This is a Sources Sought Notice and Request for Information (RFI) issued by the U.S. Army Corps of Engineers (USACE), Fort Worth District, for market research purposes regarding a Progressive Design-Build (PDB) project under Other Transaction Authority (OTA) pursuant to 10 U.S.C. § 2808a.
The project involves designing and constructing a permanent-party barracks facility at Fort Hood, Texas, to accommodate 250 Soldiers in modern housing. The scope includes the barracks building with living quarters, bathrooms, storage areas, a day room, furnishings, self-contained HVAC systems, fire protection and alarm systems, antiterrorism features, PACS, CCTV, EMCS connectivity, cybersecurity measures, and accessibility provisions. Supporting work encompasses site development, utilities, parking, paving, sidewalks, storm drainage, lighting, landscaping, signage, and roadway/pedestrian crossings. Type II construction standards are required, along with sustainability and energy-efficiency measures. The site has contamination concerns, including potentially uncontrolled fill from prior demolition. The Government has established a Target Price Range (TPR) between $99,628,420.00 (strict CCL) and $110,698,420.00 (estimated Construction Budget), within a total Programmed Amount of $125,000,000.00. The projected award date for Phase 1 (Design and Preconstruction Services) is Third or Fourth Quarter of FY27, with an approximate Period of Performance of 1,000 calendar days following Phase 2 Construction execution.
Interested firms must submit responses by Thursday, September 17, 2026, NLT 10:00 A.M. CDT, including confirmation of interest in the PDB/OTA model, a capability statement addressing secure facility construction, progressive design-build mechanics, and advanced technical methods, and complete answers to the Project Delivery & Acquisition Strategy Questionnaire. Technical questions must be submitted by Thursday, September 10, 2026, NLT 10:00 A.M. CDT. All submissions should be emailed to Contracting Specialist Bijay Gurung (Bijay.Gurung@usace.army.mil) with a courtesy copy to Contracting Officer Shayla Lucas (shayla.j.lucas@usace.army.mil). A virtual Industry Day will be scheduled with details published on SAM.gov.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Special Notice: Progressive Design Build Services Under Other Transaction Authority - Permanent-Party Barracks #104 at Fort Hood, Texas, to accommodate 250 Soldiers.
NOTICE TYPE: Sources Sought / Request for Information (RFI) for Market Research Purposes Only
SUBJECT: Sources Sought (RFI) – Fort Hood Barracks #104
1. DISCLAIMER: This is a Request for Information (RFI) / Sources Sought Notice only. This notice is issued solely for market research, information, and planning purposes. It does not constitute a Request for Proposals (RFP), a Request for Qualifications (RFQ), or a commitment by the Government to write, issue, or award an agreement or contract. The Government will not pay for any information or administrative costs incurred in response to this notice. All response costs will be borne solely by the interested party.
2. PROJECT OVERVIEW & POTENTIAL PATHWAY: The U.S. Army Corps of Engineers (USACE), Fort Worth District, is conducting public market research to gauge industry interest, capacity, and capability from commercial construction firms, design-builders, and Non-Traditional Defense Contractors (NDCs).
This project will potentially be executed as a Progressive Design-Build (PDB) project utilizing Other Transaction Authority (OTA) pursuant to 10 U.S.C. § 2808a. Prospective partners are advised that the Federal Acquisition Regulation (FAR) does NOT apply to this potential procurement path. The negotiated, bilateral Other Transaction (OT) Agreement would serve as the sole governing contract.
3. SCOPE OF WORK:
The proposed project consists of constructing a permanent-party barracks at Fort Hood, Texas, to accommodate 250 Soldiers in modern housing located near existing unit headquarters and motor pools. The facility shall be designed and constructed, at a minimum, as Type II construction in accordance with applicable codes and criteria. The facility will include living and sleeping quarters, bathrooms, storage and service areas, a day room, comprehensive furnishings-related interior design, self-contained HVAC systems, fire protection and alarm systems, antiterrorism features, PACS, CCTV, EMCS connectivity, building information systems, cybersecurity measures, accessibility provisions, and applicable sustainability and energy-efficiency measures. Supporting work will include utilities and connections, site development, parking, paving, sidewalks, curbs and gutters, storm drainage, lighting, landscaping, signage, and roadway and pedestrian waterway crossings. Post Construction Award Services will also be included. The project site is currently clear of buildings; however, portions of the site previously contained structures that were reportedly demolished to depths of approximately eight feet, with demolition debris potentially placed back into the excavations as uncontrolled fill. These conditions may require additional geotechnical investigation, removal or remediation of unsuitable materials, and special foundation systems. An existing asphalt parking lot is located in the southwest corner of the site, and concrete sidewalks border the southern edge; no existing roadways are located within the project site.
• Target Price Range (TPR): The Government has established a Target Price Range (TPR) for construction between $99,628,420.00 (the strict CCL) and $110,698,420.00 (the estimated Construction Budget), within a total Programmed Amount (PA) of $125,000,000.00.
• Projected Award Date: The Government targets the formal award of the potential Agreement Phase 1 (Design and Preconstruction Services) on or about Third or Fourth Quarter of FY27.
• Period of Performance (POP): Approximately 1000 calendar days following the potential execution of the Phase 2 Construction modification.
4. ACTION REQUIRED & SUBMISSION INSTRUCTIONS: Interested industry partners are requested to submit their complete response as a single, consolidated PDF or Microsoft Word Document attachment. Your attached submittal file must include:
1. A clear confirmation of your firm's interest in proposing on this project under a potential PDB/OTA model.
2. Please provide a brief capability statement addressing your firm’s ability to design and construct the Fort Hood Barracks, specifically highlighting:
Secure Facility Construction: Demonstrated experience and compliance with military installation security protocols, secure construction environments, and Type II construction standards.
Progressive Design-Build Mechanics: Proven ability to successfully execute projects utilizing collaborative, progressive design-build delivery methods.
Advanced Technical Methods: Application of modern, innovative technical approaches to optimize the design, construction, and long-term resilience of the facility.
3. Your firm's complete, numbered answers to the Project Delivery & Acquisition Strategy Questionnaire must be filled out completely and submitted with your package reference Attachment 02 .
All responses must be emailed directly to the Contracting Specialist Bijay Gurung Bijay.Gurung@usace.army.mil, with a courtesy copy (CC) to the Contracting Officer, Shayla Lucas, at shayla.j.lucas@usace.army.mil .
mailto:Bijay.Gurung@usace.army.mil mailto:shayla.j.lucas@usace.army.mil
• Technical Question and Cutoff for This Sources Sought Notice : Please submit all questions and concerns regarding this Sources Sought Notice via email ONLY to Mr. Bijay Gurung, ensuring you courtesy copy (CC) Shayla Lucas on the transmission. The absolute cutoff for all inquiries is Thursday, September 10, 2026, NLT 10:00 A.M. Central Daylight Time (CDT). Please ensure the subject line of your email reads exactly: Attention: Fort Hood Barracks #104. Please allow a 48-hour turnaround time for a response to your questions.
• Capability Statement Response and Complete Package Submission Deadline: Thursday, September 17, 2026, NLT 10:00 A.M. CDT.
FUTURE INDUSTRY DAY: A virtual Industry Day is being scheduled; however, a specific date and time have not yet been established. This scheduling information, along with registration details and access links, will be published in a subsequent Special Notice on SAM.gov.
We ask all interested parties to closely monitor SAM.gov for these upcoming details.
During the session, the USACE Project Delivery Team (PDT) and AFCEC representatives will discuss the collaborative mechanics of the potential PDB/OTA model.