This federal solicitation is for operation and maintenance services for government-owned facilities and equipment along the Tennessee-Tombigbee Waterway and Okatibbee Lake Projects in Alabama and Mississippi. Services include general management, cleaning, grass mowing, wastewater treatment facility operation, and visitor center operation. The waterway extends 234 miles connecting the Tennessee and Tombigbee Rivers. Work involves maintenance of locks, dams, buildings, roads, recreation areas and floating plant. The contract has firm-fixed-price and cost-plus-fixed-fee line items, and is set aside for small business with a size standard of $41.5 million average annual revenue. The base period is one year with four one-year options. The Department of the Army Corps of Engineers Engineering District Mobile is the contracting agency. The solicitation will be issued on SAM.gov and paper copies will not be provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 7900)

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXT.

C. E-MAIL ADDRESS

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTION PAGE(S) (X) SEC. PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRS., CONDS., AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECS./WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS(%)

DATEAMENDMENT NO.AMENDMENT NO. DATE

15A. NAME AND

ADDRESS

OF OFFER-

OR

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXT.

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER SUCH

ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION:

10 U.S.C. 2304 (c) 41 U.S.C. 253 (c)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV,. 9-97)

Prescribed by GSA - Far (48 CFR) 53.214 (c)

SEALED BID (IFB)

NEGOTIATED (RFP)

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

1 136

Same as Block 7 Attn: Sophia Chin (CT-S) / W9127819R0025

W91278

ENDIST MOBILE CONTRACTING DIVISION

109 ST JOSEPH ST, MOBILE, AL 36602

W9127819R0025

See Section L Block 8 1400

SOPHIA M CHIN sophia.m.chin@usace.army.mil

2-14 15-79

83-90

97-98

91-96

04/15/2020

251 6903349

99-102

103-128 129-136

X

W9127819R0025

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Base Year - TP-1

FFP

General Management for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee Waterway and Okatibbee Lake Projects, Alabama and Mississippi FOB: Destination

NET AMT

0002 1 Job Base Year - TP-2

FFP

Cleaning Services, Refuse Removal, and Waste Removal for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee- Tombigbee Waterway Project, Alabama and Mississippi

0003 1 Job Base Year - TP-3

FFP

Grass Mowing and Maintenance of Grassed and Landscaped Areas for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-

0004 1 Job Base Year - TP-4

FFP

Operation of Wastewater Treatment Facilities for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee Waterway Project, Alabama and Mississippi

0005 1 Job Base Year - TP-5

FFP

Operation and Maintenace of Visitor Centers for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee Waterway

0006 1 Job Base Year - TPs 6-21

FFP

Operation and Maintenace of Visitor Centers for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee Waterway and Okatibbee Lake Projects, Alabama and Mississippi

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

0007 1 Job OPTION Option Year 1 - TP-1

FFP

General Management for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee Waterway and Okatibbee Lake

0008 1 Job OPTION Option Year 1 - TP-2

FFP

Cleaning Services, Refuse Removal, and Waste Removal for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-

0009 1 Job OPTION Option Year 1 - TP-3

FFP

Grass Mowing and Maintenance of Grassed and Landscaped Areas for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-

0010 1 Job OPTION Option Year 1 - TP-4

FFP

Operation of Wastewater Treatment Facilities for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee Waterway

0011 1 Job OPTION Option Year 1 - TP-5

FFP

Operation and Maintenace of Visitor Centers for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee Waterway

0012 1 Job OPTION OptionYear 1 - TPs 6-21

FFP

Operation and Maintenace of Visitor Centers for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee

0013 1 Job OPTION Option Year 2 - TP-1

FFP

General Management for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee Waterway and Okatibbee Lake

0014 1 Job OPTION Option Year 2 - TP-2

FFP

Cleaning Services, Refuse Removal, and Waste Removal for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-

0015 1 Job OPTION Option Year 2 - TP-3

FFP

Grass Mowing and Maintenance of Grassed and Landscaped Areas for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-

0016 1 Job OPTION Option Year 2 - TP-4

FFP

Operation of Wastewater Treatment Facilities for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee Waterway

0017 1 Job OPTION Option Year 2 - TP-5

FFP

Operation and Maintenace of Visitor Centers for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee Waterway

0018 1 Job OPTION OptionYear 2 - TPs 6-21

FFP

Operation and Maintenace of Visitor Centers for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee

0019 1 Job OPTION Option Year 3 - TP-1

FFP

General Management for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee Waterway and Okatibbee Lake

0020 1 Job OPTION Option Year 3 - TP-2

FFP

Cleaning Services, Refuse Removal, and Waste Removal for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-

0021 1 Job OPTION Option Year 3 - TP-3

FFP

Grass Mowing and Maintenance of Grassed and Landscaped Areas for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-

0022 1 Job OPTION Option Year 3 - TP-4

FFP

Operation of Wastewater Treatment Facilities for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee Waterway

0023 1 Job OPTION Option Year 3 - TP-5

FFP

Operation and Maintenace of Visitor Centers for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee Waterway

0024 1 Job OPTION OptionYear 3 - TPs 6-21

FFP

Operation and Maintenace of Visitor Centers for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee

0025 1 Job OPTION Option Year 4 - TP-1

FFP

General Management for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee Waterway and Okatibbee Lake

0026 1 Job OPTION Option Year 4 - TP-2

FFP

Cleaning Services, Refuse Removal, and Waste Removal for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-

0027 1 Job OPTION Option Year 4 - TP-3

FFP

Grass Mowing and Maintenance of Grassed and Landscaped Areas for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-

0028 1 Job OPTION Option Year 4 - TP-4

FFP

Operation of Wastewater Treatment Facilities for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee Waterway

0029 1 Job OPTION Option Year 4 - TP-5

FFP

Operation and Maintenace of Visitor Centers for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee Waterway

0030 1 Job OPTION OptionYear 4 - TPs 6-21

FFP

Operation and Maintenace of Visitor Centers for Operation & Maintenance of Government-Owned Facilities and Equipment at Tennessee-Tombigbee

Section C - Descriptions and Specifications

SCOPE OF WORK

SECTION C

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

TECHNICAL PROVISIONS (TPs)

FIXED PRICE:

TP-1: GENERAL MANAGEMENT

TP-2: CLEANING SERVICES, REFUSE REMOVAL, AND WASTE REMOVAL

TP- 3: GRASS MOWING AND MAINTENANCE OF GRASSED AND LANDSCAPED

AREAS

TP-4: OPERATION OF WASTEWATER TREATMENT FACILITIES

TP-5: OPERATION AND MAINTENANCE OF VISITOR CENTERS

COST PLUS:

TP-6: BOUNDARY LINE MAINTENANCE

TP-7: MAINTENANCE OF BUILDINGS, STRUCTURES, MECHANICAL, PLUMBING

AND ELECTRICAL SYSTEMS (TENN-TOM)

TP-8: MAINTENANCE OF BUILDINGS, STRUCTURES, MECHANICAL, PLUMBING

AND ELECTRICAL SYSTEMS (OKATIBBEE LAKE SITE)

TP-9: LOCK, DAM, SPILLWAY AND FLOW STRUCTURE MAINTENANCE

TP-10: CHANNEL MAINTENANCE

TP-11: SLOPE REPAIR AND MAINTENANCE

TP-12: DISPOSAL AREA MAINTENANCE

TP-13: FACILITY CLOSING, WINTERIZING, RE-OPENING, AND FLOOD

RESPONSE/RECOVERY

TP-14: MAINTENANCE AND REPAIR OF PAVED ROADS, CRUSHED STONE

ROADS, GRAVEL ROADS, AND PARKING AREAS

TP-15: MAINTENANCE AND REPAIR OF FENCING, SIGNS, BUOYS, GATES,

BARRICADES, BULLETIN BOARDS, CONCRETE BUMPERS, POSTS,

GUARDRAILS, AND TRAFFIC COUNTERS

TP-16: PEST AND INVASIVE PLANT CONTROL

TP-17: WILDLIFE AND FORESTRY MANAGEMENT

TP-18: RECREATION FACILITY REPAIRS AND RENOVATION

TP-19: EMERGENCY RESPONSE SUPPORT, STORAGE AND DISPOSAL OF

HAZARDOUS AND TOXIC MATERIALS

TP-20: MAJOR LOCK MAINTENANCE CLOSURES

TP-21: MAINTENANCE OF GOVERNMENT FURNISHED EQUIPMENT AND

VEHICLES

TECHNICAL PROVISION 1

TP-1 GENERAL MANAGEMENT

This TP applies to the Tenn-Tom Project and the Okatibbee Lake Site.

SCOPE OF WORK: The Contractor shall provide all general management, supervision, and labor to operate and maintain the U.S. Army Corps of Engineers projects sites along the Tennessee-Tombigbee (Tenn-Tom) Waterway (Tenn-Tom Project). In addition, the Contractor is to provide certain equipment, materials and parts. The project is a vital inland waterway that connects the north-flowing Tennessee River to the south-flowing Tombigbee River. The waterway extends from mile 217 on the Black Warrior Tombigbee near Demopolis, Alabama, to mile 215 on the Tennessee River in the Pickwick Pool near the common boundary of Mississippi, Tennessee, and Alabama. The project is located in west central Alabama, and Northeastern Mississippi; Sumter, Greene, and Pickens Counties in Alabama, and, Noxubee, Lowndes, Clay, Monroe, Itawamba, Prentiss, and Tishomingo Counties in Mississippi.

Reference Section J for the comprehensive list of Government owned facilities, navigation channels, various recreational sites, lakes, locks, dams, spillways, systems and various types of vehicles and equipment used for this contract. With appropriate Government oversight, the Contractor will be responsible for planning and supervising the day-to-day activities of Section C.

In addition, this contract includes Okatibbee Lake Site near Meridian, Mississippi located in East Central Mississippi to include Lauderdale and Kemper Counties in Mississippi.

Government vs. Contractor furnished: The Contractor shall provide all labor, materials, supplies, and other items necessary for the operation, maintenance, repair, and replacement requirements as specified herein unless otherwise indicated in Section J.

Other Direct Costs (ODC): The Contractor shall include ODCs for the management and administration of this contract under TP-1. ODCs include but are not limited to: uniforms, office supplies, drug testing, training, travel, safety expenses, fees, licenses, postage, insurance, etc.

CRITERIA AND PUBLICATIONS.

The Contractor shall perform all work in accordance with applicable publications to include, but not limited to, the listing below:

Emergency Spill Response 29 CFR 1810.201.q

Original Specifications Painting for work required in TP-3 Operation Manuals for Each Structure

TP-3

Safety:

EM 385-1-1 (Corps of Engineer’s Safety Manual) EP 310-1-6a and EP 310-1-6b (U. S. Army Corps of Engineers’ Sign Standards Manual) Environmental Review Guide for Operations

Equipment Manufacturer's:

Operating Manuals Repair Manuals

Industrial Standards and Codes: (Latest Editions) Air Moving and Conditioning Association American Association of Nurserymen, Inc.

American Concrete Institute American Institute of Steel Construction American Society of Heating, Air-Conditioning and Air-Conditioning and Refrigeration Institute American Society of Heating, Refrigeration and Air-Conditioning Engineers American Society for Testing and Materials American National Standards Institute American Welding Society Architectural Aluminum Manufacturers Association Architectural Graphics Standards Asphalt Institute Consumer Products Safety Commissions Handbook for Public Playground Safety International Building Code National Association of Architectural Metal Manufacturers National Association of Fan Manufacturers National Electrical Code National Fire Protection Association National Plumbing Codes Standards Illustrated National Warm Air and Air Conditioning Association Portland Cement Association Sheet Metal Manufacturers The Aluminum Association

Other General Services Administration (GSA) guidelines and schedules for vehicle maintenance.

EM 1110-1-400 Engineering and Design –Recreation Facility and Customer Services and Standards-

PRE-WORK CONFERENCE

The Contractor shall attend a pre-work conference as soon after award as practical, depending on when actual performance is to begin. The intent is to conduct the conference prior to work start;

however, if not practical, then not later than 15 days after award of contract. During this conference, the Contracting Officer (KO) shall establish the lines of authority and Government procedures for contractual, administrative, and work matters. The schedule of required submittals and reports will also be discussed. The Contractor shall provide names of all key personnel and provide a copy of each individual resume at this meeting. A letter of record, documenting all pre-work conference discussions, will be furnished to all attendees.

COORDINATION MEETING

The coordination meeting will be separate from the Pre-work Conference as required in the previous paragraph. Before work commences, the Contractor and its staff shall meet with the Contracting Officer’s Representative (COR). Discussion will be held to develop a mutual understanding of quality control requirements, details of the reporting requirements, implementation of the accident prevention plan, the inter-relationship of the Government’s inspection system to the Contractor Quality Control (CQC) plan, and all other aspects of the contract. A record of the proceedings will be furnished to all attendees.

The Contractor shall personally supervise the work or have a competent superintendent on the site at all times. The superintendent shall possess full authority to act on behalf of the Contractor and to legally bind the Contractor. Such authorization shall be submitted in writing to the COR prior to commencement of work.

COMMUNICATION, DEVICES AND RESPONSIBILITIES

The Contractor shall provide adequate communication between the Corps and the Contractor’s superintendent, and between the contractor’s employees.

The Government will provide an office telephone system and one (1) cellular phone for the Project Superintendent. Computers, communication devices, and other office equipment provided by the Government are identified in Section J. These will be utilized to perform various duties such as inventory control, Maintenance Management, Facilities and Equipment Maintenance (FEM) system, and the use of the Government e-mail system. This will require Common Access Cards (CAC) for the Contractor’s management and administrative staff who utilize the Government furnished computer equipment and network. Any software utilized by the Contractor for contract management will be subject to approval by the Government prior to installation.

NOTIFICATION OF WORK TO BE DONE

When the Contractor, or his duly Authorized Representative, is notified of work required under these specifications, it is the spirit and intent of these specifications that the Contractor respond to such notification of the COR within twenty-four hours after the receipt of such notification, or the Contractor shall present his plan within twenty-four hours to perform such work as soon as practicable. The notification to the Contractor of work to be performed shall be verbally, by radio, telephone, e-mail, memo or letters as appropriate to the instant case.

The Contractor shall furnish and keep current a list of key personnel to be contacted in the event that emergency repairs or service become necessary. The Contractor must ensure that contact can be made with these personnel either by telephone, radio, or other means, within one (1) hour, and the personnel will respond within two (2) hours after notification. Contact will be made by the COR or person designated by the COR. The Contractor and the COR will establish a written policy and procedure for responding to emergency work assignments. The Contractor shall maintain its schedule of cleaning services regardless of inclement weather with the exception of flooding, ice, and snow, which may make the roads impassable and working conditions too hazardous.

INTERRUPTIONS TO SYSTEMS

All work that requires an interruption to the use of the project facilities or systems, or otherwise disrupt navigation traffic, building occupants and/or the visiting public, shall be fully coordinated and approved in advance by the COR. Interruptions shall be kept to an absolute minimum, and all repairs and/or replacement of equipment or components shall be accomplished in an expeditious and efficient manner.

SITE CLOSURES AND RESPONSIBILITIES

From time to time during the life of the contract, facilities or recreational areas may be subject to lease, closure, and/or consolidation due to management initiatives being implemented. As a result of a lease, closure, and/or consolidation, the number and type of facilities located in each area may fluctuate on a temporary and/or permanent basis. The Contractor’s work schedule must be sufficiently flexible to meet these changing needs. All closure and/or consolidations actions will be done only with approval of the COR. Reference TP-13 and TP-20 for project specific requirements.

EXPERIENCE AND QUALIFICATION OF KEY PERSONNEL

The Contractor shall provide an adequate and efficient number of trained and fully qualified personnel to supervise, maintain, repair, inspect and operate the Tenn-Tom Project in accordance with these specifications. All employees shall be subject to such Government regulations as are applicable during the time spent on Government property. The Contractor shall inform the COR of any personnel changes.

Subcontractors may be utilized to perform highly specialized or one-time type repair work. The Contractor shall provide an adequate number of fully qualified personnel at the Tenn-Tom Project site to efficiently and effectively comply with these specifications. In some instances and for some duties, contract employees will be required to undergo background investigations prior to performing the duties.

Background Checks: The Contractor will be required to provide background checks on all employees who must access Government secure facilities. Examples are Locks, Dams, offices, Visitor Centers, etc. The Contractor will be required to provide background checks on all employees who must access Government computer systems.

Removal of Contractor’s Employee(s): All contract employees shall conduct themselves in a proper manner at all times. The Contractor shall remove or reassign from work under this contract any employee who, in the opinion of the COR, is objectionable or incompetent. The COR may require the Contractor to immediately remove from the work site any employee of the Contractor who is considered incompetent, or who endangers persons or property, or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform the work. Contract employees found to be under the influence of drug or alcohol, mental or physical impairment, negligent in the use of personal safety equipment or established safety policies or procedures, may be subject to immediate dismissal, depending on the nature of incident. Repeated or continual ongoing safety infractions shall be grounds for dismissal.

Notification of objection by the COR will be made promptly to the Contractor in writing if time or circumstances permit. Otherwise, notification shall be by telephone and shall be confirmed in writing as soon as possible. These requirements shall not be the basis of any claim for compensation and/or damages against the United States and/or any of its officers or agents. In addition, no such removal will reduce the Contractor's obligation to perform all the work under this contract, and immediate replacement will be made as required.

ANTITERRORISM AND OPERATIONS SECURITY (AT/OPSEC)

In accordance with OPORD 2013-74, Annex A, the following paragraphs apply to this requirement:

a. AT Level I Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:

http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.

b. Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

c. For contractors requiring Common Access Card (CAC). The contractor and all sub-contractors employees will be issued a CAC only if duties involve one of the following:

(1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an interim CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

d. For contractors who do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

e. Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.

f. Contractor Employees Who Require Access to Government Information Systems.

All contractor employees with access to a government info system must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the information systems and then annually thereafter in accordance with personnel security standards listed in AR 25-2 (Information Assurance), an appropriate background investigation will be conducted prior to accessing the government information systems.

g. For Contracts that Require OPSEC Training. All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty.

Additionally, all contractor employees must complete annual OPSEC awareness training.

The Contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites: https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.

h. For Information assurance (IA)/information technology (IT) training. All contractor employees and associated sub-contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of employment.

i. Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award. *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.

PLANS

The Contractor shall furnish the following plans within 30 days after award date (unless noted otherwise) for approval by the Contracting Officer.

1. Contractor Quality Control Plan (CQC) (within 15 days after award). The Contractor will establish a comprehensive quality control program in accordance with contract clause entitled "Inspection of Services". This plan should discuss in detail the proposed Quality Control Program to be used to assure compliance with the contract specifications and the offeror's proposal per the SECTION H, SPECIAL CLAUSE REQUIREMENTS, “OFFEROR’S PROPOSAL”. The Quality Control Plan should consist of an outline describing the quality control concepts, purpose, and general program overview. Discuss the methods to be utilized to ensure that the program is effective and efficient. Provide a list of all quality control personnel and include their responsibilities, authorities, and positions relative to the organization chart.

Describe the inspection program to be utilized to ensure quality control goals are met. Include the frequency, inspection method, and schedule for each lock, dam and other project facilities and plant. Describe how corrective measures will be applied. Describe the interaction and coordination efforts that should occur between Quality Control and Government Quality Assurance Personnel. The Quality Control Plan will be in sufficient detail to assure the Government that the Contractor is cognizant of the contract requirements and satisfies all performance requirements. In addition to the above, the Quality Control Plan should establish methods of control for the following areas:

Timely indoctrination and training of personnel.

Employee performance and evaluation of this performance.

Identification of decline in quality of performance.

Corrective action to restore substandard performance and correct deficiencies.

Assurance of employee knowledge of work assignment, regulations pertaining thereto or affecting his work, such as fire reporting, safety, erosion of embankments, etc.

Employee health and hygiene.

Security of facilities and equipment (including key control).

Maintenance of facilities and equipment.

Proper reporting by Contractor employees of maintenance needs.

Preparation and submission of required reports to both Government technical and contracting personnel.

Contractor Quality Control Officer. The Contractor shall designate, in writing, a Contractor Quality Control Officer (CQCO) who will be responsible for ensuring the implementation of the CQC Plan. The Quality Control Officer shall be:

Employed directly by the Contractor with limited collateral duties beyond those specified in the QC Plan.

Independent of the Contractor’s field-organization.

Responsible only to the Contractor’s top-level managers/owners (excluding the on-site superintendent).

Have minimum experience of five (5) years in quality control work.

100% of the CQCO’s time shall be utilized at the Tenn-Tom Project performing QC or limited collateral duties.

The Contractor Quality Control Plan shall include 2 Quality Control Inspectors, in addition to the CQCO. The CQC Inspector qualifications shall be the same as the CQCO qualification requirements. One CQC Inspector shall work out of the Bay Springs Office and one CQC Inspector shall work out of the Columbus Office. Both CQC Inspectors shall report to the

CQCO.

Determination of all work required to maintain and repair all facilities, buildings, structures, and all systems in safe and efficient operating conditions are the responsibility of the Contractor.

However, the COR may direct the Contractor to perform repairs or maintenance if deficiencies are observed. This notification may be verbal or in writing. The Contractor shall respond as soon as possible, but no later than 24 hours after notification to repair such work items, or advise the COR in writing why this condition cannot be met. Failure to respond within these guidelines without acceptable justification may be counted against the Contractor as evidence of unsatisfactory performance in evaluation for award fees.

The CQCO shall provide for inspection of all items of work and rework to ensure conformance to specifications and drawings. Inspection activities performed shall also include monitoring of subcontractor performance, inventory control, and procurement of supplies. The CQC plan will provide for ongoing inspections of the CQC functions described herein. Government Quality Assurance inspectors will assure that CQC is being followed and is effective, but the presence or absence of a Government inspector shall not relieve the Contractor of responsibility for the proper execution of work in accordance with the specifications. All compliance inspections shall be recorded on a form approved by the COR. All Contractor documentation developed to monitor quality control, to include records of deficiencies observed and corrective actions taken shall be furnished to the Government. If recurrent deficiencies indicate that the quality control system is inadequate, corrective action will be taken as directed by the COR. Upon approval of the plan, any proposed changes must be approved by the COR prior to implementation.

2. Purchasing Plan. The Contractor shall submit a purchasing plan. The Contractor may not purchase any piece of equipment or property, which would require placement on the Contractor's property account without prior approval. Lost, damaged or destroyed items may not be replaced or repaired without prior approval. These parts may be procured locally. In the event that emergency repair parts are required, and it is not possible to obtain advance procurement approval from the COR, the Contractor is authorized and shall be required to procure those parts necessary to affect immediate repair in order to protect personnel and/or property. The Government reserves the right to make major purchases for the Contractor through other Government sources in order to take advantage of special Government pricing, and thus save money.

The Contractor shall maintain a purchasing system which will assure efficiency in expending Government funds. The Federal Acquisition Regulation (FAR) shall be used as a guide in establishing purchasing procedures and standards commensurate with the policies and techniques contained therein. The Contractor shall afford Small Business concerns an equitable opportunity to compete for all contracts they can perform. The Contractor's purchasing system is subject to review and approval by the Contracting Officer.

3. Management Plan. The Contractor shall submit a management plan addressing personnel staffing, and physical aspects (utilization of equipment, personnel requirements and facilities).

The Government reserves the right, through a coordinated effort with the Contractor, to assist in the finalization and approval of the plans after contract award. EM-385-1-1 and/or OSHA may require other plans.

a. Employee Uniform and Identification Plan. The Contractor will be required to submit a proposed uniform apparel package for approval by the COR. This plan will contain the Contractor’s recommended uniform items including styles, colors and types of uniform items proposed. Prior to commencement of work, the Contractor shall provide employees with approved uniforms. Company identification shall be accomplished by a patch on the breast pocket or left shoulder. Uniforms shall also be provided to subcontractors working on the project on a full-time basis.

b. Subcontracting Plan. Part of the management plan is the subcontracting plan and it is to include, as a minimum, the degree and rational of the subcontracting contemplated.

c. Equipment Utilization Plan. Contractor will submit an equipment utilization plan as a part of its management plan. This plan shall include types of equipment to be used, ownership, etc. The Contractor will utilize a combination of Government owned and

Contractor owned (or rental) equipment in the performance of this contract. However, during the performance of this contract, the Government reserves the right to change the Government furnished equipment list during the life of the contract.

4. Facilities Maintenance Plan (within 90 days after contract award). The Contractor shall submit a quarterly, annual, and a five-year plan for all routine maintenance and duties covered by the specifications. In addition, the Contractor shall prepare weekly schedules detailing all planned activities. A weekly schedule of upcoming work will be provided to the COR at least seven (7) days in advance. The frequency of submittal of plans and schedules may be adjusted as needed and directed by the COR. Routine cleaning, janitorial, and grass mowing will not be included in these plans.

Work incidental or related to contract work items, but not specifically identified or described in each Section, may be required of the Contractor. This work will be accomplished by the existing work force utilizing existing equipment and will be performed by rescheduling and/or reapportioning the Contractor’s long range and weekly schedules, as approved by the COR.

The use of the Facilities and Equipment Maintenance (FEM) system shall be a requirement of this contract. The FEM system is the Corps of Engineers Asset Management’s comprehensive computerized maintenance work management program for planned and unplanned activities including long- and short-term planning, preventive, reactive and condition-based maintenance.

It is used to schedule maintenance, optimize resources, and track key performance indicators. All maintenance is performed from work orders from FEM. All labor and materials are captured to aid in the business decision making process. FEM is based on IBM’s MAMIXO platform. The Government will provide the necessary training for the implementation of the FEM program.

5. Inventory Management and Property Control Plan. The Contractor shall submit Contractor’s recommendation for stock items and levels for approval of the COR. Contractor’s inventory management and property control plan, including control of Government property, shall be implemented upon approval. The inventory control program will utilize FEM. The Contractor shall inventory existing stock items and materials available at the beginning of the contract and shall input the results of the inventory into FEM.

The property control plan will contain provisions to protect, preserve, account for, and control all Government furnished property (GFP) from its acquisition through disposition. This plan will be in writing. The Contractor will be required to use the FEM system for property and inventory control once it is fully functional. The following will be documented in FEM:

The name, description, and NSN/NCN Quantity received (or fabricated), issued, and on hand Unit price Contract number or equivalent code designation Location Disposition Posting reference and date of transaction

Bar Code Serial Number (if applicable) Manufacturer Summary price for all property

The plan will be forwarded to the COR for approval. If for any reason the plan is disapproved, the COR will notify the Contractor in writing, requesting prompt correction of deficiencies. If the Contractor does not correct the deficiencies within a reasonable period, the COR will:

a. Notify the Contractor in writing of any required corrections and establish a schedule for completion of actions.

b. Caution the Contractor that failure to take the required corrective actions within the time specified will result in withholding or withdrawing plan approval.

c. Advise the Contractor that its liability for loss of or damage to Government property will increase if approval is withheld or withdrawn.

The inventory shall be complete and accurate. The Contractor shall submit no less than monthly, a complete updated printout of the inventory. The Contractor shall be subject to a monthly property management audit by the Government.

All property furnished to the Contractor will be controlled by means of the established inventory list. This inventory list will be maintained by the Contractor. It will include all property, which is currently used by the O&M Contractor and any additional property items procured throughout the life of the contract. The purchase of new accountable-property items will require approval of the Contracting Officer. The Contractor will designate, in writing, a Contractor Property Officer (CPO), who will be responsible for maintaining accountability and record keeping. This individual will be a management official and may be assigned other duties by the Contractor.

An interim inventory management and property control system may be utilized by the Contractor with the approval of the COR. This interim system will only be utilized until the proper training and credentials for use of the FEM system are accomplished by the Contractor. The Government will provide the necessary training for the implementation of the FEM program.

Excess/Disposal/Returns: All property returned by the Contractor to the Government, for whatever reason, will be accompanied with the property records. The CPO will notify the COR when serviceable GFP equipment is not needed to perform the work and otherwise will remain inactive.

The COR will review the Contractor’s plan as frequently as condition warrants. These reviews will take place at any time during contract performance, upon contract completion or termination, or at any time thereafter during the period the Contractor is required to retain such records. The Contractor will make all such records and related correspondence available to the

COR.

Safe Guarding Government Property and Accident Notification: The Contractor shall cooperate with Government personnel in safeguarding Government property and reporting accidents. The Contractor shall be responsible for reporting to the COR all acts of vandalism, larceny, pilferage, and/or other property damage. The COR will ensure that local law enforcement personnel are notified. The Contractor shall provide a full description of the security procedures and safeguards that will be established to protect equipment, materials, tools, and other resources from loss or damage. The Contractor shall notify the COR immediately upon discovery of any Government Furnished Property that is lost, damaged, or destroyed while in the Contractor’s possession. Telephone or radio reports to the COR with timely follow-up in writing will be acceptable. Under normal conditions, written reports will be provided within 24 hours. In very unusual circumstances, reports will be submitted within 48 hours. On a monthly basis, the Contractor will provide a consolidated report of property damage, acts of vandalism, larceny, pilferage or other damages or loss of Government facilities maintained by the Contractor.

The Contractor will be responsible for providing immediate notification to the COR of any accident which involves personal injury, death, any property damage and other significant occurrences. Initial notification will be verbal with follow-up in writing as directed by the COR.

All accidents involving on-the-job injuries or property damage will be telephonically reported to the COR as soon as reasonably possible after the accident, but no later than the end of shift on the day of the accident. The Contractor will also be required to complete all appropriate reports and submit them within 24 hours of the accident or 48 hours under unusual circumstances. The COR will provide the Contractor with guidance regarding the proper forms to submit for each type of accident, which might occur on the job. The Contractor shall submit accident exposure and experience incidental to this work in accordance with Section 2, EM-385-1-1 and instructions from the COR.

The Contractor will be responsible for safeguarding all work sites in parks and public recreation use areas. Appropriate signs, warning devices, and barriers will be used to protect the general public, Contractor employees, and Government employees where work is being accomplished.

The Contractor shall ensure that all contract personnel are aware of the responsibility to be good stewards of Government property entrusted to them. Property that is portable and easily pilfered will be included in the property inventory listing. These items are controlled, regardless of dollar value. Examples of controlled equipment are hand and power tools, battery chargers, computers, binoculars, cameras, portable radios, etc.

6. Cost Schedule Plan. The Contractor shall have a Cost Schedule Plan with work breakdown structure of cost estimates to be incurred for each TP for each month of the contract. The Plan shall be updated monthly as required to reflect changes in expenditures due to changes in work.

Additionally, daily written records shall be maintained of all maintenance, repair, and operation activities. Cost data for each activity will be maintained and be subject to Government audit, as determined by the COR. This cost data shall include labor (in hours and dollar value), supplies, materials, or parts costs for each separate scheduled work task, and in sufficient detail to reflect the type of materials, supplies and parts being ordered. This information will be furnished to the COR upon request.

7. Spill Prevention, Control and Countermeasures Plan

a. Spill Prevention and Response Plan. For TP-19, the Contractor shall provide a Spill Prevention and Response Plan to address the required response/cleanup effort for a worst case scenario based on information from the Project Spill Prevention, Control and Countermeasures Plan. This plan shall take into account weather conditions, man-hour requirements, equipment and material requirements/methods of procurement, levels/sources of training for response personnel and safety requirements.

b. Hazardous and/or Toxic Materials Handling, Storage and Disposal Plan. For TP-19 the Contractor shall develop a Hazardous and/or Toxic Materials Handling, Storage and Disposal Plan required for emergency spill responses identified in TP-19.

c. Site Safety and Health Plan. For TP-19 the Contractor shall develop a Site Safety and Health Plan (SSHP) for each level of Emergency Spill Response actions identified in TP-

19. The SSHP addresses the safety and health hazards of each phase of site activity and the procedures for their control. The Corps will appoint a Site Safety Officer (SSO) to work under the direction of the On-Scene Incident Commander (OSIC). While the overall coordination of on-site activities will be under the direction of the OSIC, safety issues will be coordinated by the SSO. The SSO may curtail or cease operations, in his/her opinion; a continued spill response effort poses a threat to the health and safety of on-site personnel.

8. Accident Prevention/Hazardous Analysis Plan to include Hazard Control Plan and Confined Space Entry Plan (within 15 days after award). The Contractor is to provide these plans in compliance with EM 385-1-1.

9. Comprehensive Pest Control Plan. The Contractor is to provide a comprehensive pest and invasive species control plan in accordance with the requirements in TP-16.

10. Security Plan. The Contractor will provide a comprehensive plan detailing its procedures for security of Government Furnished Property, material and supplies, keys and all other items supplied by the government.

11. Antiterrorism and Operations Security into the Contract Support Planning and Execution (AT/OPSEC). The Contractor is to provide this plan within 30 days after award of the contract.

INVOICING

Invoices are to be broken down by TP and location. Cost plus TPs should include all costs associated with labor, materials, supplies, services, other direct costs, and subcontractors. Lump sum invoices for cost plus TPs will not be paid. Fixed price TPs should include total cost for the contract line item for the invoice period. A summary checklist of all work completed during the invoice period will be included with the submitted invoice.

EMERGENCIES

The Contractor shall respond to emergency situations such as (but not limited to) damage to recreation areas, visitor centers and offices, miter and tainter gates, oil spills, severe levee erosion and spillway/stilling basin undermining as necessary to affect immediate repairs. If needed, the Government reserves the right to mobilize additional contract/hired labor effort as required to complete repairs.