B.08_Attachment_A_-Price_Schedule.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
FY20 Dredge Vessel Yaquina Overhaul
Solicitation number
W9127N19R0059
Issued by

About this file

Attachment A - Price Schedule

View the file

Other files

File Type Posted
B.08W9127N19R0059P0004.pdf PDF
Y-2232-11-2_OF_2.TIF TIF image
B.08W9127N19R0059P0003.pdf PDF
Y-2232-15__Transv_Bhd_68,_78,_83,_88.pdf PDF
Y-2232-11-1_OF_2.TIF TIF image
Generator_Manual_and_Alignment_Information.pdf PDF
12V2000_P82_operating_instructions.pdf PDF
PBSAsbestosBulkRpt_25621.001_P0001_S0001-0018.pdf PDF
B.08W9127N19R0059P0002.pdf PDF
B.08_Attachment_A_-PriceSchedule_P0002.xlsx XLSX spreadsheet
Updated_one_line_diagram.pdf PDF
DURAMAX_MARINE_Instruction_-_Air_Seal_Ring_Replacement.pdf PDF
USACE_ECM_18-Y001_-_FO_TANK_OVERFLOW_PPG_MOD.PDF PDF
Y-2232-32_---_Boat_Deck_Plating_and_Beams_(Alum).pdf PDF
DURAMAX_MARINE_Drawing_-_Stuffing_Box_Assembly.pdf PDF
Y-3871-2_---_Arrangement,_Sounding_Tubes,_Air_Escapes,_and_Overflows_.pdf PDF
Switchboard_Drawing.pdf PDF
B.08AttachmentAPriceScheduleAmend1Revised.xlsx XLSX spreadsheet
B.08_W9127N19R0059P0001Final.pdf PDF
Y-3874-4_Bilge_and_Ballast_System.pdf PDF
DT50-55_Tech_Manual_80-677_Pages_for_HPU.pdf PDF
Y-3874-3_Bilge_and_Ballast_System.pdf PDF
YaquinaOverhaulBrandNameDetermination_Redacted.pdf PDF
Y-2232-3__---_Shell_Framing.pdf PDF
Y-2232-12_---_Shell_Expansion.pdf PDF
C.04_Attachment_B_Small_Business_Subcontracting_Plan.pdf PDF
B.08W9127N19R0059Final.pdf PDF
A.02AttachmentAYaquinaQualificationChecklist.pdf PDF
A.02AttachmentAYaquinaQualificationChecklist.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAT A

Category A Work Item DescriptionPWS ParagraphQtyUnitUnit PriceAmount
Transportation5.1.14Each
Crane Services5.1.360Hour
Field Office5.1.478Day
Parking5.1.578Day
Drydock Services5.2.11Job
Drydock Lay Day5.2.230Day
Wet Berth Services5.2.31Job
Wet Berth Lay Day5.2.4Day
Electricity5.2.5420,000kWh
Steam5.2.678Day
Compressed Air5.2.778Day
Sanitation5.2.878Day
Potable Water5.2.978Day
Internet5.2.1078Day
Connection/Disconnection of Services5.2.113Each
Pump Room Bilge Cleaning5.3.11Job
Engine Room Bilge Cleaning5.3.21Job
Slops Tanks Annual Maintenance5.3.31Job
Pressure Wash Exterior Hull5.4.11Job
Coating Weather Decks5.4.4100Sqft
Coating Aluminum House5.4.5100Sqft
Hull Anode Renewal5.51Job
Hopper Inspection Staging5.61Job
Sluice Valve Replacement5.121Job
Sliding Piece Fit-Up5.141Job
Bow Thruster - Inspection Setup5.19.11Job
Bow Thruster - Inspection, Oil, and Seal Change5.19.21Job
Main Propulsion System - Propeller Blade Replacement5.20.11Job
Main Propulsion System- Shaft Bearing Clearances5.20.21Job
Life Raft Annual Service5.241Job
Clean and Inspect Galley Exhaust Duct5.251Job
Fire Supression Services5.261Job
Chain Locker and Ballast Tank Cleaning5.271Job
Internal Tank Inspection5.281Job
Skin Valves and Sea Strainers Inspection5.291Job
Annual Rescue Boat Davit Maintenance5.301Job
Dock and Sea Trials5.311Job
Navigation Equipment Service5.321Job
Emergency Generator Service5.331Job
CRPP Control Service5.341Job
ABS Inspection Services5.351Job
Engine Services5.361Job
House Flooring Renewal5.371Job
Cross Flood Tank including Air and CO2 Coating5.381Job
Shore Power Connection5.391Job
Bilge System Piping Replacement5.401Job
Pump Room Bilge and Ballast Manifolds Replacemnt5.411Job
King Post Renew5.421Job
Stern Tube Shaft Inflatable Seal; Replace5.431Job
Potable Water Tanks; Disinfect5.441Job
Shaft Knives Replacement5.451Job
Fuel Oil Tank Overflow Piping; Modify5.461Job
Annual Launch Davit Maintenance5.471Job
Watertight Door Installation5.481Job
HVAC Duct Cleaning5.491Job
Fire Main Piping Replacement5.501Job
Service Vessel Crane5.511Job
Plumbing Drain Vent Goosenecks; Replace5.521Job
Hull Sctructural Repairs; Accomplish5.531Job
House HVAC Supply Fan Repair5.541Job
DETACOUPLE Replacement5.551Job
Total Category A Work Items

CAT B

Category B Work Item DescriptionPWS ParagraphQtyUnitUnit PriceAmount
Tug Services5.1.21Job
Coating of Hull Above Waterline5.4.21Job
Coating of Hull Below Waterline5.4.31Job
Anchor and Anchor Chain Reconditioning5.71Job
Suction Inlet Hull Rings and Pipe Liners Replacement5.81Job
Hopper Door Hydraulic Cylinder Overhaul5.91Job
Hopper Overflow Hydraulic Cylinder Overhaul5.101Job
Swell Compensator Cylinder Overhaul5.111Job
20-inch Pipe Replacement5.132Job
Draghead Winch Reconditioning5.15.11Job
Gimbal Winch Reconditionig5.15.21Job
Hopper Door Operating Rod Replacement5.161Job
Hopper Door Bearing Support Channel Overhaul5.171Job
Hopper Door Hinge Bushing Renewal5.184Job
Bow Thruster - Sleeve Replacement5.19.31Job
Bow Thruster - Pod Preservation5.19.41Job
Main Propulsion System -Tailshaft/Hub Assembly Replacement5.20.31Job
Main Propulsion System - Shaft Bearing Replacement5.20.41Job
Aft Fire Pump Overhaul5.211Job
Steering System - Rudder Assembly Replacement5.22.11Job
Steering System - Steering Gear Overhaul5.22.21Job
Engine Room Supply Fan Overhaul5.23.11Job
Engine Room Exhaust Fan Overhaul5.23.21Job
Auxiliary Machinery Room Supply or Exhaust Fan Overhaul5.23.31Job
Pump Room Supply Fan Overhaul5.23.41Job
Pump Room Exhaust Fan Overhaul5.23.51Job
House Main HVAC Supply Fan Overhaul5.23.61Job
Composite Labor Hour Rate for Contract Changes5.56.11000HR
Services of Outside Machinist5.56.21000HR
Services of Inside Machinist and Machine Shop5.56.3350HR
Services of Sheet Metal Fabricator5.56.4150HR
Services of Welders5.56.51200HR
Services of Pipefitter and Pipe Welder5.56.6700HR
Services of Painters5.56.7350HR
Services of Cleaners and Pumpers5.56.8200HR
Services of Electricians5.56.9200HR
Services of Subcontractors5.56.10Rate
Additional Required Materials5.56.11Rate
Total Category B Work Items

File details come from the government source that posted it.