C.04 - Abstract - 7N21B0022.pdf

PDF 357 KB Posted

Attached to
Coos Bay North Jetty Repair
Solicitation number
W9127N21B0022
Issued by

About this file

This document summarizes an invitation for bids for repair work on the Coos Bay North Jetty in Oregon. The U.S. Army Corps of Engineers Portland District intends to award a firm fixed-price contract to repair approximately 2,000 feet of the jetty trunk and head with stone placement and reconstruction work. Optional repairs are also included for an additional 3,000 feet of the jetty trunk. The estimated stone volumes total approximately 58,200 cubic yards. The period of performance for required work is April 1 through October 31, 2022, with an optional period of April 1 through October 31, 2023 if optional items are exercised. Five staging areas totaling over 56 acres are available near the project site. The estimated value of construction is between $25 million and $100 million. Bids are due by September 1, 2021 and the NAICS code for this procurement is 237990.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NO. 2. DATE ISSUED 3. DATE OPENED PAGE 1 OF 1

7/23/2021 9/1/2021

4. ISSUING OFFICE

DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE

PORTLAND DISTRICT, CORPS OF ENGINEERS

P.O. BOX 2946

PORTLAND, OR 97208-2946

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

(CHECK A, B, OR C AND COMPLETE NO.1 NO.2

D, E, AND F.) A. OFFEROR J.E. McAmis A. OFFEROR Trade West Construction

A. HIRED LABOR

B. REASONABLE CONTRACT B. BID SECURITY

X (WITHOUT PROFIT) 20% of bid price 20% of bid price

C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED

(INCLUDING PROFIT) YES YES

6. NUMBER OF ADDENDA ISSUED 1

7A.

ITEM E. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED

NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

MANDATORY LINE ITEMS

0001 Moblization and Demobilization 1 Job 6,652,000.00$ 6,652,000.00$ 12,650,000.00$ 12,650,000.00$ 16,000,000.00$ 16,000,000.00$ 0002 Reach 1 Armor Stone 12700 CY 754.30$ 9,579,610.00$ 800.00$ 10,160,000.00$ 750.00$ 9,525,000.00$ 0003 Reach 1 Reconstruction of Existing Stone 700 SY 387.10$ 270,970.00$ 600.00$ 420,000.00$ 500.00$ 350,000.00$ 0004 Reach 1 Select Armor Stone 9780 CY 809.40$ 7,915,932.00$ 1,010.00$ 9,877,800.00$ 750.00$ 7,335,000.00$ 0005 Inferior Stone Removal and Placement 290 CY 204.70$ 59,363.00$ 240.00$ 69,600.00$ 1,000.00$ 290,000.00$ 0006 Reach 2 Armor Stone 10250 CY 738.60$ 7,570,650.00$ 760.00$ 7,790,000.00$ 750.00$ 7,687,500.00$ 0007 Reach 2 Reconstruction of Existing Stone 700 SY 387.10$ 270,970.00$ 600.00$ 420,000.00$ 1,000.00$ 700,000.00$ 0008 Reach 2 Bedding Material Class 50 Riprap 630 CY 168.20$ 105,966.00$ 240.00$ 151,200.00$ 700.00$ 441,000.00$ 0009 Inferior Stone Removal and Placement 2110 CY 204.70$ 431,917.00$ 240.00$ 506,400.00$ 1,000.00$ 2,110,000.00$ 0010 Haul Roads and Ramps 1 Job 3,259,297.00$ 3,259,297.00$ 5,400,000.00$ 5,400,000.00$ 4,500,000.00$ 4,500,000.00$ 0011 Material Off-Loading Facility 1 Job 1,845,332.00$ 1,845,332.00$ -$ -$ 250,000.00$ 250,000.00$ 0012 Site Restoration 1 Job 744,524.00$ 744,524.00$ 1,100,000.00$ 1,100,000.00$ 4,000,000.00$ 4,000,000.00$

38,706,531.00$ 48,545,000.00$ 53,188,500.00$

0013 Reach 3 Armor Stone 9250 CY 630.30$ 5,830,275.00$ 520.00$ 4,810,000.00$ 355.00$ 3,283,750.00$ 0014 Reach 3 Reconstruction of Existing Stone 500 SY 401.90$ 200,950.00$ 600.00$ 300,000.00$ 100.00$ 50,000.00$ 0015 Bedding Material (Class 50 Riprap) 1410 CY 178.50$ 251,685.00$ 240.00$ 338,400.00$ 100.00$ 141,000.00$ 0016 Inferior Stone Removal and Placement 1410 CY 212.70$ 299,907.00$ 350.00$ 493,500.00$ 355.00$ 500,550.00$ 0017 Reach 3 Armor Stone 7670 CY 630.40$ 4,835,168.00$ 515.00$ 3,950,050.00$ 355.00$ 2,722,850.00$ 0018 Reach 4 Armor Stone 14120 CY 541.60$ 7,647,392.00$ 390.00$ 5,506,800.00$ 355.00$ 5,012,600.00$ 0019 Reach 4 Core Stone 3380 CY 424.50$ 1,434,810.00$ 240.00$ 811,200.00$ 100.00$ 338,000.00$ 0020 Bedding Material (Class 50 Riprap) 2190 CY 177.70$ 389,163.00$ 240.00$ 525,600.00$ 100.00$ 219,000.00$ 0021 Removal and Disposal of Relic Pilings 50 EA 327.30$ 16,365.00$ 240.00$ 12,000.00$ 1,000.00$ 50,000.00$ 0022 Reach 5 Armor Stone 5700 CY 493.30$ 2,811,810.00$ 405.00$ 2,308,500.00$ 355.00$ 2,023,500.00$ 0023 Reach 5 Core Stone 910 CY 407.20$ 370,552.00$ 240.00$ 218,400.00$ 100.00$ 91,000.00$ 0024 Bedding Material (Class 50 Riprap) 900 CY 178.10$ 160,290.00$ 240.00$ 216,000.00$ 100.00$ 90,000.00$

62,954,898.00$ 68,035,450.00$ 67,710,750.00$

ABSTRACT OF OFFERS

W9127N21B0022

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.

Optional CLINs

B. BID SECURITY

Coos Bay North Jetty Repairs

7B. DESCRIPTION OF OFFERED ITEM 7C. EST D.

TOTAL

300 Hafen Lane

Mesquite, NV 89027-6276

DUNS: 195635628 CAGE: 1MSR9

621 Country Drive

Chico, CA 95928-7148

DUNS: 060693512 CAGE: 0C9P9

Mandatory CLINs Subtotal

NSN 7540-01-150-0981 1419-101 STANDARD FORM 1419 (10-3)

2021-11-03T13:24:56-0700
ELLOSO.HARRON.EMERSON.1261817361
2021-11-03T15:42:41-0700
MORROW.KRISTINA.KAYE.1290513320