Solicitation_W9126G21R0004.pdf

PDF 6 MB Posted

Attached to
Lewisville Dam Safety Modification (LDSM) Spillway (AMD09)
Solicitation number
W9126G21R0004
Issued by

About this file

This solicitation is for a design-bid-build construction project to modify Lewisville Dam in Texas for safety. Required work includes installing post-tensioned anchors and rock dowels in the spillway, stabilizing and raising training walls, removing and replacing apron slabs, installing drainage features, placing concrete overlays, and installing an upstream geomembrane. The response deadline is October 4, 2021. The award will be a firm-fixed-price contract for work expected to cost between $25-100 million. Evaluation factors include technical approach, experience, management approach, past performance, and small business participation. The solicitation requires pricing schedules, certifications, and descriptions of technical and management plans for completing the work safely and on schedule.

View the file

Other files

File Type Posted
AMD09_W9126G21R0004_LDSM_25Oct2021.pdf PDF
Bidder Inqiries_21R0004_Lewisville DSM_Spillway.pdf PDF
AMD08_GFI_Preconstruction Survey_20191108.pdf PDF
AMD08_21R0004_LDSM_21Oct2021.pdf PDF
AMD07_W9126G21R0004_LDSM_18Oct2021.pdf PDF
AMD06_W9126G21R0004_LDSM_8Oct2021.pdf PDF
AMD05_W9126G21R0004_LDSM_30Sep2021.pdf PDF
AMD04_W9126G21R0004_LDSM_22Sep2021.pdf PDF
AMD03_W9126G21R0004_LDSM_10Sep2021.pdf PDF
Non Interpretive Appendices Part 3.zip ZIP file
Contract 2_Lewisville_GDR.pdf PDF
Interpretive Appendices Part 3.zip ZIP file
Non Interpretive Appendices Part 2.zip ZIP file
Non Interpretive Appendices Part 1.zip ZIP file
Non Interpretive Appendices Part 6.zip ZIP file
Non Interpretive Appendices Part 4b.zip ZIP file
Non Interpretive Appedices Part 5b.zip ZIP file
AMD02_W9126G21R0004_LDSM_08Sep2021.pdf PDF
Interpretive Appendices Part 1.zip ZIP file
Non Interpretive Appendices Part 4a.zip ZIP file
Non Interpretive Appendices Part 5a.zip ZIP file
Contract 2_Lewisville_GIR.pdf PDF
Interpretive Appendices Part 2.zip ZIP file
Site_Visit_Attendance_List.pdf PDF
AMD01_W9126G21R0004_LDSM_30Aug2021.pdf PDF
W9126G21R0004_RTA_PLANS_Part2.pdf PDF
W9126G21R0004_RTA_PLANS_Part1.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers Fort Worth District SPECIFICATIONS

DAM SAFETY MODIFICATION - SPILLWAY

LEWISVILLE LAKE

TRINITY RIVER BASIN

ELM FORK TRIBUTARY

DENTON COUNTY, TEXAS

August 2021

UNRESTRICTED SOLICITATION RTA

SOLICITATION NO. W9126G21R0004

CT

Dam Safety Modification - Spillway Solicitation No. W9126G21R0004

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 10 TABLE OF CONTENTS

00 11 00 STANDARD FORM (SF) 1442 AND CLIN SCHEDULE

00 21 00 INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

00 22 11 SOLICITATION PROVISIONS

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 72 00 CONTRACT CLAUSES

00 73 00 SPECIAL CONTRACT REQUIREMENTS

00 73 46 WAGE DETERMINATION SCHEDULE

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 00 00.00 44 SCHEDULE REQUIREMENTS AND RESTRICTIONS

01 11 00 SUMMARY OF WORK

01 20 00 MEASUREMENT AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 71 23.00 44 SURVEY, LAYOUT, AND OTHER DATA

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

DI VI SI ON 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DI VI SI ON 05 - METALS

05 50 14 STRUCTURAL METAL FABRICATIONS

05 50 15 CIVIL WORKS FABRICATIONS

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 01 10 TEMPORARY COFFERDAM

31 09 13.00 INSTRUMENTATION AND MONITORING

31 63 29 DRILLED CONCRETE PIERS AND SHAFTS

31 68 13 WEIR ANCHORS

31 68 14 APRON ROCK DOWELS

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 11 23 FLEXIBLE BASE COURSE

32 11 23.23 CEMENT STABILIZED OPEN GRADE MATERIAL

32 92 10.00 44 BORROW AREA, STAGING AREAS, AND HAUL ROUTE TURFING

32 92 19 HYDROSEEDING

PROJECT TABLE OF CONTENTS Page 1

Dam Safety Modification - Spillway Solicitation No. W9126G21R0004

DI VI SI ON 33 - UTI LI TI ES

33 46 16 DRAINAGE AND PIPING

33 56 19 GEOMEMBRANE

DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON

35 31 19 STONE PROTECTION

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2

Section 00 01 10 - Table of Contents

CONTRACTING OFFICER STATEMENT

Only a warranted Contracting Officer (either PCO or ACO) acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.

Section 00 11 00 - Standard Form (SF) 1442 and CLIN Schedule

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

Specif ications and Draw ings attached

Project Title: Lew isville Dam Safety Modif ication - Spillw ay, Lew isville Texas, Denton County

NAICS: 237990, Other Heavy and Civil Engineering

Set-aside: Unrestricted

Contract Type: Firm Fixed Price Construction Contract

Magnitude of Construction: Betw een $25 Million and $100 Million

The contractor shall not begin on-site w ork until the bond documents and insurance certif icates have been accepted by the Contracting Officer and a Notice to Proceed, signed by the Contracting Officer, has been received and signed by the contractor.

CLYDE GARDNER

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

19-Aug-2021

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

817.886.1211

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________1258 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________04 Oct 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAYLOR ST, CT OFC RM 2A17

FORT WORTH TX 76102-0300

W9126G

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

(817) 886-6403FAX:TEL: TEL: FAX:

W9126G21R0004 98

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

00 11 00

BIDDING SCHEDULE

(To be attached to SF 1442)

Solicitation No. W9126G21R0004

Line Item No.

Description Estimated Quantity

Unit Measure

Unit Price Amount

0001 WIER ANCHORS X X XXX XXX

0001AA Weir Anchors 73 EA $__________ $__________

0001AB Work Platform 1 JOB XXX $__________

0001AC Anchor Testing: Proof Testing 59 EA $__________ $__________

0001AD Anchor Testing: Performance Testing 10 EA $__________ $__________

0001AE Anchor Testing: Extended Creep Testing 4 EA $__________ $__________

0001AF Demolition of Existing Locked Off Anchors 1 JOB XXX $__________

0001AG Test Drill Holes 1 JOB XXX $__________

0002 APRON OVERLAY X X XXX XXX

0002AA Remove and Replace Existing Apron Slabs 1 JOB XXX $__________

0002AB Grind Existing Slabs 1,271 SY $__________ $__________

0002AC Trench Drain 1 JOB XXX $__________

0002AD CSOG Drainage Layer and Apron Drain Lines 1 JOB XXX $__________

0002AE Foundation Drain Redrilling 1 JOB XXX $__________

0002AF Rock Dowels - #14 Reinforcement 720 EA $__________ $__________

0002AG Rock Dowels - #11 Reinforcement 216 EA $__________ $__________

0002AH Rock Dowel Testing: Proof Testing 124 EA $__________ $__________

0002AI Concrete Apron Overlay 1 JOB XXX $__________

0002AJ Demonstration Slab 1 JOB XXX $__________

0003 TRAINING WALLS X X XXX XXX

0003AA Concrete Wall Extension 1 JOB XXX $__________

0003AB Wall Filter Drainage System 1 JOB XXX $__________

0003AC Removal of Material Behind the Training Wall 1 JOB XXX $__________

0003AD Grinding Wall Joints 78 LF $__________ $__________

0003AE Remove and Replace Stem Wall 1 JOB XXX $__________

TOTAL PAGE 1 $__________

00 11 00

BIDDING SCHEDULE

(To be attached to SF 1442)

Solicitation No. W9126G21R0004

Line Item No.

Description Estimated Quantity

Unit Measure

Unit Price Amount

0004 GEOMEMBRANE AND TEMPORARY COFFERDAM X X XXX XXX

0004AA Excavation 17,750 CY $__________ $__________

0004AB Geomembrane 1 JOB XXX $__________

0004AC Riprap 1,452 CY $__________ $__________

0004AD Gravel Bedding 450 CY $__________ $__________

0004AE Temporary Cofferdam 1 JOB XXX $__________

0005 SITE WORK X X XXX XXX

0005AA Mobilization and Demobilization 1 JOB XXX $__________

0005AB Haul Roads 1 JOB XXX $__________

0005AC Excavation of Upstream and Downstream Channels 3,795 CY $__________ $__________

0005AD Lime Treated Earthfill 8,200 CY $__________ $__________

0005AE Hydroseeding 223,400 SY $__________ $__________

0005AF Instrumentation 1 JOB XXX $__________

0006 TURNDOWN WALL SYSTEM X X XXX XXX

0006AA Drilled Piers 11,033 LF $__________ $__________

0006AB Reinforced Concrete 1 JOB XXX $__________

0006AC Unclassified Excavation 5,035 CY $__________ $__________

0006AD Grouted Riprap 10,070 CY $__________ $__________

0006AE Bedding 1,600 CY $__________ $__________

0006AF Remove Apron Extension 1 JOB XXX $__________

TOTAL PAGE 2 $__________

TOTAL PAGES 1 AND 2 $___________

CLIN Notes

1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

2. Offerors must insert a price on all number/letter combination items (i.e. 0002AA) of the CLIN Schedule. Failure to do so may result in the offer being unacceptable

3. Responders are advised that this requirement may be delayed, cancelled, or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process.

4. Any proposal that is materially unbalanced as to prices may be rejected. An unbalanced proposal is one that is based on prices significantly less than the cost for some work and prices that are significantly overstated for other work and can also exist where only overpricing or underpricing exists.

5. Proposed prices must be valid for 120 calendar days after proposal submission.

6. The Government will not pay profit on bonds or insurance.

Section 00 21 00 - Instructions, Conditions and Notices to Offerors

LOCAL INFORMATION

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

1.0 GENERAL INFORMATION

1.1 GENERAL DESCRIPTION OF WORK

The scope of the project includes all work required for construction to make necessary repairs to Lewisville Dam, Lewisville, Texas. The measures to address the structural stability concerns associated with PFM 6 consist of post-tensioned anchors installed through the ogee weir, and an upstream geomembrane blanket. An anchor field testing program to gather foundation information to verify the anchoring capacity assumptions of the Eagle Ford shale foundation is complete with the relevant data and reports included in the Design Documentation Report and Geotechnical Data Report. A work platform will be required to install the anchors along the downstream slope of the monoliths.

Install 73 post-tensioned strand anchors on the spillway. The anchors will be founded approximately 130 feet below the spillway weir foundation. All anchors will be installed and tensioned before performing any demolition on apron slabs. Install permanent load cells on one anchor per monolith. Install cable through trench cut into weir to right abutment, up the abutment to a terminal box at the top of the abutment for monitoring. Test anchors as specified and per the PTI.

The upstream geomembrane blanket will be installed in the approach channel of the spillway below the current grade and attached to the ogee monoliths. A cofferdam will be required across the approach channel for the installation of the membrane. The approach channel has a relatively flat slope in the area and a water depth of 2 to 3 feet at conservation pool elevation.

The apron slab overlay will cover the existing apron slabs to address uplift and sliding concerns associated with PFM 7. The overlay slab joints will be positioned so they will be offset from the existing slab joints. The joints between the overlay slabs will be doweled and include a water stop. Each overlay slab will have anchors installed;

the number of anchors varies depending on the distance from the ogee weir. The apron slabs will be thickened in the area around the anchors to prevent pullout. A drainage layer will be included between the two slabs. Maintaining a consistent moisture content is necessary to reduce the shrinking and swelling of the foundation which led to the heave in the existing apron slabs. Some existing heaved apron slabs will be removed and replaced prior to placing the drainage system and overlay.

The existing apron slab extension will be demolished and replaced with a system of two drilled pier walls reinforced with heavy structural steel sections and connected across the top with cap beams. The downstream wall will be buried deep to prevent headcutting scour from undermining the apron slab. The upstream wall will be used as an anchor to brace the downstream wall from downstream deflections. The walls are tied with a new apron slab reinforced for tension.

Training walls were evaluated for stability and potential for overtopping during extreme flood events. Construct concrete extensions on top of the existing training walls. Reinforcement will be epoxy anchored into the top of the walls. Remove backfill from behind the walls and install new drainage piping. Place vertical butyl rubber joint seals extending from top of footing to 1’ above backfill on the soil side of the walls. Install new drainage and backfill.

Contractor must keep enough stockpile on site to backfill the walls should a flow event exceeding 5’ of flow in the apron occur. Offsets in the training wall joints on the spillway sides will be ground smooth to minimize potential for cavitation and stagnation pressures. One monolith stem wall will be removed and replaced.

Non-Overflow monoliths left and right of the spillway will have backfill stabilized with lime to reduce likelihood of slides. Instrumentation to monitor structural behavior will include load cells in the post-tensioned anchors and uplift cells in the apron slab drainage fill.

1.2 GOVERNMENT REQUIREMENTS FOR INCOMING MAIL AND PACKAGES

The Offeror(s) must ensure that ALL mail inquiries are sent to the Fort Worth District, U.S. Army Corps of Engineers, relating to either pre-contract or post-contract award. A return mailing address is required on the outside of the envelope, package, box, etc. All mail must be addressed to the Contracting office as specified below (no exceptions):

U.S. Army Engineer District, Fort Worth District ATTN: CESWF-CT, Clyde Gardner, Contract Specialist, 819 Taylor Street (Room2A17) Fort Worth, TX, 76102-0300

All Federal Express/UPS/etc. packages are required to have Offeror’s physical address and the above contracting office address including room number, contract specialist’s name and telephone number for proper delivery.

1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation and all amendments are available by INTERNET ACCESS ONLY.

All solicitation documents and amendments will be posted on the SAM.gov website at https://sam.gov and Offeror can access solicitation documents by solicitation number without dashes – W9126G21R0004

It is solely the Contractor’s responsibility to check the SAM.gov website for the solicitation and any amendments prior to the RFP closing date. The Offeror shall submit in its proposal all requested information as specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.

Additional information regarding this solicitation and potential Offerors (i.e., interested vendors list) and/or subcontractors will be available on the SAM.gov website under the solicitation number.

1.4 OFFEROR'S QUESTIONS AND COMMENTS

Questions and/or comments relative to these documents should be submitted via e-mail to:

Contract Specialist – Primary POC U.S. Army Corps of Engineers, Fort Worth District ATTN: Clyde Gardner Phone: (817) 886-1211 Email: clyde.l.gardner@usace.army.mil

Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via:

Bidder Inquiry in ProjNet at https://www.projnet.org/projnet

To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click to continue.

From this page you may view all bidder inquiries or add inquiry. Only one question will be allowed per inquiry. If multiple questions are included in a single inquiry, only the first question will be answered. All others will remain unanswered until entered in as single inquiries.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

https://sam.gov/ mailto:clyde.l.gardner@usace.army.mil https://www.projnet.org/projnet

The Solicitation Number is: W9126G21R0004

The Bidder Inquiry Key is: VCNK6Y-4B44G4

The Bidder Inquiry System will be closed to new inquiries seven (7) calendar days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary. If the System is not closed in a timely manner, an inquiry posted within the seven calendar days of the receipt of proposals would still be considered untimely and will not be answered.

Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The call center operates weekdays from 8am to 5pm U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

Oral explanations or instructions are not binding. Any information given to the offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.

1.5 SMALL BUSINESS SIZE STANDARD/NAICS CODE

See Section 00 45 00, FAR 52.204-8 for the small business size standard/NAICS Code.

1.6 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This Request for Proposal (RFP) does not commit the Government to pay as a direct charge any costs incurred by the Offeror in the preparation and submission of its proposal or revisions.

1.7 PRE-PROPOSAL CONFERENCE/SITE VISIT

See clause 52.236-27 for site visit information.

1.8 ACCURACY IN PROPOSALS

Proposals must set forth with full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.

1.9 PROPOSAL SUBMITTALS

A. Proposal Submission

1. Introduction. To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors. The Offeror shall submit in the proposal all requested information specified in this section of the Request for Proposal (RFP) solicitation at or before the exact time specified. There will be no public opening of the proposals received as a result of this RFP. Failure to meet a requirement may result in an offer being ineligible for award. Copies of the RFP are available by INTERNET ACCESS ONLY. All RFP documents will made available for viewing at the SAM.gov website (https://sam.gov). All amendments will be made available for viewing in SAM.gov. It shall be the Offeror’s responsibility to check the website for any amendments.

https://sam.gov/

2. General Proposal Submission Requirements.

a. Electronic Proposals. In an effort to reduce paperwork and costs, ALL RESPONSES TO THIS ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY. Hand carried delivery or USPS/UPS/FedEx delivery of hard copies and/or CD-ROMs are not authorized. Facsimile submission is not authorized. Email submission is authorized.

b. Submit the Price and Technical proposals electronically via the DoD SAFE website at https://safe.apps.mil/.

In order for an outside user (the contractor) to submit a proposal for the solicitation, they must receive a drop-off request from an inside user (the government). When the inside user generates a drop-off request for you, you will receive an email with a link to submit your drop-off. Optionally, the Government may provide you with a request code. In that case, click the Drop-off button on the SAFE home page and enter the Request code.

To request and receive a drop-off request for this solicitation, email the Contract Specialist and Contracting Officer two (2) working days before the proposal due date.

The Contracting Officer for this project is: Mr. Carl S. Oelschig. Email address is carl.s.oelschig@usace.army.mil. The Contract Specialist for this project is: Clyde Gardner. Email address is clyde.l.gardner@usace.army.mil. Include the solicitation number in your Email Subject Line:

c. File Names. To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention: (I) Technical Proposal and (II) Price Proposal each filename shall begin with the solicitation number, followed by the word “TECHNICAL” or “PRICE” followed by your firm’s name, and finally a brief file description:

(W9126G21R0004_TECHNICAL_FIRM NAME_LDSM SPILLWAY).

(W9126G21R0004_PRICE_FIRM NAME_LDSM SPILLWAY)

d. File Organization, Formatting, and other instructions. Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled in accordance with Proposal Submission, Paragraph 6(C)(1)(a) of the RFP. Pages shall be letter sized except for those noted in Paragraph 6(C)(1)(a). Offerors shall prepare proposals in the English language. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in each section for each factor. Electronic files shall be Microsoft Windows compatible. Files shall be submitted in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. If the electronic files are of a size at which they must be compressed (zipped), they shall be compressed into one zipped folder.

e. Upload Completion & Deadline. Interested parties shall submit responses no later than the date specified on solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within SAFE. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process and troubleshooting. Submissions may be emailed to Clyde Gardner, Contract Specialist, clyde.l.gardner@usace.army.mil.

https://safe.apps.mil/ mailto:carl.s.oelschig@usace.army.mil

1.10 JOINT VENTURE PROPOSAL REQUIREMENTS

When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the Offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.

1.11 BID GUARANTEE

Reference the provision 52.228-1, Bid Guarantee. Facsimile Bonds are not acceptable.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.236-28 Preparation of Proposals--Construction OCT 1997 252.236-7008 Contract Prices-Bidding Schedules DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price (FFP) contract resulting from this solicitation.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

18.2% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is State of Texas, Denton County, City of Lewisville.

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of provision)

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3 Million, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

US Army Corp of Engineers Attention: CESWF-CT P.O. Box 17300 Fort Worth, TX 76102-0300 Or email to:

SWF-Protest@usace.army.mil

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for:

Date: 31 AUG 2021 Time: 9:00 AM CT POC: Clyde Gardner Email: clyde.l.gardner@usace.army.mil Phone: (817) 886-1211

(c) Participants will meet at:

U.S. Army Corps of Engineers Lewisville Lake Office 1801 N. Mill St.

Lewisville, TX 75057

(End of provision)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/content/regulations

(End of provision)

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any DFARS (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of provision) https://www.acquisition.gov/content/regulations

Section 00 22 11 - Proposal Submission Requirements, Evaluation Criteria, and Basis of Award Best Value, Design-Bid-Build (Single Award)

EVALUATION FACTORS

SECTION II

SOLICITATION PROVISIONS

Section 00 22 11

A. BASIS FOR AWARD

The award will be made based on a best value tradeoff methodology. The evaluation factors, other than cost or price, when combined, are significantly more important than cost or price. The successful Offeror will be selected based on the “Best Overall Value to the Government.” The evaluation factors and their relative importance are reflected in the table below:

Factor Relative Importance to Other Factor

I. Technical Approach This factor is equal in importance to Factor II, Specialized Experience.

It is more important than Factors III.

Management Approach, IV. Past Performance, & V. Small Business.

II. Specialized Experience This factor is equal in importance to Factor I.

Technical Approach.

It is more important than III. Management Approach, IV Past Performance & V. Small Business.

III. Management Approach This factor is equal in importance to Factor IV, Past Performance.

It is more important than V. Small Business.

IV. Past Performance This factor is equal in importance to Factor III. Management Approach.

It is more important than V. Small Business.

V. Small Business This factor is the least important when compared to I. Technical Approach, II.

Experience, III. Management Approach, & IV. Past Performance.

VI. Price The evaluation factors, other than cost or price, when combined, are significantly more important than cost or price.

The Contracting Officer will award a contract to the firm whose proposal offers the best overall value to the Government considering the price and non-price factors using the Trade-Off Process.

B. FACTORS TO BE EVALUATED

The source selection evaluation factors have been carefully selected to obtain the acquisition objective of constructing the following work using techniques, workmanship, sequencing and technical oversight that will minimize risk to the dam and underlying materials during construction and result in a high quality installation that will maximize spillway stability and performance. The evaluation factors will enable the Source Selection Evaluation Board (SSEB) to complete an integral assessment of each proposal considering non-cost factors:

• Weir anchors and apron rock dowels,

• Turndown wall and associated structures,

• Stabilization and raising of training walls,

• Removal and replacement of apron slabs,

• Installation of trench and collector drains,

• Installation of cement stabilized open graded drainage layer,

• Placement of apron overlay slabs, and installation of upstream geomembrane.

The six (6) evaluation factors will enable the Source Selection Evaluation Board (SSEB) to complete an integrated assessment of each proposal considering both cost and non-cost factors.

1. FACTOR I – TECHNICAL APPROACH

Technical approach will consider the means and methods for construction of the required elements, and the approach to emergency response during construction.

2. FACTOR II – SPECIALIZED EXPERIENCE

Specialized Experience will consider the experience of both the offeror and subcontractor in completing similar work in the last 6 years.

3. FACTOR III – MANAGEMENT APPROACH

Management Approach will evaluate the contractor, subcontractor and supplier plans, the organizational structure and key personnel proposed for the project including quality control personnel, and the proposed project schedule.

4. FACTOR IV – PAST PERFORMANCE

Past Performance will evaluate the contractor and subcontractor experience and performance on similar projects.

5. FACTOR V – SMALL BUSINESS PARTICIPATION

Small Business Participation will evaluate the offeror’s Small Business Plan and prior utilization of small businesses.

6. FACTOR VI – PRICE PROPOSAL

C. PROPOSAL SUBMISSION

1. PROPOSAL FILES

The Offeror’s proposal shall consist of two separate files: I. Technical Proposal (Factors I-V) and II. Price Proposal (Factor VI) as follows:

File I: Factor I – Technical Approach

– Work Plans (Including any proposed specification deviations)

– Emergency Response

File I: Factor II – Specialized Experience

– Specialized Experience of the Entity Performing Each Activity

– Specialized Experience of Key Personnel

File I: Factor III – Management Approach

– Contractor/Major Subcontractor/Supplier Plan

– Organization with Key Personnel, Including Quality Control

Personnel (Including Attachment 5)

– Schedule

File I: Factor IV – Past Performance

– Past Performance Questionnaire, Form PPQ-0 (Attachment 1)

File I: Factor V – Small Business Participation

– Small Business Participation Plan (Attachment 2)

– Past Utilization of Small Business

Participation Plan Information Collection Sheet (Attachment 3)

File II: Factor VI - Price Proposal and the other documents listed below:

– Standard Form 1442, Solicitation, Offer and Award and Amendments

– Price Schedule, the Offeror shall include an electronic Microsoft Excel version of the Proposal Price Schedule.

– Bid Guarantee

– Proposal Data Sheet (Attachment 4)

– Offeror’s Certifications and Representations

– Copy of Quantity Backup Sheets used by the offeror (blank copy provided in Attachment 7)

For subsequent proposals, two versions of each file shall be submitted. “Clean” versions which incorporate all changes from the initial proposal shall be submitted along with a Red-Lined copy clearly identifying all changes from the initial proposal in red, and a summary file that responds to the feedback form from USACE and tells where changes were made. Changes to the Quantity Backup Sheet shall be highlighted only. These two versions shall be submitted electronically via Safe.

a. Format. The submission shall be clearly indexed and logically assembled.

Each file shall be clearly identified and shall begin at the top of a page. All pages of each file shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. Documents shall use the following page setup parameters:

Margins – Top, Bottom, Left, Right - 1” Gutter – 0” From Edge – Header, Footer - 0.5” Page Size, Width – 8.5” Page Size, Height – 11” Drawings shall be on 11”x17” pages Schedule shall be on 11”x17” pages

The following additional restrictions apply:

Each paragraph shall be separated by at least one blank line. A standard, 12-point minimum font size applies. Arial or Times New Roman fonts are required. Tables and illustrations may use a reduced font size not less than 8-point and may be landscape.

Page Count: The page count for Factors I thru V shall not exceed 40 pages for each Factor excluding the exceptions below.

EXCEPTIONS: The Cover Page, Table of Contents, proposed specification deviations, Quantity Backup Sheets (Attachment 7), and agreements between the Offeror and major subcontractors submitted under Sub-Factor V will not count towards the page limit.

b. Content Requirements. All information shall be confined to the appropriate

Factor. The Offeror shall confine submissions to essential matters, sufficient to define the proposal and provide adequate basis for evaluation. Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.

c. No price proposal data shall appear in any file other than Factor VI – Price

d. Language and Currency – In accordance with FAR 52.215 1(c)(5), Offerors shall submit proposals in response to this solicitation in English and in U.S.

dollars. Proposals shall be edited by a technical editor who is proficient in the English language.

2. EVALUATION PROCEDURES

The SSA, using sound business judgment, bases the award decision on an integrated assessment of the evaluation criteria in the factors described below. While the entire evaluation team strives for maximum objectivity, the selection process is subjective by nature and professional judgment is implicit throughout the best value process. Ultimately, the contract shall be awarded to the Offeror whose proposal, based upon the evaluation criteria, represents the best value to the Government. Proposals must meet the criteria stated in the RFP in order to be eligible for award, to include responsiveness, technical acceptability and responsibility. Offerors are reminded to include their best technical and price term in their initial offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer.

Discussions (If necessary)

The Government intends to award without discussions. A “competitive Range” is a subjective determination of the most highly rated proposals in the event that discussions with Offerors are required. In such an event, the SSA will approve a competitive range of all the most highly rated proposals. If discussions are held, the Government may engage in a broad give and take with each Offeror in the competitive range, in accordance with FAR 15.306(d). The Government will provide the Offeror an advance agenda for the discussions. During discussions, the Government may ask the Offeror to further explain its proposal and to answer questions about it. Upon conclusion of discussions, those Offerors still considered the most highly rated will be afforded an opportunity to submit their proposal revisions for final evaluation and selection.

The following shall be included in the Proposal Submission.

FILE I: -FACTOR I – TECHNICAL APPROACH

WORK PLANS

The Offeror’s proposal shall contain a detailed Site Plan that includes how the project site will be organized. The Site Plan shall illustrate, where applicable, the use of contractor work areas including, but not limited to, lay down areas, construction work areas, contractor and Government offices and maintenance facilities, quality control laboratories (if on-site), containment areas, sedimentation ponds, haul roads, access roads, employee parking, and any additional land requirements outside the designated lay down areas within the contractor work limits. Include a general description of the traffic management plan for haul routes and temporary public access along Fish Hatchery Rd.

The Offeror’s proposal shall contain a description of the Offeror’s Construction Approach Work Plan for the Lewisville Dam Spillway Modifications that includes all of the following:

For items a. through f. below discuss the following in addition to the specific items listed in each item: Discuss what equipment will be used and why it is appropriate for this contract. If applicable, provide relevant examples of how methods and/or equipment have been successfully used previously. Provide a list of risks associated with the major construction elements listed in these items and how those risks will be mitigated. Describe quality control measures for these items.

a. Proposed plan for installation of weir anchors. Plan should include but is not limited to site access and layout, sequence of anchor construction, anchor design, anchor installation, and any contractual or other significant limitations or considerations. Site access should include any work platforms required for drilling and installing the anchors. Anchor design should include the anchor head design and methods to allow for re-stressing anchors. Anchor installation should include drilling methods to drill through the concrete and protection of the interface at the foundation of the weir, duplex drilling through the free length, drilling of the bond zone and under-ream, placement and grouting of the anchor, stressing and testing of the anchor, and the estimated durations of the individual elements and overall time required to complete each anchor, including stressing, testing, lockoff, and completion of temporary weir anchor head detail including grout. Discuss methods to test integrity of corrosion protection and handling of anchors to prevent damage. Discuss and highlight any proposed differences in the dimensions of the under-ream. Discuss what equipment and tooling will be used to drill the anchors. Also, discuss how drilling tolerances will be achieved using the proposed equipment. If applicable, provide relevant examples of how methods and/or equipment have been successfully used previously. Discuss management and disposal of drill cuttings and waste grout.

b. Proposed plan for installation of apron rock dowels. Plan should address but not be limited to the applicable items as required in ‘a’ above for the installation of the weir anchors.

c. Proposed plan for…

This is the start of the file's text. The full file is on GovTribe.