John_Day_Unit_Upgrade_Bid_Schedule.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- John Day BLH Turbine Hub Upgrades
- Solicitation number
- W9127N-16-R-0016
About this file
W9127N-16-R-0016 John Day BLH Turbine Hub Upgrades Bid Schedule (in Excel format)
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Count 1 | Count 2 | Item No. | Supplies/Services | Quantity | Unit | Unit Price | Amount | Look up table to convert number to Alpha | |
| BASE WORK | 1 | A | |||||||
| 0001 | Mobilization and Demobilization | 1 | JOB | 2 | B | ||||
| 0002 | Furnish One (1) Set of Oversized Turbine Shaft-to-Runner Studs | 1 | JOB | 3 | C | ||||
| 0003 | Designated Reference Drawings | 1 | JOB | 4 | D | ||||
| 5 | E | ||||||||
| 0004 | Unit A Upgrade Work | 6 | F | ||||||
| 1 | 1 | 0004AA | Generating Unit Operational Testing, Alignment Checks, and Generating Unit Disassembly | 1 | JOB | 7 | G | ||
| 1 | 2 | 0004AB | Generator Inspection, Testing, and Cleaning | 1 | JOB | 8 | H | ||
| 1 | 3 | 0004AC | Generating Unit Reassembly, Alignment, and Operational Testing | 1 | JOB | 9 | J | ||
| 1 | 4 | 0004AD | Disassembly, Repair, and Reassembly of Turbine Runner | 1 | JOB | 10 | K | ||
| 1 | 5 | 0004AE | Redundant Hub Oil Seal Modifications | 1 | JOB | 11 | L | ||
| 1 | 6 | 0004AF | Refurbish Wicket Gate Operating Mechanism | 1 | JOB | 12 | M | ||
| 1 | 7 | 0004AG | Provide Oil Head Bushings | 1 | JOB | 13 | N | ||
| 1 | 8 | 0004AH | Clean, Inspect, and Refurbish Automatic Air Valves, Gate Valves, and Piping | 1 | JOB | 14 | P | ||
| 1 | 9 | 0004AJ | Main Shaft Packing Box and Oil Sump Inspection and Refurbishment | 1 | JOB | 15 | Q | ||
| 1 | 10 | 0004AK | Provide New Turbine Shaft Sleeve and Installation Compression Clamp | 1 | JOB | 16 | R | ||
| 1 | 11 | 0004AL | Provide Inner Head Cover Seat Ring | 1 | JOB | 17 | S | ||
| 1 | 12 | 0004AM | Disassemble, Inspect, Reassemble, and Test Two (2) Wicket Gate Servomotors | 1 | JOB | 18 | T | ||
| 1 | 13 | 0004AN | Provide Two (2) Wicket Gate Servomotor Piston Rod Bushings | 1 | JOB | 19 | U | ||
| 1 | 14 | 0004AP | Chrome Plate Two (2) Wicket Gate Servomotor Piston Rods | 1 | JOB | 20 | V | ||
| 1 | 15 | 0004AQ | Thrust Bearing Inspection - Phase I | 1 | JOB | 21 | W | ||
| 1 | 16 | 0004AR | Inspection of Guide Bearings | 1 | JOB | 22 | X | ||
| 1 | 17 | 0004AS | Spot Cavitation Repair - Mild Steel (250 Cubic Inches) | 1 | JOB | 23 | Y | ||
| 1 | 18 | 0004AT | Spot Cavitation Repair - Stainless Steel 309L (500 Cubic Inches) | 1 | JOB | 24 | Z | ||
| 25 | A | ||||||||
| 0005 | Optional Unit A Upgrade Work | 26 | B | ||||||
| 1 | 1 | 0005AA | Remove Blocks from Runner Hub (Optional) | 1 | JOB | 27 | C | ||
| 1 | 2 | 0005AB | Hone Runner Blade Servomotor Cylinder (Optional) | 1 | JOB | 28 | D | ||
| 1 | 3 | 0005AC | Bore and Hone Runner Blade Servomotor Cylinder (Optional) | 1 | JOB | 29 | E | ||
| 1 | 4 | 0005AD | Hone One (1) Wicket Gate Servomotor Cylinder (Optional) | 2 | EACH | 30 | F | ||
| 1 | 5 | 0005AE | Bore and Hone One (1) Wicket Gate Servomotor Cylinder (Optional) | 2 | EACH | 31 | G | ||
| 1 | 6 | 0005AF | Provide One (1) Wicket Gate Servomotor Piston Ring Set (Optional) | 2 | EACH | 32 | H | ||
| 1 | 7 | 0005AG | Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts (Optional) | 1 | JOB | 33 | J | ||
| 1 | 8 | 0005AH | Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts (Optional) | 1 | JOB | 34 | K | ||
| 1 | 9 | 0005AJ | Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts (Optional) | 1 | JOB | 35 | L | ||
| 1 | 10 | 0005AK | Install One (1) New Turbine Shaft-to-Runner Coupling Stud (Optional) | 8 | EACH | 36 | M | ||
| 1 | 11 | 0005AL | Thrust Shoes Phase 2 Inspections (Optional) | 1 | JOB | 37 | N | ||
| 1 | 12 | 0005AM | Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and Machining (Optional) | 1 | JOB | 38 | P | ||
| 1 | 13 | 0005AN | Thrust Runner and Thrust Collar Phase 2 Inspections (Optional) | 1 | JOB | 39 | Q | ||
| 1 | 14 | 0005AP | Complete Refurbishing of Thrust Runner (Optional) | 1 | JOB | 40 | R | ||
| 1 | 15 | 0005AQ | Resurface the Running Surface of the Runner (Optional) | 1 | JOB | 41 | S | ||
| 1 | 16 | 0005AR | Resurface the Backside and the Running Surface of the Runner (Optional) | 1 | JOB | 42 | T | ||
| 1 | 17 | 0005AS | Provide New Thrust Runner Keys (Optional) | 1 | JOB | 43 | U | ||
| 1 | 18 | 0005AT | Provide New Thrust Runner Bolts (Optional) | 1 | JOB | 44 | V | ||
| 1 | 19 | 0005AU | Refurbish Thrust Bearing Collar (Optional) | 1 | JOB | 45 | W | ||
| 1 | 20 | 0005AV | Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining (Optional) | 1 | JOB | 46 | X | ||
| 1 | 21 | 0005AW | Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including Babbitting and Machining (Optional) | 1 | JOB | 47 | Y | ||
| 1 | 22 | 0005AX | Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including Babbitting and Machining (Optional) | 1 | JOB | 48 | Z |
| 0006 | Unit B Upgrade Work | ||||
| 1 | 1 | 0006AA | Generating Unit Operational Testing, Alignment, and Disassembly | 1 | JOB |
| 1 | 2 | 0006AB | Generator Inspection, Testing, and Cleaning | 1 | JOB |
| 1 | 3 | 0006AC | Generating Unit Reassembly, Alignment, and Operational Testing | 1 | JOB |
| 1 | 4 | 0006AD | Disassembly, Repair, and Reassembly of Turbine Runner | 1 | JOB |
| 1 | 5 | 0006AE | Redundant Hub Oil Seal Modifications | 1 | JOB |
| 1 | 6 | 0006AF | Refurbish Wicket Gate Operating Mechanism | 1 | JOB |
| 1 | 7 | 0006AG | Provide Oil Head Bushings | 1 | JOB |
| 1 | 8 | 0006AH | Clean, Inspect, and Refurbish Automatic Air Valves, Gate Valves, and Piping | 1 | JOB |
| 1 | 9 | 0006AJ | Main Shaft Packing Box and Oil Sump Inspection and Refurbishment | 1 | JOB |
| 1 | 10 | 0006AK | Provide New Turbine Shaft Sleeve | 1 | JOB |
| 1 | 11 | 0006AL | Provide Inner Head Cover Seat Ring | 1 | JOB |
| 1 | 12 | 0006AM | Disassemble, Inspect, Reassemble, and Test Two (2) Wicket Gate Servomotors | 1 | JOB |
| 1 | 13 | 0006AN | Provide Two (2) Wicket Gate Servomotor Piston Rod Bushings | 1 | JOB |
| 1 | 14 | 0006AP | Chrome Plate Two (2) Wicket Gate Servomotor Piston Rods | 1 | JOB |
| 1 | 15 | 0006AQ | Thrust Bearing Inspection - Phase I | 1 | JOB |
| 1 | 16 | 0006AR | Inspection of Guide Bearings | 1 | JOB |
| 1 | 17 | 0006AS | Spot Cavitation Repair - Mild Steel (250 Cubic Inches) | 1 | JOB |
| 1 | 18 | 0006AT | Spot Cavitation Repair - Stainless Steel 309L (500 Cubic Inches) | ||
| 0007 | Optional Unit B Upgrade Work | ||||
| 1 | 1 | 0007AA | Remove Blocks from Runner Hub (Optional) | 1 | JOB |
| 1 | 2 | 0007AB | Hone Runner Blade Servomotor Cylinder (Optional) | 1 | JOB |
| 1 | 3 | 0007AC | Bore and Hone Runner Blade Servomotor Cylinder (Optional) | 1 | JOB |
| 1 | 4 | 0007AD | Hone One (1) Wicket Gate Servomotor Cylinder (Optional) | 2 | EACH |
| 1 | 5 | 0007AE | Bore and Hone One (1) Wicket Gate Servomotor Cylinder (Optional) | 2 | EACH |
| 1 | 6 | 0007AF | Provide One (1) Wicket Gate Servomotor Piston Ring Set (Optional) | 2 | EACH |
| 1 | 7 | 0007AG | Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts (Optional) | 1 | JOB |
| 1 | 8 | 0007AH | Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts (Optional) | 1 | JOB |
| 1 | 9 | 0007AJ | Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts (Optional) | 1 | JOB |
| 1 | 10 | 0007AK | Install One (1) New Turbine Shaft-to-Runner Coupling Stud (Optional) | 8 | EACH |
| 1 | 11 | 0007AL | Thrust Shoes Phase 2 Inspections (Optional) | 1 | JOB |
| 1 | 12 | 0007AM | Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and Machining (Optional) | 1 | JOB |
| 1 | 13 | 0007AN | Thrust Runner and Thrust Collar Phase 2 Inspections (Optional) | 1 | JOB |
| 1 | 14 | 0007AP | Complete Refurbishing of Thrust Runner (Optional) | 1 | JOB |
| 1 | 15 | 0007AQ | Resurface the Running Surface of the Runner (Optional) | 1 | JOB |
| 1 | 16 | 0007AR | Resurface the Backside and the Running Surface of the Runner (Optional) | 1 | JOB |
| 1 | 17 | 0007AS | Provide New Thrust Runner Keys (Optional) | 1 | JOB |
| 1 | 18 | 0007AT | Provide New Thrust Runner Bolts (Optional) | 1 | JOB |
| 1 | 19 | 0007AU | Refurbish Thrust Bearing Collar (Optional) | 1 | JOB |
| 1 | 20 | 0007AV | Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining (Optional) | 1 | JOB |
| 1 | 21 | 0007AW | Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including Babbitting and Machining (Optional) | 1 | JOB |
| 1 | 22 | 0007AX | Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including Babbitting and Machining (Optional) | 1 | JOB |
| 0008 | Unit C Upgrade Work | ||||
| 1 | 1 | 0008AA | Generating Unit Operational Testing, Alignment, and Disassembly | 1 | JOB |
| 1 | 2 | 0008AB | Generator Inspection, Testing, and Cleaning | 1 | JOB |
| 1 | 3 | 0008AC | Generating Unit Reassembly, Alignment, and Operational Testing | 1 | JOB |
| 1 | 4 | 0008AD | Disassembly, Repair, and Reassembly of Turbine Runner | 1 | JOB |
| 1 | 5 | 0008AE | Redundant Hub Oil Seal Modifications | 1 | JOB |
| 1 | 6 | 0008AF | Refurbish Wicket Gate Operating Mechanism | 1 | JOB |
| 1 | 7 | 0008AG | Provide Oil Head Bushings | 1 | JOB |
| 1 | 8 | 0008AH | Clean, Inspect, and Refurbish Automatic Air Valves, Gate Valves, and Piping | 1 | JOB |
| 1 | 9 | 0008AJ | Main Shaft Packing Box and Oil Sump Inspection and Refurbishment | 1 | JOB |
| 1 | 10 | 0008AK | Provide New Turbine Shaft Sleeve | 1 | JOB |
| 1 | 11 | 0008AL | Provide Inner Head Cover Seat Ring | 1 | JOB |
| 1 | 12 | 0008AM | Disassemble, Inspect, Reassemble, and Test Two (2) Wicket Gate Servomotors | 1 | JOB |
| 1 | 13 | 0008AN | Provide Two (2) Wicket Gate Servomotor Piston Rod Bushings | 1 | JOB |
| 1 | 14 | 0008AP | Chrome Plate Two (2) Wicket Gate Servomotor Piston Rods | 1 | JOB |
| 1 | 15 | 0008AQ | Thrust Bearing Inspection - Phase I | 1 | JOB |
| 1 | 16 | 0008AR | Inspection of Guide Bearings | 1 | JOB |
| 1 | 17 | 0008AS | Spot Cavitation Repair - Mild Steel (250 Cubic Inches) | 1 | JOB |
| 1 | 18 | 0008AT | Spot Cavitation Repair - Stainless Steel 309L (500 Cubic Inches) | ||
| 0009 | Optional Unit C Upgrade Work | ||||
| 1 | 1 | 0009AA | Remove Blocks from Runner Hub (Optional) | 1 | JOB |
| 1 | 2 | 0009AB | Hone Runner Blade Servomotor Cylinder (Optional) | 1 | JOB |
| 1 | 3 | 0009AC | Bore and Hone Runner Blade Servomotor Cylinder (Optional) | 1 | JOB |
| 1 | 4 | 0009AD | Hone One (1) Wicket Gate Servomotor Cylinder (Optional) | 2 | EACH |
| 1 | 5 | 0009AE | Bore and Hone One (1) Wicket Gate Servomotor Cylinder (Optional) | 2 | EACH |
| 1 | 6 | 0009AF | Provide One (1) Wicket Gate Servomotor Piston Ring Set (Optional) | 2 | EACH |
| 1 | 7 | 0009AG | Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts (Optional) | 1 | JOB |
| 1 | 8 | 0009AH | Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts (Optional) | 1 | JOB |
| 1 | 9 | 0009AJ | Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts (Optional) | 1 | JOB |
| 1 | 10 | 0009AK | Install One (1) New Turbine Shaft-to-Runner Coupling Stud (Optional) | 8 | EACH |
| 1 | 11 | 0009AL | Thrust Shoes Phase 2 Inspections (Optional) | 1 | JOB |
| 1 | 12 | 0009AM | Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and Machining (Optional) | 1 | JOB |
| 1 | 13 | 0009AN | Thrust Runner and Thrust Collar Phase 2 Inspections (Optional) | 1 | JOB |
| 1 | 14 | 0009AP | Complete Refurbishing of Thrust Runner (Optional) | 1 | JOB |
| 1 | 15 | 0009AQ | Resurface the Running Surface of the Runner (Optional) | 1 | JOB |
| 1 | 16 | 0009AR | Resurface the Backside and the Running Surface of the Runner (Optional) | 1 | JOB |
| 1 | 17 | 0009AS | Provide New Thrust Runner Keys (Optional) | 1 | JOB |
| 1 | 18 | 0009AT | Provide New Thrust Runner Bolts (Optional) | 1 | JOB |
| 1 | 19 | 0009AU | Refurbish Thrust Bearing Collar (Optional) | 1 | JOB |
| 1 | 20 | 0009AV | Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining (Optional) | 1 | JOB |
| 1 | 21 | 0009AW | Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including Babbitting and Machining (Optional) | 1 | JOB |
| 1 | 22 | 0009AX | Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including Babbitting and Machining (Optional) | 1 | JOB |
| 0010 | Unit D Upgrade Work | ||||
| 1 | 1 | 0010AA | Generating Unit Operational Testing, Alignment, and Disassembly | 1 | JOB |
| 1 | 2 | 0010AB | Generator Inspection, Testing, and Cleaning | 1 | JOB |
| 1 | 3 | 0010AC | Generating Unit Reassembly, Alignment, and Operational Testing | 1 | JOB |
| 1 | 4 | 0010AD | Disassembly, Repair, and Reassembly of Turbine Runner | 1 | JOB |
| 1 | 5 | 0010AE | Redundant Hub Oil Seal Modifications | 1 | JOB |
| 1 | 6 | 0010AF | Refurbish Wicket Gate Operating Mechanism | 1 | JOB |
| 1 | 7 | 0010AG | Provide Oil Head Bushings | 1 | JOB |
| 1 | 8 | 0010AH | Clean, Inspect, and Refurbish Automatic Air Valves, Gate Valves, and Piping | 1 | JOB |
| 1 | 9 | 0010AJ | Main Shaft Packing Box and Oil Sump Inspection and Refurbishment | 1 | JOB |
| 1 | 10 | 0010AK | Provide New Turbine Shaft Sleeve | 1 | JOB |
| 1 | 11 | 0010AL | Provide Inner Head Cover Seat Ring | 1 | JOB |
| 1 | 12 | 0010AM | Disassemble, Inspect, Reassemble, and Test Two (2) Wicket Gate Servomotors | 1 | JOB |
| 1 | 13 | 0010AN | Provide Two (2) Wicket Gate Servomotor Piston Rod Bushings | 1 | JOB |
| 1 | 14 | 0010AP | Chrome Plate Two (2) Wicket Gate Servomotor Piston Rods | 1 | JOB |
| 1 | 15 | 0010AQ | Thrust Bearing Inspection - Phase I | 1 | JOB |
| 1 | 16 | 0010AR | Inspection of Guide Bearings | 1 | JOB |
| 1 | 17 | 0010AS | Spot Cavitation Repair - Mild Steel (250 Cubic Inches) | 1 | JOB |
| 1 | 18 | 0010AT | Spot Cavitation Repair - Stainless Steel 309L (500 Cubic Inches) | ||
| 0011 | Optional Unit D Upgrade Work | ||||
| 1 | 1 | 0011AA | Remove Blocks from Runner Hub (Optional) | 1 | JOB |
| 1 | 2 | 0011AB | Hone Runner Blade Servomotor Cylinder (Optional) | 1 | JOB |
| 1 | 3 | 0011AC | Bore and Hone Runner Blade Servomotor Cylinder (Optional) | 1 | JOB |
| 1 | 4 | 0011AD | Hone One (1) Wicket Gate Servomotor Cylinder (Optional) | 2 | EACH |
| 1 | 5 | 0011AE | Bore and Hone One (1) Wicket Gate Servomotor Cylinder (Optional) | 2 | EACH |
| 1 | 6 | 0011AF | Provide One (1) Wicket Gate Servomotor Piston Ring Set (Optional) | 2 | EACH |
| 1 | 7 | 0011AG | Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts (Optional) | 1 | JOB |
| 1 | 8 | 0011AH | Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts (Optional) | 1 | JOB |
| 1 | 9 | 0011AJ | Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts (Optional) | 1 | JOB |
| 1 | 10 | 0011AK | Install One (1) New Turbine Shaft-to-Runner Coupling Stud (Optional) | 8 | EACH |
| 1 | 11 | 0011AL | Thrust Shoes Phase 2 Inspections (Optional) | 1 | JOB |
| 1 | 12 | 0011AM | Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and Machining (Optional) | 1 | JOB |
| 1 | 13 | 0011AN | Thrust Runner and Thrust Collar Phase 2 Inspections (Optional) | 1 | JOB |
| 1 | 14 | 0011AP | Complete Refurbishing of Thrust Runner (Optional) | 1 | JOB |
| 1 | 15 | 0011AQ | Resurface the Running Surface of the Runner (Optional) | 1 | JOB |
| 1 | 16 | 0011AR | Resurface the Backside and the Running Surface of the Runner (Optional) | 1 | JOB |
| 1 | 17 | 0011AS | Provide New Thrust Runner Keys (Optional) | 1 | JOB |
| 1 | 18 | 0011AT | Provide New Thrust Runner Bolts (Optional) | 1 | JOB |
| 1 | 19 | 0011AU | Refurbish Thrust Bearing Collar (Optional) | 1 | JOB |
| 1 | 20 | 0011AV | Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining (Optional) | 1 | JOB |
| 1 | 21 | 0011AW | Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including Babbitting and Machining (Optional) | 1 | JOB |
| 1 | 22 | 0011AX | Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including Babbitting and Machining (Optional) | 1 | JOB |
| 0012 | Unit E Upgrade Work | ||||
| 1 | 1 | 0012AA | Generating Unit Operational Testing, Alignment, and Disassembly (Optional) | 1 | JOB |
| 1 | 2 | 0012AB | Generator Inspection, Testing, and Cleaning (Optional) | 1 | JOB |
| 1 | 3 | 0012AC | Generating Unit Reassembly, Alignment, and Operational Testing (Optional) | 1 | JOB |
| 1 | 4 | 0012AD | Disassembly, Repair, and Reassembly of Turbine Runner (Optional) | 1 | JOB |
| 1 | 5 | 0012AE | Redundant Hub Oil Seal Modifications (Optional) | 1 | JOB |
| 1 | 6 | 0012AF | Refurbish Wicket Gate Operating Mechanism (Optional) | 1 | JOB |
| 1 | 7 | 0012AG | Provide Oil Head Bushings (Optional) | 1 | JOB |
| 1 | 8 | 0012AH | Clean, Inspect, and Refurbish Automatic Air Valves, Gate Valves, and Piping (Optional) | 1 | JOB |
| 1 | 9 | 0012AJ | Main Shaft Packing Box and Oil Sump Inspection and Refurbishment (Optional) | 1 | JOB |
| 1 | 10 | 0012AK | Provide New Turbine Shaft Sleeve (Optional) | 1 | JOB |
| 1 | 11 | 0012AL | Provide Inner Head Cover Seat Ring (Optional) | 1 | JOB |
| 1 | 12 | 0012AM | Disassemble, Inspect, Reassemble, and Test Two (2) Wicket Gate Servomotors (Optional) | 1 | JOB |
| 1 | 13 | 0012AN | Provide Two (2) Wicket Gate Servomotor Piston Rod Bushings (Optional) | 1 | JOB |
| 1 | 14 | 0012AP | Chrome Plate Two (2) Wicket Gate Servomotor Piston Rods (Optional) | 1 | JOB |
| 1 | 15 | 0012AQ | Thrust Bearing Inspection - Phase I (Optional) | 1 | JOB |
| 1 | 16 | 0012AR | Inspection of Guide Bearings (Optional) | 1 | JOB |
| 1 | 17 | 0012AS | Spot Cavitation Repair - Mild Steel (250 Cubic Inches) (Optional) | 1 | JOB |
| 1 | 18 | 0012AT | Spot Cavitation Repair - Stainless Steel 309L (500 Cubic Inches) (Optional) | 1 | JOB |
| 1 | 19 | 0012AU | Remove Blocks from Runner Hub (Optional) | 1 | JOB |
| 1 | 20 | 0012AV | Hone Runner Blade Servomotor Cylinder (Optional) | 1 | JOB |
| 1 | 21 | 0012AW | Bore and Hone Runner Blade Servomotor Cylinder (Optional) | 1 | JOB |
| 1 | 22 | 0012AX | Hone One (1) Wicket Gate Servomotor Cylinder (Optional) | 2 | EACH |
| 1 | 23 | 0012AY | Bore and Hone One (1) Wicket Gate Servomotor Cylinder (Optional) | 2 | EACH |
| 1 | 24 | 0012AZ | Provide One (1) Wicket Gate Servomotor Piston Ring Set (Optional) | 2 | EACH |
| 2 | 25 | 0012BA | Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts (Optional) | 1 | JOB |
| 2 | 26 | 0012BB | Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts (Optional) | 1 | JOB |
| 2 | 27 | 0012BC | Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts (Optional) | 1 | JOB |
| 2 | 28 | 0012BD | Install One (1) New Turbine Shaft-to-Runner Coupling Stud (Optional) | 8 | EACH |
| 2 | 29 | 0012BE | Thrust Shoes Phase 2 Inspections (Optional) | 1 | JOB |
| 2 | 30 | 0012BF | Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and Machining (Optional) | 1 | JOB |
| 2 | 31 | 0012BG | Thrust Runner and Thrust Collar Phase 2 Inspections (Optional) | 1 | JOB |
| 2 | 32 | 0012BH | Complete Refurbishing of Thrust Runner (Optional) | 1 | JOB |
| 2 | 33 | 0012BJ | Resurface the Running Surface of the Runner (Optional) | 1 | JOB |
| 2 | 34 | 0012BK | Resurface the Backside and the Running Surface of the Runner (Optional) | 1 | JOB |
| 2 | 35 | 0012BL | Provide New Thrust Runner Keys (Optional) | 1 | JOB |
| 2 | 36 | 0012BM | Provide New Thrust Runner Bolts (Optional) | 1 | JOB |
| 2 | 37 | 0012BN | Refurbish Thrust Bearing Collar (Optional) | 1 | JOB |
| 2 | 38 | 0012BP | Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining (Optional) | 1 | JOB |
| 2 | 39 | 0012BQ | Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including Babbitting and Machining (Optional) | 1 | JOB |
| 2 | 40 | 0012BR | Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including Babbitting and Machining (Optional) | 1 | JOB |
| 0013 | Furnish BLH Internal Hub Components - Set 1 | 1 | JOB |
| 0014 | Furnish BLH Internal Hub Components - Set 2 (Optional) | 1 | JOB |
| 0015 | Furnish BLH Internal Hub Components - Set 3 (Optional) | 1 | JOB |
| OPTIONAL SERVICES (ALL UNITS) | |||
| 0016 | Spot Cavitation Repair - Mild Steel for all units | 1,000 | CUBIC INCHES |
| 0017 | Spot Cavitation Repair - Stainless Steel 309L for all units | 2,000 | CUBIC INCHES |
&P o &N &F
Sheet2
| 0001 | 1 | A | ||||||
| 0002 | 2 | B | ||||||
| 0003 | 3 | C | 3 | C | 7 | G | 0001 | |
| 0004 | 4 | D | 0002 | |||||
| 0005 | 5 | E | 0003 | |||||
| 0006 | 6 | F | 0004 | |||||
| 0007 | 7 | G | 0005 | |||||
| 0008 | 8 | H | 0006 | |||||
| 0009 | 9 | J | 0007 | |||||
| 0010 | 10 | K | 0008 | |||||
| 0011 | 11 | L | 0009 | |||||
| 0012 | 12 | M | 0010 | |||||
| 0013 | 13 | N | 0011 | |||||
| 0014 | 14 | P | 0012 | |||||
| 0015 | 15 | Q | 0013 | |||||
| 0016 | 16 | R | 0014 | |||||
| 0017 | 17 | S | 0015 | |||||
| 0018 | 18 | T | 0016 | |||||
| 0019 | 19 | U | ||||||
| 20 | V | |||||||
| 0001 | 0005 | 21 | W | |||||
| 0002 | 0006 | 22 | X | |||||
| 0003 | 23 | Y | ||||||
| 0004 | 24 | Z |