Sheet1
| CLIN 0001 Category A Description | PWS Paragragh | Work Item Type | Quantity | Unit | Unit Price | Amount |
| Transportation | 5.1.1 | Standard | 4 | Each | $ - 0 | |
| Crane Services | 5.1.3 | Standard | 75 | Hour | $ - 0 | |
| Connection/Disconnection of Services | 5.1.4 | Standard | 3 | Each | $ - 0 | |
| Field Office | 5.1.5 | Standard | 80 | Day | $ - 0 | |
| Parking | 5.1.6 | Standard | 80 | Day | $ - 0 | |
| Drydocking Lift Day | 5.2.1 | Standard | 1 | Job | $ - 0 | |
| Drydock Lay Day | 5.2.2 | Standard | 60 | Day | $ - 0 | |
| Wet Berth | 5.2.3 | Standard | 15 | Day | $ - 0 | |
| Electricity | 5.2.4 | Standard | 420,000 | kWh | $ - 0 | |
| Steam | 5.2.5 | Standard | 75 | Day | $ - 0 | |
| Marine Chemist Certifications | 5.3.1 | Standard | 1 | Job | $ - 0 | |
| Fire Suppression Services | 5.4.1 | Standard | 1 | Job | $ - 0 | |
| Bilge Maintenance | 5.5.1 | Standard | 1 | Job | $ - 0 | |
| Touch Up Upper and Lower Hull Coatings | 5.6.1 | Nonstandard | 1 | Job | $ - 0 | |
| 1 through 6 Stbd Double Bottom Void Coatings | 5.6.2 | Nonstandard | 1 | Job | $ - 0 | |
| 1 through 6 Port Double Bottom Void Coatings | 5.6.3 | Nonstandard | 1 | Job | $ - 0 | |
| Irathane 155 Urethane Coating | 5.6.9 | Standard | 1 | Job | $ - 0 | |
| Sluice Valve Replacement | 5.8.1 | Standard | 4 | Each | $ - 0 | |
| Hopper Jetting Valve (10") Replacement | 5.8.3 | Standard | 8 | Each | $ - 0 | |
| Hopper Jetting Valve (12") Replacement | 5.8.4 | Standard | 2 | Each | $ - 0 | |
| Hopper Jetting Valve (16") Replacement | 5.8.5 | Standard | 2 | Each | $ - 0 | |
| Main Sea Strainers | 5.9.2 | 5 Year | 1 | Job | $ - 0 | |
| Purchase Drag Wires | 5.10.2 | Standard | 1 | Job | $ - 0 | |
| Dragarm Sheave Inspection | 5.10.3 | Standard | 1 | Job | $ - 0 | |
| Port Dragarm Davit Removal, Inspection, Preservation | 5.10.5 | Nonstandard | 1 | Job | $ - 0 | |
| Discharge Piping Inspection | 5.11.1 | Standard | 1 | Job | $ - 0 | |
| Discharge Piping Epoxy Repairs | 5.11.2 | Nonstandard | 1 | Job | $ - 0 | |
| Hopper Jetting System Clean | 5.13.2 | Standard | 1 | Job | $ - 0 | |
| Weir Seal Inspection | 5.13.3 | Standard | 1 | Job | $ - 0 | |
| Hopper Inspection Staging | 5.14.1 | Standard | 1 | Job | $ - 0 | |
| Tower Staging | 5.14.3 | Standard | 50 | Each | $ - 0 | |
| Rudder Stock Upper Bearing Inspection | 5.15.1 | Standard | 1 | Job | $ - 0 | |
| Stern Tube Shaft Seal Replacement | 5.16.5 | Standard | 2 | Job | $ - 0 | |
| Stbd Stern Tube and Strut Bearing Replacement | 5.16.6 | Nonstandard | 1 | Job | $ - 0 | |
| Bow Thruster - Lower Gearbox LGB / Pod Change Out | 5.17.4 | Nonstandard | 1 | Job | $ - 0 | |
| Temporary Electric Motor Heaters | 5.19.2 | Standard | 23 | Each | $ - 0 | |
| Jetting Pump Repairs | 5.21.5 | Standard | 1 | Job | $ - 0 | |
| Sewage Pipe Repairs | 5.21.6 | Nonstandard | 1 | Job | $ - 0 | |
| Dragarm Winch Motor Overhaul | 5.22.3 | Standard | 2 | Job | $ - 0 | |
| Stbd Trunnion Carriage Removal and Overhaul | 5.22.5 | Nonstandard | 1 | Job | $ - 0 | |
| Stbd Service Frame Replacement | 5.22.7 | Nonstandard | 1 | Job | $ - 0 | |
| ABS Support | 5.24.0 | Standard | 1 | Job | $ - 0 | |
| Audio Gauge Reading | 5.24.1 | Standard | 3000 | Each | $ - 0 | |
| Elevator Inspection and Repair | 5.25.1 | Standard | 1 | Job | $ - 0 | |
| Anchor Chain and Chain Locker Inspection for Vessel General Permit | 5.26.3 | Standard | 1 | Job | $ - 0 | |
| Life Raft Annual Service | 5.28.1 | Standard | 1 | Job | $ - 0 | |
| Sludge Tank Annual Maintenance | 5.29.1 | Standard | 1 | Job | $ - 0 | |
| Tailshaft Bearing Clearance Documentation | 5.31.1 | New Spec | 1 | Job | $ - 0 | |
| Rudder Bushing Clearance Documentations | 5.31.2 | Standard | 1 | Job | $ - 0 | |
| Dock and Sea Trials | 5.33.1 | Standard | 1 | Job | $ - 0 | |
| Hopper Steel Repair | 5.44.1 | Nonstandard | 1 | Job | $ - 0 | |
| Hull Steel Repairs | 5.44.2 | Nonstandard | 1 | Job | $ - 0 | |
| ALMO Pipe Chute and Lower Pump Room Dredge Pipe Removal | 5.44.3 | Nonstandard | 1 | Job | $ - 0 | |
| AMR Steel Renewal | 5.44.4 | Nonstandard | 1 | Job | $ - 0 | |
| Pedestal Crane Replacement | 5.45.1 | Nonstandard | 1 | Job | $ - 0 | |
| Stateroom Carpet Replacement | 5.45.3 | Nonstandard | 1 | Job | $ - 0 | |
| Refer Box Replacement | 5.45.4 | Nonstandard | 1 | Job | $ - 0 | |
| Swell Comp Compressor Replacement | 5.45.5 | Nonstandard | 1 | Job | $ - 0 | |
| Salt Water Pump Replacement | 5.47.1 | Nonstandard | 1 | Job | $ - 0 | |
| CFW Pump Replacements | 5.47.2 | Nonstandard | 1 | Job | $ - 0 | |
| Main Hydraulic System Repairs and Flush | 5.47.6 | Nonstandard | 1 | Job | $ - 0 | |
| Deck Drain Installation, Repair, and Clearing | 5.47.8 | Nonstandard | 1 | Job | $ - 0 | |
| Center 480V SSDG Top End Overhaul | 5.48.1 | Nonstandard | 1 | Job | $ - 0 | |
| Port 600V C280 Top End Overhaul | 5.48.2 | Nonstandard | 1 | Job | $ - 0 | |
| VULKAN Coupling Inspection and Replacement | 5.48.4 | Nonstandard | 1 | Job | $ - 0 | |
| Rescue Boat, Launch, and Lifeboat Davit Inspections | 5.53.1 | Standard | 1 | Job | $ - 0 | |
| Navigation Radar Annual Service | 5.54.1 | New Spec | 1 | Job | $ - 0 | |
| Ship Forward Whistle | 5.54.2 | Nonstandard | 1 | Job | $ - 0 | |
| Total Category A Work Items | $ - 0 | |||||
| Category B Description | PWS Paragragh | Quantity | Unit | |||
| Tug Service | 5.1.2 | Standard | 1 | Job | $ - 0 | |
| Drag Wire Replacement | 5.10.1 | Standard | 1 | Job | $ - 0 | |
| Dragarm Sheave Overhaul - Single Sheave | 5.10.4 | Standard | 4 | Each | $ - 0 | |
| Dragarm Sheave Overhaul - Single Sheave Swivel Block | 5.10.4 | Standard | 1 | Each | $ - 0 | |
| Dragarm Sheave Overhaul - Swell Comp Single Sheave | 5.10.4 | Standard | 1 | Each | $ - 0 | |
| Dragarm Sheave Overhaul - Single Sheave Water Block | 5.10.4 | Standard | 1 | Each | $ - 0 | |
| Dragarm Sheave Overhaul - Swell Comp Double Sheave | 5.10.4 | Standard | 2 | Each | $ - 0 | |
| Dragarm Sheave Overhaul - Sheave Guide | 5.10.4 | Standard | 1 | Each | $ - 0 | |
| Weir Seal Replacement | 5.13.4 | Standard | 1 | Job | $ - 0 | |
| Propeller Blade Inspection | 5.16.1 | Standard | 1 | Job | $ - 0 | |
| Propeller Blade Replacement | 5.16.2 | Standard | 1 | Job | $ - 0 | |
| Propeller Hub Replacement | 5.16.3 | Standard | 1 | Job | $ - 0 | |
| Tailshaft Replacement | 5.16.4 | Standard | 1 | Job | $ - 0 | |
| Port 600V Generator Bearing Inspection | 5.48.4 | Standard | 1 | Job | $ - 0 | |
| Composite Labor Hour Rate for Contract Changes | 5.55.0 | Standard | ||||
| Services of Outside Machinists | 5.55.1 | Standard | 3000 | Hour | $ - 0 | |
| Services of Inside Machinists and Shop | 5.55.2 | Standard | 1000 | Hour | $ - 0 | |
| Services of Sheet Metal Fabricators | 5.55.3 | Standard | 400 | Hour | $ - 0 | |
| Services of Welders | 5.55.4 | Standard | 3500 | Hour | $ - 0 | |
| Services of Pipefitter and Pipe Welders | 5.55.5 | Standard | 2000 | Hour | $ - 0 | |
| Services of Painters | 5.55.6 | Standard | 1000 | Hour | $ - 0 | |
| Services of Cleaners and Pumpers | 5.55.7 | Standard | 600 | Hour | $ - 0 | |
| Services of Electricians | 5.55.8 | Standard | 800 | Hour | $ - 0 | |
| Services of Subcontractors | 5.55.9 | Standard | Rate | $ - 0 | ||
| Additional Required Materials | 5.55.10 | Standard | Rate | $ - 0 | ||
| Total Category B Work Items | $ - 0 |
&"Times New Roman,Regular"&10W9127N19R0058 FY20 Task Schedule