TASK REQUEST - ESSAYONS SHIPS TR # ESS -11-
CONTACT(S) OFFICE TR #
INITIATOR TR DATE
PRIORITY DATE REQUESTED
ROUTING INITIALS SUPERVISORS MASTERS
SYSTEM INFORMATION
SYSTEM
COMPARTMENT LEVEL
SIDE FRAME NOTE
DESCRIPTION OF TASK
DESCRIPTION OF PROBLEM
SAFETY ISSUES
ATTACHMENTS YES NO PAGES TECH. MANUAL #
ENGINEERING
COORDINATOR DATE
PRIORITY 1 PRIORITY 2 PRIORITY 3
PROJECT ENGINEER DATE JOB ORDER
SHIP’S FORCE VENDOR CONTRACTOR SHIPYARD MOORINGS
ESTIMATED COST COMPLETION DATE
υ ENGINEERING COMMENTS υ
PROPOSAL / ACTION / DIRECTION ACCEPT MORE INFO NEEDED DEFER CANCEL
TR RECEIVED FROM VESSEL TR RETURNED TO VESSEL
g2odndmp Oval g2odndmp Oval g2odndmp Typewritten Text
INSTALL THREADED CLEANOUT(S)
g2odndmp Line g2odndmp Line
GRAY WATER DRAINS LEADING TO STBD O/B
FRAME 143 – these all enter O/B drain at the OUTLET of the inboard grease trap.
ORIGINATING PORT, 2” lav fr abv
ORIGINATING PORT, 2” dk dr fr abv
ORIGINATING STBD, 3 each 3” dk dr fr abv
ORIGINATING STBD, 3” vegetable peeler dr
ORIGINATING STBD, 2” dk dr fr abv.
FRAME 146 - these all enter O/B drain at the INLET of the inboard grease trap.
ORIGINATING PORT, 3” sink fr abv
ORIGINATING PORT, 3” hood dr fr abv
ORIGINATING CTR, 2” dw dr fr abv
ORIGINATING STBD, 3” dk dr fr abv
FRAME 147 - these all enter O/B drain at the INLET of the outboard grease trap.
ORIGINATING STBD, 3” sink dr f abv
GRAY WATER DRAINS LEADING TO PORT O/B
FRAME 138 – this enters O/B drain at the INLET of the only Port grease trap.
ORIGINATING PORT, 3 each 2” dk fr abv
FRAME 147 – this enters O/B drain at the INLET of the only Port grease trap.
ORIGINATING PORT, 2” dk dr fr abv
FRAME 152– this enters O/B drain at the INLET of the only Port grease trap.
ORIGINATING STBD, 3” dk dr fr abv
FRAME 148 – this enters O/B drain at the INLET of the only Port grease trap.
ORIGINATING PORT, 2” dk dr fr abv
FRAME 139 – this enters O/B drain at the INLET of the only Port grease trap.
ORIGINATING PORT, 2” dk dr fr abv
FRAME 146 – this enters O/B drain at the INLET of the only Port grease trap.
ORIGINATING PORT, 2” dk dr fr abv
| SHIPS TR # |
| CONTACT(S) |
| TASK REQUEST - ESSAYONS |
| OFFICE TR # |
| INITIATOR |
| TR DATE |
| PRIORITY |
| DATE REQUESTED |
| MASTERS |
| SUPERVISORS |
| ROUTING INITIALS |
| SYSTEM INFORMATION |
| NOTE |
| DESCRIPTION OF TASK |
| DESCRIPTION OF PROBLEM |
| SAFETY ISSUES |
| ATTACHMENTS |
| YES NO |
| PAGES |
| TECH. MANUAL # |
| ENGINEERING |
| COORDINATOR |
| DATE |
| PRIORITY 1 |
| PRIORITY 2 |
| PRIORITY 3 |
| PROJECT ENGINEER |
| DATE |
| JOB ORDER |
| ESTIMATED COST |
| COMPLETION DATE |
| ( ENGINEERING COMMENTS ( |
| PROPOSAL / ACTION / DIRECTION |
| TR RECEIVED FROM VESSEL |
| TR RETURNED TO VESSEL |
| ESS-15-083 - ICMS-Wonderware CorrectionsJOH.pdf |
| ESS-15-083 - ICMS-Wonderware Corrections |
| SHIPS TR # |
| CONTACT(S) |
| TASK REQUEST - ESSAYONS |
| OFFICE TR # |
| INITIATOR |
| TR DATE |
| PRIORITY |
| DATE REQUESTED |
| MASTERS |
| SUPERVISORS |
| ROUTING INITIALS |
| SYSTEM INFORMATION |
| NOTE |
| DESCRIPTION OF TASK |
| DESCRIPTION OF PROBLEM |
| SAFETY ISSUES |
| ATTACHMENTS |
| YES NO |
| PAGES |
| TECH. MANUAL # |
| ENGINEERING |
| COORDINATOR |
| DATE |
| PRIORITY 1 |
| PRIORITY 2 |
| PRIORITY 3 |
| PROJECT ENGINEER |
| DATE |
| JOB ORDER |
| ESTIMATED COST |
| COMPLETION DATE |
| ( ENGINEERING COMMENTS ( |
| PROPOSAL / ACTION / DIRECTION |
| TR RECEIVED FROM VESSEL |
| TR RETURNED TO VESSEL |
Wonderware Task Request support doc 2014
| ESS-20-040 REPLACE GRAY WATER DRAIN PIPING PG 4 DWG SET.pdf |
| 681-919-201-1 |
| 681-919-201-2 |
| 681-919-201-3 |
| 681-919-201-4 |
| Paquet/Rolle Chief Engineers: PAQUET | |
| Joe Bateman: | |
| SY 15/16: M&R 2020-21 | |
| Point of Contact: PAQUET/MCKERREGHAN | |
| tr#: ESS-21-040 | |
| MM/DD/YY: 06/07/2020 | |
| 1,2,3: 1 | |
| SYSTEM: GRAY WATER DRAINS | |
| COMPARTMENT: ELECTRIC SHOP & GEN RM | |
| LEVEL: MAIN | |
| SIDE: P/C/S | |
| FRAME: 131-152 | |
| NOTE: | |
| Task Description: CROP & REPLACE HORIZONTAL RUNS OF GRAY WATER DRAIN PIPING IDENTIFIED ON PG 2 BETWEEN FR 131 & 152. INSTALL 2 EACH NEW THREADED SANITARY CLEANOUTS WHERE INDICATED, DIRECTIONAL ORIENTATION CRITICAL. APPLY PIPE COATINGS PER VESSEL SCHEDULE. PROTECT ALL CREW WORK AREAS DURING TASK. CLEAN ALL SPACES IMMEDIATELY UPON COMPLETION OF TASK, NOT M&R PERIOD. | |
| Description of Problem: GALLEY GRAY WATER DRAINS CONTINUE TO BECOME FOULED/PLUGGED. WITNESSED HEAVY RUST/SCALE/DEBRIS DURING SNAKE OPERATIONS. DISCOVERED MAJOR CRACK IN 3" P to S DRAIN PIPING AT FR 142. PIPING ORIGINAL TO VESSEL. BECOMING A FOOD SAFETY/ HABITABILTY ISSUE. HYRDO MOLE ALL GALLEY UPPER DECK DRAINS AFTER COMPLETION OF TASK TO PROVE FREE FLOWING TO O/B. | |
| Safety Issues: INTERFENCE IS A MAJOR PORTION OF THIS TASK. GALLEY AND HOUSE WILL BE CLOSED DURING THIS EVOLUTION. | |
| Y: Yes | |
| No: Off | |
| PAGES: | |
| TECH MANUAL: | |
| Comments: 681-919-201 (1-4) | |
| COORDINATOR: | |
| DATE: | |
| PRIORITY 1: Off | |
| PRIORITY 2: Off | |
| PRIORITY 3: Off | |
| PROJECT ENGINEER: | |
| DATE_2: | |
| JOB ORDER: | |
| ship's force: Off | |
| vendor: Off | |
| contractor: Off | |
| shipyard: Off | |
| moorings: Off | |
| ESTIMATED COST: | |
| COMPLETION DATE: | |
| engineering comments: | |
| accept: Off | |
| more info: Off | |
| defer: Off | |
| cancel: Off | |
| TR RECEIVED FROM VESSEL: | |
| TR RETURNED TO VESSEL: | |
| 2019-09-13T07:16:53-0700 | |
| PAQUET.DAVID.M.JR.1228506270 |