

ENTRANCE GATE ACTUATOR MOTOR

EXHAUST FAN

EQUIPMENT GROUNDING CONDUCTOR

DOWNSTREAM

DIVISION

DIFFUSION GATE ACTUATOR MOTOR

CABLE VAULT

CABLE TRAY / CURRENT TRANSFORMER

COUNTING STATION

CATHODE RAY TUBE

CENTRAL PROCESSING UNIT

CONTROL POWER XFMR

CIRCULATING PUMP

CABLE GLAND BUSHING

CIRCUIT

CIRCUIT BREAKER

CONDUIT

BRAKE

BARE COPPER GROUND

AMERICAN WIRE GAUGE

AUTOMATIC TRANSFER SWITCH

AMPERE TRIP

ARC REDUCTION MAINTENANCE SWITCH

ALUMINUM

AMPERE INTERRUPTING RATING

AMPERE INTERRUPTING CAPACITY

ABOVE FINISHED GRADE

ABOVE FINISHED FLOOR

AMP FUSE, AMP FRAME

AMMETER, AMPERE

ZZ

ZV

ZT

ZS

YS

XMTR

WS

VT

VS

UTP

TVSS

TT

TI

TE

TDR

T/XFMR

SV

STP

STA

SS

SOL/SV

SGCC

SCR

SCADA

S/N

RLS

RIO

REG

PY

PWR

PTT

PT

PS

PRX

PRV

PLC

PL

PI

PDT

PCR

PCP

PCL

PC

PBL

PB

PA

NS

MIT

ME

MCR

LT

LS

LE

LC

IR

IY

I/P

I/O

HV

HMI

HOA

FZ

FWS

FU

FM

FC

ETM

DT

DSA

DRS

DPM

DO

DTAP

DNET

DI

CV

CU

CS

CR

CP

AWS

AUX

AO

ALM/AH

AIR

AI

POSITIONING LINEAR ACTUATOR (ELECT)

PNEUMATIC PISTON ACTUATOR

POSITION TRANSMITTER

LIMIT SWITCH

AUX ATS SWITCH

TRANSMITTER

WEIGHT/TENSION SWITCH

VIBRATION TRANSMITTER

VIBRATION SWITCH

UNSHIELDED TWISTED PAIR

TRANSIENT VOLTAGE SURGE SUPPRESSOR

TEMPERATURE TRANSMITTER

TEMPERATURE INDICATOR

TEMPERATURE ELEMENT

TIME DELAY RELAY

TRANSFORMER

SOLENOID VALVE

SHIELDED TWISTED PAIR

STATION (OPERATOR CONTROL)

SELECTOR SWITCH

SOLENOID/SOLENOID VALVE

SPILLWAY GATE CONTROL CABINET

SAFETY CONTROL RELAY

SUPERVISORY CONTROL & DATA ACQUISITION

SOLID NEUTRAL

ROTARY LIMIT SWITCH

REMOTE I/O

PRESSURE REGULATOR

PRESSURE CONVERTER

POWER

PRESS TO TEST

PRESSURE TRANSMITTER

PRESSURE SWITCH

PROXIMITY SWITCH

PRESSURE REGULATING VALVE

PROGRAMMABLE LOGIC CONTROLLER

PILOT LIGHT

PRESSURE INDICATOR

DIFFERENTIAL PRESSURE TRANSMITTER

POWER CONTACTOR, RAISE

PENDANT CONTROL PLUG

POWER CONTACTOR, LOWER

PERSONAL COMPUTER

PUSH BUTTON, LIGHTED

PUSH BUTTON

PLANT AIR

TORQUE SWITCH

RELATIVE HUMIDITY INDICATING XMTR

RELATIVE HUMIDITY/MOISTURE ELEMENT

MASTER CONTROL RELAY

LEVEL TRANSMITTER

LEVEL SWITCH

LEVEL ELEMENT

LEVEL CONTROLLER

INDUCTION RELAY

CURRENT CONVERTER

CURRENT TO PRESSURE TRANSDUCER

INPUT/OUTPUT

HAND VALVE

HUMAN MACHINE INTERFACE

HAND-OFF-AUTO

VALVE POSITION (FLOW)

FACILITY WATER SUPPLY

FUSE

FLOW METER

FLOW CONTROLLER

ELAPSED TIME METER

DEVICENET TAP

DEVICENET STARTER ASSEMBLY

DAM RECEPTACLE STATION

DIGITAL POWER METER

DISCREET OUTPUT

DEVICENET TAP

DEVICENET

DISCREET INPUT

CONTROL VALVE

COPPER

CONTROL SWITCH

CONTROL RELAY

CONTROL PANEL

AUXILLARY WATER SUPPLY

AUXILIARY

ANALOG OUTPUT

ALARM/ANNUNCIATOR HORN

AMPERE INTERRUPT RATING

ANALOG INPUT

SIGNAL OR WIRE NUMBER

ENCLOSURES, BOXES, ETC.

IDENTIFY EACH CIRCUIT WHERE IT TERMINATES OR PASSES THROUGH PANELS,

2. PROVIDE CONDUIT AND CIRCUIT ID TAGS ON ALL CONDUITS AND CIRCUITS.

USED IN THIS PROJECT.

INSTALLATION DRAWINGS. NOT ALL SYMBOLS AND ABBREVIATIONS SHOWN ARE

1. SYMBOLS AND ABBREVIATIONS APPLY TO ELECTRICAL DEMOLITION AND

WALL MOUNTED EXIT LIGHT FIXTURE

POLE MOUNTED LIGHT FIXTURE

-h PREFFERED AC, 120/208VAC

METAL ENCLOSED, VACUUM CIRCUIT BREAKER

ELECTRICALLY-OPERATED, FIXED TYPE,

-PRQ 480V SWITCHGEAR (PROJECT BUILDING)

D

C

A

B

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S I Z

E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E P

L O

T D

A T

E

C O

N T

R A

C T

N O

IDENTIFICATION

SHEET

1 2 3 4 5 6

E

D E

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

D R

A W

N B

Y

C H

E C

K E

D B

Y

/0

/2

A D

V E

R T

IS

E

B D

P .1

E

-0 X

X X

.D

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

IC

F

O R

T U

N Y

P

E

A N

S I

E

G E

C D

S E

G

S G

R

IF

F

IN

P

.E

G E

C D

E

D

A B

B R

E V

IA

T

IO

N

S

E L

E C

T R

IC

A

L L

E G

E N

D

E-001

:1

Q S

W

IT

C H

G E

A R

U P

G R

A D

E B

R A

D F

O R

D I

S L

A N

D W

N

R

N N

E V

IL

L

E L

O C

K A

N D

D A

REFERENCE DRAWINGS

BDG-6-7-25 AREA LIGHTING AND POWER

FIRE PUMPHOUSE

1 #2/0 GND

(2) CV4-t1

CONCRETE ENCASED DUCT BANK

(2) CV4-t1

1 #2/0 GND

CONCRETE ENCASED DUCT BANK

VS RE-USED.

SCHEDULE ON ED701 FOR LIST OF CONDUITS BEING DEMOLISHED

UNLESS NOTED OTHERWISE. REFER TO CONDUIT AND CABLE

CONDUCTORS ASSOCIATED WITH CONDUIT. RE-USE CONDUITS

1. CONDUITS SHOWN GREEN INDICATE REMOVAL OF

SPILLWAY SOUTH TOWER

VAULT CV4

CABLE

D

C

A

B

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S I Z

E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E P

L O

T D

A T

E

C O

N T

R A

C T

N O

IDENTIFICATION

SHEET

1 2 3 4 5 6

E

D E

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

D R

A W

N B

Y

C H

E C

K E

D B

Y

/0

/2

A D

V E

R T

IS

E

B D

P .1

E

D X

X X

.D

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

S I

E

G E

C D

S E

G

S G

R

IF

F

IN

P

.E

G E

C D

E

ED101

Q S

W

IT

C H

G E

A R

U P

G R

A D

E B

R A

D F

O R

D I

S L

A N

D W

N

R

N N

E V

IL

L

E L

O C

K A

N D

D A

M

W F

O R

T U

N Y

P

E

S

IT

E E

L E

C T

R

IC

A L

P L

A N

D E

M O

L

IT

IO

N

30' 60'0

MEZZANINE

A2

DEMOLITION ELECTRICAL SITE PLAN

SCALE 1" = 30'-0"

A3

ED109

A3

ED110

A1

ED106

A3

ED103

A1

ED104

A1

ED105

A3

ED102

A1

ED107

A1

ED108

BDG-6-7-18 POWER AND CONTROL NORTH AND SOUTH SHOPS

CONDUITS BEING DEMOLISHED VS RE-USED.

CONDUIT AND CABLE SCHEDULE ON ED701 FOR LIST OF

WILL BE RE-USED UNLESS NOTED OTHERWISE. REFER TO

CONDUCTORS ASSOCIATED WITH CONDUIT. MOST CONDUITS

2. CONDUITS SHOWN GREEN INDICATE REMOVAL OF

OTHERWISE.

1. ITEMS SHOWN GREEN ARE TO BE DEMOLISHED UNLESS NOTED

PRQ5

MATCH LINE (SOUTH SHOPS) SHEET ED103

ROOM

COMPRESSOR

ROOM

PAINT SPRAY

WASH AREA

PAINT EQUIP. ROOM

PANELBOARD PRQ6

PRQ1

ZPRJ2 ZPRJ1 PRTQ1

PRTQ2

SEE SHEET ED101

FOR CONTINUATION

TOP TO BOTTOM

KEYED NOTES#

BE RE-USED.

LOCATION OF HHPR1. CONDUITS FROM CV4 TO HHPR1 ARE TO

TRANSFORMER PAD. REFER TO E-102 FOR APPROXIMATE

NEW HAND HOLE HHPR1 AS REQUIRED TO ACCOMODATE NEW

2. REMOVE OR ABANDON CONDUITS BETWEEN BUILDING AND

RECONNECT EXISTING BRANCH CIRCUITS AS REQUIRED.

1. EXISTING PANELBOARD TO BE REPLACED. DISCONNECT AND

SEE SHEET ED101

FOR CONTINUATION

IVHJB

SEE SHEET ED101

FOR CONTINUATION

D

C

A

B

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S I Z

E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E P

L O

T D

A T

E

C O

N T

R A

C T

N O

IDENTIFICATION

SHEET

1 2 3 4 5 6

E

D E

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

D R

A W

N B

Y

C H

E C

K E

D B

Y

/0

/2

A D

V E

R T

IS

E

B D

P .1

E

D X

X X

.D

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

S I

E

G E

C D

S E

G

S G

R

IF

F

IN

P

.E

G E

C D

E B

R

ED102

Q S

W

IT

C H

G E

A R

U P

G R

A D

E B

R A

D F

O R

D I

S L

A N

D W

N

R

N N

E V

IL

L

E L

O C

K A

N D

D A

M

W F

O R

T U

N Y

P

E

D E

M O

L

IT

IO

E C

T R

IC

A

L P

L A

N

8'0 4' 16'

N O

R T

H S

H O

P S

A3

DEMOLITION - NORTH SHOPS ELECTRICAL PLAN

SCALE 3/16" = 1'-0"

A3

ED402

A3

ED401

B1

ED201

A4

ED201

BDG-6-7-18 POWER AND CONTROL NORTH AND SOUTH SHOPS

CONDUITS BEING DEMOLISHED VS RE-USED.

CONDUIT AND CABLE SCHEDULE ON ED701 FOR LIST OF

WILL BE RE-USED UNLESS NOTED OTHERWISE. REFER TO

CONDUCTORS ASSOCIATED WITH CONDUIT. MOST CONDUITS

2. CONDUITS SHOWN GREEN INDICATE REMOVAL OF

OTHERWISE.

1. ITEMS SHOWN GREEN ARE TO BE DEMOLISHED UNLESS NOTED

MATCH LINE (NORTH SHOPS) SHEET ED102

WELDING SHOP

REPAIR AREA

WASH AREA

KEYED NOTES#

RECONNECT EXISTING BRANCH CIRCUITS AS REQUIRED.

1. EXISTING PANELBOARD TO BE REPLACED. DISCONNECT AND

M A

T C

H L

IN

E

W

E S

T S

H O

P S

/O F

F

IC

E S

S

H E

E T

E D

PANELBOARD PRQ4

PANELBOARD PRQ9

SEE ED104

FOR CONTINUATION

D

C

A

B

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S I Z

E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E P

L O

T D

A T

E

C O

N T

R A

C T

N O

IDENTIFICATION

SHEET

1 2 3 4 5 6

E

D E

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

D R

A W

N B

Y

C H

E C

K E

D B

Y

/0

/2

A D

V E

R T

IS

E

B D

P .1

E

D X

X X

.D

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

S I

E

G E

C D

S E

G

S G

R

IF

F

IN

P

.E

G E

C D

E B

R

ED103

Q S

W

IT

C H

G E

A R

U P

G R

A D

E B

R A

D F

O R

D I

S L

A N

D W

N

R

N N

E V

IL

L

E L

O C

K A

N D

D A

M

W F

O R

T U

N Y

P

E

D E

M O

L

IT

IO

E C

T R

IC

A

L P

L A

N

8'0 4' 16'

S O

U T

H S

H O

P S

A3

DEMOLITION - SOUTH SHOPS ELECTRICAL PLAN

SCALE 3/16" = 1'-0"

B4

BDG-6-7-17 POWER AND CONTROL WEST SHOPS AND OFFICES

CONDUITS BEING DEMOLISHED VS RE-USED.

CONDUIT AND CABLE SCHEDULE ON ED701 FOR LIST OF

WILL BE RE-USED UNLESS NOTED OTHERWISE. REFER TO

CONDUCTORS ASSOCIATED WITH CONDUIT. MOST CONDUITS

2. CONDUITS SHOWN GREEN INDICATE REMOVAL OF

OTHERWISE.

1. ITEMS SHOWN GREEN ARE TO BE DEMOLISHED UNLESS NOTED

KEYED NOTES#

RECONNECT EXISTING BRANCH CIRCUITS AS REQUIRED.

1. EXISTING PANELBOARD TO BE REPLACED. DISCONNECT AND

PANELBOARD PRQ21PANELBOARD PRQ3

TRANSFORMER TR1

TRANSFORMER TR2

TRANSFORMER TR5

D

C

A

B

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S I Z

E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E P

L O

T D

A T

E

C O

N T

R A

C T

N O

IDENTIFICATION

SHEET

1 2 3 4 5 6

E

D E

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

D R

A W

N B

Y

C H

E C

K E

D B

Y

/0

/2

A D

V E

R T

IS

E

B D

P .1

E

D X

X X

.D

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

S I

E

G E

C D

S E

G

S G

R

IF

F

IN

P

.E

G E

C D

E B

R

ED104

Q S

W

IT

C H

G E

A R

U P

G R

A D

E B

R A

D F

O R

D I

S L

A N

D W

N

R

N N

E V

IL

L

E L

O C

K A

N D

D A

M

W F

O R

T U

N Y

P

E

D E

M O

L

IT

IO

E C

T R

IC

A

L P

L A

N

8'0 4' 16'

W E

S T

S H

O P

S A

N D

O F

F

IC

E S

A1

DEMOLITION WEST SHOPS AND OFFICES ELECTRICAL PLAN

SCALE 3/16" = 1'-0"

A1

CONDUITS BEING DEMOLISHED VS RE-USED.

CONDUIT AND CABLE SCHEDULE ON ED701 FOR LIST OF

WILL BE RE-USED UNLESS NOTED OTHERWISE. REFER TO

CONDUCTORS ASSOCIATED WITH CONDUIT. MOST CONDUITS

2. CONDUITS SHOWN GREEN INDICATE REMOVAL OF

OTHERWISE.

1. ITEMS SHOWN GREEN ARE TO BE DEMOLISHED UNLESS NOTED

BDG-6-7-14 MEZZANINE MISCELANEOUS SYSTEMS AND DETAILS

IVH

PR9.2

D

C

A

B

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S I Z

E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E P

L O

T D

A T

E

C O

N T

R A

C T

N O

IDENTIFICATION

SHEET

1 2 3 4 5 6

E

D E

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

D R

A W

N B

Y

C H

E C

K E

D B

Y

/0

/2

A D

V E

R T

IS

E

B D

P .1

E

D X

X X

.D

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

S I

E

G E

C D

S E

G

S G

R

IF

F

IN

P

.E

G E

C D

E B

R

ED105

Q S

W

IT

C H

G E

A R

U P

G R

A D

E B

R A

D F

O R

D I

S L

A N

D W

N

R

N N

E V

IL

L

E L

O C

K A

N D

D A

M

W F

O R

T U

N Y

P

E

D E

M O

L

IT

IO

E C

T R

IC

A

L P

L A

N

8'0 4' 16'

M E

Z Z

A N

IN

E

A1

DEMOLITION - MEZZANINE ELECTRICAL PLAN

SCALE 3/16" = 1'-0"

1 2 3 4

3 4

5 6

7 8

9 10

11 12

13 14

15 16

17 18

SN

SPARE

SPARE

NORTH WALL RECEPTACLE

EAST WALL LIGHTS

WEST WALL LIGHTS

NORTH WALL LIGHTS

PANEL LIGHT

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

OUTSIDE FLOOD LIGHT

S.W. WALL RECEPTACLE

N.E. WALL RECEPTACLE

EAST WALL RECEPTACLE

SPARE

V

R E

C E

P T

A C

L E

S

V

R E

C E

P T

A C

L E

S

S P

A R

E

S P

A R

E

GENERAL NOTES

REFERENCE DRAWINGS

CONDUITS BEING DEMOLISHED VS RE-USED.

CONDUIT AND CABLE SCHEDULE ON ED701 FOR LIST OF

WILL BE RE-USED UNLESS NOTED OTHERWISE. REFER TO

CONDUCTORS ASSOCIATED WITH CONDUIT. MOST CONDUITS

2. CONDUITS SHOWN GREEN INDICATE REMOVAL OF

OTHERWISE.

1. ITEMS SHOWN GREEN ARE TO BE DEMOLISHED UNLESS NOTED

BDG-6-7-27 EQUIPMENT SHELTER BUILDING ELECTRICAL

ISLAND SERVICE CENTER

LOCATED IN PRQ1, BRADFORD

OVERHEAD DOOR

EXISTING HEATER

EXISTING FLOODLIGHT

SLIDING DOORS

EXISTING HEATER

EXISTING OUTSIDE FLOODLIGHT

CONDUIT

EXISTING

"4

13 #2 & 1 #2 GND, 1

ESB(PRQ7)

480V BREAKER BOX

LIGHTING PANELBOARD

LIGHTING DISCONNECT

240/120V

15KVA TRANSFORMER

480V-240/120V, DISCONNECT. (2 POLE)

TRANSFORMER

480V LIGHTING

SEE SHEET ED101

FOR CONTINUATION

D

C

A

B

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S I Z

E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E P

L O

T D

A T

E

C O

N T

R A

C T

N O

IDENTIFICATION

SHEET

1 2 3 4 5 6

E

D E

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R of Engineers

US Army Corps

D R

A W

N B

Y

C H

E C

K E

D B

Y

/0

/2

A D

V E

R T

IS

E

B D

P .1

E

D X

X X

.D

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .