Attachment 02- Industry- Qustionnare.docx

DOCX document 22 KB Posted

Attached to
Sources Sought - Modular Construction Fort Hood Barracks #104
Solicitation number
W9126G27RA023
Issued by

About this file

This is an Industry Questionnaire used for market intelligence and solicitation planning purposes related to the Fort Hood Barracks #104 construction project. The questionnaire is designed to gather contractor feedback on project delivery method viability, budget realism, innovation opportunities, and supply chain risks to inform whether a Design-Build to Budget (DBtB) or Progressive Design-Build (PDB) approach should be pursued under an Other Transaction (OT) Agreement framework.

The questionnaire addresses five primary evaluation areas: (1) General Feasibility & Model Selection, requesting contractor preference between OT agreements versus traditional FAR-based contracts, identification of OT-related barriers or risks, assessment of whether a reliable fixed price is achievable after a 2-3 month design refinement period, and justification of risk factors; (2) Budget & Financial Realism, seeking validation of the Construction Cost Limitation of $110,698,420.00 for approximately 250-soldier barracks, identification of major cost drivers such as security requirements or specialized systems, and comparable project benchmarks; (3) Flexibility & Innovation, requesting identification of overly prescriptive requirements that limit cost-effective solutions and opportunities for integrated design-build teams to deliver enhanced value through modular systems, standardization, prefabrication, or energy efficiency improvements; (4) Market & Supply Chain External Risks, including long-lead equipment concerns (generators, switchgear, custom AHUs) and local labor availability constraints; and (5) Defining Value/Betterment Search, requiring contractors to rank enhancement priorities (durability, lifecycle costs, energy efficiency, technology capability, mission functionality, schedule acceleration, resiliency) and assess sustainability target achievability within the established budget. Respondents must provide firm information, detailed explanations for each response, and submit the completed questionnaire (maximum 10 pages) by September 17, 2026, at 10:00 A.M. CDT as part of their capability statement package.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Market Intelligence: First Look Questionnaire

Project Name: Fort Hood Barracks #104 Project Number: N/A Date: 20 August 2026 Purpose: The answers to this section are critical. They will guide the PDT in determining whether Design-Build to Budget (DBtB) is viable, or whether the project’s complexity and risk profile require a Progressive Design-Build (PDB) approach.

Respondent Information Firm Name: _______________________________________________ Primary Point of Contact: __________________________________ Title: ____________________________________________________ Email: ___________________________________________________ Phone: ___________________________________________________

General Feasibility & Model Selection (DBtB vs. PDB)

1. Agreement Preference The Government is exploring the use of an Other Transaction (OT) Agreement for this construction project to potentially increase collaboration, speed, and innovation.

For this specific project, do you believe an OT agreement is the most appropriate contractual vehicle, or would your firm prefer a traditional FAR-based contract?

Please explain your reasoning in detail, including any considerations related to risk allocation, flexibility, procurement efficiency, commercial terms, and project execution.

Response:

2. OT Risk & Barriers If the Government chooses to proceed with an OT framework rather than a traditional FAR Part 15 procurement, does your firm foresee any barriers, risks, or hesitations in proposing on or executing this project?

☐ Yes ☐ No If yes, please identify and explain the barriers, risks, or concerns, including any potential mitigation strategies.

03. Model Viability Based on the parameters provided in the Project Information Packet, does your firm believe it is feasible to propose a reliable, fixed price for this project after a 2–3-month collaborative design refinement period?

☐ Yes – A reliable price is likely achievable.

☐ No – There is too much risk or uncertainty to provide a reliable price this early.

Additional Comments:

4. Risk Justification Please explain your reasoning for the answer provided below.

What are the top 1–3 factors that influenced your assessment? Examples may include:

· Project complexity

· Site conditions

· Clarity of functional requirements

· Design maturity

· Unknown existing conditions

· Specialty systems or equipment

· Schedule constraints

· Market volatility

· Supply-chain risks

· Regulatory or permitting requirements

· Other factors Response:

Factor 1: ________________________________________________________________

Factor 2: ________________________________________________________________

Factor 3: ________________________________________________________________ Reasoning

5. PDB Threshold If you answered “No” to Question 3, at what level of design maturity would your firm feel confident in providing a reliable, fixed price or Guaranteed Maximum Price (GMP) through a Progressive Design-Build process?

☐ 15% Design ☐ 35% Design ☐ 60% Design ☐ 90% Design ☐ Other: ______________________________ Please explain the rationale for your selection.

Budget & Financial Realism

1. Budget Alignment Based on your firm's recent experience with similar projects, does the proposed Construction Cost Limitation (CCL) of $110,698,420.00 for approximately 250 soldier Barracks.

☐ Yes – The CCL appears realistic.

☐ Generally – The CCL is achievable with certain qualifications or adjustments.

☐ No – The CCL appears insufficient for the stated requirements.

Please explain.

2. Major Cost Drivers From a high-level review of the functional requirements, do you see any specific mission needs that you anticipate will be the primary drivers of cost?

Examples may include:

· Specialized security requirements

· Unique structural loads

· Specialized MEP systems

· High-performance building envelope

· Mission-specific technology

· Specialty equipment

· Resiliency requirements

· Site or utility requirements

· Other project-specific requirements

3. Market Precedents Are there specific benchmarks, comparable projects, or recent industry projects the Government should consider ensuring expectations for quality, performance, functionality, and cost are aligned with the proposed budget?

Relevant Project/Benchmark (if applicable):

Project Name: ______________________________________________________________ Location: _________________________________________________________________ Approximate Size: __________________________________________________________ Approximate Cost: __________________________________________________________ Completion Year: ___________________________________________________________

III. Flexibility & Innovation (The "How")

1. Prescriptive “Showstoppers” Are there any requirements in the functional description that appear overly prescriptive or “locked-in” and might prevent your firm from offering a more innovative or cost-effective solution that meets the mission requirements?

☐ Yes ☐ No If yes, please identify the requirements and explain how they could be modified to enable greater innovation or value.

2. Innovation Opportunities For this building type, where do you typically see the greatest opportunities for an integrated design-build team to provide “more for the money”?

Examples may include:

· Modular systems

· Standardization

· Envelope efficiency

· MEP coordination

· Structural optimization

· Prefabrication

· Building systems integration

· Space planning

· Construction sequencing

· Energy efficiency

· Materials selection

· Technology integration

· Other opportunities

Top Innovation Opportunity: ______________________________________________ Potential Benefit: ______________________________________________________

IV. Market & Supply Chain – External Risks

1. Long-Lead Warning Even without a full design, are there specific systems, equipment, or materials common to this facility type that are currently experiencing extended lead times that could threaten the proposed project schedule?

Examples may include:

· Generators

· Custom AHUs

· Electrical switchgear

· Transformers

· Specialty laboratory equipment

· Security systems

· Specialty glazing

· Controls systems

· Other mission-critical equipment

Recommended Mitigation Strategies:

2. Local Labor Constraints Are there specific trades in the project area that are currently over-extended or in short supply and could impact the project's risk profile, cost, or schedule?

☐ Yes ☐ No If yes, please identify the affected trades and describe the anticipated impact.

Potential Mitigation:

V. Defining Value – The “Betterment” Search

1. The Value Gap If your team discovers design efficiencies during the proprietary meetings, which betterments or enhancements should the Government prioritize as most valuable for this facility type?

Please rank the following from 1–5, with 1 being the highest priority.

Betterment / Enhancement
Rank
Enhanced durability / maintainability
_____
Lower life-cycle costs
_____
Improved energy efficiency
_____
Improved technology / systems capability
_____
Improved mission functionality / flexibility
_____
Schedule acceleration
_____
Improved resiliency / redundancy
_____
Other: ______________________________
_____

Please explain your ranking:

2. Sustainability Targets Is the proposed level of sustainability (e.g., specific energy goals, energy-use intensity targets, certifications, carbon-reduction goals, etc.) a standard “reach” for industry, or will achieving the target require significant premium pricing in this market?

☐ Standard / Routinely Achievable ☐ Achievable with Moderate Additional Cost ☐ Significant Premium Pricing Likely ☐ Target Requires Further Definition Comments:

Recommended Sustainability Target(s), if applicable: