About this file
This is a Standard Form 30 (SF 30) Amendment of Solicitation/Modification of Contract for a Dam Vegetation Maintenance Services contract (Solicitation W9126G25QA005) issued by the Department of the Army Corps of Engineers Engineering District Fort Worth. Amendment 0001 updates the evaluation criteria, specifically changing the language from "technical and past performance, when combined, are approximately equal to cost or price" to "technical and past performance, when combined, are significantly more important than cost or price."
The solicitation is a competitive 100% Small Business Set-Aside for mowing services at Belton Lake, Stillhouse Hollow Lake, and Georgetown Lake in Texas. It is an Indefinite Delivery Indefinite Quantity (IQIQ) non-personal services contract with a one-year base period and four 12-month option periods. The North American Industry Classification System (NAICS) code is 561730 with a small business size standard of $9.5 Million. Contractors must be registered in the System for Award Management (SAM) and will submit proposals through the Procurement Integrated Enterprise Environment (PIEE) suite, with a requirement to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS) before award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08 Solicitation Amendment W9126G25QA0050002 0002 SF 30.pdf | ||
| B08 Solicitation - W9126G25QA005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
List of Contract Documents, Exhibits, or Attachments
The attachments table has changed from:
Identifier Document Name Document Description Reference Identifier
Date Line Item Page Numbers
Document Type
Provided Under Separate Cover
A02 Attachment 11 Evaluation 52.212-2
A02 Attachment 11 Evaluation 52.212-2 13 Jun 2025 Attachment No
B04 All Inclusive SCA Application of Wage Determinations
Wage Determination 13 Jun 2025 Attachment No
A02 Attachment 6 Daily activity report
Attachment 6 Daily activity report 13 Jun 2025 Attachment No
A02 PWS_Attach 1 _ Attach 2 Vegetation Maintenance Final
Statement of Work 01 Jul 2025 Attachment No
A02 Attachment 9 Instruction to Offerors
A02 Attachment 9 Instruction to Offerors
01 Jul 2025 Attachment No
A02 Attachment 10 52.237-1 Site Visit Addendum
A02 Attachment 10 52.237-1 Site Visit Addendum
09 Jul 2025 Attachment No
A02 Attachment 3 Conceptual Work Plan
Attachment 3 Conceptual Work Plan 15 Apr 2025 Attachment No
Attachment 4 Service areas acreage estimate
Attachment 4 Service areas acreage estimate
15 Apr 2025 Attachment No
A02 Attachment 5 Maps
Attachment 5 Maps 15 Apr 2025 Attachment No
A02 Attachment 7 Contract Discrepancy Report
Attachment 7 Contract Discrepancy Report
15 Apr 2025 Attachment No
A02 Attachment 8 Past Performance Questionaire
A02 Attachment 8 Past Performance Questionnaire
13 Jun 2025 Attachment No
To:
Identifier Document Name Document Description Reference Identifier
Date Line Item Page Numbers
Document Type
Provided Under Separate Cover
A02 Attachment 11 Evaluation 52.212-2
A02 Attachment 11 Evaluation 52.212-2 13 Jun 2025 3 Attachment No
B04 All Inclusive SCA Application of Wage Determinations
Wage Determination 13 Jun 2025 23 Attachment No
A02 Attachment 6 Daily activity report
Attachment 6 Daily activity report 13 Jun 2025 1 Attachment No
A02 PWS_Attach 1 _ Attach 2 Vegetation Maintenance Final
Statement of Work 01 Jul 2025 22 Attachment No
A02 Attachment 9 Instruction to Offerors
A02 Attachment 9 Instruction to Offerors
01 Jul 2025 4 Attachment No
A02 Attachment 10 52.237-1 Site Visit Addendum
A02 Attachment 10 52.237-1 Site Visit Addendum
09 Jul 2025 1 Attachment No
A02 Attachment 11 Evaluation 52.212-2 Amend 01
Amend 01 Attachment 11 Evaluation 52.212-2
25 Jul 2025 3 Attachment No
W9126G25QA0050001
0002 A02 Attachment 3 Conceptual Work Plan
Attachment 3 Conceptual Work Plan 15 Apr 2025 Attachment No
Attachment 4 Service areas acreage estimate
Attachment 4 Service areas acreage estimate
15 Apr 2025 Attachment No
A02 Attachment 5 Maps
Attachment 5 Maps 15 Apr 2025 Attachment No
A02 Attachment 7 Contract Discrepancy Report
Attachment 7 Contract Discrepancy Report
15 Apr 2025 Attachment No
A02 Attachment 8 Past Performance Questionaire
A02 Attachment 8 Past Performance Questionnaire
13 Jun 2025 5 Attachment No
The following contract documents were added:
A02 Attachment 11 Evaluation 52.212-2 Amend 01
The following contract documents Page Counts were changed:
DOCUMENT PAGE COUNTS
DOCUMENT NAME FROM TO
A02 Attachment 11 Evaluation 52.212-2 Amend 01 none 3
Miscellaneous text in this section has been modified to:
Amend 01 to Attachment 11 Evaluation 52.212-2
PWS , Attach 1 thru 11
W9126G25QA0050001
52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
Offers will be evaluated by performing a comparative evaluation in accordance with FAR 13.106-2(b)(3) to determine which response represents the “best” as a whole. Comparative Evaluations is the act of comparing two or more offers or proposal in response to the RFQ.
Quotes are first evaluated to ensure all RFQ submission requirements are met. If the RFQ submission requirements have not been met, the Contracting Officer shall deem the offeror non-responsive.
Comparative evaluations of quotes may be conducted by performing a direct comparison of one offer with another in a uniform manner. The comparison of quotes to one another is to determine which quote provides the best benefit to the government.
The government reserves the right to consider a response that offers more than the minimum and select that response if it provides a benefit to the government.
The government has the discretion to accept other than the lowest priced offeror that provides additional benefits.
The government also has the discretion to make an award based on whether the lowest priced of the quotations/offers having the highest past performance rating possible represents the best benefit to the government and Best Value Continuum.
The following factors shall be used to evaluate offers:
Technical and past performance, when combined, are approximately equal to cost or price.
“Technical and past performance, when combined, are significantly more important than cost or price.” AMENDMENT 01
Factor 1: Technical Approach and Understanding of the Work
Contractor’s will receive a technical rating based on the strengths, deficiencies, weaknesses, risks, and uncertainties of the offeror’s technical submittal as identified in the Instructions to Offerors.
This factor considers whether the Offeror demonstrates an understanding of the complexity and magnitude of requirements set forth in the Performance Work Statement. At a minimum, the quote shall include a brief narrative (conceptual work plan) that clearly demonstrates an understanding of the requirements of the solicitation. The narrative shall address how the Offeror will perform, develop, and implement the work plan. It shall not exceed four pages.
SUBMISSION REQUIREMENTS:
Conceptual Work Plan – The contractor shall develop a work plan that clearly describes the contractor’s approach to successfully completing the requirements of the Performance Work Statement. Within the work plan, at a minimum, the contractor shall include the following:
1. Contractor’s approach to performing the work within the period of performance identified for each lake. How does the contractor intend on completing mowing services at all three lakes in 25 calendar days if the grass height at all lakes is considered excessive (3 to 5 feet on average)?
Identify all equipment and labor that will be used on these Letters of Instruction. Identify each calendar day the contractor would be performing work to complete these Letters of Instruction within the period of performance.
2. Contractor’s approach to performing the work within the period of performance identified for each lake. How does the contractor intend on completing mowing services at all three lakes in 25 calendar days if the grass height at all lakes is considered average (1 to 3 feet on average)?
Identify all equipment and labor that will be used on these Letters of Instruction. Identify each calendar day the contractor would be performing work to complete these Letters of Instruction within the period of performance.
3. Identify if non-slope rated mowing equipment will be used and the areas the contractor intends to use this equipment. The contractor may attach maps that references these locations.
4. Identify all equipment that the contractor has in reserve that could be available for immediate use in the event of equipment failure.
5. Identify how the contractor intends to ensure quality control activities are completed throughout the duration of the period of performance and services are performed in accordance with the Performance Work Statement. Address how rework will be prevented and how rework will be managed when required.
6. Contractor’s approach to maintain communication with Government designated personnel throughout the contract service period.
Factor 2: Past performance
Past Performance Questionnaire (PPQ) forms provided in the solicitation shall be completed and submitted in Submission. They will be evaluated to assess the degree of confidence the Government has in an Offeror's ability to supply products and services that meet users' needs based on a demonstrated record of recent and relevant work similar to the work described in this solicitation. To be considered recent, for a particular contract or combination of contracts, services must have been and/or are currently being provided at any time within the last three (3) years from the date of issuance of this solicitation.
Contracts that are not considered recent will not be evaluated for relevancy.
The Contracting Officer shall deem an offeror nonresponsive if the offeror fails to submit a PPQ IAW 52.212-1(b)(10) and evaluation criteria in 52.212-2. If for any reason the contractor does NOT have recent or relevant past performance, they are still required to submit a PPQ with a brief narrative explaining “No Recent or Relevant Past Performance”. An offeror that submits a PPQ that is deemed neither recent nor relevant will be treated as “NEUTRAL”. Offerors should submit at least 2 PPQs but no more than 3 PPQs for evaluation.
The Government reserves the right to evaluate past performance based on such information as the Contracting Officer’s knowledge and previous experience with the item or service being purchased, customer surveys, or other reasonable basis, without the existence of a formal database.
Factor 3: Price
The Government will perform a price analysis after completion of technical evaluations. Price analysis will be performed in accordance with FAR 13.106, to determine completeness, reasonableness, balance, and understanding of the work. Price will not be rated but will be a factor in making the final best value determination for award.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0001 |
| EffDate: 25 JUL 2025 |
| ReqNo: |
| ProjNo: |
| IssCode: W9126G |
| AdmCode: |
| IssuedBy: W076 ENDIST FT WORTH |
KO CONTRACTING DIVISION, 819 TAYLOR ST BOX 17300
FORT WORTH, TX 76102-6124
UNITED STATES
BONIFACIO MAGDALENO, EMAIL: BONIFACIO.MAGDALENO@USACE.ARMY.MIL TELEPHONE: 817-886-1839 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W9126G25QA005 |
| SolDate: 11 JUL 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE CONTINUATION |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: THE PURPOSE OF AMENDMENT 01 IS TO UPDATE ATTACHMENT 11 EVALUATION 52.212-2 VERBIAGE FROM: "TECHNICAL AND PAST PERFORMANCE, WHEN COMBINED, ARE APPROXIMATELY EQUAL TO COST OR PRICE" TO "TECHNICAL AND PAST PERFORMANCE, WHEN COMBINED, ARE SIGNIFICANTLY MORE IMPORTANT THAN COST OR PRICE." |
| ContNameTitle: |
| CoNameTitle: CARL S. OELSCHIG |
| ContDate: |
| CODate: 25 JUL 2025 |
File details come from the government source that posted it. Updated .