B.08 Price List_Rev1.xlsx
XLSX spreadsheet 79 KB Posted
- Attached to
- FY25 Essayons Overhaul
- Solicitation number
- W9127N24B0011
About this file
This document appears to be a pricing template for a Request for Proposal (RFP) related to the overhaul, maintenance, and repair of the U.S. Army Corps of Engineers (USACE) Dredge ESSAYONS. The RFP solicitation number is W9127N24B0011.
The pricing template outlines two categories of work items: Category A and Category B. Category A includes transportation, crane services, drydocking, coatings, piping, mechanical, and structural repairs. Category B includes tug services, hopper valve replacement, sheave overhaul, rudder stock replacement, and bow thruster work. The document also includes pricing for over and above work, including a fully burdened labor rate and daily rates for pier side and drydocking extensions. Prospective contractors must have or be capable of entering into a Master Ship Repair Agreement with USACE prior to award. The vessel will be delivered to the contractor's facility, and USACE will conduct dock and sea trials prior to acceptance. Anticipated major work items are detailed in the RFP description.
View the file
Other files
Show 40 more
Latest 50 of 99 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAT A
| Category A Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Transportation | 5.1.1 | 4 | Each | $ - 0 | |
| Crane Services | 5.1.3 | 75 | Hour | $ - 0 | |
| Connection/Disconnection of Services | 5.1.4 | 1 | Job | $ - 0 | |
| Field Office | 5.1.5 | 1 | Job | $ - 0 | |
| Parking | 5.1.6 | 1 | Job | $ - 0 | |
| Drydocking Lift Day | 5.2.1 | 1 | Job | $ - 0 | |
| Drydock Lay Day | 5.2.2 | 60 | Day | $ - 0 | |
| Wet Berth | 5.2.3 | 15 | Day | $ - 0 | |
| Electricity | 5.2.4 | 1 | Job | $ - 0 | |
| Steam/Chill Water | 5.2.5 | 75 | Day | $ - 0 | |
| Marine Chemist Certifications | 5.3.1 | 1 | Job | $ - 0 | |
| Fire Suppression Services | 5.4.1 | 1 | Job | $ - 0 | |
| Galley Hood and Fire Suppression Replacement | 5.4.2 | 1 | Job | $ - 0 | |
| Bilge Maintenance and Cleaning | 5.5.1 | 1 | Job | $ - 0 | |
| Hull Surface Prep and Coat | 5.6.1 | 1 | Job | $ - 0 | |
| Irathane 155 Urethane Coating Repair | 5.6.4 | 1 | Job | $ - 0 | |
| Aft Peak Saltwater Ballast Tank Preservation | 5.6.5 | 1 | Job | $ - 0 | |
| Sluice Valve Replacement | 5.8.1 | 1 | Job | $ - 0 | |
| 18" Sea Valves | 5.8.7 | 1 | Job | $ - 0 | |
| Replace Chloropac Power Supply | 5.8.8 | 1 | Job | $ - 0 | |
| Drag Arm Sheave Inspection | 5.10.3 | 1 | Job | $ - 0 | |
| Stbrd Dragarm Davit Cylinders Removal, Inspection, Overhaul & Preservation | 5.10.8 | 1 | Job | $ - 0 | |
| Discharge Piping Inspection | 5.11.1 | 1 | Job | $ - 0 | |
| Discharge Pipe Epoxy Repairs | 5.11.2 | 1 | Job | $ - 0 | |
| Hopper Jetting System Clean | 5.13.2 | 1 | Job | $ - 0 | |
| Weir Seal Inspection | 5.13.3 | 1 | Job | $ - 0 | |
| Anti-Turbidity Hydraulic Cylinder Removal | 5.13.5 | 1 | Job | $ - 0 | |
| Hopper Lander Flap Removal | 5.13.6 | 1 | Job | $ - 0 | |
| Hopper Inspection Staging | 5.14.1 | 1 | Job | $ - 0 | |
| Upper Hopper Staging | 5.14.2 | 1 | Job | $ - 0 | |
| Tower Staging | 5.14.3 | 50 | Each | $ - 0 | |
| Port & Stbd Rudder Stock Upper Bearing and Packing Gland Inspection | 5.15.1 | 1 | Job | $ - 0 | |
| Jastram Potentiometer Replacement and Calibration | 5.15.3 | 1 | Job | $ - 0 | |
| Propeller Blade Inspection | 5.16.1 | 1 | Job | $ - 0 | |
| Propeller Blade and Blade Seal Replacement | 5.16.2 | 1 | Job | $ - 0 | |
| Stern Tube Shaft Seal Replacement | 5.16.5 | 1 | Job | $ - 0 | |
| Temporary Electric Motor Heaters | 5.19.2 | 1 | Job | $ - 0 | |
| Sewage Pipe Repairs | 5.21.6 | 1 | Job | $ - 0 | |
| Drag Arm Winch Motor Overhaul | 5.22.3 | 2 | Each | $ - 0 | |
| ABS Support | 5.24.0 | 1 | Job | $ - 0 | |
| Audio Gauge Reading | 5.24.1 | 1 | Job | $ - 0 | |
| Internal Tank Inspection | 5.24.4 | 1 | Job | $ - 0 | |
| Anchor Chain and Chain Locker Inspection for Vessel General Permit | 5.26.3 | 1 | Job | $ - 0 | |
| Life Raft Annual Service | 5.28.1 | 1 | Job | $ - 0 | |
| Sludge Tanks Annual Maintenance | 5.29.1 | 1 | Job | $ - 0 | |
| Strut and Stern Tube Bearing Inspection | 5.31.1 | 1 | Job | $ - 0 | |
| Rudder Bushing Clearance Documentation | 5.31.2 | 1 | Job | $ - 0 | |
| Dock and Sea Trials | 5.33.1 | 1 | Job | $ - 0 | |
| Lower Hopper Steel Repairs | 5.44.1 | 1 | Job | $ - 0 | |
| Upper Hopper Steel Repairs | 5.44.2 | 1 | Job | $ - 0 | |
| Fore Peak Steel Angle Repair and Ballast Valve Replacement | 5.44.3 | 1 | Job | $ - 0 | |
| Inlet Hull Doubler Replacement | 5.44.7 | 1 | Job | $ - 0 | |
| Generator Room Fans S4, S5, E6, & E7 Overhauls | 5.46.1 | 1 | Job | $ - 0 | |
| Pump Room Fan S12 Overhaul and Ducting Replacement | 5.46.2 | 1 | Job | $ - 0 | |
| Service Frame and Dragarm Conduit and Cable | 5.46.3 | 1 | Job | $ - 0 | |
| OSDP Bell Housing Replacements | 5.46.4 | 1 | Job | $ - 0 | |
| Port & Stbd Saltwater Pump Overhaul | 5.47.1 | 2 | Job | $ - 0 | |
| Generator Emergency CFW Cooling Pump Overhaul | 5.47.2 | 1 | Job | $ - 0 | |
| ME Emergency Cooling Pump Overhaul | 5.47.3 | 1 | Job | $ - 0 | |
| Potable Water Riser Piping and Valve Replacement | 5.47.7 | 1 | Job | $ - 0 | |
| Deck Drain Installation, Repair, and Clearing | 5.47.8 | 1 | Job | $ - 0 | |
| Fuel Oil Overflow Piping and Aft Deep Fuel Containment Repair | 5.47.9 | 1 | Job | $ - 0 | |
| Heat Exchanger Room Salt Water Piping Replacement | 5.47.10 | 1 | Job | $ - 0 | |
| Port SSDG SR4B Generator Overhaul | 5.48.1 | 1 | Job | $ - 0 | |
| Port & Stbd 600V Kato Generator Bearing Replacement | 5.48.2 | 1 | Job | $ - 0 | |
| Port 3512 SSDG Top End Overhaul | 5.48.3 | 1 | Job | $ - 0 | |
| C280 Generator VULKAN Coupling Replacement | 5.48.4 | 1 | Job | $ - 0 | |
| Exhaust Stack Repairs | 5.48.8 | 1 | Job | $ - 0 | |
| #1 Start & #2 Control Air Compressor Replacement | 5.48.11 | 1 | Job | $ - 0 | |
| Rescue Boat, Launch, and Lifeboat Davit Inspections | 5.53.1 | 1 | Job | $ - 0 | |
| Essayons Launch Service | 5.53.2 | 1 | Job | $ - 0 | |
| Navigation Equipment Annual Service | 5.54.1 | 1 | Job | $ - 0 | |
| Total Category A Work Items | $ - 0 |
CAT B
| Category B Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Tug Service | 5.1.2 | 1 | Job | $ - 0 | |
| Deep Cleaning of Vessel Hotel Spaces | 5.1.7 | 1 | Job | $ - 0 | |
| Hopper Jetting Valve (10") Replacement | 5.8.3 | 1 | Each | $ - 0 | |
| Drag Arm Sheave Overhaul, Sheave Guide | 5.10.4 | 1 | Each | $ - 0 | |
| Drag Arm Sheave Overhaul, Single Sheave Water Block | 5.10.5 | 1 | Each | $ - 0 | |
| Drag Arm Sheave Overhaul, Single Sheave | 5.10.6 | 1 | Each | $ - 0 | |
| Drag Arm Sheave Overhaul, Swell Comp Single Sheave | 5.10.7 | 1 | Each | $ - 0 | |
| Weir Seal Replacement | 5.13.4 | 1 | Job | $ - 0 | |
| Rudder Stock Replacement | 5.15.2 | 1 | Job | $ - 0 | |
| Tailshaft Replacement | 5.16.4 | 1 | Job | $ - 0 | |
| Bow Thruster - Lower Gearbox (LGB) / Pod Change Out | 5.17.4 | 1 | Job | $ - 0 | |
| Jetting Pump Repairs | 5.21.5 | 1 | Job | $ - 0 | |
| Total Category B Work Items | $ - 0 |
Over & Above Work
| Over & Above Work | |||||
| SCHEDULE OF PRICES/RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED) | |||||
| Over & Above Work | |||||
| Item Description | PWS | ||||
| Paragraph | Required Level | ||||
| Of Effort Hours | Materials | Fully Burdened | |||
| Labor Rate | Material Burden Rate | Total Cost | |||
| Ship Repair Labor Rate | 6.1 | 13,000 | $0.00 | ||
| Materials & Subcontractor | 6.1 | $ 920,000.00 | $ 920,000.00 |
| SCHEDULE OF PRICES/RATES FOR THE PURPOSES OF A GOVERNMENT REQUIRED EXTENSION: DAILY RATES FOR PIER SIDE AND DRY-DOCKING (FULLY BURDENED) | ||||||
| Over & Above Work | ||||||
| Item Description | PWS | |||||
| Paragraph | Qty | Unit | Unit Price | Total Cost | ||
| Dry-Docking Extension Cost | 6.1 | 10 | Days | $ - 0 | ||
| Pier Side Extension Costs | 6.1 | 14 | Days | $ - 0 | ||
| Total Over & Above Work Items | $920,000.00 |