Function & Load Test Report Serial Number 2218 111038982

View the file

Other files

File Type Posted
A.02_W9127N19R0058_BrandName_5.48_REDACTED.pdf PDF
B.08_W9127N19R00580001Final.pdf PDF
B.08_Attachment_A-Price_Schedule-Final.xlsx XLSX spreadsheet
B.08_70.010-4411-942_Rev_B.PDF PDF
B.08_70.010-4411-942_Rev_C.PDF PDF
B.08_70.010-4411-942_(2_of_2).pdf PDF
B.08_E-2705-1-2.tif TIF image
B.08_E-1710-06.pdf PDF
B.08_E-2705-1-6.tif TIF image
B.08_E-1710-25.pdf PDF
B.08_E-2705-1-4.tif TIF image
B.08_E-2705-1-5.tif TIF image
B.08_70.010-4411-942_(1_of_2).pdf PDF
B.08_E-1710-15.pdf PDF
B.08_E-2705-1-1.tif TIF image
B.08_E-2705-1-7.tif TIF image
B.08_E-2705-1-3.tif TIF image
B.08_E-1710-22.pdf PDF
B.08_354-F720-01-Rev_1_-_PEDESTAL_CRANE_ELECTRICAL_MODS.pdf PDF
354-F399-01_Rev_4_Analysis_Report_112559977_112099023.pdf PDF
GA-2218_R1_MCF-9583_Signed_TCG.pdf PDF
Aurora_Cut_Sheet.pdf PDF
354-F330-01-4.pdf PDF
P7008-ESSAYONS_Final_6-18-19.pdf PDF
RL_Crane_Fdn_T1860524-KI-14May2019_112561579.pdf PDF
B.08W9127N19R0058Final.pdf PDF
B.08_Attachment_A-Price_Schedule.xlsx XLSX spreadsheet
A.02_Attachment_B_SubcontractingPlanGoalLetter_19R0058.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

North Pacific Crane Company

Tel: (206) 361-7064

Fax: (206) 361-7065

10734 Lake City Way NE Seattle, WA 98125 info@northpacificcrane.com www.northpacificcrane.com

FUNCTION & LOAD TEST REPORT

Owner: U.S. ARMY CORP. OF ENGINEERS � VICKSBURG IMO Number: IMO Number ABS Class Number: 821 021 3 Test Time/Date: _________________________ Crane Serial Number: 221 8 Crane Model Number: MCF-9583 (Double Tapered Fixed Boom) Location of Test: _________________________________________________________

Functional Test Procedure Accept Reject

1 . Install Slew Drives, Valves, etc. and inspect

2. Energize hydraulic power supply, and check for leaks.

3. Operate all crane functions to full physical limit, Observe and record cycle time as required.

A) Swing � Left/Right

B) Luffing � Up/Down

C) Main Winch � Pay In/Out

D) Aux Winch � Pay In/Out (If any)

4. Check for control functions

5. Check for oil leaks.

6. Check and record circuit pressure

Circuit pressure:

7. Demonstrate correct operation of safety devices.

S e e A

B S H o u s to n L e tt e r R e f T D a te d

-F

E B -2 http://www.northpacificcrane.com

Functional Test Procedure (Con�t.) Accept Reject

8. Check winch drum for correct spooling

9. Examine hydraulic system for leaks

Load Test Procedure Accept Reject

1 . Secure crane to level platform.

2. Main Winch Load Test #1 - - - Load: 58,025 LBS

@ 48.0 Degrees, Radius 55 Feet

3. Main Winch Load Test #2 - - - Load: 25,000 LBS

@ 0.0 Degrees, Radius 80 Feet

4. Main Winch Load Test #3 - - - Load: 58,025 LBS

@ 76.0 Degrees, Radius 20 Feet

5. Aux. Winch Load Test #1 - - - Load: 1 2,500 LBS

@ 0.0 Degrees, Radius 83.0 Feet

6. Aux. Winch Load Test #2 - - - Load: 1 2,500 LBS

@ 55.0 Degrees, Radius 50 Feet

7. Aux. Winch Load Test #3 - - - Load: 1 2,500 LBS

@ 77.0 Degrees, Radius 20 Feet

5. Raise and lower load with main & aux winch.

6. Swing loads both directions.

7. Release load and examine structure and rigging.

S e e A

B S H o u s to n L e tt e r R e f T D a te d

-F

E B -2

Notes; The static test of the crane after installation on board prior to first use and performed within a harbor or sheltered area or in very mild environmental conditions.

The above crane and other hoisting machine, with accessory gear, shall be tested with a proof load which shall exceed the safe working load or rated load of 25% in excess for all the SWL ≤ 44,1 00 LBS & 1 1 ,025 LBS in excess for all the SWL 44,1 00-1 1 0,250 LBS. The proof load shall be lifted and swung as far as possible in both directions. The listed above 2 extreme boom configuration is tested with a proof load, as defined above. If required proof load test should also be carried out for the intermediate radii (referring the load chart) or the item 4 from above table.

When the load lifted is less than the proof test load required as stated above, a notation is to be made on the certificate that this load was the maximum possible load. However, in no case is the test load to be less than the safe working load stated on the certificate. It will also be noted on the certificate that the load was limited by a built in electric or hydraulic load limit control and that the adjusting devices or relief valves were found sealed.

After being tested, each crane or hoist, with the whole of the gear accessory thereto, shall be examined to see whether any part has been damaged or permanently deformed by the tests.

Witness and Acceptance:

Signature - - NPCC Representative Print name Date

Signature - - Customer Representative Print name Date

Signature - - Customer Representative Print name Date

Signature - - Classification Society Witness Print name Date

Note: Include additional page for any other remarks