Bid_Abstract_16-B-0006.pdf
PDF 56 KB Posted
- Attached to
- Oregon Coast Clamshell Maintenance Dredging 2016 Federal contract opportunity
- Solicitation number
- W9127N-16-B-0006
About this file
Bid Abstract W9127N-16-B-0006
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amd_0003_W9127N-16-B-0006.pdf | ||
| Amd_0002_W9127N-16-B-0006.pdf | ||
| Amd_0001_W9127N-16-B-0006.pdf | ||
| Solicitation_W9127N-16-B-0006_Specs.pdf | ||
| Solicitation_W9127N-16-B-0006_Plans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NO 2. DATE ISSUED 3. DATE OPENED PAGE 1 OF 1 PAGES
5/2/2016 6/1/2016
4. ISSUING OFFICE
DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE
PORTLAND DISTRICT, CORPS OF ENGINEERS
P.O. BOX 2946
PORTLAND, OR 97208-2946
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
(CHECK A, B, OR C AND COMPLETE NO.1 NO.2 NO.3 NO.4
D, E, AND F.) A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
A. HIRED LABOR
B. REASONABLE CONTRACT B. BID SECURITY
X (WITHOUT PROFIT) 20% of bid price 20% of bid price 20% of bid price 20% of bid price
C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED ADDENDA ACKNOWLEDGED ADDENDA ACKNOWLEDGED (INCLUDING PROFIT) Amd. 0001 through 0003 Amd. 0001 through 0003 Amd. 0001 through 0003 Amd. 0001 through 0003
6. NUMBER OF ADDENDA ISSUED 2
7A.
ITEM E. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT No. 1 vs IGE No. 2 vs IGE No. 3 vs IGE No. 4 vs IGE
BIG CLIFF DAM BASE LINE ITEMS
0001 Mobilization and Demobilization 1 JOB 982,532.00$ 982,532.00$ 433,000.00$ 433,000.00$ 525,000.00$ 525,000.00$ 1,100,000.00$ 1,100,000.00$ 2,923,000.00$ 2,923,000.00$ -55.9% -46.6% 12.0% 197.5%
Dredging and Placement of Materials; Port Orford
(INFORMATIONAL CLIN)
0002AA First 20,000 Cubic Yards 20000 CY 10.70$ 214,000.00$ 9.00$ 180,000.00$ 8.00$ 160,000.00$ 10.00$ 200,000.00$ 19.20$ 384,000.00$ -15.9% -25.2% -6.5% 79.4% 0002AB Over 20,000 Cubic Yards 10000 CY 10.46$ 104,600.00$ 6.00$ 60,000.00$ 6.85$ 68,500.00$ 10.00$ 100,000.00$ 23.10$ 231,000.00$ -42.6% -34.5% -4.4% 120.8%
Dredging and Placement of Materials; Port Orford (OPTION)
5000 CY 12.10$ 60,500.00$ 6.00$ 30,000.00$ 6.85$ 34,250.00$ 10.00$ 50,000.00$ 23.10$ 115,500.00$ -50.4% -43.4% -17.4% 90.9%
Dredging and Placement of Materials; Charleston
(INFORMATIONAL CLIN)
0004AA First 15,000 Cubic Yards 15000 CY 11.05$ 165,750.00$ 9.00$ 135,000.00$ 7.50$ 112,500.00$ 10.00$ 150,000.00$ 25.10$ 376,500.00$ -18.6% -32.1% -9.5% 127.1% 0004AB Over 15,000 Cubic Yards 5000 CY 11.28$ 56,400.00$ 8.00$ 40,000.00$ 7.40$ 37,000.00$ 10.00$ 50,000.00$ 29.70$ 148,500.00$ -29.1% -34.4% -11.3% 163.3%
Dredging and Placement of Materials; Baker Bay
(INFORMATIONAL CLIN)
0005AA First 75,000 Cubic Yards 75000 CY 9.15$ 686,250.00$ 7.00$ 525,000.00$ 8.40$ 630,000.00$ 8.00$ 600,000.00$ 13.80$ 1,035,000.00$ -23.5% -8.2% -12.6% 50.8% 0005AB Over 75,000 Cubic Yards 25000 CY 9.40$ 235,000.00$ 8.00$ 200,000.00$ 8.30$ 207,500.00$ 8.00$ 200,000.00$ 18.60$ 465,000.00$ -14.9% -11.7% -14.9% 97.9%
Dredging and Placement of Materials; Baker Bay (OPTION)
20000 CY 12.28$ 245,600.00$ 7.00$ 140,000.00$ 8.00$ 160,000.00$ 8.00$ 160,000.00$ 13.80$ 276,000.00$ -43.0% -34.9% -34.9% 12.4%
Dredging and Placement of Materials; Skipanon River
(INFORMATIONAL CLIN)
0007AA First 160,000 Cubic Yards 160000 CY 6.52$ 1,043,200.00$ 5.00$ 800,000.00$ 5.20$ 832,000.00$ 8.00$ 1,280,000.00$ 16.40$ 2,624,000.00$ -23.3% -20.2% 22.7% 151.5% 0007AB Over 160,000 Cubic Yards 40000 CY 6.64$ 265,600.00$ 5.00$ 200,000.00$ 5.20$ 208,000.00$ 8.00$ 320,000.00$ 17.40$ 696,000.00$ -24.7% -21.7% 20.5% 162.0%
Dredging and Placement of Materials; Skipanon River (OPTION) 50000 CY 8.07$ 403,500.00$ 4.00$ 200,000.00$ 4.00$ 200,000.00$ 8.00$ 400,000.00$ 17.40$ 870,000.00$ -50.4% -50.4% -0.9% 115.6%
0009 Government Directed Stand-By (OPTION) 8 HOURS 1,630.97$ 13,047.76$ 500.00$ 4,000.00$ 800.00$ 6,400.00$ 1,000.00$ 8,000.00$ 2,500.00$ 20,000.00$ -69.3% -50.9% -38.7% 53.3% 0010 Government Directed Stand-By (OPTION) 8 HOURS 1,630.97$ 13,047.76$ 500.00$ 4,000.00$ 800.00$ 6,400.00$ 1,000.00$ 8,000.00$ 2,500.00$ 20,000.00$ -69.3% -50.9% -38.7% 53.3% 0011 Government Directed Stand-By (OPTION) 8 HOURS 1,630.97$ 13,047.76$ 500.00$ 4,000.00$ 800.00$ 6,400.00$ 1,000.00$ 8,000.00$ 2,500.00$ 20,000.00$ -69.3% -50.9% -38.7% 53.3%
SUBTOTAL FOR MANDATORY LINE ITEMS 3,753,332.00$ 2,573,000.00$ 2,780,500.00$ 4,000,000.00$ 8,883,000.00$ -31.4% -25.9% 6.6% 136.7% SUBTOTAL FOR OPTIONAL LINE ITEMS 748,743.28$ 382,000.00$ 413,450.00$ 634,000.00$ 1,321,500.00$ -49.0% -44.8% -15.3% 76.5%
4,502,075.28$ 2,955,000.00$ 3,193,950.00$ 4,634,000.00$ 10,204,500.00$ -34.4% -29.1% 2.9% 126.7%
NSN 7540-01-150-0981 1419-101
DLF RES Joint Venture 121 E 31st Street Suite C National City, CA 91950
B. BID SECURITY
ABSTRACT OF OFFERS
W9127N-16-B-0006
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.
Oregon Coast Clamshell Maintenance Dredging 2016
7B. DESCRIPTION OF OFFERED ITEM
7C. EST D.
TOTAL
% IGE
ACCEPTANCE LIMITATION - DAYS
INFORMALITIES
J.E. McAmis, Inc.
621 Country Drive Chico, CA 95928
B. BID SECURITY B. BID SECURITY
American Construction Co., Inc.
1501 Taylor Way Tacoma, WA 98421
STANDARD FORM 1419 (10-3)
HME Construction, Inc.
6801 NW Old Lower River Road Vancouver, WA 98660
Sheet1
| 2016-06-02T10:40:01-0700 | |
| BOONE.DAVID.C.1272229755 |
| 2016-06-02T10:56:32-0700 | |
| KOVAR.KIMBERLY.A.1075767583 |
File details come from the government source that posted it. Updated .