AMD02_W9126G21R0004_LDSM_08Sep2021.pdf

PDF 563 KB Posted

Attached to
Lewisville Dam Safety Modification (LDSM) Spillway (AMD09)
Solicitation number
W9126G21R0004
Issued by

About this file

This is an amendment to a solicitation for the Lewisville Dam Safety Modification project. The amendment adds four separate files to the solicitation: a Geotechnical Interpretive Report, Geotechnical Data Report, and two parts of non-interpretive and interpretive appendices. The solicitation is for design-build services for spillway modifications and is issued by the U.S. Army Corps of Engineers Fort Worth District. The solicitation number is W9126G21R0004 and responses are due as indicated in the original solicitation dated August 2, 2021, with award anticipated at a future date.

View the file

Other files

File Type Posted
AMD09_W9126G21R0004_LDSM_25Oct2021.pdf PDF
Bidder Inqiries_21R0004_Lewisville DSM_Spillway.pdf PDF
AMD08_GFI_Preconstruction Survey_20191108.pdf PDF
AMD08_21R0004_LDSM_21Oct2021.pdf PDF
AMD07_W9126G21R0004_LDSM_18Oct2021.pdf PDF
AMD06_W9126G21R0004_LDSM_8Oct2021.pdf PDF
AMD05_W9126G21R0004_LDSM_30Sep2021.pdf PDF
AMD04_W9126G21R0004_LDSM_22Sep2021.pdf PDF
AMD03_W9126G21R0004_LDSM_10Sep2021.pdf PDF
Non Interpretive Appendices Part 3.zip ZIP file
Contract 2_Lewisville_GDR.pdf PDF
Interpretive Appendices Part 3.zip ZIP file
Non Interpretive Appendices Part 2.zip ZIP file
Non Interpretive Appendices Part 1.zip ZIP file
Non Interpretive Appendices Part 6.zip ZIP file
Non Interpretive Appendices Part 4b.zip ZIP file
Non Interpretive Appedices Part 5b.zip ZIP file
Interpretive Appendices Part 1.zip ZIP file
Non Interpretive Appendices Part 4a.zip ZIP file
Non Interpretive Appendices Part 5a.zip ZIP file
Contract 2_Lewisville_GIR.pdf PDF
Interpretive Appendices Part 2.zip ZIP file
Site_Visit_Attendance_List.pdf PDF
AMD01_W9126G21R0004_LDSM_30Aug2021.pdf PDF
W9126G21R0004_RTA_PLANS_Part2.pdf PDF
W9126G21R0004_RTA_PLANS_Part1.pdf PDF
Solicitation_W9126G21R0004.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The Solicitation for Lew isville DAm Safety Modification (LDSM) is amended to include the follow ing separate files:

1. Geotechnical Interpretive Report (GIR)

2. Geotechnical Data Report (GDR)

3. Non-Interpretive Appendices

4. Interpretive Appendices

See SF30 Continuation Sheet(s)

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9126G21R0004

X 9B. DATED (SEE ITEM 11)

02-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

A0002

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Sep-2021

CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAYLOR ST, CT OFC RM 2A17

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9126G21R0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added as separate files:

AMD 0002

1. Geotechnical Interpretive Report (GIR)

2. Geotechnical Data Report (GDR)

3. Non-Interpretive Appendices (Part 1-3)

4. Interpretive Appendices (Part 1-6)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .