B.08 Price List_Rev1.xlsx

XLSX spreadsheet 79 KB Posted

Attached to
FY25 Essayons Overhaul
Solicitation number
W9127N24B0011
Issued by

About this file

This document appears to be a pricing template for a Request for Proposal (RFP) related to the overhaul, maintenance, and repair of the U.S. Army Corps of Engineers (USACE) Dredge ESSAYONS. The RFP solicitation number is W9127N24B0011.

The pricing template outlines two categories of work items: Category A and Category B. Category A includes transportation, crane services, drydocking, coatings, piping, mechanical, and structural repairs. Category B includes tug services, hopper valve replacement, sheave overhaul, rudder stock replacement, and bow thruster work. The document also includes pricing for over and above work, including a fully burdened labor rate and daily rates for pier side and drydocking extensions. Prospective contractors must have or be capable of entering into a Master Ship Repair Agreement with USACE prior to award. The vessel will be delivered to the contractor's facility, and USACE will conduct dock and sea trials prior to acceptance. Anticipated major work items are detailed in the RFP description.

View the file

Other files

File Type Posted
C.04_FormalAbstractOfOffers7N24B0011.pdf PDF
C.04_BidRoster7N24B0011.xlsx XLSX spreadsheet
B.08 W9127N24B0011 0001 Essayons Overhaul Solicitation.pdf PDF
B.08 W9127N24B0011 Essayons Overhaul Solicitation.pdf PDF
B.08 W9127N24B0011 Essayons Overhaul Solicitation Projnet Questions and Responses.pdf PDF
ES2705-14.pdf PDF
Phoenix-Spherical-Bearing (2).pdf PDF
70010-4345-925 Pump CONNECTING PIECE.pdf PDF
681-0905-302-2 Rev 3 Combined.pdf PDF
19737 Rev A Gimbal Winch Motor Foundation.pdf PDF
Propulsion Exhaust Drawings.pdf PDF
SSDG Exaust Drawings.pdf PDF
DDG Exhaust Drawings.pdf PDF
681-0700-136 Rev 2 (1 of 1).pdf PDF
70.010-2730-921 Rev B.pdf PDF
681-0713-201 Rev 6 (3 of 3).pdf PDF
70.010-5069-901.pdf PDF
681-0713-102 Rev 2 (3 of 4).pdf PDF
5069-907 Rev A (1 of 1).pdf PDF
70010-5069-907 Rev A (1 of 1).pdf PDF
70.010-4421-051 Combined.pdf PDF
Aurora 413 Cut Sheet.pdf PDF
D201049C.pdf PDF
681-0700-159 Rev 4 (1 of 1).pdf PDF
681-0879-203 Combined.pdf PDF
70.010-2730-921 (2 of 2).pdf PDF
E 1710 SERIES.pdf PDF
70.010-5069-910.pdf PDF
681-0915-304 Combined.pdf PDF
70.010-5058-918.pdf PDF
70.010-2560-057.pdf PDF
681-0700-161 Rev 2 (1 of 1).pdf PDF
70.010-4046-902.pdf PDF
390-VGR-02.pdf PDF
681-0785-201 Combined.pdf PDF
681-0713-102 Rev 2 (1 of 4).pdf PDF
70.010-5058-902 Rev C.pdf PDF
70.010-5069-902 Rev C.pdf PDF
NPDS3500H_Technical_description.pdf PDF
70.010-5069-902.pdf PDF
70.010-5058-902 Rev B.pdf PDF
ESS-25-012 PUMP ROOM HVAC DUCTING S12.pdf PDF
70.010-4411-942 Combined.pdf PDF
70010-5058-904 Rev C (1 of 1).pdf PDF
70010-4421-052.pdf PDF
70.010-4046-902 Rev B.pdf PDF
70.010-0341-901.pdf PDF
681-0700-137 Rev 2 (1 of 1).pdf PDF
Aurora 400 Series Split Case Pump - Manual.pdf PDF
70010-5058-907 Rev A (1 of 1).pdf PDF
Show 40 more

Latest 50 of 99 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAT A

Category A Work Item DescriptionPWS ParagraphQtyUnitUnit PriceAmount
Transportation5.1.14Each$ - 0
Crane Services5.1.375Hour$ - 0
Connection/Disconnection of Services5.1.41Job$ - 0
Field Office5.1.51Job$ - 0
Parking5.1.61Job$ - 0
Drydocking Lift Day5.2.11Job$ - 0
Drydock Lay Day5.2.260Day$ - 0
Wet Berth5.2.315Day$ - 0
Electricity5.2.41Job$ - 0
Steam/Chill Water5.2.575Day$ - 0
Marine Chemist Certifications5.3.11Job$ - 0
Fire Suppression Services5.4.11Job$ - 0
Galley Hood and Fire Suppression Replacement5.4.21Job$ - 0
Bilge Maintenance and Cleaning5.5.11Job$ - 0
Hull Surface Prep and Coat5.6.11Job$ - 0
Irathane 155 Urethane Coating Repair5.6.41Job$ - 0
Aft Peak Saltwater Ballast Tank Preservation5.6.51Job$ - 0
Sluice Valve Replacement5.8.11Job$ - 0
18" Sea Valves5.8.71Job$ - 0
Replace Chloropac Power Supply5.8.81Job$ - 0
Drag Arm Sheave Inspection5.10.31Job$ - 0
Stbrd Dragarm Davit Cylinders Removal, Inspection, Overhaul & Preservation5.10.81Job$ - 0
Discharge Piping Inspection5.11.11Job$ - 0
Discharge Pipe Epoxy Repairs5.11.21Job$ - 0
Hopper Jetting System Clean5.13.21Job$ - 0
Weir Seal Inspection5.13.31Job$ - 0
Anti-Turbidity Hydraulic Cylinder Removal5.13.51Job$ - 0
Hopper Lander Flap Removal5.13.61Job$ - 0
Hopper Inspection Staging5.14.11Job$ - 0
Upper Hopper Staging5.14.21Job$ - 0
Tower Staging5.14.350Each$ - 0
Port & Stbd Rudder Stock Upper Bearing and Packing Gland Inspection5.15.11Job$ - 0
Jastram Potentiometer Replacement and Calibration5.15.31Job$ - 0
Propeller Blade Inspection5.16.11Job$ - 0
Propeller Blade and Blade Seal Replacement5.16.21Job$ - 0
Stern Tube Shaft Seal Replacement5.16.51Job$ - 0
Temporary Electric Motor Heaters5.19.21Job$ - 0
Sewage Pipe Repairs5.21.61Job$ - 0
Drag Arm Winch Motor Overhaul5.22.32Each$ - 0
ABS Support5.24.01Job$ - 0
Audio Gauge Reading5.24.11Job$ - 0
Internal Tank Inspection5.24.41Job$ - 0
Anchor Chain and Chain Locker Inspection for Vessel General Permit5.26.31Job$ - 0
Life Raft Annual Service5.28.11Job$ - 0
Sludge Tanks Annual Maintenance5.29.11Job$ - 0
Strut and Stern Tube Bearing Inspection5.31.11Job$ - 0
Rudder Bushing Clearance Documentation5.31.21Job$ - 0
Dock and Sea Trials5.33.11Job$ - 0
Lower Hopper Steel Repairs5.44.11Job$ - 0
Upper Hopper Steel Repairs5.44.21Job$ - 0
Fore Peak Steel Angle Repair and Ballast Valve Replacement5.44.31Job$ - 0
Inlet Hull Doubler Replacement5.44.71Job$ - 0
Generator Room Fans S4, S5, E6, & E7 Overhauls5.46.11Job$ - 0
Pump Room Fan S12 Overhaul and Ducting Replacement5.46.21Job$ - 0
Service Frame and Dragarm Conduit and Cable5.46.31Job$ - 0
OSDP Bell Housing Replacements5.46.41Job$ - 0
Port & Stbd Saltwater Pump Overhaul5.47.12Job$ - 0
Generator Emergency CFW Cooling Pump Overhaul5.47.21Job$ - 0
ME Emergency Cooling Pump Overhaul5.47.31Job$ - 0
Potable Water Riser Piping and Valve Replacement5.47.71Job$ - 0
Deck Drain Installation, Repair, and Clearing5.47.81Job$ - 0
Fuel Oil Overflow Piping and Aft Deep Fuel Containment Repair5.47.91Job$ - 0
Heat Exchanger Room Salt Water Piping Replacement5.47.101Job$ - 0
Port SSDG SR4B Generator Overhaul5.48.11Job$ - 0
Port & Stbd 600V Kato Generator Bearing Replacement5.48.21Job$ - 0
Port 3512 SSDG Top End Overhaul5.48.31Job$ - 0
C280 Generator VULKAN Coupling Replacement5.48.41Job$ - 0
Exhaust Stack Repairs5.48.81Job$ - 0
#1 Start & #2 Control Air Compressor Replacement5.48.111Job$ - 0
Rescue Boat, Launch, and Lifeboat Davit Inspections5.53.11Job$ - 0
Essayons Launch Service5.53.21Job$ - 0
Navigation Equipment Annual Service5.54.11Job$ - 0
Total Category A Work Items$ - 0

CAT B

Category B Work Item DescriptionPWS ParagraphQtyUnitUnit PriceAmount
Tug Service5.1.21Job$ - 0
Deep Cleaning of Vessel Hotel Spaces5.1.71Job$ - 0
Hopper Jetting Valve (10") Replacement5.8.31Each$ - 0
Drag Arm Sheave Overhaul, Sheave Guide5.10.41Each$ - 0
Drag Arm Sheave Overhaul, Single Sheave Water Block5.10.51Each$ - 0
Drag Arm Sheave Overhaul, Single Sheave5.10.61Each$ - 0
Drag Arm Sheave Overhaul, Swell Comp Single Sheave5.10.71Each$ - 0
Weir Seal Replacement5.13.41Job$ - 0
Rudder Stock Replacement5.15.21Job$ - 0
Tailshaft Replacement5.16.41Job$ - 0
Bow Thruster - Lower Gearbox (LGB) / Pod Change Out5.17.41Job$ - 0
Jetting Pump Repairs5.21.51Job$ - 0
Total Category B Work Items$ - 0

Over & Above Work

Over & Above Work
SCHEDULE OF PRICES/RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)
Over & Above Work
Item DescriptionPWS
ParagraphRequired Level
Of Effort HoursMaterialsFully Burdened
Labor RateMaterial Burden RateTotal Cost
Ship Repair Labor Rate6.113,000$0.00
Materials & Subcontractor6.1$ 920,000.00$ 920,000.00
SCHEDULE OF PRICES/RATES FOR THE PURPOSES OF A GOVERNMENT REQUIRED EXTENSION: DAILY RATES FOR PIER SIDE AND DRY-DOCKING (FULLY BURDENED)
Over & Above Work
Item DescriptionPWS
ParagraphQtyUnitUnit PriceTotal Cost
Dry-Docking Extension Cost6.110Days$ - 0
Pier Side Extension Costs6.114Days$ - 0
Total Over & Above Work Items$920,000.00