This document contains details regarding a federal solicitation for an Oil Spill Prevention System project at Foster Dam. The U.S. Army Corps of Engineers, Engineering District Portland, is seeking proposals to introduce a reliable and efficient Oil Spill Prevention System at Foster Powerhouse to ensure compliance with NPDES permitting and SPCC rules. The project aims to mitigate the risk of oil and other hydrocarbons negatively impacting the environment. The estimated cost is between $1,000,000 to $5,000,000. The solicitation number is W9127N21R0008 and responses are due to the Primary Point of Contact, Mr. Jordan Quantock, by email. This is a 100% small business set-aside utilizing other than full and open procedures under NAICS code 237990 with a size standard of $36.5M. The period of performance is estimated to begin in September 2021 with a final completion date of May 2022. Evaluation will follow a best value tradeoff process and the government may include options in the resulting firm-fixed price contract.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E= Extremely High Risk H= High Risk M= Moderate Risk L= Low Risk
S e v e r i t y
PROBABILTY
Frequent Likely Occasional Seldom Unlikely
E E H H M
E H H M L
H M M L L
M L L L L
Catastrophic
Critical
Marginal
Negligible
Print Form Reset Form
U.S. ARMY CORPS OF ENGINEERS
ACTIVITY HAZARDS ANALYSIS
Date Prepared: Feb 2, 2021
Date Revised: Jun 17, 2021
RISK ASSESSMENT CODE MATRIX
Overall Risk Assessment Code (RAC) (Use highest code) L
Prepared by: Bonara Tan
Revised by: Sarah Hermann
Reviewed by:
AHA Number:
Job Description: OSPS Prebid Site Visit
Comp. Person/Area: Sarah Hermann
Reference EM 385-1-1, Section 01.A.14/15
Form Revised: 03/21/2017
WO/PM Number:
Location: Foster Powerhouse & Dam
Qual. Person/Area:
Cert. Person/Area:
Signature:
Signature:
Signature:
Date Reviewed:
Clearance Required: NO Clearance #:
SDS Required: NO SDS Attached:
Add Row JOB STEPS HAZARDS RECOMMENDED CONTROLS RAC
Not fully vaccinated
SARS-CoV-2 infection is transmitted predominately by inhalation of respiratory droplets generated when people cough, sneeze, sing, talk, or breathe.
Use multi-layer cloth masks and maintain social distancing of at least 6 feet apart.
ExceptionS:
1. Performing work where fogging could present a safety hazard, such as detailed electrical work, reading clearance cards, and reading meters.
2. Communicating while maintaining physical distancing such as on the phone or radio in noisy areas.
3. Working around rotating machinery.
4. Welding and machining.
5. Working while in or on a man basket, ladder or scaffolding (TMP).
6. Operating heavy equipment, driving vehicles, etc.
7. Engaging in high intensity activities that would make breathing difficult while wearing a mask.
L
Fully Vaccinated
People are considered fully vaccinated:
--2 weeks after their second dose in a 2-dose series, such as the Pfizer or Moderna vaccines, or
--2 weeks after a single-dose vaccine, such as Johnson & Johnson’s Janssen vaccine.
MASK OPTIONAL
MAINTAIN SOCIAL DISTANCING
PRACTICE HYGIENE PROTOCALS
GSA Vehicle
Should individuals choose to share GSA vehicles, all individuals will wear a mask in the GSA vehicle unless all individuals in the vehicle choose to share their vaccination status, are fully vaccinated and agree to go without masks.
L
- Monitor your health
Be alert for symptoms. Watch for fever, cough, shortness of breath, or other symptoms of COVID-19, and report through your chain of command.
L
While walking through the facility Electrical/Operational Hazards
Be aware of all electrical or operational hazards.
Moving or energized equipment is present in the dam and powerhouse.
Do not touch or operate any equipment.
If access is needed behind any closed door or electrical cabinet, contact Project personnel, they will determine accessibility.
Watch for slip/trip/fall hazards.
Do not climb ladders unless instructed to do so. Only one person on a ladder at a time.
There will be a briefing on Hazardous Energy Control prior to entering the powerhouse or dam.
There is CO2 fire protection on the generator housings. Project personnel will brief the group on that hazard prior to entering the powerhouse.
Participants should bring safety toed boots and hard hats. Be aware of any overhead hazards.
Add Row EQUIPMENT TRAINING INSPECTION
FACE MASK
Date:
Approved by:
Print Employee Name Employee Signature * Date Print Employee Name Employee Signature * Date
AHA Number: Job Description: OSPS Prebid Site Visit
Page 4 of 4* Employee signatures certify they have read and understood the corresponding AHA.
E= Extremely High Risk H= High Risk M= Moderate Risk L= Low Risk S e v e r i t y
PROBABILTY
E E H H M E H H M L H M M L L M L L L L
U.S. ARMY CORPS OF ENGINEERS
ACTIVITY HAZARDS ANALYSIS
RISK ASSESSMENT CODE MATRIX
Reference EM 385-1-1, Section 01.A.14/15
Form Revised: 03/21/2017 8.2.1.4029.1.523496.503679 406-526-3431 ext 3204 Lara Smith AHA Form 10/20/2015 10/20/2015 Page of Print Employee Name Employee Signature * Date Print Employee Name Employee Signature * Date Page of
* Employee signatures certify they have read and understood the corresponding AHA.
Bonara Tan Sarah Hermann Sarah Hermann
NO
NO
Cell1: Not fully vaccinated
| Cell1: Fully Vaccinated |
| Cell1: GSA Vehicle |
| Cell1: Monitor your health |
| Cell1: While walking through the facility |
| Cell2: |
SARS-CoV-2 infection is transmitted predominately by inhalation of respiratory droplets generated when people cough, sneeze, sing, talk, or breathe.
Cell2: People are considered fully vaccinated:
--2 weeks after their second dose in a 2-dose series, such as the Pfizer or Moderna vaccines, or
--2 weeks after a single-dose vaccine, such as Johnson & Johnson’s Janssen vaccine.
| Cell2: Electrical/Operational Hazards |
| Cell3: Use multi-layer cloth masks and maintain social distancing of at least 6 feet apart. |
ExceptionS:
1. Performing work where fogging could present a safety hazard, such as detailed electrical work, reading clearance cards, and reading meters.
2. Communicating while maintaining physical distancing such as on the phone or radio in noisy areas.
3. Working around rotating machinery.
4. Welding and machining.
5. Working while in or on a man basket, ladder or scaffolding (TMP).
6. Operating heavy equipment, driving vehicles, etc.
7. Engaging in high intensity activities that would make breathing difficult while wearing a mask.
Cell3: MASK OPTIONAL
MAINTAIN SOCIAL DISTANCING
PRACTICE HYGIENE PROTOCALS
| Cell3: Should individuals choose to share GSA vehicles, all individuals will wear a mask in the GSA vehicle unless all individuals in the vehicle choose to share their vaccination status, are fully vaccinated and agree to go without masks. |
| Cell3: Be alert for symptoms. Watch for fever, cough, shortness of breath, or other symptoms of COVID-19, and report through your chain of command. |
| Cell3: |
Be aware of all electrical or operational hazards. Moving or energized equipment is present in the dam and powerhouse.
Do not touch or operate any equipment.
If access is needed behind any closed door or electrical cabinet, contact Project personnel, they will determine accessibility.
Watch for slip/trip/fall hazards.
Do not climb ladders unless instructed to do so. Only one person on a ladder at a time.
There will be a briefing on Hazardous Energy Control prior to entering the powerhouse or dam.
There is CO2 fire protection on the generator housings. Project personnel will brief the group on that hazard prior to entering the powerhouse.
Participants should bring safety toed boots and hard hats. Be aware of any overhead hazards.
| Cell4: L |
| Cell4: L |
| Cell4: L |
| Cell4: L |
| Cell4: L |
| Cell5: |
| PrintButton1: |
| ResetButton1: |
| Date the AHA was prepared.: 2021-02-02 |
| Date the AHA was revised.: 2021-06-17 |
| For multiple job steps, use the highest obtained Risk Code. Note: the risk code is the residual risk after controls have been implemented. The following codes require the appropriate personnel approvals: |
E = Division Commander (E = Extremely High Risk). Equates to loss of ability to accomplish mission if hazards occur during mission.
H = District Commander (H = High Risk). Results in significant degradation of mission capabilities if hazards occur during mission.
M = Program Manager, Project Manager, Project Engineer (M = Moderate). Minor injury, lost workday accident, compensable injury or illness, minor system damage, or minor property damage.
L = First Line Supervisor, Quality Assurance Representative (L = Low). Little or no impact on mission accomplishment.: L
| Name of person(s) preparing this AHA form.: |
| Name of person(s) revising this AHA form.: |
| Name of person(s) revising this AHA form.: |
| AHANumber: |
| Describe specific job in which this AHA is being prepared, i.e.., Unit 2 Annual Maintenance: OSPS Prebid Site Visit |
| Responsible person who has reviewed the AHA form for accuracy and completeness. Note: the AHA does not need to list minor hazards but should list major hazards most likely to result in personal injury, damage to property, materials, or the environment.: |
| WONum: |
| Describe specific job in which this AHA form is being prepared for, i.e., Unit 2 Annual Maintenance: Foster Powerhouse & Dam |
| Responsible person who has reviewed the AHA form for accuracy and completeness. Note: the AHA does not need to list minor hazards but should list major hazards most likely to result in personal injury, damage to property, materials, or the environment.: |
| Responsible person who has reviewed the AHA form for accuracy and completeness. Note: the AHA does not need to list minor hazards but should list major hazards most likely to result in personal injury, damage to property, materials, or the environment.: |
| Responsible person who has reviewed the AHA form for accuracy and completeness. Note: the AHA does not need to list minor hazards but should list major hazards most likely to result in personal injury, damage to property, materials, or the environment.: |
| Responsible person who has reviewed the AHA form for accuracy and completeness. Note: the AHA does not need to list minor hazards but should list major hazards most likely to result in personal injury, damage to property, materials, or the environment.: |
| Responsible person who has reviewed the AHA form for accuracy and completeness. Note: the AHA does not need to list minor hazards but should list major hazards most likely to result in personal injury, damage to property, materials, or the environment.: |
| Date the AHA was revised.: |
| Name of person(s) revising this AHA form.: |
| Name of person(s) revising this AHA form.: |
| Name of person(s) revising this AHA form.: |
| Name of person(s) revising this AHA form.: |
| Button2: |
| Button1: |
| cmdAdd: |
| cmdDel: |
| Button3: |
| List equipment needed for the job.: |
| List any specialized training or certifications needed for the job.: |
| List any inspection requirements, before, during, or after the job is complete.: |
| TextField: FACE MASK |
| DateTimeField2: |
| CurrentPage: 3.00000000 |
| CurrentPage: 4.00000000 |
| PageCount: 4.00000000 |
| PageCount: 4.00000000 |
| SignatureField1: |
| DateTimeField: |
| Cell6: |
| : |
File details come from the government source that posted it. Updated .