AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This Amendment is issued to update the follow ing:
1. Offerors shall provide the total proposed price for mandatory items, the total proposed price for optional items, and the total proposed overall price at the end of Section 00010 in the corresponding fields (see attached).
2. SubCLINs 0005AS, 0007AS, 0009AS, 0011AS, and 0012BL in the table found in FAR 52.217-7 Option for Increased Quantity--Separately Priced Line Item (MAR 1989) have been revised (see attached).
3. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Feb-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-16-R-0016
X 9B. DATED (SEE ITEM 11)
20-Nov-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Feb-2016
CODE
US ARMY CORPS OF ENGINEERS
333 SW FIRST AVE
PORTLAND OR 97204-3495
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N-16-R-0016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SECTION 00100 - BIDDING SCHEDULE / INSTRUCTIONS TO BIDDERS
AMENDMENT 0003
This Amendment is issued to update the following:
1. Offerors shall provide the total proposed price for mandatory items, the total proposed price for optional items, and the total proposed overall price at the end of Section 00010 in the corresponding fields (see attached).
2. SubCLINs 0005AS, 0007AS, 0009AS, 0011AS, and 0012BL in the table found in FAR 52.217-7 Option for Increased Quantity--Separately Priced Line Item (MAR 1989) have been revised (see attached).
3. All other terms and conditions remain unchanged.
Section 00010 - Solicitation Contract Form
AMOUNT
Mobilization and Demobilization
FFP
Mobilization and Demobilization in accordance with the contract documents.
FOB: Destination
NET AMT
Furnish One (1) Set of Oversized Turbine
Furnish One (1) Set of Oversized Turbine Shaft-to-Runner Studs in accordance with the contract documents.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
0001 1 Job
0002 1 Job
Designated Reference Drawings
Designated Reference Drawings in accordance with the contract documents.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Unit A Upgrade Work
FFP
Unit A Upgrade Work in accordance with the contract documents.
Generating Unit Operational Testing, Generating Unit Operational Testing, Alignment Checks, and Disassembly in accordance with the contract documents.
0003 1 Job
0004AA 1 Job
Generator Inspection, Testing, Generator Inspection, Testing, and Cleaning in accordance with the contract documents.
Generating Unit Reassembly, Alignment, Generating Unit Reassembly, Alignment, and Operational Testing in accordance
Disassembly, Repair, and Reassembly
Disassembly, Repair, and Reassembly of Turbine Runner in accordance with the contract documents.
0004AB 1 Job
0004AC 1 Job
0004AD 1 Job
Redundant Hub Oil Seal Modifications
Redundant Hub Oil Seal Modifications in accordance with the contract documents.
Refurbish Wicket Gate Operating
Refurbish Wicket Gate Operating Mechanism in accordance with the contract
0004AE 1 Job
0004AF 1 Job
Provide Oil Head Bushings
Provide Oil Head Bushings in accordance with the contract documents.
Clean, Inspect, and Refurbish Automatic
Clean, Inspect, and Refurbish Automatic Air Valves, Gate Valves, and Piping in
Main Shaft Packing Box and Oil Sump
Main Shaft Packing Box and Oil Sump Inspection and Refurbishment in
0004AG 1 Job
0004AH 1 Job
0004AJ 1 Job
Provide New Turbine Shaft Sleeve and
Provide New Turbine Shaft Sleeve and Installation Compression Clamp in
Provide Inner Head Cover Seat Ring
Provide Inner Head Cover Seat Ring in accordance with the contract documents.
0004AK 1 Job
0004AL 1 Job
Disassemble, Inspect, Reassemble, and
Disassemble, Inspect, Reassemble, and Test Two Wicket Gate Servomotors in
Provide Two Wicket Gate Servomotor
Provide Two Wicket Gate Servomotor Piston Rod Bushings in accordance with the
Chrome Plate Two Wicket Gate Servomotor
Chrome Plate Two Wicket Gate Servomotor Piston Rods in accordance with the contract documents.
FOB: Destination
0004AM 1 Job
0004AN 1 Job
0004AP 1 Job
Thrust Bearing Inspection - Phase 1
Thrust Bearing Inspection - Phase 1 in accordance with the contract documents.
Inspection of Guide Bearings
Inspection of Guide Bearings in accordance with the contract documents.
Spot Cavitation Repair - Mild Steel
Spot Cavitation Repair - Mild Steel (250 Cubic Inches) in accordance with the contract documents.
FOB: Destination
0004AQ 1 Job
0004AR 1 Job
0004AS 1 Job
Spot Cavitation Repair - Stainless Steel
Spot Cavitation Repair - Stainless Steel 309L (500 Cubic Inches) in accordance
OPTION Optional Unit A Upgrade Work
FFP
Optional Unit A Upgrade Work in accordance with the contract documents.
0004AT 1 Job
OPTION Remove Blocks from Runner Hub
Remove Blocks from Runner Hub in accordance with the contract documents.
0005AB 1 Job OPTION Hone Runner Blade Servomotor Cylinder
FFP
Hone Runner Blade Servomotor Cylinder in accordance with the contract
0005AC 1 Job OPTION Bore and Hone Runner Blade Servomotor
FFP
Bore and Hone Runner Blade Servomotor Cylinder in accordance with the contract
0005AA 1 Job
OPTION Hone One (1) Wicket Gate Servomotor
Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the contract
0005AE 2 Each OPTION Bore and Hone One (1) Wicket Gate
FFP
Bore and Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the
0005AD 2 Each
OPTION Provide One (1) Wicket Gate Servomotor
Provide One (1) Wicket Gate Servomotor Piston Ring Set in accordance with the
0005AG 1 Job OPTION Provide One (1) Set of Outer Head Cover
FFP
Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts in accordance
OPTION Furnish One (1) Set of Intermediate Head
Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts in
0005AF 2 Each
0005AH 1 Job
OPTION Provide One (1) Set of Inner Head Cover
Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts in accordance
0005AK 8 Each OPTION Install One (1) New Turbine Shaft-to-
FFP
Install One (1) New Turbine Shaft-to-Runner Coupling Stud in accordance with the contract documents.
OPTION Thrust Shoes Phase 2 Inspections
Thrust Shoes Phase 2 Inspections in accordance with the contract documents.
0005AJ 1 Job
0005AL 1 Job
0005AM 1 Job OPTION Refurbish One (1) Set of Thrust Bearing
FFP
Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and Machining in accordance with the contract documents.
0005AN 1 Job OPTION Thrust Runner and Thrust Collar Phase 2
FFP
Thrust Runner and Thrust Collar Phase 2 Inspections in accordance with the
OPTION Complete Refurbishing of Thrust Runner
Complete Refurbishing of Thrust Runner in accordance with the contract
0005AQ 1 Job OPTION Resurface the Running Surface of the
FFP
Resurface the Running Surface of the Runner in accordance with the contract
OPTION Resurface the Backside and the Running
Resurface the Backside and the Running Surface of the Runner in accordance with
0005AP 1 Job
0005AR 1 Job
OPTION Provide New Thrust Runner Keys
Provide New Thrust Runner Keys in accordance with the contract documents.
0005AT 1 Job OPTION Provide New Thrust Runner Bolts
FFP
Provide New Thrust Runner Bolts in accordance with the contract documents.
0005AU 1 Job OPTION Refurbish Thrust Bearing Collar
FFP
Refurbish Thrust Bearing Collar in accordance with the contract documents.
0005AS 1 Job
0005AV 1 Job OPTION Refurbish One (1) Turbine Guide Bearing
FFP
Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining in
0005AW 1 Job OPTION Refurbish One (1) Set of Upper Generator
FFP
Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including Babbitting and Machining in accordance with the contract documents.
OPTION Refurbish One (1) Set of Lower Generator
Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including
Unit B Upgrade Work
FFP
Unit B Upgrade Work in accordance with the contract documents.
Generating Unit Operational Testing, Alignment Checks, and Disassembly in
0005AX 1 Job
0006AA 1 Job
Generator Inspection, Testing, and
Generator Inspection, Testing, and Cleaning in accordance with the contract
Generating Unit Reassembly, Alignment, and Operational Testing in accordance
Disassembly, Repair, and Reassembly of
Disassembly, Repair, and Reassembly of Turbine Runner in accordance with the
0006AB 1 Job
0006AC 1 Job
0006AD 1 Job
Refurbish Wicket Gate Operating Mechanism in accordance with the contract
0006AE 1 Job
0006AF 1 Job
Clean, Inspect, and Refurbish Automatic Air Valves, Gate Valves, and Piping in
Main Shaft Packing Box and Oil Sump Inspection and Refurbishment in
0006AG 1 Job
0006AH 1 Job
0006AJ 1 Job
Provide New Turbine Shaft Sleeve
Provide New Turbine Shaft Sleeve in accordance with the contract documents.
Disassemble, Inspect, Reassemble, and Test Two (2) Wicket Gate Servomotors in
0006AK 1 Job
0006AL 1 Job
0006AM 1 Job
Provide Two (2) Wicket Gate Servomotor
Provide Two (2) Wicket Gate Servomotor Piston Rod Bushings in accordance with
Chrome Plate Two (2) Wicket Gate
Chrome Plate Two (2) Wicket Gate Servomotor Piston Rods in accordance with
0006AN 1 Job
0006AP 1 Job
Spot Cavitation Repair - Mild Steel (250 Cubic Inches) in accordance with the
0006AQ 1 Job
0006AR 1 Job
0006AS 1 Job
Spot Cavitation Repair - Stainless Steel 309L (500 Cubic Inches) in accordance
OPTION Optional Unit B Upgrade Work
FFP
Optional Unit B Upgrade Work in accordance with the contract documents.
0007AA 1 Job OPTION Remove Blocks from Runner Hub
FFP
0006AT 1 Job
OPTION Hone Runner Blade Servomotor Cylinder
Hone Runner Blade Servomotor Cylinder in accordance with the contract
0007AC 1 Job OPTION Bore and Hone Runner Blade Servomotor
FFP
Bore and Hone Runner Blade Servomotor Cylinder in accordance with the contract
0007AB 1 Job
Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the contract
0007AE 2 Each OPTION Bore and Hone One (1) Wicket Gate
FFP
Bore and Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the
Provide One (1) Wicket Gate Servomotor Piston Ring Set in accordance with the
0007AD 2 Each
0007AF 2 Each
OPTION Provide One (1) Set of Outer Head Cover
Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts in accordance
0007AH 1 Job OPTION Furnish One (1) Set of Intermediate Head
FFP
Furnish One (1) Set of Intermediate Head Tie Down Studs and Nuts in accordance
0007AG 1 Job
Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts in accordance
0007AK 8 Each OPTION Install One (1) New Turbine Shaft-to-
FFP
Install One (1) New Turbine Shaft-to-Runner Coupling Stud in accordance with
0007AJ 1 Job
0007AL 1 Job
OPTION Refurbish One (1) Set of Thrust Bearing
Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and
0007AN 1 Job OPTION Thrust Runner and Thrust Collar Phase 2
FFP
Thrust Runner and Thrust Collar Phase 2 Inspections in accordance with the
Complete Refurbishing of Thrust Runner in accordance with the contract
0007AM 1 Job
0007AP 1 Job
0007AQ 1 Job OPTION Resurface the Running Surface of the
FFP
Resurface the Running Surface of the Runner in accordance with the contract
0007AR 1 Job OPTION Resurface the Backside and the Running
FFP
Resurface the Backside and the Running Surface of the Runner in accordance with
0007AT 1 Job OPTION Provide New Thrust Runner Bolts
FFP
0007AU 1 Job OPTION Refurbish Thrust Bearing Collar
FFP
0007AS 1 Job
OPTION Refurbish One (1) Turbine Guide Bearing
Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining in
0007AW 1 Job OPTION Refurbish One (1) Set of Upper Generator
FFP
Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including
Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including
0007AV 1 Job
0007AX 1 Job
Unit C Upgrade Work
FFP
Unit C Upgrade Work in accordance with the contract documents.
Generating Unit Operational Testing, Alignment Checks, and Disassembly in
0008AA 1 Job
Generator Inspection, Testing, and Cleaning in accordance with the contract
Generating Unit Reassembly, Alignment, and Operational Testing in accordance
Disassembly, Repair, and Reassembly of Turbine Runner in accordance with the contract documents.
FOB: Destination
0008AB 1 Job
0008AC 1 Job
0008AD 1 Job
Refurbish Wicket Gate Operating Mechanism in accordance with the contract
Provide Oil Head Bushings in accordance with the contract documents.
FOB: Destination
0008AE 1 Job
0008AF 1 Job
0008AG 1 Job
Clean, Inspect, and Refurbish Automatic Air Valves, Gate Valves, and Piping in
Main Shaft Packing Box and Oil Sump Inspection and Refurbishment in
0008AH 1 Job
0008AJ 1 Job
Disassemble, Inspect, Reassemble, and Test Two (2) Wicket Gate Servomotors in
0008AK 1 Job
0008AL 1 Job
0008AM 1 Job
Provide Two (2) Wicket Gate Servomotor Piston Rod Bushings in accordance with
Chrome Plate Two (2) Wicket Gate Servomotor Piston Rods in accordance with
0008AN 1 Job
0008AP 1 Job
Thrust Bearing Inspectiong - Phase 1
Thrust Bearing Inspectiong - Phase 1 in accordance with the contract documents.
Spot Cavitation Repair - Mild Steel (250 Cubic Inches) in accordance with the
0008AQ 1 Job
0008AR 1 Job
0008AS 1 Job
Spot Cavitation Repair - Stainless Steel 309L (500 Cubic Inches) in accordance
OPTION Optional Unit C Upgrade Work
FFP
Optional Unit C Upgrade Work in accordance with the contract documents.
0009AA 1 Job OPTION Remove Blocks from Runner Hub
FFP
0008AT 1 Job
OPTION Hone Runner Blade Servomotor Cylinder
Hone Runner Blade Servomotor Cylinder in accordance with the contract
0009AC 1 Job OPTION Bore and Hone Runner Blade Servomotor
FFP
Bore and Hone Runner Blade Servomotor Cylinder in accordance with the contract
0009AB 1 Job
Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the contract
0009AE 2 Each OPTION Bore and Hone One (1) Wicket Gate
FFP
Bore and Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the
Provide One (1) Wicket Gate Servomotor Piston Ring Set in accordance with the
0009AD 2 Each
0009AF 2 Each
Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts in accordance
0009AH 1 Job OPTION Furnish One (1) Set of Intermediate Head
FFP
Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts in
0009AG 1 Job
Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts in accordance
0009AK 8 Each OPTION Install One (1) New Turbine Shaft-to-
FFP
Install One (1) New Turbine Shaft-to-Runner Coupling Stud in accordance with
0009AL 1 Job OPTION Thrust Shoes Phase 2 Inspections
FFP
0009AJ 1 Job
0009AM 1 Job OPTION Refurbish One (1) Set of Thrust Bearing
FFP
Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and
0009AN 1 Job OPTION Thrust Runner and Thrust Collar Phase 2
FFP
Thrust Runner and Thrust Collar Phase 2 Inspections in accordance with the
Complete Refurbishing of Thrust Runner in accordance with the contract
0009AQ 1 Job OPTION Resurface the Running Surface of the
FFP
Resurface the Running Surface of the Runner in accordance with the contract
Resurface the Backside and the Running Surface of the Runner in accordance with
0009AP 1 Job
0009AR 1 Job
0009AT 1 Job OPTION Provide New Thrust Runner Bolts
FFP
0009AU 1 Job OPTION Refurbish Thrust Bearing Collar
FFP
0009AS 1 Job
Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining in
0009AW 1 Job OPTION Refurbish One (1) Set of Upper Generator
FFP
Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including
0009AV 1 Job
Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including
Unit D Upgrade Work
FFP
Unit D Upgrade Work in accordance with the contract documents.
Generating Unit Operational Testing, Alignment Checks, and Disassembly in
0009AX 1 Job
0010AA 1 Job
Generator Inspection, Testing, and Cleaning in accordance with the contract
Generating Unit Reassembly, Alignment, and Operational Testing in accordance
0010AB 1 Job
0010AC 1 Job
Disassembly, Repair, and Reassembly of Turbine Runner in accordance with the
Refurbish Wicket Gate Operating Mechanism in accordance with the contract
0010AD 1 Job
0010AE 1 Job
0010AF 1 Job
Clean, Inspect, and Refurbish Automatic Air Valves, Gate Valves, and Piping in
Main Shaft Packing Box and Oil Sump Inspection and Refurbishment in accordance with the contract documents.
FOB: Destination
0010AG 1 Job
0010AH 1 Job
0010AJ 1 Job
Disassemble, Inspect, Reassemble, and Test Two (2) Wicket Gate Servomotors in accordance with the contract documents.
FOB: Destination
0010AK 1 Job
0010AL 1 Job
0010AM 1 Job
Provide Two (2) Wicket Gate Servomotor Piston Rod Bushings in accordance with
Chrome Plate Two (2) Wicket Gate Servomotor Piston Rods in accordance with
0010AN 1 Job
0010AP 1 Job
Spot Cavitation Repair - Mild Steel (250 Cubic Inches) in accordance with the
0010AQ 1 Job
0010AR 1 Job
0010AS 1 Job
Spot Cavitation Repair - Stainless Steel 309L (500 Cubic Inches) in accordance
OPTION Optional Unit D Upgrade Work
FFP
Optional Unit D Upgrade Work in accordance with the contract documents.
0011AA 1 Job OPTION Remove Blocks from Runner Hub
FFP
0010AT 1 Job
0011AB 1 Job OPTION Hone Runner Blade Servomotor Cylinder
FFP
Hone Runner Blade Servomotor Cylinder in accordance with the contract
0011AC 1 Job OPTION Bore and Hone Runner Blade Servomotor
FFP
Bore and Hone Runner Blade Servomotor Cylinder in accordance with the contract
Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the contract
0011AE 2 Each OPTION Bore and Hone One (1) Wicket Gate
FFP
Bore and Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the
Provide One (1) Wicket Gate Servomotor Piston Ring Set in accordance with the
0011AD 2 Each
0011AF 2 Each
Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts in accordance
0011AH 1 Job OPTION Furnish One (1) Set of Intermediate Head
FFP
Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts in
0011AG 1 Job
Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts in accordance
0011AK 8 Each OPTION Install One (1) New Turbine Shaft-to-
FFP
Install One (1) New Turbine Shaft-to-Runner Coupling Stud in accordance with
0011AJ 1 Job
0011AL 1 Job
OPTION Refurbish One (1) Set of Thrust Bearing
Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and
0011AN 1 Job OPTION Thrust Runner and Thrust Collar Phase 2
FFP
Thrust Runner and Thrust Collar Phase 2 Inpsections in accordance with the
0011AM 1 Job
Complete Refurbishing of Thrust Runner in accordance with the contract
0011AQ 1 Job OPTION Resurface the Running Surface of the
FFP
Resurface the Running Surface of the Runner in accordance with the contract
Resurface the Backside and the Running Surface of the Runner in accordance with
0011AP 1 Job
0011AR 1 Job
0011AT 1 Job OPTION Provide New Thrust Runner Bolts
FFP
0011AU 1 Job OPTION Refurbish Thrust Bearing Collar
FFP
0011AS 1 Job
Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining in
0011AW 1 Job OPTION Refurbish One (1) Set of Upper Generator
FFP
Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including
0011AV 1 Job
Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including
OPTION Unit E Upgrade Work
FFP
Unit E Upgrade Work in accordance with the contract documents.
0012AA 1 Job OPTION Generating Unit Operational Testing, FFP
Generating Unit Operational Testing, Alignment Checks, and Disassembly in
0011AX 1 Job
OPTION Generator Inspection, Testing, and
Generator Inspection, Testing, and Cleaning in accordance with the contract
0012AC 1 Job OPTION Generating Unit Reassembly, Alignment, FFP
Generating Unit Reassembly, Alignment, and Operational Testing in accordance with the contract documents
OPTION Disassembly, Repair, and Reassembly of
Disassembly, Repair, and Reassembly of Turbine Runner in accordance with the
0012AB 1 Job
0012AD 1 Job
0012AE 1 Job OPTION Redundant Hub Oil Seal Modifications
FFP
OPTION Refurbish Wicket Gate Operating
Refurbish Wicket Gate Operating Mechanism in accordance with the contract
0012AF 1 Job
OPTION Provide Oil Head Bushings
0012AH 1 Job OPTION Clean, Inspect, and Refurbish Automatic
FFP
Clean, Inspect, and Refurbish Automatic Air Valves, Gate Valves, and Piping in
0012AJ 1 Job OPTION Main Shaft Packing Box and Oil Sump
FFP
Main Shaft Packing Box and Oil Sump Inspection and Refurbishment in accordance with the contract documents.
FOB: Destination
0012AG 1 Job
OPTION Provide New Turbine Shaft Sleeve
0012AL 1 Job OPTION Provide Inner Head Cover Seat Ring
FFP
0012AM 1 Job OPTION Disassemble, Inspect, Reassemble, and
FFP
Disassemble, Inspect, Reassemble, and Test Two (2) Wicket Gate Servomotors in accordance with the contract documents.
FOB: Destination
0012AK 1 Job
OPTION Provide Two (2) Wicket Gate Servomotor
Provide Two (2) Wicket Gate Servomotor Piston Rod Bushings in accordance with
0012AP 1 Job OPTION Chrome Plate Two (2) Wicket Gate
FFP
Chrome Plate Two (2) Wicket Gate Servomotor Piston Rods in accordance with
OPTION Thrust Bearing Inspection - Phase 1
0012AN 1 Job
0012AQ 1 Job
0012AR 1 Job OPTION Inspection of Guide Bearings
FFP
0012AS 1 Job OPTION Spot Cavitation Repair - Mild Steel
FFP
Spot Cavitation Repair - Mild Steel (250 Cubic Inches) in accordance with the
OPTION Spot Cavitation Repair - Stainless Steel
Spot Cavitation Repair - Stainless Steel 309L (500 Cubic Inches) in accordance
0012AU 1 Job OPTION Remove Blocks from Runner Hub
FFP
0012AV 1 Job OPTION Hone Runner Blade Servomotor Cylinder
FFP
Hone Runner Blade Servomotor Cylinder in accordance with the contract
0012AT 1 Job
0012AW 1 Job OPTION Bore and Hone Runner Blade Servomotor
FFP
Bore and Hone Runner Blade Servomotor Cylinder in accordance with the contract
0012AX 2 Each OPTION Hone One (1) Wicket Gate Servomotor
FFP
Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the contract
OPTION Bore and Hone One (1) Wicket Gate
Bore and Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the
0012AZ 2 Each OPTION Provide One (1) Wicket Gate Servomotor
FFP
Provide One (1) Wicket Gate Servomotor Piston Ring Set in accordance with the
Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts in accordance
0012AY 2 Each
0012BA 1 Job
OPTION Furnish One (1) Set of Intermediate Head
Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts in
0012BC 1 Job OPTION Provide One (1) Set of Inner Head Cover
FFP
Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts in accordance
0012BB 1 Job
OPTION Install One (1) New Turbine Shaft-to-
Install One (1) New Turbine Shaft-to-Runner Coupling Stud in accordance with
0012BE 1 Job OPTION Thrust Shoes Phase 2 Inspections
FFP
0012BF 1 Job OPTION Refurbish One (1) Set of Thrust Bearing
FFP
Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and
0012BD 8 Each
OPTION Thrust Runner and Thrust Collar Phase 2
Thrust Runner and Thrust Collar Phase 2 Inspections in accordance with the
0012BH 1 Job OPTION Complete Refurbishing of Thrust Runner
FFP
Complete Refurbishing of Thrust Runner in accordance with the contract
OPTION Resurface the Running Surface of the
Resurface the Running Surface of the Runner in accordance with the contract
0012BG 1 Job
0012BJ 1 Job
0012BK 1 Job OPTION Resurface the Backside and the Running
FFP
Resurface the Backside and the Running Surface of the Runner in accordance with
0012BL 1 Job OPTION Provide New Thrust Runner Keys
FFP
OPTION Provide New Thrust Runner Bolts
0012BN 1 Job OPTION Refurbish Thrust Bearing Collar
FFP
0012BM 1 Job
Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining in
OPTION Refurbish One (1) Set of Upper Generator
Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including
0012BP 1 Job
0012BQ 1 Job
Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including
Furnish BLH Internal Hub Components
Furnish BLH Internal Hub Components - Set 1 in accordance with the contract
0012BR 1 Job
0013 1 Job
OPTION Furnish BLH Internal Hub Components
Furnish BLH Internal Hub Components - Set 2 in accordance with the contract
OPTION Furnish BLH Internal Hub Components
Furnish BLH Internal Hub Components - Set 3 in accordance with the contract
0014 1 Job
0015 1 Job
0016 1,000 Cubic
Inches OPTION Spot Cavitation Repair - Mild Steel
FFP
Spot Cavitation Repair - Mild Steel for all units in accordance with the contract documents. This CLIN is NTE 1,000 Cubic Inches.
0017 2,000 Cubic
Inches OPTION Spot Cavitation Repair - Stainless Steel
FFP
Spot Cavitation Repair - Stainless Steel 309L for all units in accordance with the contract documents. This CLIN is NTE 2,000 Cubic Inches.
SUBTOTAL FOR MANDATORY LINE ITEMS
SUBTOTAL FOR OPTIONAL LINE ITEMS
TOTAL PROPOSED PRICE FOR ALL LINE ITEMS
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor as specified in the OPTIONAL ITEMS table below.
The table below identifies the time extension (if any) that will be provided with the award of each optional item.
Time extensions will be applied to the overall contract performance period and to applicable interim completion dates. Time extensions will be applied to interim completion dates for subsequent unit work in order to maintain the original durations provided.
For example, if Optional Item 0007AU (Unit B Thrust Bearing Collar Refurbishment) is exercised, the required completion date for Units B, C, and D will all be extended by 60 days. The Final Completion date will also be extended by 60 days.
When options are exercised, the table in Clause 52.217-7 Option for Increased Quantity – Separately Priced Line Item will be updated to reflect the revised interim and final completion dates.
ITEM DESCRIPTION DEADLINE FOR AWARD OF OPTION
TIME
EXTENSION
(IF ANY)
OPTIONAL REQUIREMENTS
0005AA
Remove Blocks from Runner Hub (Optional)
Within sixty (60) days after Notice to Proceed No additional time will be allowed
0005AB
Hone Runner Blade Servomotor Cylinder (Optional)
Within fifteen (15) days after Government acceptance of the Internal Hub Components Dimensional Report (Section 48 13 13.01 26)
No additional time will be allowed
0005AC
Bore and Hone Runner Blade Servomotor Cylinder (Optional)
Within fifteen (15) days after Government acceptance of the Internal Hub Components Dimensional Report (Section 48 13 13.01 26)
No additional time will be allowed
0005AD
Hone One (1) Wicket Gate Servomotor Cylinder (Optional)
Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)
No additional time will be allowed
0005AE
Bore and Hone One (1) Wicket Gate Servomotor Cylinder (Optional)
Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)
No additional time will be allowed
0005AF
Provide One (1) Wicket Gate Servomotor Piston Ring Set (Optional)
Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)
No additional time will be allowed
0005AG
Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts (Optional)
Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)
No additional time will be allowed
0005AH
Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts (Optional)
Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)
No additional time will be allowed
0005AJ
Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts (Optional)
Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)
No additional time will be allowed
0005AK
Install One (1) New Turbine Shaft-to-Runner Coupling Stud (Optional)
Within fifteen (15) days after Government acceptance of the As Found Inspection Report and Refurbishment Recommendations (Section 48 13 13.02 26)
No additional time will be allowed
0005AL
Thrust Shoes Phase 2 Inspections (Optional)
Within fifteen (15) days after Government acceptance of the Phase 1 Inspection Report (Section 48 13 13.06 26)
No additional time will be allowed
0005AM
Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and Machining (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Shoes Phase 2 Inspection Report (Section 48 13 13.06 26)
No additional time will be allowed
0005AN
Thrust Runner and Thrust Collar Phase 2 Inspections (Optional)
Within fifteen (15) days after Government acceptance of the Phase 1 Inspection Report (Section 48 13 13.06 26)
No additional time will be allowed
0005AP
Complete Refurbishing of Thrust Runner (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
Thirty (30) days
0005AQ
Resurface the Running Surface of the Runner (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
Thirty (30) days
0005AR
Resurface the Backside and the Running Surface of the Runner (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
Thirty (30) days
0005AS
Provide New Thrust Runner Keys (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
Thirty (30) days No additional time will be allowed
0005AT
Provide New Thrust Runner Bolts (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
No additional time will be allowed
0005AU
Refurbish Thrust Bearing Collar (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
Sixty (60) days
0005AV
Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining (Optional)
Within fifteen (15) days after Government acceptance of the Turbine Guide Bearing Site Inspection Report (Section 48 13 13.07 26)
No additional time will be allowed
0005AW
Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including Babbitting and Machining (Optional)
Within fifteen (15) days after Government acceptance of the Generator Guide Bearing Site Inspection Reports (Section 48 13 13.07 26)
No additional time will be allowed
0005AX
Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including Babbitting and Machining (Optional)
Within fifteen (15) days after Government acceptance of the Generator Guide Bearing Site Inspection Reports (Section 48 13 13.07 26)
0007AA
Remove Blocks from Runner Hub (Optional)
Within fifteen (15) days of acceptance of Unit A No additional time will be allowed
0007AB
Hone Runner Blade Servomotor Cylinder (Optional)
Within fifteen (15) days after Government acceptance of the Internal Hub Components Dimensional Report (Section 48 13 13.01 26)
0007AC
Bore and Hone Runner Blade Servomotor Cylinder (Optional)
Within fifteen (15) days after Government acceptance of the Internal Hub Components Dimensional Report (Section 48 13 13.01 26)
No additional time will be allowed
0007AD
Hone One (1) Wicket Gate Servomotor Cylinder (Optional)
Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)
No additional time will be allowed
0007AE
Bore and Hone One (1) Wicket Gate Servomotor Cylinder (Optional)
Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)
No additional time will be allowed
0007AF
Provide One (1) Wicket Gate Servomotor Piston Ring Set (Optional)
Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)
No additional time will be allowed
0007AG
Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts (Optional)
Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)
No additional time will be allowed
0007AH
Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts (Optional)
Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)
No additional time will be allowed
0007AJ
Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts (Optional)
Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)
No additional time will be allowed
0007AK
Install One (1) New Turbine Shaft-to-Runner Coupling Stud (Optional)
Within fifteen (15) days after Government acceptance of the As Found Inspection Report and Refurbishment Recommendations (Section 48 13 13.02 26)
No additional time will be allowed
0007AL
Thrust Shoes Phase 2 Inspections (Optional)
Within fifteen (15) days after Government acceptance of the Phase 1 Inspection Report (Section 48 13 13.06 26)
No additional time will be allowed
0007AM
Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and Machining (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Shoes Phase 2 Inspection Report (Section 48 13 13.06 26)
0007AN
Thrust Runner and Thrust Collar Phase 2 Inspections (Optional)
Within fifteen (15) days after Government acceptance of the Phase 1 Inspection Report (Section 48 13 13.06 26)
No additional time will be allowed
0007AP
Complete Refurbishing of Thrust Runner (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
Thirty (30) days
0007AQ
Resurface the Running Surface of the Runner (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
Thirty (30) days
0007AR
Resurface the Backside and the Running Surface of the Runner (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
Thirty (30) days
0007AS
Provide New Thrust Runner Keys (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
Thirty (30) days No additional time will be allowed
0007AT
Provide New Thrust Runner Bolts (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
No additional time will be allowed
0007AU
Refurbish Thrust Bearing Collar (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
Sixty (60) days
0007AV
Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining (Optional)
Within fifteen (15) days after Government acceptance of the Turbine Guide Bearing Site Inspection Report (Section 48 13 13.07 26)
No additional time will be allowed
0007AW
Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including Babbitting and Machining (Optional)
Within fifteen (15) days after Government acceptance of the Generator Guide Bearing Site Inspection Reports (Section 48 13 13.07 26)
No additional time will be allowed
0007AX
Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including Babbitting and Machining (Optional)
Within fifteen (15) days after Government acceptance of the Generator Guide Bearing Site Inspection Reports (Section 48 13 13.07 26)
0009AA
Hub (Optional)
Within fifteen (15) days of acceptance of Unit B No additional time will be allowed
0009AB
Hone Runner Blade Servomotor Cylinder (Optional)
Within fifteen (15) days after Government acceptance of the Internal Hub Components Dimensional Report (Section 48 13 13.01 26)
No additional time will be allowed
0009AC
Bore and Hone Runner Blade Servomotor Cylinder (Optional)
Within fifteen (15) days after Government acceptance of the Internal Hub Components Dimensional Report (Section 48 13 13.01 26)
No additional time will be allowed
0009AD
Hone One (1) Wicket Gate Servomotor Cylinder (Optional)
Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)
No additional time will be allowed
0009AE
Bore and Hone One (1) Wicket Gate Servomotor Cylinder (Optional)
Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)
No additional time will be allowed
0009AF
Provide One (1) Wicket Gate Servomotor Piston Ring Set (Optional)
Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)
No additional time will be allowed
0009AG
Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts (Optional)
Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)
No additional time will be allowed
0009AH
Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts (Optional)
Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)
No additional time will be allowed
0009AJ
Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts (Optional)
Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)
0009AK
Install One (1) New Turbine Shaft-to-Runner Coupling Stud (Optional)
Within fifteen (15) days after Government acceptance of the As Found Inspection Report and Refurbishment Recommendations (Section 48 13 13.02 26)
No additional time will be allowed
0009AL
Thrust Shoes Phase 2 Inspections (Optional)
Within fifteen (15) days after Government acceptance of the Phase 1 Inspection Report (Section 48 13 13.06 26)
No additional time will be allowed
0009AM
Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and Machining (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Shoes Phase 2 Inspection Report (Section 48 13 13.06 26)
No additional time will be allowed
0009AN
Thrust Runner and Thrust Collar Phase 2 Inspections (Optional)
Within fifteen (15) days after Government acceptance of the Phase 1 Inspection Report (Section 48 13 13.06 26)
No additional time will be allowed
0009AP
Complete Refurbishing of Thrust Runner (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
Thirty (30) days
0009AQ
Resurface the Running Surface of the Runner (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
Thirty (30) days
0009AR
Resurface the Backside and the Running Surface of the Runner (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
Thirty (30) days
0009AS
Provide New Thrust Runner Keys (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
Thirty (30) days No additional time will be allowed
0009AT
Provide New Thrust Runner Bolts (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
No additional time will be allowed
0009AU
Refurbish Thrust Bearing Collar (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
Sixty (60) days
0009AV
Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining (Optional)
Within fifteen (15) days after Government acceptance of the Turbine Guide Bearing Site Inspection Report (Section 48 13 13.07 26)
No additional time will be allowed
0009AW
Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including Babbitting and Machining (Optional)
Within fifteen (15) days after Government acceptance of the Generator Guide Bearing Site Inspection Reports (Section 48 13 13.07 26)
No additional time will be allowed
0009AX
Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including Babbitting and Machining (Optional)
Within fifteen (15) days after Government acceptance of the Generator Guide Bearing Site Inspection Reports (Section 48 13 13.07 26)
0011AA
Hub (Optional)
Within fifteen (15) days of acceptance of Unit C No additional time will be allowed
0011AB
Hone Runner Blade Servomotor Cylinder (Optional)
Within fifteen (15) days after Government acceptance of the Internal Hub Components Dimensional Report (Section 48 13 13.01 26)
No additional time will be allowed
0011AC
Bore and Hone Runner Blade Servomotor Cylinder (Optional)
Within fifteen (15) days after Government acceptance of the Internal Hub Components Dimensional Report (Section 48 13 13.01 26)
No additional time will be allowed
0011AD
Hone One (1) Wicket Gate Servomotor Cylinder (Optional)
Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)
No additional time will be allowed
0011AE
Bore and Hone One (1) Wicket Gate Servomotor Cylinder (Optional)
Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)
No additional time will be allowed
0011AF
Provide One (1) Wicket Gate Servomotor Piston Ring Set (Optional)
Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)
0011AG
Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts (Optional)
Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)
No additional time will be allowed
0011AH
Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts (Optional)
Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)
No additional time will be allowed
0011AJ
Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts (Optional)
Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)
No additional time will be allowed
0011AK
Install One New Turbine Shaft-to-Runner Coupling Stud (Optional)
Within fifteen (15) days after Government acceptance of the As Found Inspection Report and Refurbishment Recommendations (Section 48 13 13.02 26)
No additional time will be allowed
0011AL
Thrust Shoes Phase 2 Inspections (Optional)
Within fifteen (15) days after Government acceptance of the Phase 1 Inspection Report (Section 48 13 13.06 26)
No additional time will be allowed
0011AM
Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and Machining (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Shoes Phase 2 Inspection Report (Section 48 13 13.06 26)
No additional time will be allowed
0011AN
Thrust Runner and Thrust Collar Phase 2 Inspections (Optional)
Within fifteen (15) days after Government acceptance of the Phase 1 Inspection Report (Section 48 13 13.06 26)
No additional time will be allowed
0011AP
Complete Refurbishing of Thrust Runner (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
Thirty (30) days
0011AQ
Resurface the Running Surface of the Runner (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
Thirty (30) days
0011AR
Resurface the Backside and the Running Surface of the Runner (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
0011AS
Provide New Thrust Runner Keys (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
Thirty (30) days No additional time will be allowed
0011AT
Provide New Thrust Runner Bolts (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
No additional time will be allowed
0011AU
Refurbish Thrust Bearing Collar (Optional)
Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13
13.06 26)
Sixty (60) days
0011AV
Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining (Optional)
Within fifteen (15) days after Government acceptance of the Turbine Guide Bearing Site Inspection Report (Section 48 13 13.07 26)
No additional time will be allowed
0011AW
Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including Babbitting and Machining (Optional)
Within fifteen (15) days after Government acceptance of the Generator Guide Bearing Site Inspection Reports (Section 48 13 13.07 26)
No additional time will be allowed
0011AX
Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including Babbitting and Machining (Optional)
Within fifteen (15) days after Government acceptance of the Generator Guide Bearing Site Inspection Reports (Section 48 13 13.07 26)
0012AA
Generating Unit Operational Testing, Alignment, and Disassembly (Optional)
Within seventy five (75) days of acceptance of Unit C
Three hundred thirty
(330) days
0012AB
Generator Inspection, Testing, and Cleaning (Optional)
Concurrent with the exercise of CLIN 0012AA No additional time will be allowed
0012AC
Generating Unit Reassembly, Alignment, and Operational Testing (Optional)
Concurrent with the exercise of CLIN 0012AA
0012AD
Disassembly, Repair, and Reassembly of Turbine Runner (Optional)
Concurrent with the exercise of CLIN 0012AA No additional time will be allowed
0012AE
Redundant Hub Oil Seal Modifications (Optional)
Concurrent with the exercise of CLIN 0012AA No additional time will be allowed
0012AF
Refurbish Wicket Gate Operating Mechanism (Optional)
Concurrent with the exercise of CLIN 0012AA No additional time will be allowed
0012AG
Provide Oil Head Bushings (Optional)
Concurrent with the exercise of CLIN 0012AA No additional time will be allowed
0012AH
Clean, Inspect, and Refurbish Automatic Air Valves, Gate Valves, and Piping (Optional)
Concurrent with the exercise of CLIN 0012AA No additional time will be allowed
0012AJ
Main Shaft Packing Box and Oil Sump Inspection and Refurbishment (Optional)
Concurrent with the exercise of CLIN 0012AA No additional time will be allowed
0012AK
Provide New Turbine Shaft Sleeve (Optional)
Concurrent with the exercise of CLIN 0012AA No additional time will be allowed
0012AL
Provide Inner Head Cover Seat Ring (Optional)
Concurrent with the exercise of CLIN 0012AA No additional time will be allowed
0012AM
Disassemble, Inspect, Reassemble, and Test Two (2) Wicket Gate Servomotors (Optional)
Concurrent with the exercise of CLIN 0012AA No additional time will be allowed
0012AN
Provide Two (2) Wicket Gate Servomotor Piston Rod Bushings (Optional)
Concurrent with the exercise of CLIN 0012AA
0012AP
Chrome Plate Two (2) Wicket Gate Servomotor Piston Rods (Optional)
Concurrent with the exercise of CLIN 0012AA No additional time will be allowed
0012AQ
Thrust Bearing…