W9127827RA002_Solicitation Amend 0002 FY27 FL Panhandle ORC (Signed).pdf
PDF 5 MB Posted
- Solicitation number
- W9127827RA002
About this file
This is an Amendment 0002 to a Request for Proposal (RFP) for environmental remediation services under Solicitation Number W9127827RA002, issued by the U.S. Army Corps of Engineers Mobile District on behalf of the Air Force. The amendment modifies the Performance Work Statement (PWS), Section L proposal submission requirements, Past Performance Questionnaire, CLIN structure, Integrated Master Schedule (IMS) template, Key Personnel requirements, and Bid Sheet. The solicitation extends the Request for Information (RFI) submission window through November 20, 2026 at 1400 CST, and establishes a proposal receipt window between December 7, 2026 at 0700 CST and December 18, 2026 at 1400 CST, with electronic submission required via the Procurement Integrated Enterprise Environment (PIEE).
The contract is a ten-year, performance-based, definitive (C-type) contract to conduct environmental remediation at three Air Force installations in Florida: Eglin Air Force Base, Hurlburt Field, and Tyndall Air Force Base. The scope encompasses investigation, design, construction, operation and maintenance, and optimization of remedial systems across 56 Installation Restoration Program (IRP) sites and five Military Munitions Response Program (MMRP) sites. Key deliverables include a Project Management Plan (PMP), Integrated Master Schedule (IMS), Milestone Payment Schedule (MPS), Quality Program Plans (QPPs), performance models for optimization sites, and comprehensive monitoring and reporting documentation. Contractors must demonstrate achievement of site-specific performance objectives within defined performance periods, maintain compliance with applicable environmental regulations (CERCLA, RCRA, state programs), and submit all invoices based on milestone completion with a monthly submission limitation. Offerors must acknowledge receipt of both RFP amendments and submit signed copies of all SF 30 amendments along with a completed Bid Sheet with costs rounded to whole dollars.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9127827RA002_BidSheet_10Nov2026.xlsx | XLSX spreadsheet | |
| W9127827RA002_Site Walk Attendee List GFI.pdf | ||
| W9127827RA002_Attach 5_Entry Authorization List (EAL) Request V2.xlsx | XLSX spreadsheet | |
| W9127827RA002_Solicitation Amend 0001 FY27 FL Panhandle ORC (Signed).pdf | ||
| W9127827RA002_Solicitation FY27 FL Panhandle ORC (Signed).pdf | ||
| W9127827RA002_Attach 5_Entry Authorization List (EAL) Request.xlsx | XLSX spreadsheet | |
| W9127827RA002_Attach 8_FY27 FLPHORC_MPS Structure Template.xlsx | XLSX spreadsheet | |
| W9127827RA002_Attach 7_FY27 FL PHORC_IMS Structure Template.xlsx | XLSX spreadsheet | |
| W9127827RA002_Attach 18_Bid Sheet.xlsx | XLSX spreadsheet | |
| W9127827RA002_Attach 6_CLIN Structure_9.10.26.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS, MOBILE DISTRICT
100 CANAL STREET
MOBILE, AL 36602-1901
CESAM-CT November 13, 2026
U.S. Army Corps Of Engineers Mobile District, Directorate of Contracting 100 Canal Street Mobile, AL 36602
REPLY TO THE ATTENTION OF:
CESAM-CT
SUBJECT: Amended Request for Proposal (RFP) Solicitation No. W9127827RA002 Amendment 0002 – FY27 Florida Panhandle Optimized Remediation Contract (ORC) for Eglin Air Force Base, Hurlburt Field, and Tyndall Air Force Base, Florida
TO: ALL INTERESTED PARTIES
Requirement Overview: The U.S. Army Corps of Engineers (USACE), Mobile District, is pleased to issue this Request for Proposal for the FY27 Florida Panhandle Optimized Remediation Contract (ORC) for Eglin Air Force Base, Hurlburt Field, and Tyndall Air Force Base, Florida. This requirement is for a stand-alone, definitive (C-type) contract for performance-based remediation services at the three Air Force installations. This contract includes all work, equipment, and services required to achieve Performance Objectives within the Performance Periods specified in the Performance Work Statement, including administrative, management, and general support required to execute this ORC. This contract will have a ten (10) year period of performance and will be awarded based on the availability of funds.
Note: Additional GFI files not already in the Air Force Administrative Record (AR) will be sent to the Offerors via DOD Safe.
Revisions Made: Performance Work Statement (PWS), Section L, Section L Attachment L001 Past Performance Questionnaire (PPQ), CLIN Structure, IMS Structure Template, Key Personnel and Bid Sheet have all been updated.
Request for Information (RFI) submission window has been extended. All inquiries regarding this solicitation must be submitted in writing via ProjNet as indicated in Section L of this solicitation (Instructions for ProjNet included). Inquiries will be accepted until November 20, 2026, at 1400 CST.
The Government is not obligated to respond to inquiries received after this deadline.
Proposals must be received no earlier than [0700 CST] on December 07, 2026 and no later than [1400 CST] on December 18, 2026. Submissions shall be delivered electronically via the [PIEE/Procurement Integrated Enterprise Environment] as specified in Section L. Please also include
Please be sure to submit a completed FY27 Florida Panhandle ORC Bid Sheet (Attachment 18), with your offer. Be sure to round all final CLIN costs to the nearest whole dollar.
Please be sure to also include a signed copy of each SF30 RFP Amendment (0001 and 0002) along with a signed copy of the original SF30 Solicitation with your proposal.
Request for Proposal Solicitation No. W9127826RA002
Respectfully:
Paul M. Adamo
SSG, USA
Contracting Officer
Attachments:
1. RFP Amendment 0002
2. Original Solicitation (without original additional attachments included)
3. RFP Amendment 0001
4. FY27 Florida Panhandle ORC PWS and Enclosures (Revised)
5. Section L Proposal Submission Requirements and Instructions (Revised)
6. Section L Attachment L001 PPQ (Revised)
7. FY27 Florida Panhandle ORC CLIN Structure (Revised)
8. FY27 Florida Panhandle ORC IMS Structure Template (Revised)
9. FY27 Florida Panhandle ORC Key Personnel (Revised)
10. FY27 Florida Panhandle ORC Bid Sheet (Revised)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
J 1 24
0002 13 NOV 2026
W91278
W074 ENDIST MOBILE
KO CONTRACTING DIVISION, 100 CANAL STREET
MOBILE, AL 36602-3630
UNITED STATES
DANIELLE KACHELE, EMAIL: DANIELLE.L.KACHELE@USACE.ARMY.MIL
TELEPHONE: (251) 694-3812
SCD: PAS:
W9127827RA002
11 SEP 2026
SEE SECTION G - CONTRACT ADMINISTRATION DATA
The subject Request for Proposal for: FY27 Florida Panhandle ORC for the Air Force; is modified in the following: Performance Work Statement (PWS), Section L, Section L Attachment L001 Past Performance Questionnaire (PPQ), CLIN Structure, IMS Structure Template, Key Personnel and Bid Sheet have all been updated.
X 1
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
J 1 2
0001 16 SEP 2026
W91278
W074 ENDIST MOBILE
KO CONTRACTING DIVISION, 100 CANAL STREET
MOBILE, AL 36602-3630
UNITED STATES
DANIELLE KACHELE, EMAIL: DANIELLE.L.KACHELE@USACE.ARMY.MIL
TELEPHONE: (251) 694-3812
SCD: PAS:
W9127827RA002
11 SEP 2026
SEE SECTION G - CONTRACT ADMINISTRATION DATA
The subject Request for Proposal for: FY26 Florida Panhandle ORC for the Air Force; is modified in the following: Attachment 5 Entry Authorization List (EAL) Excel Attachment has been revised to make it accessible and useable.
X 1
PERFORMANCE WORK STATEMENT
For
FY27 Florida Panhandle Group
Optimized Remediation Contract
At
Eglin Air Force Base, Florida
Hurlburt Field, Florida
Tyndall Air Force Base, Florida
US Army Corps of Engineers (USACE) - Mobile District
Contract: W91278XXXXXXX
Solicitation: W9127827RA002
09 November 2026
TABLE OF CONTENTS
1.0 SCOPE
1.1 INTRODUCTION
1.2 OVERVIEW OF ORC SCOPE AND REQUIREMENTS
1.2.1 Specific Scope Discussion and Limits
1.2.2 Preliminary Assessment/Site Inspection, Remedial Investigation or Remedial Investigation/Feasibility
Study (including Supplemental Investigations), and Decision Document
1.2.3 Response Complete or Site Closeout
1.2.4 Remedial Action-Operation with Optimization
1.2.5 Remedial Action-Operation and Reduce Life Cycle Cost; Long Term Management and Reduce Life
Cycle Cost
1.2.6 Remedial Action-Operation or Long-Term Management (as appropriate)
1.2.7 Alternate Objectives
1.2.8 PO ACTIVITIES
1.3 PERFORMANCE REQUIREMENTS
1.3.1 Table 1: Performance Table
1.3.2 Additional Scope Discussion and Limits
2.0 APPLICABLE DOCUMENTS
3.0 GOVERNMENT FURNISHED INFORMATION AND PROPERTY
4.0 MANAGEMENT, PLANNING, AND REPORTING REQUIREMENTS
4.1 PROJECT MANAGEMENT PLAN
4.2 SCHEDULE AND PLANNING REQUIREMENTS – INTEGRATED MASTER SCHEDULE
4.3 MILESTONE PAYMENT SCHEDULE
4.4 COST AND STATUS REPORTING
4.4.1 INVOICES
4.5 ORC DOCUMENT REPOSITORY
4.6 MEETING AND CONFERENCE REQUIREMENTS
4.6.1 Meeting/Teleconference Support
4.6.2 Public Meetings and Hearings
4.6.2.1 Community Involvement Plan (CIP) Update
4.7. SPATIAL DATA (MAP) REQUIREMENTS
4.8 INFORMATION SECURITY
4.8.1 Cybersecurity Standard Operating Procedure
4.9 NOTIFICATION REQUIREMENTS
4.10 PERMITS
4.10.1 Environmental Permits
4.10.2 Rights of Access to Non-AF Real Property
4.11 PHOTO DOCUMENTATION
4.12 REMOTE AND/OR AUSTERE SITES
4.13 INSTALLATION/SITE ACCESS AND SECURITY
4.14 WORKSITE ACTIVITIES AND COORDINATION
4.14.1 Coordination of Activities
4.14.2 GENERAL REQUIREMENTS DURING FIELD ACTIVITIES
4.14.3 Radiological Waste, Hazardous Material, and Hazardous Waste Permitting and Reporting
4.14.3.1 Regulatory Requirements
4.15 ORC TRANSITION PLAN
5.0 CHEMISTRY REQUIREMENTS
5.1 QUALITY ASSURANCE
5.2 LABORATORY SELECTION
5.3 ANALYTICAL DATA MANAGEMENT
5.4 RECORD KEEPING
5.5 PFAS SAMPLING AND ANALYSIS
6.0 MUNITIONS RESPONSE AND EXPLOSIVES SAFETY REQUIREMENTS
6.1 3RS (RECOGNIZE, RETREAT, REPORT) EXPLOSIVES SAFETY EDUCATION PROGRAM TRAINING
6.2 EXPLOSIVE SAFETY SUBMITTALS
6.3 ENVIRONMENTAL REQUIREMENTS
6.4 MEC RELATED GUIDANCE
6.5 REVISION 02 UNIFORM FEDERAL POLICY QUALITY ASSURANCE PROJECT PLAN (UFP-QAPP)
6.6 QUALITY CONTROL
6.7 QUALITY MANAGEMENT
6.8 GEOPHYSICAL DELIVERABLE REQUIREMENTS
6.9 GEOGRAPHIC INFORMATION SYSTEM
7.0 PLANS AND REPORTS
7.1 QUALITY PROGRAM PLANS
7.1.1 Work Plans
7.1.2 Health and Safety Plan
7.1.3 Construction Quality Plan
7.2 TECHNICAL PLANS AND REPORTS
7.3 DELIVERABLE SUBMISSION CYCLE
7.4 RESPONSE TO COMMENTS
7.5 PROJECT DELIVERY TEAM
8.0 SITE WORK
8.1 CONSERVATION
8.2 SITE CHARACTERIZATION AND FIELD INVESTIGATION
8.3 SITE PREPARATION
8.4 DEMOLITION
8.5 SITE RESTORATION
9.0 ENVIRONMENTAL REQUIREMENTS
9.1 ENVIRONMENTAL RESTORATION PROCESS APPLICATION
9.1.1 Conceptual Site Model Guidance
9.1.2 Exit Strategy
9.5 INNOVATIVE AND PROVEN TECHNOLOGIES
9.6 OPERATIONS AND MAINTENANCE
9.7 MPPEH REMOVAL AND SUPPORT
9.8 HAZARDOUS/NON-HAZARDOUS WASTE REMOVAL AND SUPPORT
9.9 STUDY EFFORT INCIDENTAL TO REMEDY OR CORRECTIVE ACTION
9.10 FIVE-YEAR REVIEW SUPPORT
9.11 IDENTIFICATION OF NEW SITE
9.12 CHANGE AND DIFFERING CONDITIONS
9.13 OTHER PROVISIONS
9.14 KEY PERSONNEL
10.0 PERFORMANCE STANDARDS AND SURVEILLANCE ACTIVITIES
11.0 POINTS OF CONTACT
12.0 CONTRACTOR MANPOWER REPORTING REQUIREMENTS
12.1 CONTRACTOR MANPOWER REPORTING REQUIREMENTS
12.2 VETERANS EMPLOYMENT
12.3 SUSTAINABILITY REQUIREMENTS
13.0 PERIOD OF PERFORMANCE
1.0 SCOPE
This requirement is for environmental remediation activities at Eglin Air Force Base (AFB), Hurlburt Field, and Tyndall AFB. This Performance Work Statement (PWS) defines the scope of environmental services necessary to conduct site restoration under the Optimized Remediation
Contract (ORC). The range of activities includes investigation, design, construction of remedial systems, operation and maintenance of established remedies, optimization at applicable sites, and achievement of site-specific objectives. The Contractor shall undertake Environmental
Remediation activities to achieve Performance Objectives (POs) at 56 Installation Restoration
Program (IRP) sites and five Military Munitions Response Program (MMRP) sites. The Period of Performance (PoP) for this “C” Type Contract will be ten (10) years from the date of award.
NOTE: For purposes of this ORC, the term “Government” includes the Air Force (AF) and
United States Army Corps of Engineers (USACE). While regulators are a governmental entity, they are also a third party over whom the AF has no control and, as such, will be referred to as
“regulators.”
1.1 Introduction
EGLIN AFB
Eglin AFB is located east of Pensacola, Florida, occupying 724 square miles of land in the northwest Florida panhandle. Its 101,000 square miles of air space extends over the eastern third of the Gulf of Mexico, an area extending from the Florida Panhandle to the Florida Keys.
Seventeen miles of shoreline allows test and evaluation of a littoral environment. The surrounding properties include wetlands, unimproved, rural, highly developed residential areas, commercial areas, and light industrial areas.
Eglin AFB is the former home of the 39th Bomb Wing and the 4135th Strategic Wing. The Eglin
Range is managed by the 96th Wing. It is primarily a weapons development, testing and training base, with tenant units from the Navy, Army, and National Guard, that is currently undergoing massive growth (>$1 billion) due to Base Realignment and Closure (BRAC) activities such as bed-down facilities for the F-35 Joint Strike Fighter training mission and relocation of the US
Army 7th Special Forces Group from Fort Bragg, North Carolina.
Remediation activities at Eglin AFB are being conducted pursuant to the Resource Conservation and Recovery Act (RCRA) and Chapter 62-780 Florida Administrative Code (FAC) requirements. Regulatory oversight is provided by the Florida Department of Environmental
Protection (FDEP).
Eglin AFB is being administered under a RCRA Corrective Action / Hazardous and Solid Waste
Amendments (HSWA) Permit. The RCRA Permit is renewed on a five (5) year cycle and the next renewal is scheduled to occur in FY29. The Contractor is responsible for all costs associated with the RCRA Permit renewal.
HURLBURT FIELD
Hurlburt Field is a United States AF installation in the Florida panhandle between Pensacola and
Panama City and covers approximately 6,600 acres in Okaloosa County. Hurlburt Field was originally designated as Eglin Auxiliary Field No. 9, one of the original pilot and gunnery training fields built in the 1940s. Hurlburt Field is home of the 1st Special Operations Wing, a part of Air Force Special Operations Command (AFSOC). The mission of the wing is to organize, train, and equip USAF special operations forces for global deployment, and to assist foreign countries in the establishment of internal air defense abilities. The wing focuses on unconventional warfare including counterinsurgency and psychological operations during low intensity conflicts.
Remediation activities at Hurlburt Field are being conducted pursuant to the Comprehensive
Environmental Rehabilitation, Compensation, and Liability Act (CERCLA) for MMRP sites only, RCRA, and Chapter 62-780 FAC. Regulatory oversight is provided by the FDEP.
Hurlburt Field is being administered under a RCRA Corrective Action / HSWA Permit. The
RCRA Permit is renewed on a ten (10) year cycle and the next renewal is scheduled to occur in
FY31; the HSWA portion of the permit is updated approximately every 2.5 years. The
Contractor is responsible for all costs associated with the RCRA Permit renewal.
TYNDALL AFB
Tyndall AFB occupies approximately 29,000 acres on a narrow 18-mile-long northwest-southeast trending peninsula. Tyndall AFB was activated in 1941, initially as an Army Air Corps facility. It was re-designated as an AFB in 1947. Currently, Tyndall AFB is part of the Air
Combat Command and is used for the training of air defense crews and provides combat power for AF missions.
Tyndall AFB was finalized for listing on the National Priorities List (NPL) on 1 April 1997. A
Federal Facility Agreement (FFA) between the United States Environmental Protection Agency
(USEPA) Region 4, FDEP, and the AF was signed 20 September 2013 and the FFA became final and effective on 3 January 2014. The Contractor shall adhere to CERCLA requirements and terms in the Final FFA dated 3 January 2014.
Remediation activities at Tyndall AFB are being conducted pursuant to the FFA under the
CERCLA with the exception of OT018, TA523, TU204, and TU233. These Petroleum, Oil, and
Lubricant (POL) sites are addressed under the FDEP Contaminated Site Cleanup Criteria
(Chapter 62-780, F.A.C.). Sites deferred from CERCLA by FFA paragraph 9.2.1.2 to another program will achieve the site PO with approval from the applicable regulatory agency.
Regulatory oversight is provided by USEPA Region 4 and FDEP.
1.2 Overview of ORC Scope and Requirements
The Contractor shall perform all the necessary environmental remediation activities needed to achieve the performance requirement described in Table 1: Performance Table, and additional scope in 1.3.2. This PWS and enclosures listed below detail the project requirements needed to meet the AF objectives:
• Enclosure 1 – Acronyms and Definitions
• Enclosure 2A – Eglin AFB Well Abandonment List
• Enclosure 2B – Hurlburt Field Well Abandonment List
• Enclosure 2C – Tyndall AFB Well Abandonment List
• Enclosure 2D – Eglin AFB Administrative Record List
• Enclosure 2E – Hurlburt Field Administrative Record List
• Enclosure 2F – Tyndall AFB Administrative Record List
• Enclosure 3 – FL Panhandle ORC Government Furnished Property (GFP)
• Enclosure 4 – Community Involvement Plan (CIP) Guidance version 4
• Enclosure 5 – Eglin Standard Operating Procedures (ESOP) 1-20
The intent of the ORC initiative is to advance site cleanup during the Period of Performance
(PoP) in the most efficient and cost-effective manner, as supported by a cost-benefit analysis and exit strategy that achieves the greatest reduction in life-cycle cost (LCC). The AF is interested in substantial reduction of long-term environmental liabilities and total LCC. Technical approaches reduced to a minimal level of effort, with no well-planned contingencies, or that provide no assurance to the Government that the POs will be achieved without work stoppages or change orders, are not in keeping with the intent of this performance-based contracting effort. The AF is required to implement remedies, as necessary, to enable the mission, protect human health and the environment, and comply with laws and regulations. The goal of the ORC initiative is to ensure the AF continues to fulfill all facets of its Environmental Restoration Program (ERP)
Mission by effectively and efficiently managing the program in a performance-based, results-oriented, and cost-conscious framework.
The AF requires all sites to be remediated to meet standards that allow for the current or reasonably anticipated future land use of the property. Accurate documentation and reporting of contaminant removal and cost savings are essential components to optimization success. In accordance with Defense Environmental Restoration Program (DERP) and Air Force Instruction
(AFI) 32-7020, the AF defines optimization under the ORC as reducing contaminant mass and concentrations, reducing LCC, or any combination of activities that accelerates Response
Complete (RC)/Site Closeout (SC) resulting from the remedial implementation undertaken by the Contractor, exceeding what is required to maintain compliance with an approved Decision
Document (DD).
The Contractor shall maintain compliance with all DDs/Records of Decision (RODs)/Proposed
Plans/RCRA Permits currently in place until they are no longer required, or an alternate approach is approved. The Contractor shall conduct DD/ROD amendments or Explanations of
Significant Differences (ESDs) as required to implement new approaches.
The Contractor shall function as an integral team member in support of the Air Force Civil
Engineer Center (AFCEC) mission, to include the sharing of information with USACE, other
AFCEC contractors, and AF personnel, in cooperation with community stakeholders, regulators, and other government entities.
Requirements for efficient management of this contract include achieving the POs within the
Performance Period (PP) as outlined in Table 1 and the work detailed in Section 1.3.2 of this
PWS. Requirements include timely identification and resolution of impediments to successful project execution. The Contractor shall provide all personnel, equipment, supplies, tools, materials, and other items necessary to perform the tasks defined in this PWS. The Contractor is solely responsible for reviewing all available information and forming independent, professional conclusions and interpretations of site conditions and requirements to achieve the POs of this contract within the PoP specified in accordance with Section 3.0. AFCEC will rely on the
Contractor’s expertise in recognizing and addressing problematic issues during the execution of this contract. The Contractor shall perform all work in accordance with federal, state, and local statutes and regulations. The Contractor shall also comply with Installation regulations.
Remedies shall conform to environmental permits, DD requirements, or other legal requirements.
The Contractor shall continue work throughout the entire duration of the PoP. The Contractor’s local office presence will be relied upon to provide rapid-response actions for field activities and on-site meetings.
1.2.1 Specific Scope Discussion and Limits
The scope of this contract is to perform environmental remediation services for the sites listed in
Table 1 of the PWS. The ORC Contractor shall assume contractual liability and responsibility for achieving the POs. If the selected technical approach is not effective, as demonstrated by the trends in the performance model, the Contractor shall develop and implement a revised technical approach to achieve the POs, including DD amendments, if required, to implement the remedial approach. This scope includes all known contaminants linked to the specific sites per Table 1 of the PWS (including contaminants on, under, or sourced at/migrating from the specific sites) without regard to quantity (e.g., plume size, concentrations). See reference to Section 1.3.2 of this PWS for exclusions. The AF remains statutorily responsible for all sites listed in Table 1 and the work described in Section 1.3.2.
All cost associated with this Contract shall be rounded to whole dollars, including CLIN Price, MPS, invoices, etc.
1.2.2 Preliminary Assessment/Site Inspection, Remedial Investigation or Remedial
Investigation/Feasibility Study (including Supplemental Investigations), and
Decision Document
Table 1 of the PWS identifies Preliminary Assessment/Site Inspection (PA/SI), Remedial
Investigation (RI), or RI/Feasibility Study (FS), including Supplemental Investigations, and DDs as the PO for selected sites. The Contractor is responsible for achieving these POs as identified in Table 1 and the work described in Section 1.3.2. See PO definitions in Enclosure 1, Acronyms and Definitions.
1.2.3 Response Complete or Site Closeout
Table 1 of the PWS identifies Response Complete (RC) or Site Closeout (SC) as the PO for selected sites. The Contractor is responsible for achieving these objectives as identified in Table
1 and the work described in Section 1.3.2. See PO definitions in Enclosure 1, Acronyms and
Definitions. The performance components, including the need for a performance model, are described in Section 8.1.3.
1.2.4 Remedial Action-Operation with Optimization
Table 1 of the PWS identifies the following POs, which include optimization as follows: 1.
Remedy in Place (RIP) and Remedial Action-Operation (RA-O) with Optimization, 2. DD
Amendment (or ESD) with Remedy Implementation and RA-O with Optimization, or 3. RA-O with Optimization. The Contractor is responsible for achieving these POs as identified in Table
1and additional scope described in Section 1.3.2. See PO definitions in Enclosure 1, Acronyms and Definitions.
The optimization and performance components, including the need for a performance model showing interim and final performance payment milestones, are described in Section 8.1.3.
Optimization goals may include one or more of the following:
1. Shorten time to RC, SC, or other Department of Defense (DoD) goals.
2. Improve remedy performance and/or accelerate the progress of the remediation.
3. Enhance source or plume control for engineering systems.
1.2.5 Remedial Action-Operation and Reduce Life Cycle Cost; Long Term Management and Reduce Life Cycle Cost
NOT APPLICABLE
1.2.6 Remedial Action-Operation or Long-Term Management (as appropriate)
Table 1 of the PWS identifies RA-O, Long-Term Management (LTM), or Land Use Controls
(LUCs) in accordance with the approved DD/ROD as the PO for selected sites. See PO definitions in Enclosure 1, Acronyms and Definitions.
The Contractor shall achieve the following objectives for each RA-O, LTM, or LUC site:
• Maintain compliance with all DDs and permits (currently in place or to be approved) throughout the PP. Update or revise site-specific work plans, monitoring plans, and/or
DDs, as appropriate.
• For RA-O sites, develop performance models addressing all COCs and breakdown products. Refer to Section 8.1.3.1, Performance Models.
• Provide a realistic projection to achieve SC or RC after the PoP (the Contractor shall identify which PO is the optimal endpoint).
1.2.7 Alternate Objectives
NOT APPLICABLE
1.2.8 PO Activities
The Contractor is responsible for all activities leading to the completion of the POs described in
Section 1.2 and listed in Table 1 or Section 1.3.2 of the PWS, inclusive of the following:
• Maintaining and performing all required O&M on remediation systems and equipment for the full duration of the contract, ensuring continuous, reliable, and compliant system performance.
• Keeping systems operating as intended throughout the contract PoP, or until the system is no longer needed (e.g., Achievement of RC), whichever is longer. If a system becomes non-operational, the Contractor is responsible for all costs associated with repairs and upgrades. If the repair or replacements will take longer than 10 days from the time of initial non-operation, the timeline for repair should be coordinated with the COR and the
Contractor shall submit, in writing, the plan to get the system operating again to the COR and Installation RPM within 10 days. The plan shall include the planned repairs and timeline.
• O&M of all wells, including the following examples: semi-annual inspections, well repairs, replacement of missing or broken parts/tags/locks, well pad repair or replacement, removal of obstructions, and well redevelopment.
• Replacing wells if necessary; and/or abandoning wells with AF, USACE, and regulatory approval (if required) when the well is no longer necessary.
Site maintenance including vegetation control (if required) to maintain fencelines, structures, and access routes.
1.3 Performance Requirements
1.3.1 Table 1: Performance Table
Table 1 presents the POs, PPs, and Performance Standards associated with all Installations/sites under this ORC. The PP specified in Table 1 is from the date of award of the first performance
AFCEC Contract Line-Item Number (CLIN) or AFCEC Sub-Contract Line-Item Number (Sub-
CLIN) for the site unless otherwise specified. All approvals (both Government and regulator) per the Performance Standard are required in writing. Additional scope discussion and limits can be found in Section 1.3.2.
Table 1: Performance Table Site Performance Objective Performance Period* Performance Standard
N/A Project Management Plan (PMP):
1) Revision 00 PMP
2) Revision 01 PMP
3) Updates as necessary
Revision 00 PMP within 60 calendar days from contract award, Revision 01 PMP within 14 calendar days of receipt of AF and
USACE comments on
Revision 00 and update as necessary throughout the PoP. The AF and
USACE will determine when whole document
PMP updates are warranted
AF and USACE approval of
PMP.
The PMP should be maintained with accuracy and completeness based on the current technical approach for each site, management structure, etc.
N/A Integrated Master Schedule (IMS)/Milestone
Payment Schedule (MPS)
Revision 00 IMS/MPS within 60 calendar days from contract award, Revision 01 IMS/MPS within 14 calendar days of receipt of AF and
USACE comments on
Revision 00, and updates by the 10th of each month throughout the PoP
AF and USACE approval of
IMS/MPS.
N/A Base-wide Quality Program Plans (QPPs) for each Installation
Revision 00 Base-wide
QPP within 60 calendar days from contract award and update as necessary throughout the PoP
AF, USACE, and regulatory approval of Base-wide QPP.
Site Performance Objective Performance Period* Performance Standard
Eglin AFB
All Open
Sites (IRP, MMRP, Per- and polyfluoroa lkyl substances
(PFAS),
etc.)
Community Involvement Plan (CIP) and updates are required prior to the RI phase, after the DD/ROD is signed, and every three
(3) years thereafter for each Installation and associated Geographically Separated Units, per Enclosure 4.
Revision 00 CIP or
Update within 180 calendar days from
AFCEC Sub-CLIN award; Revision 01 CIP or Update within 14 calendar days of receipt of AF comments on
Revision 00; Revision
02 CIP or Update within 14 calendar days of approval by the AF
AF and USACE approval of
CIP.
CF288 Achieve Remedial Action Plan (RAP)
Five (5) years AF, USACE, and regulatory approval of RAP
DP009
LTM in accordance with the approved
ROD/DD
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
Reports).
DP084 LTM in accordance with the approved
ROD/DD
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
Reports).
DP261
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
FT028
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
LF003
RAO in accordance with the approved
Through the duration of the PoP
AF, USACE, and regulatory approval of RA-O documentation (e.g., Quinquennially
Groundwater Monitoring
Reports, Land Use Control
Inspection Reports).
LF005
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
LF008
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
LF010
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
LF051
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
Reports).
LF322 Site Assessment Four (4) years AF, USACE, and regulatory approval of PA/SI.
OT083
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
OT100
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
OT262
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
OT263
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
OT264
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
OT265
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
OT269
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
OT270
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
OT271
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
POI523
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
Reports).
SS025 LTM in accordance with the approved
ROD/DD
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
Reports).
SS026 LTM in accordance with the approved
ROD/DD
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
Reports).
SS086 LTM in accordance with the approved
ROD/DD
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
Reports).
SS278 LTM in accordance with the approved
ROD/DD
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
Reports).
SS281 LTM in accordance with the approved
ROD/DD
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
Reports).
SS283 LTM in accordance with the approved
ROD/DD
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
Reports).
SS313 SC Six (6) years AF, USACE, and regulatory approval of SC documentation (e.g., Site
Closeout Report and Well
Abandonment Confirmation
Report).
ST069 RC Six (6) years AF, USACE, and regulatory approval of RC documentation (e.g., Revision 02 Remedial
Action Completion Report and System
Decommissioning and Well
Abandonment Report
Hurlburt Field
All Open
Sites (IRP, MMRP, Per- and polyfluoroa lkyl substances
(PFAS),
etc.)
CIP and updates are required prior to the RI phase, after the DD/ROD is signed, and every three (3) years thereafter for each
Installation and associated Geographically
Separated Units, per Enclosure 4.
Revision 00 CIP or
Update within 180 calendar days from
AFCEC Sub-CLIN award; Revision 01 CIP or Update within 14 calendar days of receipt of AF comments on
Revision 00; Revision
02 CIP or Update within 14 calendar days of approval by the AF
AF and USACE approval of
CG219 Achieve Remedial Action Plan (RAP)
Five (5) years AF, USACE, and regulatory approval of RAP
LF013
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
LF014
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
Reports).
LF015 LTM in accordance with the approved
ROD/DD
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
Reports).
LF016 LTM in accordance with the approved
ROD/DD
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
Reports).
LF017 LTM in accordance with the approved
ROD/DD
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
Reports).
LF018 LTM in accordance with the approved
ROD/DD
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
Reports).
LF019 LTM in accordance with the approved
ROD/DD
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
LF020 LTM in accordance with the approved
ROD/DD
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
Reports).
SS125 SC Seven (7) years AF, USACE, and regulatory approval of SC documentation (e.g., Site
Closeout Report and Well
Abandonment Confirmation
Report).
ST123 LTM in accordance with the approved
ROD/DD
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
Reports).
XU002 ROD/DD Ten (10) years AF, USACE, and regulatory approval of ROD/DD (i.e., Air Force and regulatory signatures on Revision 02
ROD/DD).
Tyndall AFB
All Open
Sites (IRP, MMRP, Per- and polyfluoroa lkyl substances
(PFAS),
etc.)
CIP and updates are required prior to the RI phase, after the DD/ROD is signed, and every three (3) years thereafter for each
Installation and associated Geographically
Separated Units, per Enclosure 4.
Revision 00 CIP or
Update within 180 calendar days from
AFCEC Sub-CLIN award; Revision 01 CIP or Update within 14 calendar days of receipt of AF comments on
Revision 00; Revision
02 CIP or Update within 14 calendar days of approval by the AF
DA046 SC Ten (10) years AF, USACE, and regulatory approval of SC documentation (e.g., Site
Closeout Report and Well
Abandonment Confirmation
Report).
FR038
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
FT016 FS
Upon achievement of LUCIP, conduct RA-O in accordance with the Interim Action
ROD/DD throughout the duration of the PoP
Ten (10) years AF, USACE, and regulatory approval of FS and LUCIP.
approval of RA-O documentation (e.g., Land
Reports, etc.).
FT016 1,4-Dioxane Step 2 Five (5) years approval of Technical
Memorandum/Report
FT017 FS
ROD/DD throughout the duration of the PoP
Ten (10) years AF, USACE, and regulatory approval of FS and LUCIP documentation (e.g., Land
LF006 RC
Upon achievement of RC, continue LTM in accordance with the ROD/DD throughout the
PoP
Seven (7) years AF, USACE, and regulatory approval of RC documentation (e.g., Revision 02 Remedial
Action Completion Report and Revision 02 Land Use
Control Implementation
Plan).
approval of LTM documentation (e.g., Land
Use Control Inspection
LF007 RC
PoP
Seven (7) years AF, USACE, and regulatory approval of RC documentation (e.g., Revision 02 Remedial
Action Completion Report).
documentation (e.g., Land
Use Control Inspection
Reports).
OT018 Confirmatory Sampling Four (4) years AF, USACE, and regulatory approval of Confirmatory
Sampling Report
OT029 RC
PoP
Seven (7) years AF, USACE, and regulatory approval of RC (e.g., Proposed Plan, Regulator approval of, and Air Force signature on Record of
Decision, Final Remedial
Action Report).
Performance Model
Evaluation Report during
RA-O.
documentation (e.g., Land
OW217 Final ROD
ROD/DD throughout the duration of the PoP
Six (6) years AF, USACE, and regulatory approval of ROD/DD (i.e., Air Force and regulatory signatures on Revision 02
ROD/DD).
AF, USACE, and regulatory approval of RA-O documentation (e.g., Land
Use Control Inspection
OW582 RIP
Upon achievement of RIP, continue RA-O in duration of the PoP
Four (4) years AF, USACE, and regulatory approval of RIP (e.g., Construction Completion
Report and first RA-O
Report demonstrating remedy is operating properly and successfully).
Evaluation Report during
RA-O.
documentation (e.g., Annual
Groundwater Monitoring
Reports, Monthly O&M
Reports, Land Use Control
Inspection Reports, etc.).
SR169 SC (Well Abandonment) Four (4) years AF, USACE, and regulatory approval of SC documentation (e.g., Site
Closeout Report, No Further
Action Explosive Safety
Submission, and Well
Abandonment Report).
SR170 Record of Decision/Decision Document
(ROD/DD)
Four (4) Years AF, USACE, and regulatory approval of/signatures on
ROD/DD.
SR170A LTM in accordance with the approved
ROD/DD
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
SS015 Final ROD
ROD/DD throughout the duration of the PoP
Six (6) years AF, USACE, and regulatory approval of ROD/DD (i.e., Air Force and regulatory signatures on Revision 02
ROD/DD).
AF, USACE, and regulatory approval of RA-
O documentation (e.g., Land
Use Control Inspection
SS026 Final ROD
ROD/DD throughout the duration of the PoP
Six (6) years AF, USACE, and regulatory approval of ROD/DD (i.e., Air Force and regulatory signatures on Revision 02
ROD/DD).
AF, USACE, and regulatory approval of RA-
O documentation (e.g., Land
Use Control Inspection
Reports, etc.).
TA523 LTM in accordance with the approved
ROD/DD
Through the duration of the PoP
AF, USACE, and regulatory approval of LTM documentation (e.g., Land
Use Control Inspection
Reports).
TS183 RA-O with optimization in accordance with the approved ROD/DD
Through the duration of the PoP
AF, USACE, and regulatory approval of RA-O documentation (e.g., Annual
Groundwater Monitoring
Reports, Monthly O&M
Reports, Land Use Control
Inspection Reports, etc.).
Evaluation Report.
TU204 SC Five (5) years AF, USACE, and regulatory approval of SC documentation (e.g., Site
Closeout Report and Well
Abandonment Confirmation
Report).
TU205 Final ROD
ROD/DD throughout the duration of the PoP
Six (6) years AF, USACE, and regulatory approval of ROD/DD (i.e., Air Force and regulatory signatures on Revision 02
ROD/DD).
AF, USACE, and regulatory approval of RA-
O documentation (e.g., Land
Use Control Inspection
Reports, etc.).
TU233 SC Seven (7) years AF, USACE, and regulatory approval of SC documentation (e.g., Site
Closeout Report and Well
Abandonment Confirmation
Report).
* The Performance Period is from the date of award of the first performance AFCEC Sub-CLIN.
1.3.2 Additional Scope Discussion and Limits
In addition to the requirements identified in Table 1, the Contractor shall be responsible for:
a. Establishing a quality assurance/quality control (QA/QC) process to ensure documents are of an acceptable quality and do not contain typos, formatting issues, contradictory information in tables, texts, and figures, etc.
b. Contaminants for which there are promulgated federal, state, or local standards.
c. Additional sites or work which may be added to the contract via modification if AFCEC determines during the PoP, that clean-up needs to be accomplished at a site where Per-and polyfluoroalkyl substances (PFAS) are present, and there is a promulgated State
Maximum Contaminant Level (MCL) that is approved for use by the DoD as an
Applicable or Relevant and Appropriate Requirement standard.
d. Conducting 1,4-Dioxane investigations as described in “Interim Air Force Guidance on
Sampling and Response Actions for 1,4-Dioxane at Operational and Base Realignment and Closure Installations,” dated 24 May 2013.
e. Management and disposal of investigation-derived waste (IDW) media associated with
PFAS in accordance with AF Guidance Memorandum “Updated Interim Guidance on
Destruction or Disposal of Materials Containing Per- and Polyfluoroalkyl Substances in the United States” dated 20 February 2026 (or the most recent and applicable ASD or
SAF/IEE guidance on PFAS destruction or disposal of Materials containing PFAS), and
Section 4.14.2 of this document.
f. The Contractor shall analyze IDW for PFAS using EPA Standard Method 1633 as required for waste acceptance. This includes, but is not limited to, sites:
• Eglin AFB: CF288, FT028, LF003, LF005, SS086, SS281, SS283, and ST069.
• Hurlburt Field: CG219, ST123, and SS125.
• Tyndall AFB: DA046, FT016, FT017, LF006, OT029, OW217, SR169, SS015, SS026, TA523, TS183 and TU205.
g. Ensuring that remedial actions do not negatively impact the distribution of any other contaminants and/or emerging contaminants (e.g., PFAS, 1,4-dioxane).
h. Eglin AFB: Providing one (1) 4’x6’ full color printed dry-erase laminated wall maps (one for Eglin Main Base and one for Eglin Reservation) and one (1) 3’x5’ full color printed dry erase laminated wall map for Duke Field twice during the contract Period of
Performance (PoP) (approximately FY29 and FY33). The costs for the maps shall be proposed as part of the project management plan AFCEC Sub-CLIN. The Installation will provide GIS files for printing.
i. Hurlburt Field and Tyndall AFB: Providing two (2) 4’x6’ full color printed dry-erase laminated wall maps twice during the contract PoP (approximately FY29 and FY33). The costs for the maps shall be proposed as part of the project management plan AFCEC Sub-
CLINs. The Installation will provide GIS files for printing.
The Contractor shall NOT be responsible for:
j. Reasonably unanticipated contaminants at sites identified in Table 1 (e.g., previously undetected mercury within a TCE plume); however, Contractors shall be responsible for reasonably anticipated contaminants (e.g., vinyl chloride in a TCE plume).
k. Remediation or treatment of contaminants for which there are no promulgated federal, state, or local standards or AF agreements at the time of contract award, unless included via modification.
l. Official regulatory changes occurring after contract award, as documented in
Administrative Code, laws, and regulations, e.g., decrease in residential Soil Cleanup
Target Levels, Groundwater Cleanup Target Levels, etc.
m. Sites not identified in Table 1.
n. Sites containing radiological waste.
o. Remediation of sites with Munitions and Explosives of Concern. MEC includes but may not be limited to: Unexploded Ordnance (UXO), as defined in 10 United States Code
(U.S.C.) 101(e)(5); Discarded Military Munitions (DMM), as defined in 10 U.S.C.
2710(e)(2); or Munitions Constituents (MC), as defined in 10 U.S.C. 2710(e)(3), present in high enough concentrations to pose an explosive hazard.
2.0 APPLICABLE DOCUMENTS
The Contractor shall identify and comply with all applicable federal, state, and local statutes;
DoD and AF instructions, manuals, handbooks, regulations, guidance, and policy letters
(including AF policy and guidance for IRP and MMRP); Executive Orders (EOs), American
Society for Testing and Materials (ASTM) Standards, American Petroleum Institute Codes, National Fire Protection Association (NFPA) Standards, Association for Materials Protection and Performance, National Electric Codes (NEC), Uniform Fire Codes, and International
Building Codes, including all changes and amendments in effect on the date of issuance of this contract. It is the Contractor’s responsibility to identify and comply with all applicable requirements. In addition, the Contractor shall refer to the current versions of the DoD Policy and Guidelines for Acquisitions Involving Environmental Sampling or Testing and the United
States AF Construction Management Implementation Guide.
The Contractor shall identify and comply with all applicable documents for the Installations including RODs, ROD Amendments, ESDs, RCRA Permits and subsequent modifications, documents, the Endangered Species Act, other DDs, Deeds, waste management guidance, and conveyance notices.
3.0 GOVERNMENT FURNISHED INFORMATION AND PROPERTY
Government Furnished Information (GFI) is contained in the Administrative Record
(https://ar.cce.af.mil/) or listed in Enclosure 2. The documentation provided represents the most recent and appropriate documentation available for the Installation(s) and sites identified in this
PWS. Electronic format is not guaranteed.
The Contractor shall properly account for and manage all new and existing Government
Furnished Property (GFP) procured and utilized at the Installations as-is where-is, in accordance with the Federal Acquisition Regulation (FAR). All Real Property installed during the contract shall be turned over to the Government consistent with procedures identified in Section 9.3.2.
The Contractor shall be responsible for providing all other supplies and equipment, not already installed and not listed in Enclosure 3, that are required to achieve the POs of this contract. All
AF-owned property, including real property used for remediation purposes, must be…
This is the start of the file's text. The full file is on GovTribe.