Oregon Coast Clamshell Maintenance Dredging 2016 Federal contract opportunity
Solicitation number
W9127N-16-B-0006
Issued by
Department of the Army Corps of Engineers Engineering District Portland

About this file

Bid Abstract W9127N-16-B-0006

View the file

Other files for this federal contract opportunity

Other files attached to Oregon Coast Clamshell Maintenance Dredging 2016, newest first.
File Type Posted
Amd_0003_W9127N-16-B-0006.pdf PDF
Amd_0002_W9127N-16-B-0006.pdf PDF
Amd_0001_W9127N-16-B-0006.pdf PDF
Solicitation_W9127N-16-B-0006_Specs.pdf PDF
Solicitation_W9127N-16-B-0006_Plans.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NO 2. DATE ISSUED 3. DATE OPENED PAGE 1 OF 1 PAGES

5/2/2016 6/1/2016

4. ISSUING OFFICE

DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE

PORTLAND DISTRICT, CORPS OF ENGINEERS

P.O. BOX 2946

PORTLAND, OR 97208-2946

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

(CHECK A, B, OR C AND COMPLETE NO.1 NO.2 NO.3 NO.4

D, E, AND F.) A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

A. HIRED LABOR

B. REASONABLE CONTRACT B. BID SECURITY

X (WITHOUT PROFIT) 20% of bid price 20% of bid price 20% of bid price 20% of bid price

C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED ADDENDA ACKNOWLEDGED ADDENDA ACKNOWLEDGED (INCLUDING PROFIT) Amd. 0001 through 0003 Amd. 0001 through 0003 Amd. 0001 through 0003 Amd. 0001 through 0003

6. NUMBER OF ADDENDA ISSUED 2

7A.

ITEM E. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT No. 1 vs IGE No. 2 vs IGE No. 3 vs IGE No. 4 vs IGE

BIG CLIFF DAM BASE LINE ITEMS

0001 Mobilization and Demobilization 1 JOB 982,532.00$ 982,532.00$ 433,000.00$ 433,000.00$ 525,000.00$ 525,000.00$ 1,100,000.00$ 1,100,000.00$ 2,923,000.00$ 2,923,000.00$ -55.9% -46.6% 12.0% 197.5%

Dredging and Placement of Materials; Port Orford

(INFORMATIONAL CLIN)

0002AA First 20,000 Cubic Yards 20000 CY 10.70$ 214,000.00$ 9.00$ 180,000.00$ 8.00$ 160,000.00$ 10.00$ 200,000.00$ 19.20$ 384,000.00$ -15.9% -25.2% -6.5% 79.4% 0002AB Over 20,000 Cubic Yards 10000 CY 10.46$ 104,600.00$ 6.00$ 60,000.00$ 6.85$ 68,500.00$ 10.00$ 100,000.00$ 23.10$ 231,000.00$ -42.6% -34.5% -4.4% 120.8%

Dredging and Placement of Materials; Port Orford (OPTION)

5000 CY 12.10$ 60,500.00$ 6.00$ 30,000.00$ 6.85$ 34,250.00$ 10.00$ 50,000.00$ 23.10$ 115,500.00$ -50.4% -43.4% -17.4% 90.9%

Dredging and Placement of Materials; Charleston

(INFORMATIONAL CLIN)

0004AA First 15,000 Cubic Yards 15000 CY 11.05$ 165,750.00$ 9.00$ 135,000.00$ 7.50$ 112,500.00$ 10.00$ 150,000.00$ 25.10$ 376,500.00$ -18.6% -32.1% -9.5% 127.1% 0004AB Over 15,000 Cubic Yards 5000 CY 11.28$ 56,400.00$ 8.00$ 40,000.00$ 7.40$ 37,000.00$ 10.00$ 50,000.00$ 29.70$ 148,500.00$ -29.1% -34.4% -11.3% 163.3%

Dredging and Placement of Materials; Baker Bay

(INFORMATIONAL CLIN)

0005AA First 75,000 Cubic Yards 75000 CY 9.15$ 686,250.00$ 7.00$ 525,000.00$ 8.40$ 630,000.00$ 8.00$ 600,000.00$ 13.80$ 1,035,000.00$ -23.5% -8.2% -12.6% 50.8% 0005AB Over 75,000 Cubic Yards 25000 CY 9.40$ 235,000.00$ 8.00$ 200,000.00$ 8.30$ 207,500.00$ 8.00$ 200,000.00$ 18.60$ 465,000.00$ -14.9% -11.7% -14.9% 97.9%

Dredging and Placement of Materials; Baker Bay (OPTION)

20000 CY 12.28$ 245,600.00$ 7.00$ 140,000.00$ 8.00$ 160,000.00$ 8.00$ 160,000.00$ 13.80$ 276,000.00$ -43.0% -34.9% -34.9% 12.4%

Dredging and Placement of Materials; Skipanon River

(INFORMATIONAL CLIN)

0007AA First 160,000 Cubic Yards 160000 CY 6.52$ 1,043,200.00$ 5.00$ 800,000.00$ 5.20$ 832,000.00$ 8.00$ 1,280,000.00$ 16.40$ 2,624,000.00$ -23.3% -20.2% 22.7% 151.5% 0007AB Over 160,000 Cubic Yards 40000 CY 6.64$ 265,600.00$ 5.00$ 200,000.00$ 5.20$ 208,000.00$ 8.00$ 320,000.00$ 17.40$ 696,000.00$ -24.7% -21.7% 20.5% 162.0%

Dredging and Placement of Materials; Skipanon River (OPTION) 50000 CY 8.07$ 403,500.00$ 4.00$ 200,000.00$ 4.00$ 200,000.00$ 8.00$ 400,000.00$ 17.40$ 870,000.00$ -50.4% -50.4% -0.9% 115.6%

0009 Government Directed Stand-By (OPTION) 8 HOURS 1,630.97$ 13,047.76$ 500.00$ 4,000.00$ 800.00$ 6,400.00$ 1,000.00$ 8,000.00$ 2,500.00$ 20,000.00$ -69.3% -50.9% -38.7% 53.3% 0010 Government Directed Stand-By (OPTION) 8 HOURS 1,630.97$ 13,047.76$ 500.00$ 4,000.00$ 800.00$ 6,400.00$ 1,000.00$ 8,000.00$ 2,500.00$ 20,000.00$ -69.3% -50.9% -38.7% 53.3% 0011 Government Directed Stand-By (OPTION) 8 HOURS 1,630.97$ 13,047.76$ 500.00$ 4,000.00$ 800.00$ 6,400.00$ 1,000.00$ 8,000.00$ 2,500.00$ 20,000.00$ -69.3% -50.9% -38.7% 53.3%

SUBTOTAL FOR MANDATORY LINE ITEMS 3,753,332.00$ 2,573,000.00$ 2,780,500.00$ 4,000,000.00$ 8,883,000.00$ -31.4% -25.9% 6.6% 136.7% SUBTOTAL FOR OPTIONAL LINE ITEMS 748,743.28$ 382,000.00$ 413,450.00$ 634,000.00$ 1,321,500.00$ -49.0% -44.8% -15.3% 76.5%

4,502,075.28$ 2,955,000.00$ 3,193,950.00$ 4,634,000.00$ 10,204,500.00$ -34.4% -29.1% 2.9% 126.7%

NSN 7540-01-150-0981 1419-101

DLF RES Joint Venture 121 E 31st Street Suite C National City, CA 91950

B. BID SECURITY

ABSTRACT OF OFFERS

W9127N-16-B-0006

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.

Oregon Coast Clamshell Maintenance Dredging 2016

7B. DESCRIPTION OF OFFERED ITEM

7C. EST D.

TOTAL

% IGE

ACCEPTANCE LIMITATION - DAYS

INFORMALITIES

J.E. McAmis, Inc.

621 Country Drive Chico, CA 95928

B. BID SECURITY B. BID SECURITY

American Construction Co., Inc.

1501 Taylor Way Tacoma, WA 98421

STANDARD FORM 1419 (10-3)

HME Construction, Inc.

6801 NW Old Lower River Road Vancouver, WA 98660

Sheet1

2016-06-02T10:40:01-0700
BOONE.DAVID.C.1272229755
2016-06-02T10:56:32-0700
KOVAR.KIMBERLY.A.1075767583