B.08W9127N20B0022Amendment0002.pdf

PDF 382 KB Posted

Attached to
Dredge Vessel Essayons Overhaul
Solicitation number
W9127N20B0022
Issued by

View the file

Other files

File Type Posted
5.47.3 controller schematic.pdf PDF
5.54.2 Pro-Flo-SHIFT-PS4-Spec-Sheet.pdf PDF
5.47.3 Interconection Scematic.pdf PDF
70010-4013-905 Rev A (1 of 1).pdf PDF
E-1740-12 Sht 2.pdf PDF
681-0879-201 Rev 0 (2 of 215).pdf PDF
681-0879-201 Rev 0 (84 of 215).pdf PDF
681-0879-204-4 Rev 2 (1 of 1).pdf PDF
681-0902-301 Rev 14 (5 of 5).pdf PDF
681-0921-303 Rev 4 (1 of 2).pdf PDF
681-0879-201 Rev 0 (103 of 215).pdf PDF
681-0879-201 Rev 0 (198 of 215).pdf PDF
681-0917-201-2 Rev 2 (1 of 1).pdf PDF
681-0879-205 Rev 0 (39 of 55).pdf PDF
681-0879-201 Rev 0 (79 of 215).pdf PDF
681-0879-201 Rev 0 (179 of 215).pdf PDF
681-0879-201 Rev 0 (207 of 215).pdf PDF
681-0879-201 Rev 0 (36 of 215).pdf PDF
681-0879-201 Rev 0 (195 of 215).pdf PDF
GA-2218 R1_MCF-9583 Signed TCG.pdf PDF
681-0879-201 Rev 0 (22 of 215).pdf PDF
681-0879-201 Rev 0 (29 of 215).pdf PDF
681-0902-301 Rev 13 (5 of 8).pdf PDF
681-0879-201 Rev 0 (118 of 215).pdf PDF
681-0879-201 Rev 0 (41 of 215).pdf PDF
681-0879-201 Rev 0 (174 of 215).pdf PDF
681-0879-201 Rev 0 (149 of 215).pdf PDF
681-0879-201 Rev 0 (27 of 215).pdf PDF
681-0879-201 Rev 0 (123 of 215).pdf PDF
681-0879-201 Rev 0 (33 of 215).pdf PDF
681-0902-301 Rev 5 (1 of 2).pdf PDF
681-0879-201 Rev 0 (78 of 215).pdf PDF
681-0879-201 Rev 0 (24 of 215).pdf PDF
681-0879-205 Rev 0 (52 of 55).pdf PDF
ESS-21-040 REPLACE GRAY WATER DRAIN PIPING.pdf PDF
Platform Analysis Report Rev -.pdf PDF
681-0902-301 Rev 5 (2 of 2).pdf PDF
681-0879-201 Rev 0 (97 of 215).pdf PDF
681-0879-201 Rev 0 (74 of 215).pdf PDF
681-0905-308 Rev 2 (1 of 2).pdf PDF
681-0879-205 Rev 0 (44 of 55).pdf PDF
681-0921-303 Rev 5 (4 of 7).pdf PDF
Grundfos 5015-9 0 KPVS General Arrangement.pdf PDF
681-0879-201 Rev 0 (209 of 215).pdf PDF
681-0879-201 Rev 0 (96 of 215).pdf PDF
681-0879-201 Rev 0 (38 of 215).pdf PDF
681-0879-205 Rev 0 (1 of 55).pdf PDF
681-0879-203-1 Rev 1 (1 of 1).pdf PDF
681-0879-203 Rev 4 (3 of 7).pdf PDF
681-0879-201 Rev 0 (44 of 215).pdf PDF
Show 40 more

Latest 50 of 309 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to revise the follow ing item (indicated by red text):

Section L, Instructions to Offerors

All other terms and conditions remain unchanged

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127N20B0022

X 9B. DATED (SEE ITEM 11)

06-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Sep-2020

CODE

USACE PORTLAND DISTRICT

CENWP

333 SW 1ST AVE

PORTLAND OR 97204-3440

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N20B0022

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

Bidders shall submit their bids via email to the following individuals by no later than the date and time established in Block 9 of the Standard Form (SF) 33, or Block 14 of the most recently issued SF 30 as applicable:

Mitchell Johnson, Contracting Officer Mitchell.J.Johnson@usace.army.mil Brandon Lasich, Contract Specialist Brandon.M.Lasich@usace.army.mil

Each email shall contain the following information:

Solicitation No. W9127N20B0022 Bid Due Date and Time: ______ Bid Validity Date: ______ (90 days from the bid due date)

Bids received after the date and time stated within Block 9 of the SF 33, or Block 14 of the most recently issued SF 30 as applicable, will be considered late and will not be considered for award. To avoid rejection of a bid, the offeror must make every effort to ensure its electronic submission is virus-free.

Bidders should enter a description for every file submitted. For files over 20 megabytes (MB) the bidders shall break the file into smaller files sent via separate emails with each email marked to identify which number the email is relative to the total number of emails submitted (i.e. “email one of four”). Once all of the emails submitted have been received the Government will confirm receipt via responsive email. If a bidder submits multiple bids the Government will only consider the last bid submitted prior to the bid due date and time.

Do not assume submission will be instantaneous. File size and number of files submitted shall be considered.

Bidder/Teammate/Subcontractors should allow adequate time for submission completion because the entire bid (i.e.

bidders’ submission and all teammate/subcontractor(s) independent submissions) must be received by the bid due date and time specified in Block 9 of SF 33, or SF 30 as applicable.

Electronic submission of bids satisfies the requirement set forth in Block 9 of the SF 33 (‘…in original and ___ copies…”). Additionally, electronic submission of the bid guarantee, when a bid guarantee is required, is due with the bid submission. Mailing a bid guarantee for submission is not allowed.

Bid Bond:

The Bid Guarantee shall be submited electronically with the bid. The original hardcopy bid bond shall be mailed to the address below and received by the bid due date above:

U.S. ARMY CORPS OF ENGINEERS – PORTLAND DISTRICT

ATTN: CECT-NWP-P (Mitchell Johnson)

PO BOX 2946

PORTLAND, OR 97208-2946

Wage Determinations:

The Service Contract Act (SCA) wage determination will be based on the location of the awardee, since the contract will be performed at the contractor’s facility. The appropriate SCA wage determination will be incorporated into the job order award. See FAR Clause 52.222-49, Service Contract Labor Standards--Place Of Performance Unknown

W9127N20B0022

(May 2014) in Section I of this invitation for bids.

BID OPENING

Bidders are advised there will NOT be a physical bid opening held for this invitation for bids. The bid opening will be held telephonically via conference call at 3:00 pm on the date bids are due. Due to the requirement that bids be submitted electronically only, the bid opening is scheduled to take place one hour following the bid due date and time of 2:00 pm in order to allow the contracting office time to download all bid documents submitted. The USACE Portland District will not accept any hard copy documentation submitted in response to this invitation for bids.

Bidders wishing to participate in the telephonic bid opening shall email a list of participants to both Contracting Officer (Mitchell.J.Johnson@usace.army.mil) and Contract Specialist (Brandon.M.Lasich@usace.army.mil) no later than 24 hours prior to the bid due date and time. Please reference “W9127N20B0022 Essayons Overhaul Bid Opening” in the email subject line. A reply email will be sent to the bidder which will include confirmation of the list of participants, the conference call-in telephone number, and the security passcode for participants to utilize for the telephonic bid opening.

(End of Summary of Changes)