Foster Oil Spill Prevention System

Closed Solicitation Posted

Solicitation number
W9127N21R0008
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Oregon 97345, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Engineering District Portland is soliciting proposals to design and install an Oil Spill Prevention System at Foster Dam to introduce reliable and efficient equipment preventing oil discharges into the tailrace in accordance with NPDES permitting and SPCC rules. The solicitation will use a best value tradeoff process to evaluate proposals submitted in response to request for proposal number W9127N21R0008, with responses due by July 21, 2021.

This is a 100% small business set-aside under NAICS code 237990 for heavy and civil engineering construction, with a size standard of $36.5 million. The estimated value is between $1 million to $5 million to be performed from September 2021 to May 2022 at Foster Dam in Oregon. Evaluation criteria and contractor selection will follow best value tradeoff procedures outlined in the solicitation.

Notice text

9 versions

Update #9 · Latest ·

Amendment 0006 is released July 19, 2021 to provide the FINAL drawing markup attachment. No other amendments are anticipated and the proposal due date remains 1300 PST, July 21,2021. 

Amendment 0005 is released July 16, 2021 to extend the proposal due date to 1300 PST, July 21,2021. 

Amendment 0004 is released July 1, 2021 to extend the proposal due date to 1300 PST, July 16,2021. In addition, bidder inquiries (via ProjNet) will be opened until July 7, 2021.

Amendmend 0003 is released June 25, 2021 to extend the proposal due date to 1300PST, July 7, 2021

Amendmend 0002 is released June 17, 2021 to move the site visit date to June 23, 2021 and provide and updated AHA.

SITE VISIT INFORMATION CHANGE: Please note the site visit start time has been moved from 10:00am to 12:00pm (noon). 

Amendmend 0001 is released  June 9, 2021 to move the site visit date to June 21, 2021, and to provide attendee submission information details.   

Amended June 8, 2021 to include Attachment A - Offerors Experience Form, and Attachment B - Past Performance Questionnaire that were originally omitted. 

PROJECT DESCRIPTIONS:

Foster Dam is a rock-fill structure with a concrete gated spillway and was completed with Green Peter Dam in 1968. Foster Dam is used to regulate power-generating water releases from Green Peter Dam and regulate flows from the south Santiam River. It has two generators capable of producing 10 megawatts each. The dam works in coordination with Green Peter Dam for flood risk management, hydropower, water quality improvement, irrigation, fish and wildlife habitat, and recreation.

The current sump configuration at Foster Dam has limited ability to prevent oil discharges to the tailrace with the current equipment and systems. The system will alarm if a large amount of oil accumulates in the sump which will trigger a response by Operations personnel. However, there are no downstream oil separation or containment features and the release of oil remains a high risk with the current system because the pumps are setup to pump whether the liquid is water, oil, grease, or a mixture thereof.

The objectives of this project are to introduce a reliable, efficient, and easily maintainable Oil Spill Prevention System (OSPS) at Foster Powerhouse to assure compliance with the requirements of a future National Pollutant Discharge Elimination System (NPDES) permit and continued compliance with 40 CFR 112 including SPCC rules. These efforts mitigate the risk of oil and other hydrocarbons from negatively impacting the environment.

The period of performance from contract award is estimated to be September 2021 with a final construction physical completion date in May 2022.

Acquisition Strategy: The solicitation will be a request for proposal (RFP). Best Value/Trade Off source selection process will be used in the evaluation of proposals. Evaluation criteria will be stated in the RFP. The Government will include options in the RFP. This acquisition will result in a single firm-fixed price contract.

Magnitude of Construction: The estimated cost of the project is between $1,000,000 and $5,000,000.

Set Asides and Codes: This is a 100% Small Business set-aside, utilizing other than full and open procedures. This effort is classified through the North American Industry Classification System (NAICS) under code 237990, Other Heavy and Civil Engineering Construction (Size Standard: $36.5M).The FSC is Z1KA - Maintenance to Dams.

Point of Contact: The USACE-NWP Contract Specialist will be the primary point of contact for this action. E-mail responses to the Primary Point of Contact, Mr. Jordan Quantock at Jordan.m.quantock@usace.army.mil.

For Small Business questions, please contact Mrs. Carol A. McIntyre at Carol.A.McIntyre@usace.army.mil or via phone at 503-808-4602.

Update #8 ·

Amendment 0005 is released July 16, 2021 to extend the proposal due date to 1300 PST, July 21,2021. 

Amendment 0004 is released July 1, 2021 to extend the proposal due date to 1300 PST, July 16,2021. In addition, bidder inquiries (via ProjNet) will be opened until July 7, 2021.

Amendmend 0003 is released June 25, 2021 to extend the proposal due date to 1300PST, July 7, 2021

Amendmend 0002 is released June 17, 2021 to move the site visit date to June 23, 2021 and provide and updated AHA.

SITE VISIT INFORMATION CHANGE: Please note the site visit start time has been moved from 10:00am to 12:00pm (noon). 

Amendmend 0001 is released  June 9, 2021 to move the site visit date to June 21, 2021, and to provide attendee submission information details.   

Amended June 8, 2021 to include Attachment A - Offerors Experience Form, and Attachment B - Past Performance Questionnaire that were originally omitted. 

PROJECT DESCRIPTIONS:

Foster Dam is a rock-fill structure with a concrete gated spillway and was completed with Green Peter Dam in 1968. Foster Dam is used to regulate power-generating water releases from Green Peter Dam and regulate flows from the south Santiam River. It has two generators capable of producing 10 megawatts each. The dam works in coordination with Green Peter Dam for flood risk management, hydropower, water quality improvement, irrigation, fish and wildlife habitat, and recreation.

The current sump configuration at Foster Dam has limited ability to prevent oil discharges to the tailrace with the current equipment and systems. The system will alarm if a large amount of oil accumulates in the sump which will trigger a response by Operations personnel. However, there are no downstream oil separation or containment features and the release of oil remains a high risk with the current system because the pumps are setup to pump whether the liquid is water, oil, grease, or a mixture thereof.

The objectives of this project are to introduce a reliable, efficient, and easily maintainable Oil Spill Prevention System (OSPS) at Foster Powerhouse to assure compliance with the requirements of a future National Pollutant Discharge Elimination System (NPDES) permit and continued compliance with 40 CFR 112 including SPCC rules. These efforts mitigate the risk of oil and other hydrocarbons from negatively impacting the environment.

The period of performance from contract award is estimated to be September 2021 with a final construction physical completion date in May 2022.

Acquisition Strategy: The solicitation will be a request for proposal (RFP). Best Value/Trade Off source selection process will be used in the evaluation of proposals. Evaluation criteria will be stated in the RFP. The Government will include options in the RFP. This acquisition will result in a single firm-fixed price contract.

Magnitude of Construction: The estimated cost of the project is between $1,000,000 and $5,000,000.

Set Asides and Codes: This is a 100% Small Business set-aside, utilizing other than full and open procedures. This effort is classified through the North American Industry Classification System (NAICS) under code 237990, Other Heavy and Civil Engineering Construction (Size Standard: $36.5M).The FSC is Z1KA - Maintenance to Dams.

Point of Contact: The USACE-NWP Contract Specialist will be the primary point of contact for this action. E-mail responses to the Primary Point of Contact, Mr. Jordan Quantock at Jordan.m.quantock@usace.army.mil.

For Small Business questions, please contact Mrs. Carol A. McIntyre at Carol.A.McIntyre@usace.army.mil or via phone at 503-808-4602.

Update #7 ·

Amendment 0004 is released July 1, 2021 to extend the proposal due date to 1300 PST, July 16,2021. In addition, bidder inquiries (via ProjNet) will be opened until July 7, 2021.

Amendmend 0003 is released June 25, 2021 to extend the proposal due date to 1300PST, July 7, 2021

Amendmend 0002 is released June 17, 2021 to move the site visit date to June 23, 2021 and provide and updated AHA.

SITE VISIT INFORMATION CHANGE: Please note the site visit start time has been moved from 10:00am to 12:00pm (noon). 

Amendmend 0001 is released  June 9, 2021 to move the site visit date to June 21, 2021, and to provide attendee submission information details.   

Amended June 8, 2021 to include Attachment A - Offerors Experience Form, and Attachment B - Past Performance Questionnaire that were originally omitted. 

PROJECT DESCRIPTIONS:

Foster Dam is a rock-fill structure with a concrete gated spillway and was completed with Green Peter Dam in 1968. Foster Dam is used to regulate power-generating water releases from Green Peter Dam and regulate flows from the south Santiam River. It has two generators capable of producing 10 megawatts each. The dam works in coordination with Green Peter Dam for flood risk management, hydropower, water quality improvement, irrigation, fish and wildlife habitat, and recreation.

The current sump configuration at Foster Dam has limited ability to prevent oil discharges to the tailrace with the current equipment and systems. The system will alarm if a large amount of oil accumulates in the sump which will trigger a response by Operations personnel. However, there are no downstream oil separation or containment features and the release of oil remains a high risk with the current system because the pumps are setup to pump whether the liquid is water, oil, grease, or a mixture thereof.

The objectives of this project are to introduce a reliable, efficient, and easily maintainable Oil Spill Prevention System (OSPS) at Foster Powerhouse to assure compliance with the requirements of a future National Pollutant Discharge Elimination System (NPDES) permit and continued compliance with 40 CFR 112 including SPCC rules. These efforts mitigate the risk of oil and other hydrocarbons from negatively impacting the environment.

The period of performance from contract award is estimated to be September 2021 with a final construction physical completion date in May 2022.

Acquisition Strategy: The solicitation will be a request for proposal (RFP). Best Value/Trade Off source selection process will be used in the evaluation of proposals. Evaluation criteria will be stated in the RFP. The Government will include options in the RFP. This acquisition will result in a single firm-fixed price contract.

Magnitude of Construction: The estimated cost of the project is between $1,000,000 and $5,000,000.

Set Asides and Codes: This is a 100% Small Business set-aside, utilizing other than full and open procedures. This effort is classified through the North American Industry Classification System (NAICS) under code 237990, Other Heavy and Civil Engineering Construction (Size Standard: $36.5M).The FSC is Z1KA - Maintenance to Dams.

Point of Contact: The USACE-NWP Contract Specialist will be the primary point of contact for this action. E-mail responses to the Primary Point of Contact, Mr. Jordan Quantock at Jordan.m.quantock@usace.army.mil.

For Small Business questions, please contact Mrs. Carol A. McIntyre at Carol.A.McIntyre@usace.army.mil or via phone at 503-808-4602.

Update #6 ·

Amendmend 0003 is released June 25, 2021 to extend the proposal due date to 1300PST, July 7, 2021

Amendmend 0002 is released June 17, 2021 to move the site visit date to June 23, 2021 and provide and updated AHA.

SITE VISIT INFORMATION CHANGE: Please note the site visit start time has been moved from 10:00am to 12:00pm (noon). 

Amendmend 0001 is released  June 9, 2021 to move the site visit date to June 21, 2021, and to provide attendee submission information details.   

Amended June 8, 2021 to include Attachment A - Offerors Experience Form, and Attachment B - Past Performance Questionnaire that were originally omitted. 

PROJECT DESCRIPTIONS:

Foster Dam is a rock-fill structure with a concrete gated spillway and was completed with Green Peter Dam in 1968. Foster Dam is used to regulate power-generating water releases from Green Peter Dam and regulate flows from the south Santiam River. It has two generators capable of producing 10 megawatts each. The dam works in coordination with Green Peter Dam for flood risk management, hydropower, water quality improvement, irrigation, fish and wildlife habitat, and recreation.

The current sump configuration at Foster Dam has limited ability to prevent oil discharges to the tailrace with the current equipment and systems. The system will alarm if a large amount of oil accumulates in the sump which will trigger a response by Operations personnel. However, there are no downstream oil separation or containment features and the release of oil remains a high risk with the current system because the pumps are setup to pump whether the liquid is water, oil, grease, or a mixture thereof.

The objectives of this project are to introduce a reliable, efficient, and easily maintainable Oil Spill Prevention System (OSPS) at Foster Powerhouse to assure compliance with the requirements of a future National Pollutant Discharge Elimination System (NPDES) permit and continued compliance with 40 CFR 112 including SPCC rules. These efforts mitigate the risk of oil and other hydrocarbons from negatively impacting the environment.

The period of performance from contract award is estimated to be September 2021 with a final construction physical completion date in May 2022.

Acquisition Strategy: The solicitation will be a request for proposal (RFP). Best Value/Trade Off source selection process will be used in the evaluation of proposals. Evaluation criteria will be stated in the RFP. The Government will include options in the RFP. This acquisition will result in a single firm-fixed price contract.

Magnitude of Construction: The estimated cost of the project is between $1,000,000 and $5,000,000.

Set Asides and Codes: This is a 100% Small Business set-aside, utilizing other than full and open procedures. This effort is classified through the North American Industry Classification System (NAICS) under code 237990, Other Heavy and Civil Engineering Construction (Size Standard: $36.5M).The FSC is Z1KA - Maintenance to Dams.

Point of Contact: The USACE-NWP Contract Specialist will be the primary point of contact for this action. E-mail responses to the Primary Point of Contact, Mr. Jordan Quantock at Jordan.m.quantock@usace.army.mil.

For Small Business questions, please contact Mrs. Carol A. McIntyre at Carol.A.McIntyre@usace.army.mil or via phone at 503-808-4602.

Update #5 ·

Amendmend 0002 is released June 17, 2021 to move the site visit date to June 23, 2021 and provide and updated AHA.

SITE VISIT INFORMATION CHANGE: Please note the site visit start time has been moved from 10:00am to 12:00pm (noon). 

Amendmend 0001 is released  June 9, 2021 to move the site visit date to June 21, 2021, and to provide attendee submission information details.   

Amended June 8, 2021 to include Attachment A - Offerors Experience Form, and Attachment B - Past Performance Questionnaire that were originally omitted. 

PROJECT DESCRIPTIONS:

Foster Dam is a rock-fill structure with a concrete gated spillway and was completed with Green Peter Dam in 1968. Foster Dam is used to regulate power-generating water releases from Green Peter Dam and regulate flows from the south Santiam River. It has two generators capable of producing 10 megawatts each. The dam works in coordination with Green Peter Dam for flood risk management, hydropower, water quality improvement, irrigation, fish and wildlife habitat, and recreation.

The current sump configuration at Foster Dam has limited ability to prevent oil discharges to the tailrace with the current equipment and systems. The system will alarm if a large amount of oil accumulates in the sump which will trigger a response by Operations personnel. However, there are no downstream oil separation or containment features and the release of oil remains a high risk with the current system because the pumps are setup to pump whether the liquid is water, oil, grease, or a mixture thereof.

The objectives of this project are to introduce a reliable, efficient, and easily maintainable Oil Spill Prevention System (OSPS) at Foster Powerhouse to assure compliance with the requirements of a future National Pollutant Discharge Elimination System (NPDES) permit and continued compliance with 40 CFR 112 including SPCC rules. These efforts mitigate the risk of oil and other hydrocarbons from negatively impacting the environment.

The period of performance from contract award is estimated to be September 2021 with a final construction physical completion date in May 2022.

Acquisition Strategy: The solicitation will be a request for proposal (RFP). Best Value/Trade Off source selection process will be used in the evaluation of proposals. Evaluation criteria will be stated in the RFP. The Government will include options in the RFP. This acquisition will result in a single firm-fixed price contract.

Magnitude of Construction: The estimated cost of the project is between $1,000,000 and $5,000,000.

Set Asides and Codes: This is a 100% Small Business set-aside, utilizing other than full and open procedures. This effort is classified through the North American Industry Classification System (NAICS) under code 237990, Other Heavy and Civil Engineering Construction (Size Standard: $36.5M).The FSC is Z1KA - Maintenance to Dams.

Point of Contact: The USACE-NWP Contract Specialist will be the primary point of contact for this action. E-mail responses to the Primary Point of Contact, Mr. Jordan Quantock at Jordan.m.quantock@usace.army.mil.

For Small Business questions, please contact Mrs. Carol A. McIntyre at Carol.A.McIntyre@usace.army.mil or via phone at 503-808-4602.

Update #4 ·

SITE VISIT INFORMATION CHANGE: Please note the site visit start time has been moved from 10:00am to 12:00pm (noon). 

Amendmend P00001 is released  June 9, 2021 to move the site visit date to June 21, 2020, and to provide attendee submission information details.   

Amended June 8, 2021 to include Attachment A - Offerors Experience Form, and Attachment B - Past Performance Questionnaire that were originally omitted. 

PROJECT DESCRIPTIONS:

Foster Dam is a rock-fill structure with a concrete gated spillway and was completed with Green Peter Dam in 1968. Foster Dam is used to regulate power-generating water releases from Green Peter Dam and regulate flows from the south Santiam River. It has two generators capable of producing 10 megawatts each. The dam works in coordination with Green Peter Dam for flood risk management, hydropower, water quality improvement, irrigation, fish and wildlife habitat, and recreation.

The current sump configuration at Foster Dam has limited ability to prevent oil discharges to the tailrace with the current equipment and systems. The system will alarm if a large amount of oil accumulates in the sump which will trigger a response by Operations personnel. However, there are no downstream oil separation or containment features and the release of oil remains a high risk with the current system because the pumps are setup to pump whether the liquid is water, oil, grease, or a mixture thereof.

The objectives of this project are to introduce a reliable, efficient, and easily maintainable Oil Spill Prevention System (OSPS) at Foster Powerhouse to assure compliance with the requirements of a future National Pollutant Discharge Elimination System (NPDES) permit and continued compliance with 40 CFR 112 including SPCC rules. These efforts mitigate the risk of oil and other hydrocarbons from negatively impacting the environment.

The period of performance from contract award is estimated to be September 2021 with a final construction physical completion date in May 2022.

Acquisition Strategy: The solicitation will be a request for proposal (RFP). Best Value/Trade Off source selection process will be used in the evaluation of proposals. Evaluation criteria will be stated in the RFP. The Government will include options in the RFP. This acquisition will result in a single firm-fixed price contract.

Magnitude of Construction: The estimated cost of the project is between $1,000,000 and $5,000,000.

Set Asides and Codes: This is a 100% Small Business set-aside, utilizing other than full and open procedures. This effort is classified through the North American Industry Classification System (NAICS) under code 237990, Other Heavy and Civil Engineering Construction (Size Standard: $36.5M).The FSC is Z1KA - Maintenance to Dams.

Point of Contact: The USACE-NWP Contract Specialist will be the primary point of contact for this action. E-mail responses to the Primary Point of Contact, Mr. Jordan Quantock at Jordan.m.quantock@usace.army.mil.

For Small Business questions, please contact Mrs. Carol A. McIntyre at Carol.A.McIntyre@usace.army.mil or via phone at 503-808-4602.

Update #3 ·

Amendmend P00001 is released  June 9, 2021 to move the site visit date to June 21, 2020, and to provide attendee submission information details.   

Amended June 8, 2021 to include Attachment A - Offerors Experience Form, and Attachment B - Past Performance Questionnaire that were originally omitted. 

PROJECT DESCRIPTIONS:

Foster Dam is a rock-fill structure with a concrete gated spillway and was completed with Green Peter Dam in 1968. Foster Dam is used to regulate power-generating water releases from Green Peter Dam and regulate flows from the south Santiam River. It has two generators capable of producing 10 megawatts each. The dam works in coordination with Green Peter Dam for flood risk management, hydropower, water quality improvement, irrigation, fish and wildlife habitat, and recreation.

The current sump configuration at Foster Dam has limited ability to prevent oil discharges to the tailrace with the current equipment and systems. The system will alarm if a large amount of oil accumulates in the sump which will trigger a response by Operations personnel. However, there are no downstream oil separation or containment features and the release of oil remains a high risk with the current system because the pumps are setup to pump whether the liquid is water, oil, grease, or a mixture thereof.

The objectives of this project are to introduce a reliable, efficient, and easily maintainable Oil Spill Prevention System (OSPS) at Foster Powerhouse to assure compliance with the requirements of a future National Pollutant Discharge Elimination System (NPDES) permit and continued compliance with 40 CFR 112 including SPCC rules. These efforts mitigate the risk of oil and other hydrocarbons from negatively impacting the environment.

The period of performance from contract award is estimated to be September 2021 with a final construction physical completion date in May 2022.

Acquisition Strategy: The solicitation will be a request for proposal (RFP). Best Value/Trade Off source selection process will be used in the evaluation of proposals. Evaluation criteria will be stated in the RFP. The Government will include options in the RFP. This acquisition will result in a single firm-fixed price contract.

Magnitude of Construction: The estimated cost of the project is between $1,000,000 and $5,000,000.

Set Asides and Codes: This is a 100% Small Business set-aside, utilizing other than full and open procedures. This effort is classified through the North American Industry Classification System (NAICS) under code 237990, Other Heavy and Civil Engineering Construction (Size Standard: $36.5M).The FSC is Z1KA - Maintenance to Dams.

Point of Contact: The USACE-NWP Contract Specialist will be the primary point of contact for this action. E-mail responses to the Primary Point of Contact, Mr. Jordan Quantock at Jordan.m.quantock@usace.army.mil.

For Small Business questions, please contact Mrs. Carol A. McIntyre at Carol.A.McIntyre@usace.army.mil or via phone at 503-808-4602.

Update #2 ·

Amended June 8, 2021 to include Attachment A - Offerors Experience Form, and Attachment B - Past Performance Questionnaire that were originally omitted. 

PROJECT DESCRIPTIONS:

Foster Dam is a rock-fill structure with a concrete gated spillway and was completed with Green Peter Dam in 1968. Foster Dam is used to regulate power-generating water releases from Green Peter Dam and regulate flows from the south Santiam River. It has two generators capable of producing 10 megawatts each. The dam works in coordination with Green Peter Dam for flood risk management, hydropower, water quality improvement, irrigation, fish and wildlife habitat, and recreation.

The current sump configuration at Foster Dam has limited ability to prevent oil discharges to the tailrace with the current equipment and systems. The system will alarm if a large amount of oil accumulates in the sump which will trigger a response by Operations personnel. However, there are no downstream oil separation or containment features and the release of oil remains a high risk with the current system because the pumps are setup to pump whether the liquid is water, oil, grease, or a mixture thereof.

The objectives of this project are to introduce a reliable, efficient, and easily maintainable Oil Spill Prevention System (OSPS) at Foster Powerhouse to assure compliance with the requirements of a future National Pollutant Discharge Elimination System (NPDES) permit and continued compliance with 40 CFR 112 including SPCC rules. These efforts mitigate the risk of oil and other hydrocarbons from negatively impacting the environment.

The period of performance from contract award is estimated to be September 2021 with a final construction physical completion date in May 2022.

Acquisition Strategy: The solicitation will be a request for proposal (RFP). Best Value/Trade Off source selection process will be used in the evaluation of proposals. Evaluation criteria will be stated in the RFP. The Government will include options in the RFP. This acquisition will result in a single firm-fixed price contract.

Magnitude of Construction: The estimated cost of the project is between $1,000,000 and $5,000,000.

Set Asides and Codes: This is a 100% Small Business set-aside, utilizing other than full and open procedures. This effort is classified through the North American Industry Classification System (NAICS) under code 237990, Other Heavy and Civil Engineering Construction (Size Standard: $36.5M).The FSC is Z1KA - Maintenance to Dams.

Point of Contact: The USACE-NWP Contract Specialist will be the primary point of contact for this action. E-mail responses to the Primary Point of Contact, Mr. Jordan Quantock at Jordan.m.quantock@usace.army.mil.

For Small Business questions, please contact Mrs. Carol A. McIntyre at Carol.A.McIntyre@usace.army.mil or via phone at 503-808-4602.

Update #1 ·

PROJECT DESCRIPTIONS:

Foster Dam is a rock-fill structure with a concrete gated spillway and was completed with Green Peter Dam in 1968. Foster Dam is used to regulate power-generating water releases from Green Peter Dam and regulate flows from the south Santiam River. It has two generators capable of producing 10 megawatts each. The dam works in coordination with Green Peter Dam for flood risk management, hydropower, water quality improvement, irrigation, fish and wildlife habitat, and recreation.

The current sump configuration at Foster Dam has limited ability to prevent oil discharges to the tailrace with the current equipment and systems. The system will alarm if a large amount of oil accumulates in the sump which will trigger a response by Operations personnel. However, there are no downstream oil separation or containment features and the release of oil remains a high risk with the current system because the pumps are setup to pump whether the liquid is water, oil, grease, or a mixture thereof.

The objectives of this project are to introduce a reliable, efficient, and easily maintainable Oil Spill Prevention System (OSPS) at Foster Powerhouse to assure compliance with the requirements of a future National Pollutant Discharge Elimination System (NPDES) permit and continued compliance with 40 CFR 112 including SPCC rules. These efforts mitigate the risk of oil and other hydrocarbons from negatively impacting the environment.

The period of performance from contract award is estimated to be September 2021 with a final construction physical completion date in May 2022.

Acquisition Strategy: The solicitation will be a request for proposal (RFP). Best Value/Trade Off source selection process will be used in the evaluation of proposals. Evaluation criteria will be stated in the RFP. The Government will include options in the RFP. This acquisition will result in a single firm-fixed price contract.

Magnitude of Construction: The estimated cost of the project is between $1,000,000 and $5,000,000.

Set Asides and Codes: This is a 100% Small Business set-aside, utilizing other than full and open procedures. This effort is classified through the North American Industry Classification System (NAICS) under code 237990, Other Heavy and Civil Engineering Construction (Size Standard: $36.5M).The FSC is Z1KA - Maintenance to Dams.

Point of Contact: The USACE-NWP Contract Specialist will be the primary point of contact for this action. E-mail responses to the Primary Point of Contact, Mr. Jordan Quantock at Jordan.m.quantock@usace.army.mil.

For Small Business questions, please contact Mrs. Carol A. McIntyre at Carol.A.McIntyre@usace.army.mil or via phone at 503-808-4602.

Files

Show all 17

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Foster Oil Spill Prevention System Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning Foster Dam, Linn County, Oregon 93745 · NAICS 237990 ENDIST Portland Total Small Business
John day DAM unit 10 packing box replacement John Day Dam, Sherman County, Oregonthe John Day Dam On The Columbia River Between Sherman County, Oregon, And Klickitat County, Washington. Rufus, Oregon 97050, United States · NAICS 237990 ENDIST Portland No set-aside
John day DAM navigation lock tainter valve (TV) repairs TV3 and TV4 Location and Access Details. Oregon Side Physical Access, Near Rufus, OR 97050 accessible via I-84, Exit 109. Washington Side (Closest Town), Goldendale, WA 98620 approximately 20 miles north across the river. River Location, Mile 216.6 on the Columbia River, joining Sherman County, Oregon, and Klickitat County, Washington. 98628 · NAICS 237990 ENDIST Portland No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity