Amd_0001_W9127N-16-B-0006.pdf

PDF 8 MB Posted

Attached to
Oregon Coast Clamshell Maintenance Dredging 2016 Federal contract opportunity
Solicitation number
W9127N-16-B-0006
Issued by
Department of the Army Corps of Engineers Engineering District Portland

About this file

Amendment 0001 W9127N-16-B-0006

View the file

Other files for this federal contract opportunity

Other files attached to Oregon Coast Clamshell Maintenance Dredging 2016, newest first.
File Type Posted
Bid_Abstract_16-B-0006.pdf PDF
Amd_0003_W9127N-16-B-0006.pdf PDF
Amd_0002_W9127N-16-B-0006.pdf PDF
Solicitation_W9127N-16-B-0006_Specs.pdf PDF
Solicitation_W9127N-16-B-0006_Plans.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

As an amendment to the solicitation the follow ing changes are made:

1. All reference attachments w ithin the specifications package are hereby replaced w ith the attached updated versions, w hich are incorporated in full.

2. The "Bid Opening" provision in Section 00100 Instructions to Bidders is updated to reflect new information regarding the location of the bid opening.

3. The bid opening date is unchanged.

See Continuation Pages for additional information.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-May-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-16-B-0006

X 9B. DATED (SEE ITEM 11)

02-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-May-2016

CODE

US ARMY CORPS OF ENGINEERS

333 SW 1ST AVE

PORTLAND OR 97204-3440

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N-16-B-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The 'issued by' organization has changed from

US ARMY CORPS OF ENGINEERS - CECT-NWP

333 SW FIRST AVE

PORTLAND OR 97204-3495

to

US ARMY CORPS OF ENGINEERS

333 SW 1ST AVE

PORTLAND OR 97204-3440

SECTION 00100 - BIDDING SCHEDULE / INSTRUCTIONS TO BIDDERS

The following have been modified:

BID OPENING

The bid opening will be held in the 1st/ground floor conference room of the Block 300 Building, 333 S.W. First Avenue, Portland, Oregon.

NOTICE:

Allow adequate time for arrival. Bids will not be accepted from company representative(s) who are in the building, but not in the bid room by 2:00 PM. The bid must be in the bid room prior to closing of the door.

Those planning to attend the bid opening are requested to send an e-mail to the individual below. In the email subject line use title, “OREGON COAST CLAMSHELL MAINTENANCE DREDGING 2016 BID OPENING”

It is requested that the following information be included in that e-mail.

FULL NAME

COMPANY

If more than one individual from one company is attending, then the above information is requested for each person attending.

Send your attendance email to: david.c.boone@usace.army.mil

If you do not receive an e-mail confirmation that your information has been received then call 503-808-4614 and ask for David Boone or have the individual answering the phone assist you.

(End of Summary of Changes)

TOC-1

G2eccecc Note Marked set by G2eccecc

TOC-2

Below are samples of the construc-tion project identification sign showing how this panel is adapt-able for use to identify either military or civil works projects and the Corps of Engineers signature.

The graphic format for this 4’x 6’ sign panel follows the legend guidelines and layout as specified below. The large 4’ x 4’ section of the panel on the right is to be white with black legend. The 2’ x4’ section of the sign on the left with the full Corps signature (reverse version) is to be screen printed Communications Red on the white background.

Legend Group 1:

One- to two-line description of Corps relationship to project.

Color: White Typeface: 1.25" Helvetica Regular Maximum line length: 19”

Legend Group 2:

Division or District Name (optional).

Placed below 10.5” Reverse Signature (6” Castle).

Color: White Typeface: 1.25” Helvetica Regular

Legend Group 3:

One to three-line project title legend describes the work being done under this Contract.

Color: Black Typeface: 3” Helvetica Regular Maximum line length: 42”

Legend Group 4:

One to two-line identification of project or facility (civil works) or name of sponsoring department (Military) Color: Black Typeface: 1.5” Helvetica Regular Maximum line length: 42”

Cross-align the first line of Legend Group 4 with the first line of the Corps Signature (U.S. Army Corps) as shown.

Legend Group 5a-b:

One to five-line identification of prime contractors including: type (architect, general contractor, etc.), corporate for firm name, city, state. Use of Legend Group 5 is optional.

Color: Black Typeface: 1.25” Helvetica Regular Maximum line length: 21”

All typography is flush left and rag right, upper and lower case with initial capitals only as shown.

Letter- and word-spacing to follow Corps standards.

Project Identification Sign

Feedwater Pumps and Piping for Building 195

Design and Construction Supervised by:

US Army Corps of Engineers®

Portland District

Fort Eustis, Virginia

6"

4.5"

4.5"

6"

2.25"

9.5"

1.875" 1.875" 1.875" 1.875"

7.75"

3" 3" 3"21" 42"

4.5"

2"

6.25"

10.5"

2.5"

Architects:

Williams-Russell & Associates Atlanta, Georgia

Sponsored by U.S. Air Force Tactical Air Command

Contractor:

Fenwick Associates, Inc.

Athens, Georgia

3" 21" 1" 21" 2"

US Army Corps of Engineers®

Portland District

6"

1.25"

1.25"

1.25"

1.5"

1.5"

.5"

REPLACED IN ITS ENTIRETY

A1-1

AMD# 0001

Contract No.:

Reference Meets 385 1-1 Remarks

(Section) (Yes/No) (If Non Applicable or marked No, explain in detail)

05.A

05.G

05.J.03

05.J.04

05.K

07.A.07

07.A.8

09.A.06

09.B.18

09.G

11.G

14.C

15.A.05

15.A.07

15.B

16.A.02

Each employer shall furnish to each of its employees, employment, and place of employment, which are free from hazards (PL 91-596).

Note: Paragraph references in this table refers to paragraphs in EM 385-1-1 (15 September 2008).

Date of QC Inspection:

FLOATING PLANT INSPECTION CHECKLIST

United States Coast Guard Certificate of Inspection - Expiration Date:

Stability Letter - Date Issued:

Contractor's Representative:

Representatives Title:

Contractor Name:

Clamshell

NOTE: This is a checklist only and does not include ALL pertinent safety requirements. For detailed requirements, refer to EM 385-1-1, 15 September 2008

Items

14. Running Lines within 6ft-6in

17. Cranes or hoisting equipment inspected, tested and certified in writing prior to being placed in use (Attach certification)

16. Rigging personnel qualifications

15. Custom designed beams, clamp, etc, must be tested and marked

12. Housekeeping (Attach most recent daily inspection report)

(Brief description)

8. All sources of ignition shall be prohibited within 50 feet of operations with potential fire hazard

2. Respiratory protection program (Attach training records and Medical evaluations)

1. Personal Protective and Safety Equipment (Attach training records)

13. Rigging inspections

9. Storage areas/tanks shall be surrounded by a curb, earthen dike or other equivalent means of containment of at least 6 in (.15 m) in height

11. Batteries and Battery Charging

10. Firefighting Equipment

5. Lifesaving and Safety Skiff

4. PDF automatically activated light

3. All wearable PFDs shall be of a highly visible orange/redish color

7. Work performed at night, a night operations lighting plan shall be developed (Attach Plan)

6. Lamps for general illumination shall be protected from accidental contact of breakage

A2-1

(Section) (Yes/No) (If Non Applicable or marked No, explain in detail)

16.A.12

16.A.15

16.B

16.B.03 (b)(6)

16.B.06

16.D

16.D.02

16.D.10

16.E

16.F.02

16.F.03

16.G.01

16.G.09 (b)(2)

16.I.01

16.L

16.L.06

16.L.08

16.T

18.G.02

19.A.01

19.A.07 (J)

19.B.02

19.B.04 (b)

19.A.05(h)

41. For floating plant with internal combustion engines, marine quality listed CO monitors shall be installed and maintained

36. machinery and mechanized equipment must be inspected and tested in accordance with the manufacturer's recommendations and requirement of this manual and certified in writing (Attach documents)

22. Operator physical qualifications/ Examination (Attach written/ signed documentation for acceptance prior to operating a crane)

24. Records of crane and hoisting equipment and inspections (Attach records)

23. Inspection Criteria for Cranes and Hoisting Equipment (Attach all inspection logs that apply, but no less than a Periodic inspection)

26. Safety Devices and Operational Aids required on all Cranes and Derricks

33. Safety devices and operational aids

34. Additional inspection requirements for barges, pontoons, vessel or other means of flotation used to support a land crane/Derrick

Items

(Brief description)

19. Maintenance/repairs of cranes and Hoisting equipment (Attach recent records of maintenance and repairs)

35. Crane -Supported personnel platforms: work platform and suspension system shall be designed and certified by a registered professional engineer

37. All floating plant regulated by the USCG shall have required USCG documentation that is current (Attach Documents)

39. Access to/from vessels

40. Two means of escape shall be provided for normal work, assembly, sleeping, and messing areas on floating plants

32. Floating Cranes/ Derricks, Crane Barges, and Auxiliary shipboard mounted Cranes (Attach Navel Architectural analysis for load rating)

38. Stumbling and tripping hazards must be painted yellow

27. Operational Testing

28. Load Testing

29. All Cranes and hoisting equipment shall have the following documents in the cab at all times they are to be operated:

30. Accessible areas within the swing radius of the crane or hoisting equipment , shall be barricaded to prevent an employee from being struck or crushed

31. Projects shall have adequate means for monitoring local weather conditions, including a wind-indicating device

21. Crane Operators certified by option 2: 16.B.03 (b) (Attach records of Audits)

20. Personnel Qualifications of all crane Operators (Attach proof of qualifications prior to start of work)

18. Work area control in accessible areas where equipment is rotating

25. Periodic Inspection (Attach Records)

A2-2

(Section) (Yes/No) (If Non Applicable or marked No, explain in detail)

19.A.05 (j)

19.A.06

19.C.01

19.D.07

19.E

20.A

20.D

21.H

21.M

24.B

24.C

34.A.04

34.A.05 (a)

34.A.06

34.B

49. Personal Fall protection Systems (Attach Inspection documentation)

50. Rescue plan and procedures (Attach Rescue plan and procedure)

44. Railings

43 .Fuel Systems and Fuel Transfers

Items

(Brief description)

56. Work performed in confined and enclosed spaces on ships and vessels

52. Handrails

51. The Construction, installation, and use of Ladders

55. Confined Space Program Elements

53. Confined space identification (Attach the list of confined spaces)

42. Escape hatches and emergency exits shall be marked on both sides with letters, at least 1 in (2.5 cm) high, stating "EMERGENCY EXIT - KEEP

CLEAR."

54. Identification and Labeling confined space

46. Marine Railing types

47. Pressurized Equipment and Systems (Attach inspection and Test logs)

48. Compressed Gas Cylinders

45. Small boats with length 26 ft or less shall be provided with integrated combinations

A2-3

REPLACED IN ITS ENTIRETY A3-1 AMD# 0001

REPLACED IN ITS ENTIRETY A4-1 AMD# 0001

DAILY REPORT OF OPERATIONS – PIPELINE, DIPPER, OR BUCKET OPERATIONS CONTRACT NO:

TO: CONTRACTOR DATE(S) REPORT NO:

CONTRACT DAY:

NAME: AUTHORIZED

DIMENSIONS

WIDTH: DEPTH

PROJECT AND BAR

LOCATION (include station no.): OVERDEPTH:

PIPELINE: DIPPER OR BUCKET: NAME AND TYPE SIZE

in. dia. disch. cy. cap.

HORSEPOWER

OF

DREDGE

PUMP:

SUCTION

PIPE JET:

CUTTER

OR BUCKET:

PROPULSION:

NUMBER OF CREW MEMBERS WORK SCHEDULE

DREDGE

Dredge: Shore: Other: Total: Shifts per day: Days per week

CHANNEL CONDITION

AVERAGE

D E P T H

BEFORE

DREDGING

AFTER

DREDGING

MINIMUM

SOU

NDI

NG

BEFORE

DREDGING:

AFTER

DREDGING:

GRAVEL MUD STONE DISTRIBUTION OF TIME

SAND CLAY HARDPAN

CHARACTER

OF

MATERIAL AND

PERCENTAGE SILT OTHERS:

EFFECTIVE WORKING TIME

(chargeable to cost of work) HOURS MIN

WORK PERFORMED PUMPING OR DREDGING

ITEM UNIT QTY BOOSTER (in line)

AVERAGE WIDTH OF CUT FEET NONE-EFFECTIVE WORKING TIME

TOTAL ADVANCE THIS PERIOD FEET HANDLING PIPE LINES

TOTAL ADVANCE PREVIOUS TO THIS PERIOD FEET HANDLING ANCHOR LINES

TOTAL ADVANCE TO DATE FEET CLEARING PUMP AND PIPE LINE

FLOATING PIPE: SHORE PIPE: CLEARING CUTTER OR SUCTION HEAD

TOTAL LENGTH OF DISCHARGE PIPE FEET WAITING FOR SCOWS

AVERAGE LIFT FEET TO AND FROM WHARF OR ANCHORAGE

AVERAGE PUMP SPEED R.P.M. CHANGING LOCATION OF PLANT ON JOB

AVERAGE DREDGED PER PUMP HOUR, GROSS CU.YD. LOSS DUE TO OPPOSING NATURAL ELEM.

SCOWS LOADED NUMBER LOSS DUE TO PASSING VESSELS

AVERAGE LOAD PER SCOW CU. YD. SHORE LINE AND SHORE WORK

CUBIC YARDS REMOVED WAITING FOR BOOSTER

AMOUNT DREDGED THIS PERIOD: MINOR OPER. REPAIRS (explain below)

(1) GROSS (computed amount) WAITING FOR ATTENDANT PLANT

(2) CREDITED (pay place) PREPARATION AND MAKING UP TOW

AMOUNT PREVIOUSLY REPORTED: TRANSFERRING PLAN BETWEEN WORKS

(1) GROSS (computed amount) LAY TIME OFF SHIFT AND SATURDAYS

(2) CREDITED (pay place) SUNDAYS AND HOLIDAYS

AMOUNT DREDGED TO DATE: FIRE DRILL

(1) GROSS (computed amount) MISCELLANEOUS (explain below)

(2) CREDITED (pay place) TOTAL NON-EFFECTIVE WORKING TIME

ATTENDANT PLANT

ITEM NAME OR NUMBER HOURS

TOTAL EFFECTIVE AND NON-EFFECTIVE

TIME

(chargeable to cost of work)

LOST TIME

(chargeable to cost of work)

Has anything developed which might lead to a change order or claim: MAJOR REPAIRS AND ALTERATIONS

CESSATION

COLLISIONS

MISCELLANEOUS

TOTAL LOST TIME:

TOTAL TIME IN PERIOD

ALL WORK PERFORMED DURING THIS PERIOD COMPLIES WITH THE CONTRACT SPECIFICATIONS AND DRAWINGS:

TITLE SIGNATURE

A5-1

A-4-2

INSTRUCTIONS FOR THE PREPARATION OF NPP FORM 430 (FACSIMILE)

REPORT OF OPERATIONS FOR PIPELINE, DIPPER, OR BUCKET DREDGES

General.

In order to standardize the data submitted on the Report of Operations, NPP Form 430 (facsimile), the following definition and instructions have been prepared. The reporting day will be 24 hours starting at midnight. Items considered self-explanatory have been omitted.

1. CONTRACT OR DREDGING ORDER

a. Number: The contract number for the work being report.

b. To: COR, Portland District

c. REPORT NO. Reports will be numbered consecutively. The first figure is in the report number. The second figure is the number of days since receipt of Notice to Proceed.

2. PROJECT AND BAR

a. Name: The name of the project and the bar or sheet number (not file number) of the map used, (C&LW, Wauna Bar; Coos Bay, Sheet 3P, etc.).

b. Authorized Dimensions:

1. Width: The standard channel width, not including widening for turns.

2. Depth: project or contract depth as applicable.

3. Overdepth: The depth, beyond contract project or contract depth, for which yardage will be credited.

c. Location: The exact location of the work performed (beginning and ending station number designation of cut, etc.). Do not include skipped areas.

3. DREDGE

a. Name and Type: Name of dredge and type of main power.

b. Pipeline Size: Inside diameter of discharge pipe.

c. Dipper or Bucket: Indicate whether dipper or bucket by striking out inapplicable phrase, show of capacity in cubic yards.

d. Horsepower of: Horsepower of the engine or motor supplying power to the listed items.

e. Number of Crew Members: Include all shifts and personnel per shift.

4. CHANNEL CONDITION

a. Average Depth:

1. Before Dredging: The average depth of the reported area from the pre-dredge survey.

2. After dredging: The average depth after dredging.

b. Minimum Sounding Before and After Dredging: Report only unusual conditions (rock pinnacles, sinker left in channel, etc.) where required depth was purposely not achieved.

Explain in remarks.

5. CHARACTER OF MATERIAL AND PERCENTAGE

Show estimated percentage of each type of material encountered during reporting period.

A5-2 g2odncpo Typewritten Text

Typewritten Text

Rectangle

A-4-3

6. WORK PERFORMED

a. Average Width of Cut: Identify the average width of cut for the location shown in PROJECT AND BAR. DO NOT include overswing to dig side slopes.

b. Advance This Period: The amount of advance in cut to the nearest 10 feet. Areas skipped or jumped shall not be reported as advance.

c. Advance Previous to This Period: Total Advance to Date from preceding report. Start over with zero for each bar.

d. Pipe: Record the length of each type in the spaces provided.

e. Average Lift: The average lift to the highest point of the discharge pipe during the reporting day as measured from the water surface.

f. Average Pump Speed: The average r.p.m. at which the pump was running while moving material.

g. Average Dredged per Pumping Hour, Gross: The quantity recorded below as AMOUNT

DREDGED THIS PERIOD divided by the effective pumping or dredging time for this period, or scow amounts.

7. CUBIC YARD REMOVED

a. Amount Dredged This Period: Record on the GROSS line the Contractor’s estimated cubic yards of material removed and properly disposed of during the reporting day. Record on the CREDITED line the Corps estimate (if different).

b. Amount Previously Reported: The total estimated amount dredged to date from the previous report. Contractor on GROSS, Corps on CREDITED.

c. Total Amount Dredged to Date: The sum of items a and b. Contractor on GROSS, Corps on CREDITED.

8. ATTENDANT PLANT

List all attendant plant performing work on the job, (cats, tugs, etc.) and the number of hours operated.

9. DISTRIBUTION OF TIME

Reporting period is based on 24 hours starting at midnight.

a. Effective Working Time:

1. Pumping or Dredging: Time spent actually dredging material.

2. Booster (in line): Total time booster in operation.

b. Non-Effective Working Time:

1. Handling Pipeline: Time spent adding or removing pipeline or moving pipeline anchors other than in preparation for move to new work site.

2. Handling Anchor Lines: The time spent moving the dredge swing anchor lines and quarter lines for advance in cut. Time spent taking in anchors for move to new bar should be shown under “Preparation and making up tows.”

3. To and From Wharf or Anchorage: The time spent getting the dredge in and out of the channel, at the beginning and end of a job, and for any normal lay periods.

4. Changing Location of Plant on Job: Time used in making jumps and moving to new cuts on the same bars.

5. Loss due to Opposing Natural Elements: The time that operation is not possible due to adverse natural elements. Also, time spend moving dredge to safe location, returning to work site, repairs, etc. when caused by adverse weather.

A5-3

Rectangle

HYDRO SURVEY REQUEST

DATE:

DATE RECEIVED:

YES

NO

FWI:

HYDROGRAPHIC TEAM NOTES

DRAFT SPEED SEA WIND

WEATHER CONDITIONS

CLASS ONE COMPARISON

REC'D:

DATE:

date edited

COMPUTATION LIMITS:

COMPUTATION DEPTHS:COMPUTATIONS:

DATE:

GAGE SITE:

EDITED BY:

E-Mailed

SURVEY METHOD:

SURVEY FILE NAME:

COMPS FILE NAME:

TEMPLATE (S):

X-SECTION PLOTS:

CONTOUR DEPTHS: SIDE SLOPE:

VESSEL:

IN-PLACE VOLUME COMPUTATION

TEMPLATE SETTINGS:

NUMBER OF COMPS:

DOWNSTREAM LIMIT: UPSTREAM LIMIT:

Desired Survey Date

PROJECT:

SURVEYED BY:

REQUESTED BY:

Filled Out By USACE

SIDE SLOPE: CONTOUR DEPTH:

X-SECTION

CHANNEL

Comments:

AVERAGE DEVIATION:

Filled Out By Contractor

PRE-DRE

TYPE OF SURVEY :Single Beam

POST-DRE

ACCEPTANCE

AREA:

GAGE READER:

CONTRACT #:

DIFFERENTIAL STATION:

MULTIBEAM

MEAN DEVIATION:

CHECKED BY:

FATHOMETER AND

COMPUTATIONS BY:

DEPTHS

Resident Office Representative:

DATE:

SURVEY FILE NAME:

Date Ready

SPECIAL INSTRUCTIONS

A6-1

Time (2) Station Cut Weather Tide Swell Material Type

Observation of Background (3) 100 feet upcurrent and outside the area of influence (dredging or river disposal)

Discharge Point (4) 10% over background observed (yes/no)

Compliance Point (5) 10% over background observed (yes/no)

Exceedence (6) (yes/no)

Notes:

(1) Separate forms shall be used for each calendar day for dredging and in-bay/river disposal.

(2) Record at a minimum, every two hours, during periods of active dredging or disposal.

(3) Background observations shall include notation whether the water is clear or cloudy at the observation point

(4) The discharge point for dredging is at the location of the bucket; the discharge point for disposal is at the dump scow.

(5) The compliance point is 100 feet down current of the discharge

(6) An exceedence is considered to have occurred only if turbidity is observed to be 10% over background at the compliance point.

(7) The direction of the current (upcurrent versus downcurrent) is determined by surface current.

Time of Published Sunset:

Dredge:

Scow(s) Bucket (Weight/Size/Type):

Turbidity Report

Check One: Dredging‗‗‗‗‗‗‗ or Disposal‗‗‗‗‗‗‗‗

Contract No.:

Date: Time of Published Sunrise:

A7-1

Water Quality Monitoring Log

Clock Validated (hh:mm):

Test Test Load Tidal Channel Dredge Placement Placement Test Time Depth

No. Type No. Stage Dir. (kts) Dir. Height Type Condition WQ Cert. From To Area Type hh:mm:ss (x) (y)

Project Name:

Date (mm/dd/yy): Dredge Order# or Contract #

Dredge Type:

Captain:

Weather

Sunrise/Sunset (hh:mm):

Dredge:

Wind Test Coordinates (NAD83)Seas

Calibration Date (mm/dd/yy):

Dredging RM Adjusted NTU's

NTU Meter Display

Revised on 6/15/06

A8-1

Water Quality Monitoring Log

Time Activity Time Activity

NTU DO State In/Out Stopped Resumed Exceedance

Limit (mg/L) Tested Compliance Of Plume (hh:mm) (hh:mm) Action Taken

- Background

- Background

- Background

- Background

- Background

- Background

- Background

- Background

- Background

- Background

- Background

- Background

- Background

- Background

- Background

- Background

- Background

- Background

- Background

- Background

Revised on 6/15/06

General Remarks

A8-2

3847000 3847500 3848000 3848500

Easting, ft

414800

415300

415800

416300

416800

N or th in g, f t

= Port Orford nav channel

N

Port Orford Dredged Material Disposal Site

CWA 404

800 x 800 ft

Port Orford horz datum = spcs or-s nad83 vert datum = MLLW, ft

Disposal Site is partitioned into 4 cells each 400 x 400 ft

800 ft ft contour interval = 5 ft Bathyemtry = 1 SEP 2015

When recording placement location, material shall be credited to the cell in which the disposal operation is started regardless of the number of cells disposed in.

Each load shall be distributed across no less than 2 cells and 400 ft distance.

No more than 50% of a load shall be placed within any given grid cell.

MAX Volume of dredged material placement Assinged per cell (Kcy = 1,000s cy)

Mounding of dredged material placed on the seabed during 2015 shall be less than 1 ft vertical accumulation

2015 DUMP PLAN # 1

7 kcy 0 kcy

13 kcy 7 kcy

Elevation, ft MLLW

TOTAL Volume of Dredged Material to be Placed within Port Orford CWA-404 site During 2015 = 25,000 cy

TOTAL number of loads = 12, based on a 2,200 CY scow (HME, 14 CY bucket)

Number of LOADS per CELL are shown.

3 0

6 3SAMPLE

A9-1

3886000 3889000 3892000 3895000 3898000 3901000 3904000

Easting, ft

640000

643000

646000

649000

652000

655000

N or th in g, f t Pacific

Ocean typical NS cell size = 500 ft x 500 ft coordinates are SPCS Oregon, south, ft NAD83 elevations are in ft, below MLLW

N or th

S pi t

Halfmoon Bay

Coos Bay Navigation Channel typical OS cell size = 1,000 ft x 1,000 ft

Coos Bay ODMDS Placement Grid

Numbering Sequence

NEARSHORE AREA

OFFSHORE AREA

Cells 78‐80: Initiate placement for 4 loads within each cell.

Cells 87‐92 & 105‐110: Initiate placement for 4 loads within each cell.

Grid cells are used to guide the initial release point for each load of dredged material placed within ODMDS F, to promote uniform deposition of dredged material placement on the seabed

Disposal Plan SC_Charleston_2014‐02SAMPLE

A9-2 g2odntmh Line g2odntmh Line

FLOOD

EBB

OREGON

W

AS

HI

NGTO

N

OREGON

WASHINGTON

DI

KE

.47

DI

KE

.0

M id dl e

D ik e

Fl G

Sa nd I sl an d

Lo w er D ik e

Fl G

Sa nd I sl an d

F L O

O

DE

B B

O R

E G

O N

W A S

H

IN

G T

O N

"11"

"14"

D

IKE B-0.28 D

O L

D

IKE B-0.28 D

O L

D

IK

E B -0 .7

D O L

"12"

+7

52+42

DIKE 4.01

JETTY "A"

FLOOD

EBB

52+80

Entrance Jetty 2, Fl W Baker Bay West Channel

Entrance Jetty 1, Fl G Baker Bay West Channel

Channel 8, Fl W Baker Bay West Channel

Channel 10 Fl R Baker Bay West Channel

Desdemona Sands Channel Fl W

Daybeacon 9 Daybeacon 7

Daybeacon 6

HLM TWO

HEEL

X 7,304,000

Y

,0

Y

,0

Y

,0

X 7,315,000

X 7,320,000

X 7,315,000

Y

,0

X 7,310,000

X 7,310,000

X 7,320,000

Y

,0

Y

,0

Y

,0

/2 /1

Y

X

O F M

V T

IT

A N

A P P

R O

X L O

C A T

IO

N

B

A

C

D

B

A

C

D

1 3 4 5

21 3 4 5

U S

A R

M Y E

N G

IN

E E

R D

IS

T R

IC

T P

O R

T L

A N

D

C O

R P

S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P L

O T

S C

A L E

P L

O T

D A

T E

US ARMY CORPS

OF ENGINEERS

PORTLAND DISTRICT

D A

T E

A P

P R

M A

R K

M A

R K

D A

T E

A P

P R

SCALE IN FEET

N

0 500' 1000' 1500' 2000'

OF YOUR CONTRACT

SAFETY IS A PART

500'

FILE

NAME

D E

S

IG

N E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

A W

A R

D D

A T

E

D E

S

IG

N F

IL

E N

A M

E

S U

B M

IT

T E

D B

Y

C H

IE

F

W A

T E

R W

A Y

S M

A

IN

T S

E C

T

T

Q

R

S

7310850.30 961901.70

7309330.95 962448.96

7307747.52 962766.20

7307924.65 963648.93

7308889.88 963585.59

COORDINATES

PLACEMENT SITE O-3.2-IW

X

Y

Z

W 7317250.75 959962.46

7316180.27 961015.50

7317420.19 962282.45

7318493.91 961226.22

COORDINATES

PLACEMENT SITE W-4.8-IW

X COORDINATE Y COORDINATE

P

X COORDINATE Y COORDINATE

U 7309450.51 963433.90

V 7311057.00 962244.28

APPROXIMATELY 1.1 MILES

SITE O-3.2-IW

TO CENTROID OF PLACEMENT

RM 00+20+00 (BAKER BAY CHANNEL)

DISTANCE FROM

M A

IN

T E

N A

N C

E D

R E

D G

IN

G

W E

S T C

O A

S T C

L A

M S

H E

L L

T M

H

E A

S

T M

H K

A R

L A G E

L L

IS

W

N -1

-C -0

650 feet wide at Ilwaco.

deep and 150 feet side to a mooring basin 10 feet deep, 1,200 feet long and deep water in the Columbia River to mile 0.5 in the bay, thence a channel 16 feet

The existing project provides for a channel 16 feet deep and 200 feet wide from

STAFF GAGE U.S.C.G. BOAT DOCK:Northing: 973042 Easting: 7305497

Reference is Navigation Chart No. 18521

2012 Aerial Photography data source: USDA, Service Center Agenciess to represent the general condition existing at that time.

survey conducted on the date indicated and can only be considered

The information depicted on this map represents the results of a

Commitee, Pacific Northwest River Basins Commission, July 1972.

conforms to the River Mile Index of the Hydrology and Hydraulics

Datum (NAVD 88 Geoid 09) at Columbia River Mile 2.6. River mileage

Low Water. MLLW is 0.22 feet below the North American Vertical

Soundings are shown in feet and indicate depths below Mean Lower

Vertical Datum:

U.S. Survey Feet.

Coordinate System (SPCS), Oregon North Zone. Distance units in

North American Datum of 1983 (NAD83), projected to the State Plane

Horizontal Coordinate System:

NOTES:

LEGEND

Primary Control Point

Coordinated Survey Points

Uncoordinated Survey Points

Dredging Ranges

Flow Arrows

Harbor Lines

State Boundary

Aids to Navigation

Lighthouses

Lights

Lighted Ranges

Lighted Buoys

Unlighted Buoys

Daybeacons

Seasonal Lights and Lighted Dredging Ranges

Benchmarks

Gages Staff Recording

Front Rear

Straight Tidal

River Mileage from Mouth 10

FLOOD

EBB

Port

Rear

Port

Fixed Occulting

Front

Starboard Mid Channel Junction

Starboard 43

Flashing, THE EXISTING PROJECT

-J

U L -1

C O

N T

R A

C T N

O

30-JUL-2015

SURVEY DATE

W-4.8-IW

30-JUL-15

SURVEY DATE

O-3.2-IW

X 7,304,000 Y

,0

Y

,0

Y

Z

W

X

S

R

T

U

V

P

Q

APPROXIMATELY 2.4 MILES

SITE W-4.8-IW

TO CENTROID OF PLACEMENT

RM 00+20+00 (BAKER BAY CHANNEL)

DISTANCE FROM

DISPOSAL SITE O-3.2-IW

USE ON EBB TIDE ONLY

* EBB TIDE DOES NOT INCLUDE SLACK TIDE

MAX FILL: 60% OF MATERIAL FROM BAKER BAY

DISPOSAL SITE W-4.8-IW

USE DURING FLOOD AND SLACK TIDES

MAX FILL: 40% OF MATERIAL FROM BAKER BAY

DISPOSAL PLAN

BAKER BAY

W C

C

B a k e r_

B a y

D is p o s a l_

P la n .D

G N

-A

U G -1

P L

A C

E M

E N

T S

IT

E L

A Y

O U

T D

R A

W

IN

G

O -3 .2 -I

W A

N D W

-4 .8 -I

W

P L

A C

E M

E N

T S

IT

E S

*REPRESENTATIVE DISPOSAL PLAN*

CONTRACTOR SHOULD EXPECT

SIMILARLY DESIGNED DISPOSAL

PLAN FOR SKIPANON WORK

676967

666563

636364

666564

6161615

59595857

535555 575858

606258

65656463

565454

47495151

575960

555558

61616

585655 565552

47464545

444343

484950

535455

555454

51514

454445

444344

505254

565656

484747

474746

454544

565553 535252

484848

464546

495050

56555755

535455

545554

616161

606261615

606161

626161

636363

656566 656564

656562

636261

686667

697068676868

666668

606060

616361

676668

706868

66646464

60585958

A9-3

Ocean and Coastal Management Program Department of Land Conservation and Development

635 Capitol Street, Suite 150 Salem, Oregon 97301-2540

Phone (503) 373-0050

FAX (503) 378-6033

www.oregon.gov/LCD/OCMP

Oregon

John A. Kitzhaber, MD, Governor

May 8, 2014

Ms. Joyce E. Casey U.S. Army Corps of Engineers PO Box 2946 Portland, OR 97208-2946

Re: Federal Consistency Concurrence for Maintenance Dredging at Oregon Coastal Projects

Dear Ms. Casey:

Thank you for your letter of May 1, 2014, requesting that the Department of Land Conservation and Development (DLCD) renew the federal consistency concurrence DLCD issued in 2004 for maintenance dredging at federal navigation projects along the Oregon Coast. The proposed action covers eleven dredging projects at ten sites along the Oregon coast:

• Tillamook Bay

• Depoe Bay

• Yaquina Bay

• Yaquina River

• Siuslaw River

• Umpqua River

• Coos Bay

• Coquille River

• Port Orford

• Rogue River

• Chetco River

The purpose of the ongoing maintenance dredging is to maintain the federally authorized channel depths and widths by periodically removing naturally occurring sediments. Dredging is accomplished by a variety of techniques, including hopper, clamshell, and pipeline dredges.

Dredged materials are disposed of in-water, at shoreline or beach nourishment sites, at upland disposal sites, and at designated ocean dredged material disposal sites.

The actions at all sites are a continuation of dredging and disposal actions that DLCD reviewed for consistency with the Oregon Coastal Management Program (OCMP) in 2004. On August 6, 2004, DLCD concurred that the maintenance dredging and disposal actions are consistent to the maximum extent practicable with the enforceable policies of the Oregon Coastal Management Program, contingent on the use of approved dredged material disposal sites and techniques. The 2004 concurrence requires compliance with any site-specific conditions for use of dredged

A10-1 material disposal sites contained in the applicable local, state, and federal regulations, including timing considerations, adaptive management techniques, and methods of disposal. The 2004 concurrence also incorporates conditions of the Department of Environmental Quality’s 2004 water quality certification.

Over the ten years since DLCD’s 2004 review, the Corps has received additional project information and has refined the project actions accordingly. These refinements, which the April 25, 2014 consistency determination outlines in further detail, include a more accurate quantification of annual dredged material volumes, a clearer understanding of certain site dimensions (and two newly designated ocean sites), a better understanding of the number of dredge barge loads required to move the dredged material to placement sites, and an extended in-water work period in certain areas.

DLCD agrees with the Corps’ determination that the project refinements do not result in substantially different coastal effects than those previously reviewed, and therefore the maintenance dredging program remains consistent to the maximum extent practicable with the OCMP. This concurrence is not time-limited, but rather is tied to the project’s effects on coastal uses and resources. Please notify DLCD if future changes to maintenance dredging and disposal activities at the eleven Oregon Coastal Projects will affect any coastal use or resource substantially different than originally described.

If you have any questions or comments regarding this finding or the consistency review process, please contact me at (503) 934-0029 or by e-mail at: juna.hickner@state.or.us.

Sincerely, /s/

Juna Hickner Coastal State-Federal Relations Coordinator

Cc via electronic correspondence:

Greg Smith, USACE Sara Christensen, DEQ

A10-2 mailto:juna.hickner@state.or.us.

A9-1

A10-3 g2odneas Text Box

A10-4 g2odneas Text Box

A11-1

A11-2

A11-3

A11-4

A11-5

A11-6

A11-7

A11-8

A11-9

A11-10

A11-11

A11-12

A11-13

STATE OF WASHINGTON

DEPARTMENT OF ECOLOGY

PO Box 47600 o Olympia, WA 98504-7600 o 360-407-6000

711 for Washington Relay Service • Persons with a speech clisability can ca/1877-833-6341

February 19,2013

U.S Army Corps of Engineers- Pmi1and District Attn: Joyce Casey P.O. Box 2946 Portland, OR 97208-2946

RE: Water Quality Certification for Columbia River Operation and Maintenance Dredging between River Miles 3.0 to 145.

Dear Ms. Casey:

On November 1, 2012, the United States, Department of the Army, Corps of Engineers, Portland District (Corps) submitted a request to the State of Washington, Department of Ecology (Ecology) for a water quality certification pursuant to § 401 of the Clean Water Act (CWA), 33 U.S.C. § 1341 (CWA § 401) for the above-referenced project.

At this time Ecology is issuing the 401 WQC for a five (5) year period. This letter also serves to notify the Corps that Ecology is rescinding Order number 5652 and any associated amendments effective February 19,2013.

If there are any questions regarding these clarifications, please contact me at 360/407-6976 or Loree' Randall360/407-6068.

~-J(JJk Brenden McFarland, Section Manager Enviromnental Review and Transpmiation Section Shorelands and Environmental Assistance Program ecc: Loree' Randall, Ecology Perry Lund, Ecology Rick Mraz, Ecology Gretchen Smith, Corps by Ce1iified Mail 7010 2780 0000 2503 3488

A12-1

DEPARTMENT OF ECOLOGY

In the Matter of Granting a Water Quality Certification to:

Portland Distdct Corps of Engineers In Accordance with 33 U.S.C. 1341

[FWPCA § 401], RCW 90.48.260, RCW

90.48.120 and WAC 173-201A

TO: U.S. Army Corps of Engineers Attn: Joyce Casey P.O. Box 2946 Pmtland, OR 97208-2946

) ORDER No.# 9765 ) Columbia River Operations and Maintenance ) (O&M) dredging and disposal from river mile ) (RM) 3 and 145, including some side-channel ) dredging.

On November 1, 2012, the Portland District Corps of Engineers (Corps) submitted a request for a 401 water quality certification (401 Certification) from the State of Washington Depal'tment of Ecology (Ecology) pursuant to the provisions of33 U.S.C. 1341 (FWPCA § 401). The Corps request is to continue Operations and Maintenance Dredging (O&M) of Columbia River Federal Navigation Channel between River Miles (RM) 3 to 145.

The proposed projects involves the on-going maintenance dredging of the Columbia River to the federally approved depth of 43-foot between Columbia River mile (CRM) 3.0 to CRM 145. The project also includes dredging various side channels along the river to their federally approved depths.

The dredging and disposal of sediment will occur in both Oregon and Washington. This 401 Certification only authorizes the dredging and disposal of sediment within Washington's waters.

1. Maintenance Dredging

• RM 3.0 to 106.5- Maintenance dredging will occur to a depth of -48 feet (-43 feet with up to 5 feet of advanced maintenance depth) and overwidth dredging of up to 100 feet in selected high volume shoal areas.

• RM 106.5 to 145 - Maintenance dredging to a depth of -19 feet ( -17 feet with up to 2 feet of advanced maintenance depth) and up to 100 feet of over-width dredging where needed.

2. Side-channels

• Baker Bay West Channel dredging to -18 feet and overwidth where needed

• Chinook Channel dredging to -12 feet and overwidth where needed

• Skamokawa Creek dredging to -8.5 feet and overwidth where needed

• Wahkiakum Ferry/Westport Slouh dredging to -12 feet and overwidth where needed

• Old Mouth Cowlitz river dredging to -10 feet and overwidth where needed

A12-2

Water Quality Certification Order No. 9765 Portland District Corps of Engineers February 19,2013 Page2 of!O

AUTHORITIES:

In exercising authority under 33 U.S.C. § 1341, 16 U.S.C. § 1456, RCW 90.48.120, and RCW 90.48.260, Ecology has examined this application pursuant to the following:

I. Conformance with applicable water quality-based, technology-based, and toxic or pretreatment effluent limitations as provided under 33 U.S.C. §1311, 1312, 1313, 1316, and 1317 (FWPCA § 301,302,303,306 and 307);

2. Conformance with the state water quality standards contained in Chapter 173-201A WAC and authorized by 33 U.S.C. §1313 and by Chapter 90.48 RCW and with other applicable state laws; and, ·

3. Conformance with the provision of using all known, available and reasonable methods to prevent and control pollution of state waters as required by RCW 90.48.01 0.

WATER QUALITY CERTIFICATION CONDITIONS:

Through issuance of this Order, Ecology cettifies that it has reasonable assurance that the activity as proposed and conditioned will be conducted in a manner that will not violate applicable water quality standards and other appropriate requirements of state law. In view of the foregoing and in accordance with 33 U.S.C. §1341, RCW 90.48.120, RCW 90.48.260, and Chapter 173-201A WAC, water quality certification is granted to the Applicant subject to the conditions within this Order.

Ecology reserves the option to reassess the terms of this Order and amend or revoke, as necessary, in the event that:

1. new sources of potential contamination are discharged or otherwise stand to significantly affect the quality of sediments dredged from the lower Columbia River navigation channel; or,

2. new information indicates that dredging and/or disposal activities are having a significant adverse impacton water quality or characteristic uses of the lower Columbia River.

Certification ofthis proposal does not authorize the Applicant to exceed applicable state water quality standards (Chapter 173-201A WAC), or sediment quality standards (Chapter 173-204 WAC). Furthermore, nothing in this certification shall absolve the Applicant from liability for contamination and any subsequent cleanup of surface waters, ground waters or sediments occurring as a result of project construction or operations.

I. Duration of Certification

A. This 401 Certification shall become effective on February 19, 2013, and expires on February 18,2018.

A12-3

Water Quality Cettification Order No. 9765

February 19,2013

B. Ecology is also rescinding Order numbers 5652 and any associated amendments effective February 19,2013.

II. In-Water Work Windows

A. In-water work is subject to fishery closure windows within the National Marine Fisheries Service (NMFS) 2012 Biological Opinion (2012 BiOp).

III. Water Quality Monitoring

A. The Corps shall implement the water quality monitoring per the Water Quality Sampling and Monitoring Plan (Plan) prepared by the Corps, dated December 11, 2012. Any changes to this Plan shall be submitted to Ecology for review and approval. Following Ecology's approval the Corps shall comply with the approved, updated Plan.

B. The Corps shall submit the Water Quality Monitoring Reports to Ecology upon request.

C. The Corps shall submit an atmual monitoring report to Ecology. The report must include:

i. monitoring locations;

ii. background levels of turbidity;

iii. turbidity measurements at required intervals and depths;

tv. when/if the dredging or disposal was modified or stopped as a result of exceedances of levels of turbidity;

v. what actions were taken to modify the dredging or disposal if the turbidity were exceeded and/or how long the activity was stopped;

vi. what BMPs were implemented to bring the turbidity levels into compliance; and

vn. when the activity began again.

D. If monitoring results demonstrate that the applicable water quality standards or project performance standards are not being met, Ecology may require additional monitoring.

IV. Dredging

The Corps shall conduct its dredging activities according to the following conditions:

A. The following general condition applies to all dredging activities between Columbia River Mile (CRM) 3 and CRM 145:

1. Dredging operations shall be conducted in a manner that minimizes the disturbance or siltation of adjacent waters and prevents the accidental discharge of petroleum products, chemicals or other toxic or deleterious substances into waters of the State.

B. The following specific conditions apply to the specific dredging activity or the area of the river being dredged:

A12-4

Portland District Corps ofEngineers February 19,2013

1. Clamshell Dredging:

a. Mixing Zone: 900 feet downcurrent from the point of dredging and no more than 150 feet laterally from the vessel.

b. Each pass of a clamshell bucket shall be complete with no material once in the bucket returned to the water.

c. No dumping of partial or full buckets of material back into the project area is allowed.

d. Control the volume, speed, or both of digging passes to minimize siltation.

e. Large debris picked up by a clamshell dredge shall be removed from the dredged sediments prior to disposal at a flowlane disposal sites. Large debris includes old pilings or sinker logs [longer then tiu·ee feet or greater than one foot in diameter], tree stumps, and man-made materials such as scrap metals, car bodies, broken concrete or asphalt and the like.

2. Hopper and Pipeline Dredging:

a. Mixing Zone for Hopper and Pipeline Dredging: 900 feet downcurrent from the point of dredging and no more than 150 feet laterally from the vessel.

b. Hopper and pipeline dredges shall be operated with the intake at or below the surface of the sediments being removed during all periods of operation.

c. Reverse purging of the intake line shall be held to an absolute minimum.

d. If water is pumped through the dragheads to flush out the hopper dredge bins, the heads shall be at least twenty (20) feet below the water surface.

V. Dredged Matel'ial Disposal

The Corps is proposing to dispose of the dredged material at a combination of the following sites: [1] in-water sites, such as re-handling and flow lane sites located in or near the mainstem reaches of the river; [2] shoreline or beach nourislnnent sites, and [3] upland sites.

A. The Corps shall continue to develop and implement a regional sediment management (RSM) program that encompasses this project as well as other Columbia River navigation projects. Highest priority shall be given to placing dredged material at sites that have been identified by state and federal resource agencies as utilizing the material beneficially. When available for use, the Corps shall fully integrate these beneficial use sites into this project.

B. A qualitative assessment of sediments is necessary to determine the suitability of sediments for the disposal options resulting in discharges to waters of the State (of Washington). For this project, the disposal options include flowlane, beach nourislnnent, and upland disposal. The disposal options that will result in discharges of effluent to waters of the state include beach nourislunent and upland disposal.

A12-5

Water Quality Ce1tification Order No. 9765

Febmary 19, 2013

I. All dredge material from the side channels shall be tested for contaminant concentrations before dredging to help determine the appropriate disposal methods.

a. The sampling and analysis plan for each side channel shall be submitted to Ecology for review and approval no less than 90 days prior to a planned dredging event.

b. Testing results shall be provided to Ecology for review and approval prior to dredging.

C. Flow lane Disposal:

The following conditions apply to disposal of dredged material in the flowlane of the Columbia River:

1. Mixing Zone for disposal by hopper, bottom dump scow, or down spout: 900 feet downcurrent from the point of discharge and no more than !50 feet laterally from the vessel.

2. Disposal of material shall be conducted in a manner that prevents mounding of the disposed material.

3. Flowlane disposal by a hopper dredge or a bottom dump scow is approved provided the disposal sites are located:

a. waterward of the minus 20-foot contour, Columbia River Datum (CRD);

and,

b. to the greatest extent practicable, flowlane disposal sites shall be selected so that disposal material (i) disperses into or immediately adjacent to the mainstem navigational channel; (ii) is not likely to cause significantly increased shoaling in downstream side channels or to shoreline facilities such as docks, wharfs, vessel slips and marinas; and (iii) is not likely to cause a significant adverse alteration of bottom habitats critical to the life history of white sturgeon.

4. Ecology will consider the use of alternative methods for flowlane disposal, such as a flat-topped barge unloaded by a small emth mover. However, the use of an alternative disposal method shall require special review and approval by Ecology under this Order prior to usage.

5. Flowlane sites may be used for the disposal of sediments dredged by pipeline provided the dredged material is discharged through a downspout that is lowered at least 20 feet into the water column.

A12-6

Water Quality Ceiiification Order No. 9765 Pmiland District Corps of Engineers February 19, 2013

D. Shoreline Disposal by Pipeline Dredge:

The following conditions apply to pipeline dredging operations that involve the unconfined or partially confined disposal of dredged material on or immediately adjacent to the shoreline. Historically, this manner of disposal has been used primarily for erosion control, such as to protect property or structures, to nourish actively eroding beaches, and to fill fish stranding sites. Shoreline disposal may also be done to enhance, restore or create various riverine habitat features such as a spit or lagoon.

Beach nourishment is the most common shoreline disposal activity and is done by pumping a slurry of sand and water directly onto an actively eroding beach. The sand settles out on the beach while the turbid water or runoff flows back into the river.

1. Mixing Zone: 900 feet downcurrent from the discharge point.

2. Shoreline disposal operations, and particularly beach nourislm1ent, may result in the placement of dredged material waterward of the ordinary high water mark. In such cases, the disposal site shall be regraded to an approximate slope of 10 to 15 percent, with no swales.

3. Impacts to riparian vegetation at shoreline disposal sites shall be avoided or minimized whenever possible.

4. Erosion control measures shall be carried out to prevent the wind erosion of dredged material back into the channel.

E. Upland Disposal by Pipeline Dredge:

The following conditions apply to pipeline operations that pump dredged material to an upland site or confined disposal facility (CDF). Typically, a CDF consists of the following design features: [1] Earthen dikes that form the perimeter of the facility. [2] A weir structure that provides flow control and retention of the solid fraction of dredged material. [3] An outlet structure that conveys the turbid water fraction of dredged material [effluent] to a single point of discharge. The point of discharge may be a nearby surface water, wetland or bare ground.

1. Mixing Zone [for Single-point Effluent Discharge]: 300 feet downcurrent of the point of discharge.

2. CDF Design and Operation. The following "best management practices" pertain to the design and operation of a CDF:

a. The CDF should be designed to provide the maximum practical degree of solids retention during operation, and for the entire life of the site.

b. The outfall should be located so as to provide the maximum amount of

A12-7

February 19,2013 dilution or dispersion of the effluent and to minimize any potential scour or erosion effects to more sensitive aquatic resources such as small tributaries and sloughs, shallow tide flats, and wetlands.

c. To the greatest extent practicable, CDF sites shall be stabilized to prevent significant offsite erosion of the dredged material by either water or wind transport.

VI. Wetland and Wildlife Mitigation

A. The mitigation sites shall be developed as described in the Columbia River Channel Improvement Project Supplemental Evaluation, August 2008.

B. The Cottonwood Island mitigation site shall employ the specific construction and maintenance elements, as described in the Statement of Work- Columbia River Channel Improvement- Mitigation Cottonwood Island Riparian Restoration (Corps document number W9127N-09-C-0046).

C. The Woodland Bottoms- Chumbley mitigation site shall employ specific construction and maintenance elements, as described in the Statement of Work- Columbia River Channel Improvement- Mitigation- Woodland Bottoms, Chumbley Riparian Restoration (Cmps document number W9127N-09-C-0014).

D. The Corps shall monitor all mitigation sites for a period of 10 years after construction.

A minimum of five monitoring events are required within that period, e.g. years I, 3, 5, ~10. .

VII. Reporting

A. The Corps shall compile and submit an annual report to Ecology no more than 90 days after the dredging season ends. The aruma! report shall include:

• locations dredging and disposal occurred;

• aniounts of material dredged and disposed of in all locations;

• descriptions of upland disposal…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .