AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

W9127821R0013-0002

3. EFFECTIVE

02 FEB 2021

4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE W91278 7. ADMINISTERED BY (If other than item 6)

CODE

Corps of Engineers 109 St. Joseph St.

Mobile, AL 36602

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION

NO.

W9127821R0013

9B. DATED (SEE ITEM 11)

31 DEC 2020

10A. MODIFICATION OF

CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

The subject solicitation for: IDIQ MATOC FOR HORIZONTAL CONSTRUCTION, RENOVATION, REPAIR, AND

INCIDENTAL DESIGN IN ALABAMA, FLORIDA, MISSISSIPPI, AND GEORGIA

Is modified in the following: REFER TO THE ENCLOSED FOR AMENDMENT NO. 0002

Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of contracting officer)

PREVIOUS EDITION UNUSABLE STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

IDIQ Task Order Contracts for Horizontal Construction, Renovation, Repair, and Solicitation No.

Incidental Design in Alabama, Florida, Mississippi, and Georgia W9127821R0013

PART I-REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS

The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.

Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, highlighted, italic, and underlined, e.g.: additions are indicated thus.

Corresponding Added or Revised Paragraph SECTION Page, and/or Section

Statement of Work Revised Paragraph 3

Encl as stated Revised pages of the solicitation as indicated in Part I.

SF 30 Page 2 Amendment No. 0002

SEED PROJECT STATEMENT OF WORK

3 Project Scope of Work

The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to install three (3) sliding roller electric gates at three locations at the Jim Woodruff/Lake Seminole Project in accordance with this Scope of Work.

a) Within fifteen (15) calendar days of contract award, the Contractor shall have a pre-construction meeting to bring all affected parties together to get a clear understanding of the work to be performed. The pre-construction meeting shall be held at the project site. The Contractor shall field-verify all dimensions during the pre-construction meeting. Geotechnical Investigations do not apply to this task order.

b) The Contractor shall submit installation drawings for approval. The installation drawings need not be certified/signed and shall clearly indicate gate & fence locations; typical details at intersections, corners, ends, and posts; gate assembly, gate hardware, catalog data, and accessories.

c) Contractor shall submit electrical drawings for approval. Electrical design drawings shall be in accordance with NNFPA 70. All electrical drawings shall be certified/stamped by a Licensed Engineer.

d) The Contractor shall deliver materials to site in undamaged condition and store materials off the ground to provide protection against oxidation caused by ground contact.

e) The Contractor shall furnish and install latches, hinges, stops, keepers, rollers, and other hardware items as required for the operation of each gate. All items are required to match the material characteristics of the gate, existing fence system, and/or new fence being installed. The Contractor shall not install dissimilar metals.

f) The Contractor shall accept direction only from the Mobile District Contracting Officer (KO) or the Authorized Representative of the Contracting Officer (COR). Requests or desires of the users or using agency made directly to the Contractor will be immediately brought to the attention of the PM or TM, and KO. Any changes to the project scope or other provisions of the Scope of Work must be authorized in writing by the KO.

3.1 East Bank Campground

a) The closest electrical box is approximately 400 feet from the gate entrance. The Contractor will need to trench and run wires in conduit from the closest electrical box to install power for the gate.

b) Existing wooden fence to remain.

Seed Project Statement of Work

Revised by Amendment No. 0002

c) The Contractor shall remove the existing manual gate and post. The manual gate shall remain the property of the government. The Contractor shall not damage the existing gate. The Contractor shall store the gate at the maintenance compound off the ground to avoid corrosion from ground contact.

d) The Contractor shall install one 24’x4’ black wrought iron cantilever sliding gate (held above the ground, moving via rollers running along the top and inside of the fence with wheels attached to vertical posts), including one gate operator, a sensory eye and reflector, and two wireless keypads. All wired electrical components (including the sensory eye) should be placed on the side of the road where the closest power source is. The sensory eye will need to work with a reflector on the opposite side of the road to prevent the gate from closing on vehicles. The gate will need to be programmable to both close in a specified amount of time or to be left in the open position for several hours. This gate will be used for traffic control. Contractor shall submit gate for approval before purchasing. Contractor shall field-verify dimensions before purchasing.

e) See Appendix A for existing gate pictures.

Figure 1: For reference only. Typical gate to be installed

3.2 Resource Management Office

a) The closest electrical box is approximately 600 feet from the gate entrance. The Contractor will need to trench and run wires in conduit from the closest electrical box to install power for the gate.

b) The Contractor shall remove the existing manual gate and posts. The manual gate shall remain the property of the government. The Contractor shall not damage the existing gate. The Contractor shall store the gate at the maintenance compound off the ground to avoid corrosion from ground contact.

c) The Contractor shall install one 24’x4’ black wrought iron cantilever sliding gate (held above the ground, moving via rollers running along the top and inside of the fence with wheels attached to vertical posts), including one gate operator, a sensory eye and reflector, and two wireless keypads. All wired electrical components (including the sensory eye) should be placed on the side of the road where the closest power source is. The sensory eye will need to work with a reflector on the opposite side of the road to prevent the gate from closing on vehicles. The gate will need to be programmable to both close in a specified amount of time or to be left in the open position for several hours. This gate will be used for traffic control. Contractor shall submit gate for approval before purchasing. Contractor shall field-verify dimensions before purchasing. See Figure 1 for reference.

d) See Appendix A for existing gate pictures and Appendix B for existing fence.

e) BID OPTION - The Contractor shall demo, dispose, and replace approximately 1,005 linear feet of wooden fence. The Contractor shall submit for approval a new wooden fence design. The new fence shall have a minimum height of 3.5 feet and posts shall be installed into the ground a minimum of 2.5 feet. At a minimum the wood shall be Southern Pine No.

2 Grade Severe Weather Treated for ground contact. At a minimum, 6x6 boards shall be used for fence posts and 2x6 pieces shall be used for fence running boards. Fence shall be natural/brown in color and have 45-degree hip caps.

Figure 2: Typical wooden fence. For reference only (BID OPTION)

3.3 Maintenance Compound Office

a) The closest electrical box is approximately 150 feet from the gate entrance. The Contractor will need to trench and run wires in conduit from the closest electrical box to install power for the gate.

b) The Contractor shall remove the existing manual chain link gate. The manual gate shall remain the property of the government. The Contractor shall not damage the existing gate. The Contractor shall store the gate at the maintenance compound off the ground to avoid corrosion from ground contact.

c) The Contractor shall install one 24’x6’ chain link plus barbwire (3 strain) cantilever sliding gate (held above the ground, moving via rollers running along the top and inside of the fence with wheels attached to vertical posts), including the gate operator, a sensory eye and reflector, and two wireless keypads at the Maintenance Compound. All wired electrical components (including the sensory eye) should be placed on the side of the road where the closest power source is.

The sensory eye will need to work with a reflector on the opposite side of the road to prevent the gate from closing on vehicles. The gate will need to be programmable to both close in a specified amount of time or to be left in the open position for several hours. This gate will be used for security. Contractor shall submit gate for approval before purchasing.

Contractor shall field-verify dimensions before purchasing.

d) See Appendix A for existing gate pictures.

(NOTE: The remainder of the section is unchanged by the amendment.)