AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This Amendment is issued to update the follow ing:

1. Offerors shall provide the total proposed price for mandatory items, the total proposed price for optional items, and the total proposed overall price at the end of Section 00010 in the corresponding fields (see attached).

2. SubCLINs 0005AS, 0007AS, 0009AS, 0011AS, and 0012BL in the table found in FAR 52.217-7 Option for Increased Quantity--Separately Priced Line Item (MAR 1989) have been revised (see attached).

3. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Feb-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-16-R-0016

X 9B. DATED (SEE ITEM 11)

20-Nov-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Feb-2016

CODE

US ARMY CORPS OF ENGINEERS

333 SW FIRST AVE

PORTLAND OR 97204-3495

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N-16-R-0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SECTION 00100 - BIDDING SCHEDULE / INSTRUCTIONS TO BIDDERS

AMENDMENT 0003

This Amendment is issued to update the following:

1. Offerors shall provide the total proposed price for mandatory items, the total proposed price for optional items, and the total proposed overall price at the end of Section 00010 in the corresponding fields (see attached).

2. SubCLINs 0005AS, 0007AS, 0009AS, 0011AS, and 0012BL in the table found in FAR 52.217-7 Option for Increased Quantity--Separately Priced Line Item (MAR 1989) have been revised (see attached).

3. All other terms and conditions remain unchanged.

Section 00010 - Solicitation Contract Form

AMOUNT

Mobilization and Demobilization

FFP

Mobilization and Demobilization in accordance with the contract documents.

FOB: Destination

NET AMT

Furnish One (1) Set of Oversized Turbine

Furnish One (1) Set of Oversized Turbine Shaft-to-Runner Studs in accordance with the contract documents.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE

0001 1 Job

0002 1 Job

Designated Reference Drawings

Designated Reference Drawings in accordance with the contract documents.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Unit A Upgrade Work

FFP

Unit A Upgrade Work in accordance with the contract documents.

Generating Unit Operational Testing, Generating Unit Operational Testing, Alignment Checks, and Disassembly in accordance with the contract documents.

0003 1 Job

0004AA 1 Job

Generator Inspection, Testing, Generator Inspection, Testing, and Cleaning in accordance with the contract documents.

Generating Unit Reassembly, Alignment, Generating Unit Reassembly, Alignment, and Operational Testing in accordance

Disassembly, Repair, and Reassembly

Disassembly, Repair, and Reassembly of Turbine Runner in accordance with the contract documents.

0004AB 1 Job

0004AC 1 Job

0004AD 1 Job

Redundant Hub Oil Seal Modifications

Redundant Hub Oil Seal Modifications in accordance with the contract documents.

Refurbish Wicket Gate Operating

Refurbish Wicket Gate Operating Mechanism in accordance with the contract

0004AE 1 Job

0004AF 1 Job

Provide Oil Head Bushings

Provide Oil Head Bushings in accordance with the contract documents.

Clean, Inspect, and Refurbish Automatic

Clean, Inspect, and Refurbish Automatic Air Valves, Gate Valves, and Piping in

Main Shaft Packing Box and Oil Sump

Main Shaft Packing Box and Oil Sump Inspection and Refurbishment in

0004AG 1 Job

0004AH 1 Job

0004AJ 1 Job

Provide New Turbine Shaft Sleeve and

Provide New Turbine Shaft Sleeve and Installation Compression Clamp in

Provide Inner Head Cover Seat Ring

Provide Inner Head Cover Seat Ring in accordance with the contract documents.

0004AK 1 Job

0004AL 1 Job

Disassemble, Inspect, Reassemble, and

Disassemble, Inspect, Reassemble, and Test Two Wicket Gate Servomotors in

Provide Two Wicket Gate Servomotor

Provide Two Wicket Gate Servomotor Piston Rod Bushings in accordance with the

Chrome Plate Two Wicket Gate Servomotor

Chrome Plate Two Wicket Gate Servomotor Piston Rods in accordance with the contract documents.

FOB: Destination

0004AM 1 Job

0004AN 1 Job

0004AP 1 Job

Thrust Bearing Inspection - Phase 1

Thrust Bearing Inspection - Phase 1 in accordance with the contract documents.

Inspection of Guide Bearings

Inspection of Guide Bearings in accordance with the contract documents.

Spot Cavitation Repair - Mild Steel

Spot Cavitation Repair - Mild Steel (250 Cubic Inches) in accordance with the contract documents.

FOB: Destination

0004AQ 1 Job

0004AR 1 Job

0004AS 1 Job

Spot Cavitation Repair - Stainless Steel

Spot Cavitation Repair - Stainless Steel 309L (500 Cubic Inches) in accordance

OPTION Optional Unit A Upgrade Work

FFP

Optional Unit A Upgrade Work in accordance with the contract documents.

0004AT 1 Job

OPTION Remove Blocks from Runner Hub

Remove Blocks from Runner Hub in accordance with the contract documents.

0005AB 1 Job OPTION Hone Runner Blade Servomotor Cylinder

FFP

Hone Runner Blade Servomotor Cylinder in accordance with the contract

0005AC 1 Job OPTION Bore and Hone Runner Blade Servomotor

FFP

Bore and Hone Runner Blade Servomotor Cylinder in accordance with the contract

0005AA 1 Job

OPTION Hone One (1) Wicket Gate Servomotor

Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the contract

0005AE 2 Each OPTION Bore and Hone One (1) Wicket Gate

FFP

Bore and Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the

0005AD 2 Each

OPTION Provide One (1) Wicket Gate Servomotor

Provide One (1) Wicket Gate Servomotor Piston Ring Set in accordance with the

0005AG 1 Job OPTION Provide One (1) Set of Outer Head Cover

FFP

Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts in accordance

OPTION Furnish One (1) Set of Intermediate Head

Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts in

0005AF 2 Each

0005AH 1 Job

OPTION Provide One (1) Set of Inner Head Cover

Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts in accordance

0005AK 8 Each OPTION Install One (1) New Turbine Shaft-to-

FFP

Install One (1) New Turbine Shaft-to-Runner Coupling Stud in accordance with the contract documents.

OPTION Thrust Shoes Phase 2 Inspections

Thrust Shoes Phase 2 Inspections in accordance with the contract documents.

0005AJ 1 Job

0005AL 1 Job

0005AM 1 Job OPTION Refurbish One (1) Set of Thrust Bearing

FFP

Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and Machining in accordance with the contract documents.

0005AN 1 Job OPTION Thrust Runner and Thrust Collar Phase 2

FFP

Thrust Runner and Thrust Collar Phase 2 Inspections in accordance with the

OPTION Complete Refurbishing of Thrust Runner

Complete Refurbishing of Thrust Runner in accordance with the contract

0005AQ 1 Job OPTION Resurface the Running Surface of the

FFP

Resurface the Running Surface of the Runner in accordance with the contract

OPTION Resurface the Backside and the Running

Resurface the Backside and the Running Surface of the Runner in accordance with

0005AP 1 Job

0005AR 1 Job

OPTION Provide New Thrust Runner Keys

Provide New Thrust Runner Keys in accordance with the contract documents.

0005AT 1 Job OPTION Provide New Thrust Runner Bolts

FFP

Provide New Thrust Runner Bolts in accordance with the contract documents.

0005AU 1 Job OPTION Refurbish Thrust Bearing Collar

FFP

Refurbish Thrust Bearing Collar in accordance with the contract documents.

0005AS 1 Job

0005AV 1 Job OPTION Refurbish One (1) Turbine Guide Bearing

FFP

Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining in

0005AW 1 Job OPTION Refurbish One (1) Set of Upper Generator

FFP

Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including Babbitting and Machining in accordance with the contract documents.

OPTION Refurbish One (1) Set of Lower Generator

Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including

Unit B Upgrade Work

FFP

Unit B Upgrade Work in accordance with the contract documents.

Generating Unit Operational Testing, Alignment Checks, and Disassembly in

0005AX 1 Job

0006AA 1 Job

Generator Inspection, Testing, and

Generator Inspection, Testing, and Cleaning in accordance with the contract

Generating Unit Reassembly, Alignment, and Operational Testing in accordance

Disassembly, Repair, and Reassembly of

Disassembly, Repair, and Reassembly of Turbine Runner in accordance with the

0006AB 1 Job

0006AC 1 Job

0006AD 1 Job

Refurbish Wicket Gate Operating Mechanism in accordance with the contract

0006AE 1 Job

0006AF 1 Job

Clean, Inspect, and Refurbish Automatic Air Valves, Gate Valves, and Piping in

Main Shaft Packing Box and Oil Sump Inspection and Refurbishment in

0006AG 1 Job

0006AH 1 Job

0006AJ 1 Job

Provide New Turbine Shaft Sleeve

Provide New Turbine Shaft Sleeve in accordance with the contract documents.

Disassemble, Inspect, Reassemble, and Test Two (2) Wicket Gate Servomotors in

0006AK 1 Job

0006AL 1 Job

0006AM 1 Job

Provide Two (2) Wicket Gate Servomotor

Provide Two (2) Wicket Gate Servomotor Piston Rod Bushings in accordance with

Chrome Plate Two (2) Wicket Gate

Chrome Plate Two (2) Wicket Gate Servomotor Piston Rods in accordance with

0006AN 1 Job

0006AP 1 Job

Spot Cavitation Repair - Mild Steel (250 Cubic Inches) in accordance with the

0006AQ 1 Job

0006AR 1 Job

0006AS 1 Job

Spot Cavitation Repair - Stainless Steel 309L (500 Cubic Inches) in accordance

OPTION Optional Unit B Upgrade Work

FFP

Optional Unit B Upgrade Work in accordance with the contract documents.

0007AA 1 Job OPTION Remove Blocks from Runner Hub

FFP

0006AT 1 Job

OPTION Hone Runner Blade Servomotor Cylinder

Hone Runner Blade Servomotor Cylinder in accordance with the contract

0007AC 1 Job OPTION Bore and Hone Runner Blade Servomotor

FFP

Bore and Hone Runner Blade Servomotor Cylinder in accordance with the contract

0007AB 1 Job

Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the contract

0007AE 2 Each OPTION Bore and Hone One (1) Wicket Gate

FFP

Bore and Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the

Provide One (1) Wicket Gate Servomotor Piston Ring Set in accordance with the

0007AD 2 Each

0007AF 2 Each

OPTION Provide One (1) Set of Outer Head Cover

Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts in accordance

0007AH 1 Job OPTION Furnish One (1) Set of Intermediate Head

FFP

Furnish One (1) Set of Intermediate Head Tie Down Studs and Nuts in accordance

0007AG 1 Job

Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts in accordance

0007AK 8 Each OPTION Install One (1) New Turbine Shaft-to-

FFP

Install One (1) New Turbine Shaft-to-Runner Coupling Stud in accordance with

0007AJ 1 Job

0007AL 1 Job

OPTION Refurbish One (1) Set of Thrust Bearing

Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and

0007AN 1 Job OPTION Thrust Runner and Thrust Collar Phase 2

FFP

Thrust Runner and Thrust Collar Phase 2 Inspections in accordance with the

Complete Refurbishing of Thrust Runner in accordance with the contract

0007AM 1 Job

0007AP 1 Job

0007AQ 1 Job OPTION Resurface the Running Surface of the

FFP

Resurface the Running Surface of the Runner in accordance with the contract

0007AR 1 Job OPTION Resurface the Backside and the Running

FFP

Resurface the Backside and the Running Surface of the Runner in accordance with

0007AT 1 Job OPTION Provide New Thrust Runner Bolts

FFP

0007AU 1 Job OPTION Refurbish Thrust Bearing Collar

FFP

0007AS 1 Job

OPTION Refurbish One (1) Turbine Guide Bearing

Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining in

0007AW 1 Job OPTION Refurbish One (1) Set of Upper Generator

FFP

Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including

Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including

0007AV 1 Job

0007AX 1 Job

Unit C Upgrade Work

FFP

Unit C Upgrade Work in accordance with the contract documents.

Generating Unit Operational Testing, Alignment Checks, and Disassembly in

0008AA 1 Job

Generator Inspection, Testing, and Cleaning in accordance with the contract

Generating Unit Reassembly, Alignment, and Operational Testing in accordance

Disassembly, Repair, and Reassembly of Turbine Runner in accordance with the contract documents.

FOB: Destination

0008AB 1 Job

0008AC 1 Job

0008AD 1 Job

Refurbish Wicket Gate Operating Mechanism in accordance with the contract

Provide Oil Head Bushings in accordance with the contract documents.

FOB: Destination

0008AE 1 Job

0008AF 1 Job

0008AG 1 Job

Clean, Inspect, and Refurbish Automatic Air Valves, Gate Valves, and Piping in

Main Shaft Packing Box and Oil Sump Inspection and Refurbishment in

0008AH 1 Job

0008AJ 1 Job

Disassemble, Inspect, Reassemble, and Test Two (2) Wicket Gate Servomotors in

0008AK 1 Job

0008AL 1 Job

0008AM 1 Job

Provide Two (2) Wicket Gate Servomotor Piston Rod Bushings in accordance with

Chrome Plate Two (2) Wicket Gate Servomotor Piston Rods in accordance with

0008AN 1 Job

0008AP 1 Job

Thrust Bearing Inspectiong - Phase 1

Thrust Bearing Inspectiong - Phase 1 in accordance with the contract documents.

Spot Cavitation Repair - Mild Steel (250 Cubic Inches) in accordance with the

0008AQ 1 Job

0008AR 1 Job

0008AS 1 Job

Spot Cavitation Repair - Stainless Steel 309L (500 Cubic Inches) in accordance

OPTION Optional Unit C Upgrade Work

FFP

Optional Unit C Upgrade Work in accordance with the contract documents.

0009AA 1 Job OPTION Remove Blocks from Runner Hub

FFP

0008AT 1 Job

OPTION Hone Runner Blade Servomotor Cylinder

Hone Runner Blade Servomotor Cylinder in accordance with the contract

0009AC 1 Job OPTION Bore and Hone Runner Blade Servomotor

FFP

Bore and Hone Runner Blade Servomotor Cylinder in accordance with the contract

0009AB 1 Job

Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the contract

0009AE 2 Each OPTION Bore and Hone One (1) Wicket Gate

FFP

Bore and Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the

Provide One (1) Wicket Gate Servomotor Piston Ring Set in accordance with the

0009AD 2 Each

0009AF 2 Each

Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts in accordance

0009AH 1 Job OPTION Furnish One (1) Set of Intermediate Head

FFP

Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts in

0009AG 1 Job

Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts in accordance

0009AK 8 Each OPTION Install One (1) New Turbine Shaft-to-

FFP

Install One (1) New Turbine Shaft-to-Runner Coupling Stud in accordance with

0009AL 1 Job OPTION Thrust Shoes Phase 2 Inspections

FFP

0009AJ 1 Job

0009AM 1 Job OPTION Refurbish One (1) Set of Thrust Bearing

FFP

Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and

0009AN 1 Job OPTION Thrust Runner and Thrust Collar Phase 2

FFP

Thrust Runner and Thrust Collar Phase 2 Inspections in accordance with the

Complete Refurbishing of Thrust Runner in accordance with the contract

0009AQ 1 Job OPTION Resurface the Running Surface of the

FFP

Resurface the Running Surface of the Runner in accordance with the contract

Resurface the Backside and the Running Surface of the Runner in accordance with

0009AP 1 Job

0009AR 1 Job

0009AT 1 Job OPTION Provide New Thrust Runner Bolts

FFP

0009AU 1 Job OPTION Refurbish Thrust Bearing Collar

FFP

0009AS 1 Job

Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining in

0009AW 1 Job OPTION Refurbish One (1) Set of Upper Generator

FFP

Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including

0009AV 1 Job

Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including

Unit D Upgrade Work

FFP

Unit D Upgrade Work in accordance with the contract documents.

Generating Unit Operational Testing, Alignment Checks, and Disassembly in

0009AX 1 Job

0010AA 1 Job

Generator Inspection, Testing, and Cleaning in accordance with the contract

Generating Unit Reassembly, Alignment, and Operational Testing in accordance

0010AB 1 Job

0010AC 1 Job

Disassembly, Repair, and Reassembly of Turbine Runner in accordance with the

Refurbish Wicket Gate Operating Mechanism in accordance with the contract

0010AD 1 Job

0010AE 1 Job

0010AF 1 Job

Clean, Inspect, and Refurbish Automatic Air Valves, Gate Valves, and Piping in

Main Shaft Packing Box and Oil Sump Inspection and Refurbishment in accordance with the contract documents.

FOB: Destination

0010AG 1 Job

0010AH 1 Job

0010AJ 1 Job

Disassemble, Inspect, Reassemble, and Test Two (2) Wicket Gate Servomotors in accordance with the contract documents.

FOB: Destination

0010AK 1 Job

0010AL 1 Job

0010AM 1 Job

Provide Two (2) Wicket Gate Servomotor Piston Rod Bushings in accordance with

Chrome Plate Two (2) Wicket Gate Servomotor Piston Rods in accordance with

0010AN 1 Job

0010AP 1 Job

Spot Cavitation Repair - Mild Steel (250 Cubic Inches) in accordance with the

0010AQ 1 Job

0010AR 1 Job

0010AS 1 Job

Spot Cavitation Repair - Stainless Steel 309L (500 Cubic Inches) in accordance

OPTION Optional Unit D Upgrade Work

FFP

Optional Unit D Upgrade Work in accordance with the contract documents.

0011AA 1 Job OPTION Remove Blocks from Runner Hub

FFP

0010AT 1 Job

0011AB 1 Job OPTION Hone Runner Blade Servomotor Cylinder

FFP

Hone Runner Blade Servomotor Cylinder in accordance with the contract

0011AC 1 Job OPTION Bore and Hone Runner Blade Servomotor

FFP

Bore and Hone Runner Blade Servomotor Cylinder in accordance with the contract

Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the contract

0011AE 2 Each OPTION Bore and Hone One (1) Wicket Gate

FFP

Bore and Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the

Provide One (1) Wicket Gate Servomotor Piston Ring Set in accordance with the

0011AD 2 Each

0011AF 2 Each

Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts in accordance

0011AH 1 Job OPTION Furnish One (1) Set of Intermediate Head

FFP

Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts in

0011AG 1 Job

Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts in accordance

0011AK 8 Each OPTION Install One (1) New Turbine Shaft-to-

FFP

Install One (1) New Turbine Shaft-to-Runner Coupling Stud in accordance with

0011AJ 1 Job

0011AL 1 Job

OPTION Refurbish One (1) Set of Thrust Bearing

Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and

0011AN 1 Job OPTION Thrust Runner and Thrust Collar Phase 2

FFP

Thrust Runner and Thrust Collar Phase 2 Inpsections in accordance with the

0011AM 1 Job

Complete Refurbishing of Thrust Runner in accordance with the contract

0011AQ 1 Job OPTION Resurface the Running Surface of the

FFP

Resurface the Running Surface of the Runner in accordance with the contract

Resurface the Backside and the Running Surface of the Runner in accordance with

0011AP 1 Job

0011AR 1 Job

0011AT 1 Job OPTION Provide New Thrust Runner Bolts

FFP

0011AU 1 Job OPTION Refurbish Thrust Bearing Collar

FFP

0011AS 1 Job

Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining in

0011AW 1 Job OPTION Refurbish One (1) Set of Upper Generator

FFP

Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including

0011AV 1 Job

Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including

OPTION Unit E Upgrade Work

FFP

Unit E Upgrade Work in accordance with the contract documents.

0012AA 1 Job OPTION Generating Unit Operational Testing, FFP

Generating Unit Operational Testing, Alignment Checks, and Disassembly in

0011AX 1 Job

OPTION Generator Inspection, Testing, and

Generator Inspection, Testing, and Cleaning in accordance with the contract

0012AC 1 Job OPTION Generating Unit Reassembly, Alignment, FFP

Generating Unit Reassembly, Alignment, and Operational Testing in accordance with the contract documents

OPTION Disassembly, Repair, and Reassembly of

Disassembly, Repair, and Reassembly of Turbine Runner in accordance with the

0012AB 1 Job

0012AD 1 Job

0012AE 1 Job OPTION Redundant Hub Oil Seal Modifications

FFP

OPTION Refurbish Wicket Gate Operating

Refurbish Wicket Gate Operating Mechanism in accordance with the contract

0012AF 1 Job

OPTION Provide Oil Head Bushings

0012AH 1 Job OPTION Clean, Inspect, and Refurbish Automatic

FFP

Clean, Inspect, and Refurbish Automatic Air Valves, Gate Valves, and Piping in

0012AJ 1 Job OPTION Main Shaft Packing Box and Oil Sump

FFP

Main Shaft Packing Box and Oil Sump Inspection and Refurbishment in accordance with the contract documents.

FOB: Destination

0012AG 1 Job

OPTION Provide New Turbine Shaft Sleeve

0012AL 1 Job OPTION Provide Inner Head Cover Seat Ring

FFP

0012AM 1 Job OPTION Disassemble, Inspect, Reassemble, and

FFP

Disassemble, Inspect, Reassemble, and Test Two (2) Wicket Gate Servomotors in accordance with the contract documents.

FOB: Destination

0012AK 1 Job

OPTION Provide Two (2) Wicket Gate Servomotor

Provide Two (2) Wicket Gate Servomotor Piston Rod Bushings in accordance with

0012AP 1 Job OPTION Chrome Plate Two (2) Wicket Gate

FFP

Chrome Plate Two (2) Wicket Gate Servomotor Piston Rods in accordance with

OPTION Thrust Bearing Inspection - Phase 1

0012AN 1 Job

0012AQ 1 Job

0012AR 1 Job OPTION Inspection of Guide Bearings

FFP

0012AS 1 Job OPTION Spot Cavitation Repair - Mild Steel

FFP

Spot Cavitation Repair - Mild Steel (250 Cubic Inches) in accordance with the

OPTION Spot Cavitation Repair - Stainless Steel

Spot Cavitation Repair - Stainless Steel 309L (500 Cubic Inches) in accordance

0012AU 1 Job OPTION Remove Blocks from Runner Hub

FFP

0012AV 1 Job OPTION Hone Runner Blade Servomotor Cylinder

FFP

Hone Runner Blade Servomotor Cylinder in accordance with the contract

0012AT 1 Job

0012AW 1 Job OPTION Bore and Hone Runner Blade Servomotor

FFP

Bore and Hone Runner Blade Servomotor Cylinder in accordance with the contract

0012AX 2 Each OPTION Hone One (1) Wicket Gate Servomotor

FFP

Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the contract

OPTION Bore and Hone One (1) Wicket Gate

Bore and Hone One (1) Wicket Gate Servomotor Cylinder in accordance with the

0012AZ 2 Each OPTION Provide One (1) Wicket Gate Servomotor

FFP

Provide One (1) Wicket Gate Servomotor Piston Ring Set in accordance with the

Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts in accordance

0012AY 2 Each

0012BA 1 Job

OPTION Furnish One (1) Set of Intermediate Head

Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts in

0012BC 1 Job OPTION Provide One (1) Set of Inner Head Cover

FFP

Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts in accordance

0012BB 1 Job

OPTION Install One (1) New Turbine Shaft-to-

Install One (1) New Turbine Shaft-to-Runner Coupling Stud in accordance with

0012BE 1 Job OPTION Thrust Shoes Phase 2 Inspections

FFP

0012BF 1 Job OPTION Refurbish One (1) Set of Thrust Bearing

FFP

Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and

0012BD 8 Each

OPTION Thrust Runner and Thrust Collar Phase 2

Thrust Runner and Thrust Collar Phase 2 Inspections in accordance with the

0012BH 1 Job OPTION Complete Refurbishing of Thrust Runner

FFP

Complete Refurbishing of Thrust Runner in accordance with the contract

OPTION Resurface the Running Surface of the

Resurface the Running Surface of the Runner in accordance with the contract

0012BG 1 Job

0012BJ 1 Job

0012BK 1 Job OPTION Resurface the Backside and the Running

FFP

Resurface the Backside and the Running Surface of the Runner in accordance with

0012BL 1 Job OPTION Provide New Thrust Runner Keys

FFP

OPTION Provide New Thrust Runner Bolts

0012BN 1 Job OPTION Refurbish Thrust Bearing Collar

FFP

0012BM 1 Job

Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining in

OPTION Refurbish One (1) Set of Upper Generator

Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including

0012BP 1 Job

0012BQ 1 Job

Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including

Furnish BLH Internal Hub Components

Furnish BLH Internal Hub Components - Set 1 in accordance with the contract

0012BR 1 Job

0013 1 Job

OPTION Furnish BLH Internal Hub Components

Furnish BLH Internal Hub Components - Set 2 in accordance with the contract

OPTION Furnish BLH Internal Hub Components

Furnish BLH Internal Hub Components - Set 3 in accordance with the contract

0014 1 Job

0015 1 Job

0016 1,000 Cubic

Inches OPTION Spot Cavitation Repair - Mild Steel

FFP

Spot Cavitation Repair - Mild Steel for all units in accordance with the contract documents. This CLIN is NTE 1,000 Cubic Inches.

0017 2,000 Cubic

Inches OPTION Spot Cavitation Repair - Stainless Steel

FFP

Spot Cavitation Repair - Stainless Steel 309L for all units in accordance with the contract documents. This CLIN is NTE 2,000 Cubic Inches.

SUBTOTAL FOR MANDATORY LINE ITEMS

SUBTOTAL FOR OPTIONAL LINE ITEMS

TOTAL PROPOSED PRICE FOR ALL LINE ITEMS

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor as specified in the OPTIONAL ITEMS table below.

The table below identifies the time extension (if any) that will be provided with the award of each optional item.

Time extensions will be applied to the overall contract performance period and to applicable interim completion dates. Time extensions will be applied to interim completion dates for subsequent unit work in order to maintain the original durations provided.

For example, if Optional Item 0007AU (Unit B Thrust Bearing Collar Refurbishment) is exercised, the required completion date for Units B, C, and D will all be extended by 60 days. The Final Completion date will also be extended by 60 days.

When options are exercised, the table in Clause 52.217-7 Option for Increased Quantity – Separately Priced Line Item will be updated to reflect the revised interim and final completion dates.

ITEM DESCRIPTION DEADLINE FOR AWARD OF OPTION

TIME

EXTENSION

(IF ANY)

OPTIONAL REQUIREMENTS

0005AA

Remove Blocks from Runner Hub (Optional)

Within sixty (60) days after Notice to Proceed No additional time will be allowed

0005AB

Hone Runner Blade Servomotor Cylinder (Optional)

Within fifteen (15) days after Government acceptance of the Internal Hub Components Dimensional Report (Section 48 13 13.01 26)

No additional time will be allowed

0005AC

Bore and Hone Runner Blade Servomotor Cylinder (Optional)

Within fifteen (15) days after Government acceptance of the Internal Hub Components Dimensional Report (Section 48 13 13.01 26)

No additional time will be allowed

0005AD

Hone One (1) Wicket Gate Servomotor Cylinder (Optional)

Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)

No additional time will be allowed

0005AE

Bore and Hone One (1) Wicket Gate Servomotor Cylinder (Optional)

Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)

No additional time will be allowed

0005AF

Provide One (1) Wicket Gate Servomotor Piston Ring Set (Optional)

Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)

No additional time will be allowed

0005AG

Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts (Optional)

Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)

No additional time will be allowed

0005AH

Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts (Optional)

Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)

No additional time will be allowed

0005AJ

Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts (Optional)

Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)

No additional time will be allowed

0005AK

Install One (1) New Turbine Shaft-to-Runner Coupling Stud (Optional)

Within fifteen (15) days after Government acceptance of the As Found Inspection Report and Refurbishment Recommendations (Section 48 13 13.02 26)

No additional time will be allowed

0005AL

Thrust Shoes Phase 2 Inspections (Optional)

Within fifteen (15) days after Government acceptance of the Phase 1 Inspection Report (Section 48 13 13.06 26)

No additional time will be allowed

0005AM

Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and Machining (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Shoes Phase 2 Inspection Report (Section 48 13 13.06 26)

No additional time will be allowed

0005AN

Thrust Runner and Thrust Collar Phase 2 Inspections (Optional)

Within fifteen (15) days after Government acceptance of the Phase 1 Inspection Report (Section 48 13 13.06 26)

No additional time will be allowed

0005AP

Complete Refurbishing of Thrust Runner (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

Thirty (30) days

0005AQ

Resurface the Running Surface of the Runner (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

Thirty (30) days

0005AR

Resurface the Backside and the Running Surface of the Runner (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

Thirty (30) days

0005AS

Provide New Thrust Runner Keys (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

Thirty (30) days No additional time will be allowed

0005AT

Provide New Thrust Runner Bolts (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

No additional time will be allowed

0005AU

Refurbish Thrust Bearing Collar (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

Sixty (60) days

0005AV

Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining (Optional)

Within fifteen (15) days after Government acceptance of the Turbine Guide Bearing Site Inspection Report (Section 48 13 13.07 26)

No additional time will be allowed

0005AW

Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including Babbitting and Machining (Optional)

Within fifteen (15) days after Government acceptance of the Generator Guide Bearing Site Inspection Reports (Section 48 13 13.07 26)

No additional time will be allowed

0005AX

Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including Babbitting and Machining (Optional)

Within fifteen (15) days after Government acceptance of the Generator Guide Bearing Site Inspection Reports (Section 48 13 13.07 26)

0007AA

Remove Blocks from Runner Hub (Optional)

Within fifteen (15) days of acceptance of Unit A No additional time will be allowed

0007AB

Hone Runner Blade Servomotor Cylinder (Optional)

Within fifteen (15) days after Government acceptance of the Internal Hub Components Dimensional Report (Section 48 13 13.01 26)

0007AC

Bore and Hone Runner Blade Servomotor Cylinder (Optional)

Within fifteen (15) days after Government acceptance of the Internal Hub Components Dimensional Report (Section 48 13 13.01 26)

No additional time will be allowed

0007AD

Hone One (1) Wicket Gate Servomotor Cylinder (Optional)

Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)

No additional time will be allowed

0007AE

Bore and Hone One (1) Wicket Gate Servomotor Cylinder (Optional)

Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)

No additional time will be allowed

0007AF

Provide One (1) Wicket Gate Servomotor Piston Ring Set (Optional)

Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)

No additional time will be allowed

0007AG

Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts (Optional)

Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)

No additional time will be allowed

0007AH

Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts (Optional)

Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)

No additional time will be allowed

0007AJ

Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts (Optional)

Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)

No additional time will be allowed

0007AK

Install One (1) New Turbine Shaft-to-Runner Coupling Stud (Optional)

Within fifteen (15) days after Government acceptance of the As Found Inspection Report and Refurbishment Recommendations (Section 48 13 13.02 26)

No additional time will be allowed

0007AL

Thrust Shoes Phase 2 Inspections (Optional)

Within fifteen (15) days after Government acceptance of the Phase 1 Inspection Report (Section 48 13 13.06 26)

No additional time will be allowed

0007AM

Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and Machining (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Shoes Phase 2 Inspection Report (Section 48 13 13.06 26)

0007AN

Thrust Runner and Thrust Collar Phase 2 Inspections (Optional)

Within fifteen (15) days after Government acceptance of the Phase 1 Inspection Report (Section 48 13 13.06 26)

No additional time will be allowed

0007AP

Complete Refurbishing of Thrust Runner (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

Thirty (30) days

0007AQ

Resurface the Running Surface of the Runner (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

Thirty (30) days

0007AR

Resurface the Backside and the Running Surface of the Runner (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

Thirty (30) days

0007AS

Provide New Thrust Runner Keys (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

Thirty (30) days No additional time will be allowed

0007AT

Provide New Thrust Runner Bolts (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

No additional time will be allowed

0007AU

Refurbish Thrust Bearing Collar (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

Sixty (60) days

0007AV

Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining (Optional)

Within fifteen (15) days after Government acceptance of the Turbine Guide Bearing Site Inspection Report (Section 48 13 13.07 26)

No additional time will be allowed

0007AW

Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including Babbitting and Machining (Optional)

Within fifteen (15) days after Government acceptance of the Generator Guide Bearing Site Inspection Reports (Section 48 13 13.07 26)

No additional time will be allowed

0007AX

Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including Babbitting and Machining (Optional)

Within fifteen (15) days after Government acceptance of the Generator Guide Bearing Site Inspection Reports (Section 48 13 13.07 26)

0009AA

Hub (Optional)

Within fifteen (15) days of acceptance of Unit B No additional time will be allowed

0009AB

Hone Runner Blade Servomotor Cylinder (Optional)

Within fifteen (15) days after Government acceptance of the Internal Hub Components Dimensional Report (Section 48 13 13.01 26)

No additional time will be allowed

0009AC

Bore and Hone Runner Blade Servomotor Cylinder (Optional)

Within fifteen (15) days after Government acceptance of the Internal Hub Components Dimensional Report (Section 48 13 13.01 26)

No additional time will be allowed

0009AD

Hone One (1) Wicket Gate Servomotor Cylinder (Optional)

Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)

No additional time will be allowed

0009AE

Bore and Hone One (1) Wicket Gate Servomotor Cylinder (Optional)

Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)

No additional time will be allowed

0009AF

Provide One (1) Wicket Gate Servomotor Piston Ring Set (Optional)

Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)

No additional time will be allowed

0009AG

Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts (Optional)

Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)

No additional time will be allowed

0009AH

Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts (Optional)

Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)

No additional time will be allowed

0009AJ

Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts (Optional)

Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)

0009AK

Install One (1) New Turbine Shaft-to-Runner Coupling Stud (Optional)

Within fifteen (15) days after Government acceptance of the As Found Inspection Report and Refurbishment Recommendations (Section 48 13 13.02 26)

No additional time will be allowed

0009AL

Thrust Shoes Phase 2 Inspections (Optional)

Within fifteen (15) days after Government acceptance of the Phase 1 Inspection Report (Section 48 13 13.06 26)

No additional time will be allowed

0009AM

Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and Machining (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Shoes Phase 2 Inspection Report (Section 48 13 13.06 26)

No additional time will be allowed

0009AN

Thrust Runner and Thrust Collar Phase 2 Inspections (Optional)

Within fifteen (15) days after Government acceptance of the Phase 1 Inspection Report (Section 48 13 13.06 26)

No additional time will be allowed

0009AP

Complete Refurbishing of Thrust Runner (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

Thirty (30) days

0009AQ

Resurface the Running Surface of the Runner (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

Thirty (30) days

0009AR

Resurface the Backside and the Running Surface of the Runner (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

Thirty (30) days

0009AS

Provide New Thrust Runner Keys (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

Thirty (30) days No additional time will be allowed

0009AT

Provide New Thrust Runner Bolts (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

No additional time will be allowed

0009AU

Refurbish Thrust Bearing Collar (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

Sixty (60) days

0009AV

Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining (Optional)

Within fifteen (15) days after Government acceptance of the Turbine Guide Bearing Site Inspection Report (Section 48 13 13.07 26)

No additional time will be allowed

0009AW

Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including Babbitting and Machining (Optional)

Within fifteen (15) days after Government acceptance of the Generator Guide Bearing Site Inspection Reports (Section 48 13 13.07 26)

No additional time will be allowed

0009AX

Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including Babbitting and Machining (Optional)

Within fifteen (15) days after Government acceptance of the Generator Guide Bearing Site Inspection Reports (Section 48 13 13.07 26)

0011AA

Hub (Optional)

Within fifteen (15) days of acceptance of Unit C No additional time will be allowed

0011AB

Hone Runner Blade Servomotor Cylinder (Optional)

Within fifteen (15) days after Government acceptance of the Internal Hub Components Dimensional Report (Section 48 13 13.01 26)

No additional time will be allowed

0011AC

Bore and Hone Runner Blade Servomotor Cylinder (Optional)

Within fifteen (15) days after Government acceptance of the Internal Hub Components Dimensional Report (Section 48 13 13.01 26)

No additional time will be allowed

0011AD

Hone One (1) Wicket Gate Servomotor Cylinder (Optional)

Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)

No additional time will be allowed

0011AE

Bore and Hone One (1) Wicket Gate Servomotor Cylinder (Optional)

Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)

No additional time will be allowed

0011AF

Provide One (1) Wicket Gate Servomotor Piston Ring Set (Optional)

Within fifteen (15) days after Government acceptance of the Wicket Gate Servomotor Inspection Report (Section 48 13 13.03 26)

0011AG

Provide One (1) Set of Outer Head Cover Tie Down Studs and Nuts (Optional)

Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)

No additional time will be allowed

0011AH

Furnish One (1) Set of Intermediate Head Cover Tie Down Studs and Nuts (Optional)

Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)

No additional time will be allowed

0011AJ

Provide One (1) Set of Inner Head Cover Tie Down Studs and Nuts (Optional)

Within fifteen (15) days after Government acceptance of the Head Cover Studs, Nuts, and Bolts Inspection Report (Section 48 13 13.02 26)

No additional time will be allowed

0011AK

Install One New Turbine Shaft-to-Runner Coupling Stud (Optional)

Within fifteen (15) days after Government acceptance of the As Found Inspection Report and Refurbishment Recommendations (Section 48 13 13.02 26)

No additional time will be allowed

0011AL

Thrust Shoes Phase 2 Inspections (Optional)

Within fifteen (15) days after Government acceptance of the Phase 1 Inspection Report (Section 48 13 13.06 26)

No additional time will be allowed

0011AM

Refurbish One (1) Set of Thrust Bearing Shoes Including Babbitting and Machining (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Shoes Phase 2 Inspection Report (Section 48 13 13.06 26)

No additional time will be allowed

0011AN

Thrust Runner and Thrust Collar Phase 2 Inspections (Optional)

Within fifteen (15) days after Government acceptance of the Phase 1 Inspection Report (Section 48 13 13.06 26)

No additional time will be allowed

0011AP

Complete Refurbishing of Thrust Runner (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

Thirty (30) days

0011AQ

Resurface the Running Surface of the Runner (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

Thirty (30) days

0011AR

Resurface the Backside and the Running Surface of the Runner (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

0011AS

Provide New Thrust Runner Keys (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

Thirty (30) days No additional time will be allowed

0011AT

Provide New Thrust Runner Bolts (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

No additional time will be allowed

0011AU

Refurbish Thrust Bearing Collar (Optional)

Within fifteen (15) days after Government acceptance of the Thrust Runner and Thrust Collar Phase 2 Inspection Report (Section 48 13

13.06 26)

Sixty (60) days

0011AV

Refurbish One (1) Turbine Guide Bearing Including Babbitting and Machining (Optional)

Within fifteen (15) days after Government acceptance of the Turbine Guide Bearing Site Inspection Report (Section 48 13 13.07 26)

No additional time will be allowed

0011AW

Refurbish One (1) Set of Upper Generator Guide Bearing Shoes Including Babbitting and Machining (Optional)

Within fifteen (15) days after Government acceptance of the Generator Guide Bearing Site Inspection Reports (Section 48 13 13.07 26)

No additional time will be allowed

0011AX

Refurbish One (1) Set of Lower Generator Guide Bearing Shoes Including Babbitting and Machining (Optional)

Within fifteen (15) days after Government acceptance of the Generator Guide Bearing Site Inspection Reports (Section 48 13 13.07 26)

0012AA

Generating Unit Operational Testing, Alignment, and Disassembly (Optional)

Within seventy five (75) days of acceptance of Unit C

Three hundred thirty

(330) days

0012AB

Generator Inspection, Testing, and Cleaning (Optional)

Concurrent with the exercise of CLIN 0012AA No additional time will be allowed

0012AC

Generating Unit Reassembly, Alignment, and Operational Testing (Optional)

Concurrent with the exercise of CLIN 0012AA

0012AD

Disassembly, Repair, and Reassembly of Turbine Runner (Optional)

Concurrent with the exercise of CLIN 0012AA No additional time will be allowed

0012AE

Redundant Hub Oil Seal Modifications (Optional)

Concurrent with the exercise of CLIN 0012AA No additional time will be allowed

0012AF

Refurbish Wicket Gate Operating Mechanism (Optional)

Concurrent with the exercise of CLIN 0012AA No additional time will be allowed

0012AG

Provide Oil Head Bushings (Optional)

Concurrent with the exercise of CLIN 0012AA No additional time will be allowed

0012AH

Clean, Inspect, and Refurbish Automatic Air Valves, Gate Valves, and Piping (Optional)

Concurrent with the exercise of CLIN 0012AA No additional time will be allowed

0012AJ

Main Shaft Packing Box and Oil Sump Inspection and Refurbishment (Optional)

Concurrent with the exercise of CLIN 0012AA No additional time will be allowed

0012AK

Provide New Turbine Shaft Sleeve (Optional)

Concurrent with the exercise of CLIN 0012AA No additional time will be allowed

0012AL

Provide Inner Head Cover Seat Ring (Optional)

Concurrent with the exercise of CLIN 0012AA No additional time will be allowed

0012AM

Disassemble, Inspect, Reassemble, and Test Two (2) Wicket Gate Servomotors (Optional)

Concurrent with the exercise of CLIN 0012AA No additional time will be allowed

0012AN

Provide Two (2) Wicket Gate Servomotor Piston Rod Bushings (Optional)

Concurrent with the exercise of CLIN 0012AA

0012AP

Chrome Plate Two (2) Wicket Gate Servomotor Piston Rods (Optional)

Concurrent with the exercise of CLIN 0012AA No additional time will be allowed

0012AQ

Thrust Bearing…