A.07.24_Amendment_0004.pdf

PDF 397 KB Posted

Attached to
Bonneville Powerhouse 1 and Powerhouse 2 Oil Storage Room Fire Protection
Solicitation number
W9127N20B0002
Issued by

About this file

Amendment 0004

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to revise the submission instructions and paragraph G. of the supplemetary conditions. As part of the transition from FBO.gov to beta.sam.gov, the feature allow ing offerors to upload bids w ill no longer be available. Reference the SUBMISSION INSTRUCTIONS section for additional detail. Also reference SUPPLEMENTARY CONDITIONS for the update to paragraph G. All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Nov-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127N20B0002

X 9B. DATED (SEE ITEM 11)

15-Oct-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Nov-2019

CODE

USACE PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204-3440

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N20B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

SUBMISSION INSTRUCTIONS

HARD COPY SUBMISSIONS WILL NOT BE CONSIDERED.

Bids are due no later than the time and date specified in Block 13 of Standard Form 1442, or SF 30 if applicable.

Bids received after the date and time in block 13A of the solicitation will be considered late, and will not be considered for award.

Offeror shall submit its Bid via email to Michael Saldana, Michael.E.Saldana@usace.army.mil, and Ryan S.

Shoemaker, Ryan.S.Shoemaker2@usace.army.mil. Offerors should enter a description for every file submitted. For files over 20 megabytes (MB) the offeror shall break the file into smaller files sent via separate emails, each marked to identify which number the email is relative to the total number of emails submitted (i.e. “one of four”). Once all of the emails submitted have been received, the Government will confirm receipt via return email. If an offeror submits multiple bids, the Government will only consider the last bid submitted prior to the bid due date and time.

The electronic Bid shall be in Portable Document Format, filename extension: “.pdf” and suitable for viewing in Adobe Reader. Offerors shall bookmark and label each electronic PDF to afford easy identification from the Bid table of contents.

Do not assume submission will be instantaneous. File size and number of files submitted shall be considered.

Offeror/Teammate/Subcontractors should allow adequate time for submission completion because the entire Bid (i.e. offerors submission and all teammate/subcontractor(s) independent submissions) must be received by the time and date specified in Block 13 of Standard Form 1442, or SF 30 if applicable.

To avoid rejection of an offer, the offeror must make every effort to ensure its electronic submission is virus-free.

Bids, or portions thereof, submitted with the presence of a virus or which are otherwise unreadable will be treated as unreadable pursuant to FAR 15.207(c).

The requirement that an original and copy(ies) be submitted as found in block 13A of the SF1442 is satisfied through the electronic submission. Additionally, electronic submission of the bid guarantee, when a bid guarantee is required, is due with the bid submission (mailing a bid guarantee is not allowed).

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

SUPPLEMENTARY CONDITIONS

SUPPLEMENTARY CONDITIONS

NUMBER DESCRIPTION

A. CONTRACT ADMINISTRATION

B. UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT OR OTHER

PERSONNEL

C. IDENTIFICATION OF EMPLOYEES

D. OTHER WORK

E. SUBMITTING PAY ESTIMATES AND PAYMENTS TO THE CONTRACTOR

F. IMPLEMENTING EQUIPMENT GUARANTEES

G. SAFEGUARDING OF INFORMATION

H. INSURANCE – WORK ON A GOVERNMENT INSTALLATION

I. PUBLIC RELEASE OF INFORMATION

J. CONTRACTOR PERFORMANCE EVALUATIONS

A. CONTRACTADMINISTRATION

This contract will be administered by:

Michael Magee, ACO, Michael.S.Magee@usace.army.mil U.S. Army Corps of Engineers, Portland District 333 SW 1st Ave Portland, OR 97204-3440 Telephone: (541) 374-5457

(End of Requirement)

B. UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT OR OTHER PERSONNEL

The Contractor shall not accept instruction issued by any person employed by the U.S. Government or otherwise, other than the Contracting Officer or the authorized representative of the Contracting Officer acting within the limits of his authority.

C. IDENTIFICATION OF EMPLOYEES

The Contractor shall be responsible for furnishing to each employee engaged on the work to display such identification as may be approved and directed by the Contracting Officer. All prescribed identification shall immediately be delivered to the Contracting Officer for cancellation upon the release of any employee.

When required by the Contracting Officer, the Contractor shall obtain and submit fingerprints of all persons employed or to be employed on the project.

D. OTHER WORK

The Contractor shall fully cooperate with other Contractors, utility companies, and Government employees engaged in other work on and/or adjacent to the work to be performed under this contract. The Contractor shall coordinate the work herein and the use of haul roads, aggregate sources, and utilities that become a joint responsibility. Any damage resulting from the use of facilities of other Contractors shall immediately be repaired to the satisfaction of, or as directed by the Contracting Officer.

E. SUBMITTING PAY ESTIMATES AND PAYMENTS TO THE CONTRACTOR

The Contractor shall use the Resident Management System-Contractor Module (RMS-CM) to prepare Engineer Form 93 (ENG 93), Payment Estimate – Contract Performance, as request for payment. The Contracting

Officer’s Representative or Administrative Contracting Officer is responsible for ensuring acceptance and approval for payment.

The Contractor must submit the certification at FAR Clause 52.232-5, paragraph (c) along with each request for progress payments.

F. IMPLEMENTING EQUIPMENT GUARANTEES

When the completed facility or part of a facility is accepted by the Contracting Officer, and the work includes equipment covered by a guarantee which exceeds the warranty of construction period as specified, the Contractor shall furnish the following information to the Contracting Officer:

a. A list of all items with make and model numbers.

b. A copy of manufacturer's or vendor's guarantee documents which extend beyond the warranty of construction period.

c. The date during which the Contractor's guarantee is in effect under the properly identified individual section and paragraph of the Technical Provisions each item of equipment on the list, indicating for each item the date of acceptance for the beginning of the guarantee period, either for beneficial use or final acceptance, whichever is earlier, and the expiration date of the guarantee period.

d. Name of an authorized representative of the Prime Contractor with complete address and telephone number, and the names, addresses, and telephone numbers of all subcontractors and/or equipment suppliers or manufacturers specifically designated in writing by the Prime Contractor for direct contact by the United States Army Corps of Engineers for implementing the guarantee after transfer of the equipment.

G. SAFEGUARDING OF INFORMATION

The personnel employed on this contract may, in the performance of their assigned duties, have access to data and information pertaining to location of goods, supplies, parts, equipment, and vehicles.

Knowledge of this nature is considered restricted security information. This information shall be protected and safeguarded against disclosure to any unauthorized person or party and shall be furnished or used on an official "need to know" basis only. Safeguarding of information is extended to dependents and guests of employees who may, in any manner, obtain any of the above-specified knowledge.

H. INSURANCE – WORK ON A GOVERNMENT INSTALLATION

a. The Contractor shall, at its own expense, provide and maintain during the entire performance period of this contract, at least the kinds and minimum amounts of insurance required by this Clause as follows:

TYPE AMOUNT

1) Workman's Compensation and Employer's Liability (including Federal Longshoremen . and Harbor Worker's Insurance)

As legally required by the State wherein the work is being performed.

2) Comprehensive General Liability Insurance Personal Injury Liability:

$1 million per person $1 million per occurrence

Property Damage (may be included in general aggregate limits or combined single unit coverage):

3) Automobile Liability Personal Injury Liability:

$1 million per person $1 million per occurrence

Property Damage (may be included in general aggregate limits or combined single unit coverage):

4) If single general aggregate limits or combined single unit coverage is obtained for General Liability and/or Automobile Liability coverage, minimum amounts shall be the sum of the personal injury and property damage coverage required above. Umbrella Form Excess Liability insurance coverage shall be added to general liability and automobile liability coverage to determine if minimum insurance limits are met.

5) If work is to be performed in railroad right-of-way, see paragraph titled ADDITIONAL REQUIREMENTS FOR RAILROAD PROTECTION in Section 01010 of SECTION C. (THIS APPLIES TO CONSTRUCTION

CONTRACTS ONLY)

b. Before commencing work under this contract, the Contractor shall certify to the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe, or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.

c. The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies available to the Contracting Officer upon request.

d. "Government Installation" for this clause includes government vessels.

I. PUBLIC RELEASE OF INFORMATION

The contractor shall coordinate with the Portland District of the U.S. Army Corps of Engineers for release of information to the public concerning this contract or any program related to this contract. This clause covers Media Relations and Printed Materials.

1. Media Relations

The contractor is permitted to speak to news media representatives in accordance with his firm’s public relations policies and in conjunction with applicable U.S. government or Army Corps of Engineers’ guidelines on release of information related to the specific program for which the contract was awarded. The contractor is required to inform the Portland District of significant media contacts. The contractor is encouraged to coordinate directly with Portland District’s Public Affairs Officer, as necessary, when the media call is being responded to; however, this shall not preclude the contractor from responding to media requests in a timely manner. The contractor shall respond to inquiries that directly fall within his domain; he shall not speak for the Army or the Corps.

2. Printed Materials

a. The contractor shall not release to anyone outside the contractor’s organization any unclassified information, regardless of medium, pertaining to this contract, unless:

i. The Portland District has given written approval, either by the Public

Affairs Officer or by the Contracting Officer;

ii. Or the information is otherwise in the public domain before the date of release.

b. The contractor shall obtain approval from the Portland District prior to the dissemination of any briefings or speeches, news releases, articles, fact sheets, advertisements, or any other informational materials intended for public release that are the result of work performed or to be performed under this contract. This review is intended to insure that public release of material does not violate government policy.

c. Requests for approval shall identify the specific information to be released, the medium to be used, and the purpose for release. This material shall be submitted to the Public Affairs Officer and to the Contracting Officer at the Portland District. The contractor shall strive to provide five working days for such approvals. Materials to be released within a shorter period of time will require special handling procedures, and the contractor shall request special consideration directly to the Public Affairs Officer or to the Contracting Officer.

d. The Contractor agrees to include a similar requirement in each subcontract under this contract. Subcontractors shall submit requests for authorization to release through the prime contractor to the government (the Public Affairs Officer and the Contracting Officer), assuring the government that the prime contractor is knowledgeable of the action and concurs.

Nothing in the foregoing section on public release of information shall affect compliance with the clause of the contract entitled, “Security Requirements.”

J. CONTRACTOR PERFORMANCE EVALUATIONS

In accordance with UAI 5142.1502-100 and the Engineering Regulation 415-1-17, Construction Contractor Performance Evaluations, dated 24 January 2012, It is USACE policy that the Procuring Contracting Officer (PCO), or designated representative of the construction office responsible for monitoring contractor performance, will evaluate construction contractor’s performance and prepare a performance evaluation report in the Contractor Performance Assessment Reporting System (CPARS). The Contractor shall be briefed of the CPARS process at the time of the Preconstruction Conference.

(End of Summary of Changes)