ESS-25-012 PUMP ROOM HVAC DUCTING S12.pdf

PDF 1 MB Posted

Attached to
FY25 Essayons Overhaul
Solicitation number
W9127N24B0011
Issued by

About this file

This document appears to be a Task Request for work on the HVAC ducting in the pump room of the U.S. Army Corps of Engineers (USACE) dredge vessel ESSAYONS. The task request identifies the need to replace all the deteriorated HVAC supply ductwork, hangers, dampers, diffusers, insulation, and related components in the pump room in order to restore the system to its original configuration. The ductwork has corroded, separated, and failed, and needs to be addressed as part of the upcoming maintenance and repair availability for the vessel. The document references related drawings and technical information, and indicates the work should be completed as part of the upcoming maintenance period.

The related federal contract opportunity is for the FY25 overhaul of the Dredge ESSAYONS, a trailing suction hopper dredge operated by USACE. The solicitation, number W9127N24B0011, is for a firm fixed price job order under a Master Ship and Repair Agreement (MSRA) to perform overhaul, maintenance, and repair work on the vessel. The solicitation includes a detailed list of potential work items, and requires offerors to attend a mandatory site visit prior to submitting bids. The work is to be performed at the contractor's facility, with the government delivering the vessel. Upon completion, USACE will conduct dock and sea trials prior to acceptance.

View the file

Other files

File Type Posted
C.04_FormalAbstractOfOffers7N24B0011.pdf PDF
C.04_BidRoster7N24B0011.xlsx XLSX spreadsheet
B.08 W9127N24B0011 0001 Essayons Overhaul Solicitation.pdf PDF
B.08 W9127N24B0011 Essayons Overhaul Solicitation.pdf PDF
B.08 W9127N24B0011 Essayons Overhaul Solicitation Projnet Questions and Responses.pdf PDF
ES2705-14.pdf PDF
Phoenix-Spherical-Bearing (2).pdf PDF
70010-4345-925 Pump CONNECTING PIECE.pdf PDF
681-0905-302-2 Rev 3 Combined.pdf PDF
19737 Rev A Gimbal Winch Motor Foundation.pdf PDF
Propulsion Exhaust Drawings.pdf PDF
SSDG Exaust Drawings.pdf PDF
DDG Exhaust Drawings.pdf PDF
B.08 Price List_Rev1.xlsx XLSX spreadsheet
681-0700-136 Rev 2 (1 of 1).pdf PDF
70.010-2730-921 Rev B.pdf PDF
681-0713-201 Rev 6 (3 of 3).pdf PDF
70.010-5069-901.pdf PDF
681-0713-102 Rev 2 (3 of 4).pdf PDF
5069-907 Rev A (1 of 1).pdf PDF
70010-5069-907 Rev A (1 of 1).pdf PDF
70.010-4421-051 Combined.pdf PDF
Aurora 413 Cut Sheet.pdf PDF
D201049C.pdf PDF
681-0700-159 Rev 4 (1 of 1).pdf PDF
681-0879-203 Combined.pdf PDF
70.010-2730-921 (2 of 2).pdf PDF
E 1710 SERIES.pdf PDF
70.010-5069-910.pdf PDF
681-0915-304 Combined.pdf PDF
70.010-5058-918.pdf PDF
70.010-2560-057.pdf PDF
681-0700-161 Rev 2 (1 of 1).pdf PDF
70.010-4046-902.pdf PDF
390-VGR-02.pdf PDF
681-0785-201 Combined.pdf PDF
681-0713-102 Rev 2 (1 of 4).pdf PDF
70.010-5058-902 Rev C.pdf PDF
70.010-5069-902 Rev C.pdf PDF
NPDS3500H_Technical_description.pdf PDF
70.010-5069-902.pdf PDF
70.010-5058-902 Rev B.pdf PDF
70.010-4411-942 Combined.pdf PDF
70010-5058-904 Rev C (1 of 1).pdf PDF
70010-4421-052.pdf PDF
70.010-4046-902 Rev B.pdf PDF
70.010-0341-901.pdf PDF
681-0700-137 Rev 2 (1 of 1).pdf PDF
Aurora 400 Series Split Case Pump - Manual.pdf PDF
70010-5058-907 Rev A (1 of 1).pdf PDF
Show 40 more

Latest 50 of 99 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK REQUEST - ESSAYONS SHIPS TR # ESS -11-

CONTACT(S) OFFICE TR #

INITIATOR TR DATE

PRIORITY DATE REQUESTED

ROUTING INITIALS SUPERVISORS MASTERS

SYSTEM INFORMATION

SYSTEM

COMPARTMENT LEVEL

SIDE FRAME NOTE

DESCRIPTION OF TASK

DESCRIPTION OF PROBLEM

SAFETY ISSUES

ATTACHMENTS YES NO PAGES TECH. MANUAL #

ENGINEERING

COORDINATOR DATE

PRIORITY 1 PRIORITY 2 PRIORITY 3

PROJECT ENGINEER DATE JOB ORDER

SHIP’S FORCE VENDOR CONTRACTOR SHIPYARD MOORINGS

ESTIMATED COST COMPLETION DATE

υ ENGINEERING COMMENTS υ

PROPOSAL / ACTION / DIRECTION ACCEPT MORE INFO NEEDED DEFER CANCEL

TR RECEIVED FROM VESSEL TR RETURNED TO VESSEL

g2odndmp Oval g2odndmp Typewritten Text

AREA OF FAILURE, BUT ALL

MATERIALS ARE IN THE SAME,

POOR CONDITION. REPLACE ALL

DUCTWORK HIGHLIGHTED.

Line

Oval

SHIPS TR #
CONTACT(S)
TASK REQUEST - ESSAYONS
OFFICE TR #
INITIATOR
TR DATE
PRIORITY
DATE REQUESTED
MASTERS
SUPERVISORS
ROUTING INITIALS
SYSTEM INFORMATION
NOTE
DESCRIPTION OF TASK
DESCRIPTION OF PROBLEM
SAFETY ISSUES
ATTACHMENTS
YES NO
PAGES
TECH. MANUAL #
ENGINEERING
COORDINATOR
DATE
PRIORITY 1
PRIORITY 2
PRIORITY 3
PROJECT ENGINEER
DATE
JOB ORDER
ESTIMATED COST
COMPLETION DATE
( ENGINEERING COMMENTS (
PROPOSAL / ACTION / DIRECTION
TR RECEIVED FROM VESSEL
TR RETURNED TO VESSEL
ESS-15-083 - ICMS-Wonderware CorrectionsJOH.pdf
ESS-15-083 - ICMS-Wonderware Corrections
SHIPS TR #
CONTACT(S)
TASK REQUEST - ESSAYONS
OFFICE TR #
INITIATOR
TR DATE
PRIORITY
DATE REQUESTED
MASTERS
SUPERVISORS
ROUTING INITIALS
SYSTEM INFORMATION
NOTE
DESCRIPTION OF TASK
DESCRIPTION OF PROBLEM
SAFETY ISSUES
ATTACHMENTS
YES NO
PAGES
TECH. MANUAL #
ENGINEERING
COORDINATOR
DATE
PRIORITY 1
PRIORITY 2
PRIORITY 3
PROJECT ENGINEER
DATE
JOB ORDER
ESTIMATED COST
COMPLETION DATE
( ENGINEERING COMMENTS (
PROPOSAL / ACTION / DIRECTION
TR RECEIVED FROM VESSEL
TR RETURNED TO VESSEL

Wonderware Task Request support doc 2014

TR 012 DWG 681-0915-304.pdf
681-0915-304 Rev 5 (1 of 9)
681-0915-304 Rev 5 (2 of 9)
681-0915-304 Rev 5 (3 of 9)
681-0915-304 Rev 5 (4 of 9)
681-0915-304 Rev 5 (5 of 9)
681-0915-304 Rev 5 (6 of 9)
681-0915-304 Rev 5 (7 of 9)
681-0915-304 Rev 5 (8 of 9) Fr1
681-0915-304 Rev 5 (8 of 9) Fr2
681-0915-304 Rev 5 (9 of 9)
Paquet/Rolle Chief Engineers: PAQUET
Joe Bateman:
SY 15/16: M&R 24-25
Point of Contact: PAQUET/YELACA
tr#: ESS-25-012
MM/DD/YY: 5/5/2024
1,2,3: 1
SYSTEM: HVAC
COMPARTMENT: PUMP ROOM
LEVEL: 35-3" to HOLD DECK
SIDE: PORT
FRAME: 46
NOTE:
Task Description: PROVIDE ALL LABOR/MATERIALS TO RENEW SUPPLY DUCTWORK IAW FAN S12. RENEW ALL HANGERS, DAMPERS, DIFFUSERS, SCREENS, INSULATION, ETC. TO RESTORE TO ORIGINAL CONFIGUATION. INSPECT/REPLACE AS NECESSARY THE REMAINING DUCTWORK FOR THIS FAN AND FAN E11. ALL DUCTWORK IS OF THE SAME AGE/CONDITION. FAN S12 OVERHAUL REQUEST IS DETAILED ON TR ESS-25-014.
Description of Problem: DUCT WORK HAS CORRODED/SEPARATED/FAILED AND IS HANGING BY INSULATION/FRICTION. REQUEST NEEDS TO BE COMPLETED THIS M&R. SEE PAGE 3 FOR PICTURE. SEE PAGE 2 FOR SNIPET OF DWG 681-0915-304, SHEET 8 of 9.
Safety Issues: COMPLETE DUCTWORK COLLAPSE/INJURING SHIPBOARD PERSONNEL, CONTRACTORS, ETC.
Y: Yes
No: Off
PAGES:
TECH MANUAL:
Comments: 681-0915-304, SHEETS 1-9 AVAILABLE FROM C/E ELECTRONICALLY.
COORDINATOR:
DATE:
PRIORITY 1: Off
PRIORITY 2: Off
PRIORITY 3: Off
PROJECT ENGINEER:
DATE_2:
JOB ORDER:
ship's force: Off
vendor: Off
contractor: Off
shipyard: Off
moorings: Off
ESTIMATED COST:
COMPLETION DATE:
engineering comments:
accept: Off
more info: Off
defer: Off
cancel: Off
TR RECEIVED FROM VESSEL:
TR RETURNED TO VESSEL:
2024-05-05T19:35:03-0700
PAQUET.DAVID.M.JR.1228506270

File details come from the government source that posted it. Updated .