B.08_W9127N21B0022-0002.pdf
PDF 507 KB Posted
- Attached to
- Coos Bay North Jetty Repair
- Solicitation number
- W9127N21B0022
About this file
This amendment to an invitation for bids modifies the solicitation to incorporate details regarding a pre-bid conference and questions submission process. The U.S. Army Corps of Engineers Portland District is seeking a firm-fixed price contract for repairs to the Coos Bay North Jetty in Oregon, including mandatory work along 2,000 feet with an estimated stone volume of 24,430 cubic yards, and optional work along an additional 3,000 feet with a stone volume of 33,770 cubic yards. Bids are due by August 27, 2021 and must be submitted electronically. A pre-bid conference will take place on August 9, 2021 and questions must be submitted through ProjNet-Bid by the close of business three days before the due date. The period of performance for stone placement is April 1 through October 31, 2022 for the base award and April 1 through October 31, 2023 for optional items. The total value of the contract is estimated between $25-100 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate the scheduled date and time for the pre-bid conference. It is scheduled for August 9, 2021 at 2PM PST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Aug-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127N21B0022
X 9B. DATED (SEE ITEM 11)
28-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Aug-2021
CODE
USACE, PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
X 1
W9127N21B0022
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
SPECIAL INSTRUCTIONS
SPECIAL INSTRUCTIONS
In accordance with FAR 9.104-2, the Government is using special standards of responsibility for this procurement. To be found responsible, a bidder must provide information demonstrating that the bidder has completed one jetty OR breakwater OR heavy marine construction project on the pacific shore of the United States to include Alaska with a total contract value greater than $15M performed within the last 15 years and that required procurement, delivery, AND placement of individual stones weighing at least 25 tons. If a bidder cannot or does not provide this information meeting the minimum standards, it will be determined nonresponsible and ineligible for award.
PRE-BID CONFERENCE
Bidders wishing to participate in the pre-bid conference shall email a list of participants to Mr.
Harron Elloso (harron.e.elloso@usace.army.mil) no later than the close of business on Friday, August 6, 2021. Please reference “Coos Bay North Jetty Repairs Pre-Bid Conference” in the email subject line. A responsive email will be sent to the bidder, which will include confirmation of the list of participants, the conference call-in telephone number, and the security passcode.
The Pre-Bid Conference is scheduled for August 9, 2021 at 2PM PST.
BIDDER INQUIRIES
All inquiries regarding this solicitation are to be submitted via ProjNet-Bid. Telephone and email inquiries will not be accepted. ProjNet-Bid is a web-based program that allows bidders to post questions regarding the solicitation and to view all questions by other bidders and answers by
USACE.
ProjNet-Bid can be accessed through ProjNet at https://www.projnet.org/projnet/.
To access the ProjNet-Bid website the first time:
A. Register B. Click Quick Add Key (the agency is USACE.)
C. Enter the following information for access:
a. The Bidder Inquiry Key: JPSFWE-NS6X2M
b. Valid business contact information (e.g. Company name, contact person, business address, phone number, and email address). (Required on first project only)
c. Establish secret question and answer which will be used as a password. (Required on first project only).
D. For subsequent access use your email address, the Bidder Inquiry Key, and response to the secret question to access the ProjNet-Bid Module.
E. Submit questions or review questions and answers. (A bidder who submits a question will receive an automated email notification that their question has been received. When an answer is posted to a question, the question and answer is then available for all bidders to review.
F. For a specific step-by-step for POSTING YOUR INQUIRIES, is available in the Reference link on the Contract Viewer.
G. For questions about the ProjNet-Bid, please contact the Call Center help desk. The contact information is listed on the ProjNet website.
No response will be posted to inquiries after the Close of Business on the third business day preceding the solicitation due date. All bidders will be held to have reviewed the questions and responses in ProjNet-Bidsm prior to bid submission. Nothing in the solicitation is changed unless an amendment is sent out.
BID SUBMISSION
A. Administrative Details and General Instructions.
1) General Bid Format. Submit bid documentation in Adobe Acrobat PDF format (filename extension “.pdf”), suitable for viewing in Adobe Reader. HARD
COPY/PAPER PROPOSAL SUBMISSIONS WILL NOT BE CONSIDERED.
Bidders shall bookmark and label each electronic PDF to afford easy identification from the bid table of contents.
2) Title Page. The title page must include the bidder’s name and address, phone number and email address, title of the solicitation, solicitation number, and date of submittal.
3) Table of Contents. The proposal shall contain a detailed table of contents.
4) Font, Page Size, and Margins. Pages containing text are expected to be 8 ½ x 11 inches with at least on-inch margins at the top, bottom, and both sides. Paragraphs should be separated by at least one blank line. A standard 12-point font in either Arial or Times New Roman is required.
5) English Language Requirement. In order for a bid to be considered it MUST be prepared in ENGLISH. Propriety information must be clearly marked.
B. Submission of Bids Bidders shall submit their bids via email to the following individuals by no later than the date and time established in Block 13 of the Standard Form (SF) 1442, or Block 14 of the most recently issued SF30 as applicable:
Kristina K. Morrow, Contracting Officer Kristina.K.Morrow@usace.army.mil Harron E. Elloso, Contract Specialist Harron.E.Elloso@usace.army.mil Each email shall contain the following information:
Solicitation No. W9127N21B0022 Bid Due Date and Time: 02:00 PM PDT August 27, 2021
Bids received after the date and time stated within Block 13 of the SF1442, or Block 14 of the most recently issued SF30 as applicable, will be considered late and will not be considered for award.
To avoid rejection of an offer, the offeror must make every effort to ensure its electronic submission is virus free. Bids, or portions thereof, submitted with the presence of a virus or which are otherwise unreadable will be treated as unreadable pursuant to FAR 14.406.
Bidders should enter a description for every file submitted. For files over 20 megabytes (MB) the bidders shall break the file into smaller files sent via separate emails with each email marked to identify which number the email is relative to the total number of emails submitted (i.e., “email one of four”). Once all of the emails submitted have been received, the Government will confirm receipt via responsive email. If a bidder submits multiple bids, the Government will only consider the last bid submitted prior to the bid due date and time.
Do not assume submission will be instantaneous. File size and number of files submitted shall be considered. Bidder/Teammate/Subcontractors should allow adequate time for submission completion because the entire bid (i.e. bidders’ submission and all teammate/subcontractor(s) independent submissions) must be received by the bid due date and time specified in Block 13 of SF1442, or SF30 as applicable.
Electronic submission of bids satisfies the requirement set forth in Block 13A of the SF 1442 (‘…in original ___ copies…”). Additionally, electronic submission of the bid guarantee, when a bid guarantee is required, is due with the bid submission. Mailing a bid guarantee for submission is not allowed.
BID OPENING
Bidders are advised there will NOT be a physical bid opening held for this invitation for bids.
The bid opening will be held telephonically via conference call at 3:00 pm on the date bids are due. Due to the requirement that bids be submitted electronically only, the bid opening is scheduled to take place one hour following the bid due date and time in order to allow the contracting office time to download all bid documents submitted. The USACE Portland District will not accept any hard copy documentation submitted in response to this invitation for bids.
Bidders wishing to participate in the telephonic bid opening shall email a list of participants to both Ms. Kristina Morrow and Mr. Harron Elloso no later than the close of business 24 hours prior to the bid due date and time. Please reference “Coos Bay North Jetty Repair” in the email subject line. A responsive email will be sent to the bidder, which will include confirmation of the list of participants, the conference call-in telephone number, and the security passcode for participants to utilize for the telephonic bid opening.
HARD COPY SUBMISSIONS WILL NOT BE CONSIDERED.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .