W66QKZ71282904
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project: Bonneville Generator Cooler Upgrade Amendment-0005 for W9127N18B0005
The purpose of this amendment is to revise the Technical Specifications, Division 42 13 19.00 26 paragraph 2.4.1 b to read:
Detailed air cooler draw ings exist for Main Units 3-10. These coolers have mirrored low er heads, a left and right hand design. This is noted on draw ing P-5923384. The Contractor must field verify all dimensions and document any additional measurements or features that are needed for fabrication. The original coolers have 204, 5/8" O.D. tubes. There are 4 row s of 25 tubes and 4 row s of 26 tubes. There are 8 fins per inch. One in-service cooler is available to ship off site for reverse engineering or to inspect on site. The other hand cooler w ill be removed from service for the contractor to inspect on site only.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Jan-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-18-B-0005
X 9B. DATED (SEE ITEM 11)
22-Nov-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Jan-2018
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N-18-B-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
Bonneville P1 and P2 Generator Air Cooler Upgrade
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.00 25 SUMMARY OF WORK
01 33 00 SUBMITTAL PROCEDURES
01 35 26.00 25 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 25 QUALITY CONTROL
01 45 00.15 25 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 78 23.00 25 OPERATION AND MAINTENANCE DATA
01 78 39.00 25 PROJECT RECORD DOCUMENTS
DIVISION 05 - METALS
05 50 03.00 26 METALWORK, FABRICATION, MACHINE WORK, AND MISCELLANEOUS
PROVISIONS
DIVISION 40 - PROCESS INTERCONNECTIONS
40 05 13.96 26 WELDING
DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
42 13 19.00 26 SURFACE AIR COOLERS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
SECTION 42 13 19.00 26
SURFACE AIR COOLERS
PART 1 GENERAL
1.1 SUMMARY OF WORK
1.2 REFERENCES
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Verification of Dimensions
1.4.2 Finned Tube Supplier Qualifications
1.4.3 Product Data
1.4.4 Shop Drawings
PART 2 PRODUCTS
2.1 GENERAL
2.1.1 Materials
2.1.2 Standard Products
2.1.3 Dissimilar Metals
2.2 BOLTS, NUTS, AND WASHERS
2.3 NAMEPLATES
2.4 SURFACE AIR COOLERS
2.4.1 Surface Air Coolers General
2.4.2 Finned Tubing Main Units 1-10
2.4.3 Finned Tubing Main Units 11-18 and Fish Units 1-2
2.4.4 Headers and Manifolds
2.4.4.1 Main Units 1-10
2.4.4.1.1 Manufactured Heads and Manifolds
2.4.4.1.2 Cast Heads and Manifolds
2.4.4.1.2.1 General
2.4.4.1.2.2 Materials
2.4.4.1.2.3 Inspection
2.4.4.1.2.4 Repair
2.4.4.2 Main Units 11-18 and Fish Units 1-2
2.4.5 Tube Sheets
2.4.6 Cooler Frame
2.4.7 Gaskets
2.4.8 Painting
2.4.8.1 Paint Contractor Qualification
2.4.8.2 Surface Preparation
2.4.8.3 Manifold and Header Paint
2.4.8.4 Inspection Reports
PART 3 EXECUTION
3.1 QUANTITY AND SPARE PARTS
3.2 COOLER AVAILABILITY FOR REVERSE ENGINEERING
3.3 FABRICATION
3.3.1 Welding
3.3.2 Metal Work
3.4 SHOP ASSEMBLY
3.5 PROTECTION OF COOLERS
SECTION 42 13 19.00 26 Page 1
(5) Maximum allowable working pressure, at temperature;
(6) Weight, empty;
(7) Weight, full of water;
b. Include a sample of the nameplate on the cooler shop drawings.
2.4 SURFACE AIR COOLERS
2.4.1 Surface Air Coolers General
a. The coolers are straight tube type with headers on either end.
Supply new coolers that are identical to the existing coolers except where modified by these specifications. The new coolers must be dimensionally interchangeable with the existing coolers so they can bolt into the existing equipment.
b. Detailed air cooler drawings exist for Main Units 3-10. These coolers have mirrored lower heads, a left and right hand design. This is noted on drawing P-5923384. The Contractor must field verify all dimensions and document any additional measurements or features that are needed for fabrication. The original coolers have 204, 5/8" O.D.
tubes. There are 4 rows of 25 tubes and 4 rows of 26 tubes. There are 8 fins per inch. One in-service cooler is available to ship off site for reverse engineering or to inspect on site. The other hand cooler will be removed from service for the contractor to inspect on site only.
c. Detailed drawings for Main Units 1-2 are not available. These coolers are of the same family and manufacturer as units 3-10 only differing in size. The original coolers have 288, 5/8" O.D. tubes.
There are 12 rows of 24 tubes. There are 8 fins per inch. The contractor must certify that these coolers do not have mirrored heads.
The contractor will need to inspect and take all measurements of the Main Units 1-2 coolers in order to properly reverse engineer them. Two coolers will be removed from service for the contractor to onsite. One in-service cooler is available to ship off site for reverse engineering.
d. Detailed drawings for Main Units 11-18 and Fish Units 1-2 are not available. Main Units 11-18 original coolers have 92, 5/8" O.D. tubes.
There are 4 rows of 23 tubes. There are 14 fins per inch. Fish Units 1-2 original coolers have 72, 5/8" O.D. tubes. There are 4 rows of 18 tubes. There are 14 fins per inch. One existing cooler of each family will be made available to the Contractor for the purpose of reverse engineering off site or to inspect on site. The specifics regarding the availability of the cooler for reverse engineering is located in PARAGRAPH: Cooler Availability for Reverse Engineering.
2.4.2 Finned Tubing Main Units 1-10
a. Use copper L-fins that are tension wound to the copper tube. Make fins from copper that meets the requirements of ASTM B152/B152M.
b. Make the inner tubes from copper, per ASTM B111/B111M, UNS C70600.
The minimum allowable wall thickness is 0.049". Expand the tube ends into the tube sheets. Do not use belled ends on the tubes as the original tubes have.
SECTION 42 13 19.00 26 Page 7
| W9127N18R00050005 |
| Technical_Sections |
| [5]: [5] |
| Amd0005: AMD #0005 |