Amendment 01.pdf
PDF 2 MB Posted
- Attached to
- RRAD B551 and 561 Repairs
- Solicitation number
- W9126G20B0031
About this file
This is a request for proposal for design-build-bid contract to repair and modernize Buildings B551 and B561 at Red River Army Depot in Texarkana, Texas. The scope of work includes structural repairs, installation of metal roofs, upgrades to electrical, fire sprinkler, and alarm systems, and installation of HVAC equipment and air distribution. Bids are due by August 3, 2020 and award is anticipated by August 31, 2020. The contract is for 660 calendar days from notice to proceed and has a firm-fixed price. The Department of the Army Corps of Engineers Engineering District Fort Worth will administer the contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_11.pdf | ||
| B3_W9126G20B0031_am_10.pdf | ||
| Amendment_09.pdf | ||
| Amendment_8.pdf | ||
| Amendment_07.pdf | ||
| am_6.pdf | ||
| B3_Amendment_05.pdf | ||
| am_04.pdf | ||
| B5_Second_Site Visit 200819 photos.pdf | ||
| B5_Second Site Visit_Completed sign in sheet 200819.pdf | ||
| B3_Amendment_03.pdf | ||
| Amendment_02.pdf | ||
| B551 and B561_Completed sign-in sheet.pdf | ||
| B3_0-551-COMBINED-RTA.pdf | ||
| B3_0-561-COMBINED-RTA.pdf | ||
| B3_W9126G20B0031.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Solicitation for Repair B551 and B561 at Red River Army Depot (RRAD), Texas is amended as follows.
See SF30 Continuation Sheet(s)
NOTE: Proposal Receipt date is 04 September 2020; at 10:00 a.m.,CST, as previously announced.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
W9126G20B0031
X 9B. DATED (SEE ITEM 11)
06-Aug-2020
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11 -Aug-2020
CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A19
P.O. BOX 17300
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
W9126G20B0031
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
CHANGES TO SOLICITATION W9126G20B0031
CHANGES TO THE DRAWINGS
1. Replacement Drawings.- Replace the drawings listed below with the attached new drawings(s) of the same number, W9126G20B0031 0001
Building 551
A-106
AD100
AD200
E-601
Building 561
AD100
AD200
E-601
End of Summary of Changes
A-301
8 9 10 11 12 13 14
E.5
F
G
H
I
J
5 5
VEHICLE
AISLE 3
VEHICLE
AISLE 4
OFF
OFF
20' - 0" 1' - 0" 19' - 0" 20' - 0" 20' - 0" 20' - 0"
6' - 4" 3' - 4" 10' - 4" 10' - 0" 10' - 0"
G.4
I.3
20' - 0"
101AA
101CC
101DD
108 107
GL-1
GL-1
GL-1 GL-1 GL-1
28' - 4" 10' - 2" 1
10' - 2"
10' - 0"
A -1
A -1
A
-1
A -1
A
-1
A -1
A -1
A -1
/8
2' - 8" 10' - 0" 10' - 0" 8' - 0"
2' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 5' - 4"
T Y
P
/8
5' - 6" 4' - 0"
1' - 10"
4' - 0"
2' - 0"
3' - 4"
6"
J.0
ABO #4
MAINTENANCE
BAY
TYP.
TYP.
A-502
TYP. E.J.
KEYED NOTES:
1. EXISTING CLAY TILE MASONRY WALL
2. EXISTING CONCRETE COLUMN
3. METAL WALL PANEL OVER RIGID INSULATION (1.5” THICK, R-9.8) TO OUTSIDE
FACE OF EXISTING CLAY TILE WALL
4. PERSONNEL DOOR
5. 16' x 16' OVERHEAD DOOR
6. 8" DIA., 4' HT BOLLARD (INTERIOR) - SEE DETAIL 3/A-501
7. 8" DIA, 4' HT BOLLARD (EXTERIOR) - SEE CIVIL DWGS
8. CMU INFILL AT DEMO’D EXISTING DOOR - SEE STRUCT DWGS
9. CFMF STUD WALL (FOR INTERIOR WALLS) - SEE DETAIL 1/A-604. REFER TO
STRUCT DWGS FOR FRAMING REQUIREMENTS
10. 6"x6" PREFINISHED METAL DOWNSPOUT
11. STEEL LADDER WITH MIN. 16 GA GAL. 72" MAX HEIGHT STEEL LADDER GUARD
ATTACHED TO LADDER BY PIANO HINGES. PROVIDE GOV. FURNISHED
OPEN/CLOSE 5200 SERIES PADLOCK WITH 1-1/8" SHACKLE. SEE DETAIL 4/A-500.
12. ELEC. SWITCH BOARD LOCATION, PROVIDE SAFETY YELLOW FLOOR STRIPING
AS SHOWN - SEE ELEC. DWGS
13. EXISTING AIR COMPRESSOR STRUCTURE - NO WORK THIS AREA. PROTECT
STRUCTURE IN PLACE DURING CONSTRUCTION. PROVIDE PREFINISHED METAL
TRIM AND ROOF FLASHING INTO ADJACENT NEW WALL CLADDING PER MBM
RECOMMENDED DETAILS.
14. SURFACE-MOUNTED SAFETY GUARDRAIL. SEE DETAIL 4/ A-501
15. OVERHEAD MOTORIZED SECURITY CURTAIN GRILLE - SEE DOOR SCHEDULE
16. DRENCH SHOWER/EYEWASH COMBO - SEE PLUMB DWGS
17. WASH-FOUNTAIN LAVATORY. SEE PLUMB DWGS
18. RECYCLING STORAGE AREA. PROVIDE 4" WIDE YELLOW PAINT STRIPING AS
SHOWN, APPROX. 3'x8'.
19. WALK-OFF MAT - SEE FFE PACKAGE
# -NOT ALL APPLY TO THIS SHEET-
GENERAL NOTES:
1. ALL DIMENSIONS ARE TO BE MEASURED FROM FACE TO FACE OF FINISHES.
GENERAL CONTRACTOR MUST FIELD VERIFY MEASUREMENTS OFF EXISTING
WALL TO NEW WALL.
2. ELECTRICAL AND MECHANICAL DEVICES ARE SHOWN FOR REFERENCE ONLY.
REFER TO ELECTRICAL AND MECHANICAL DRAWINGS FOR MORE INFORMATION.
3. COORDINATE WITH ALL OTHER TRADES FOR SPECIFIC LOCATIONS OF WALL AND
ROOF MOUNTED EQUIPMENT.
4. REFER TO BUILDING ELEVATIONS AND ELECTRICAL DWGS FOR LOCATIONS OF
EXTERIOR LIGHTING.
5. REFER TO SHEET I-601 FOR ROOM FINISH SCHEDULE.
LEGEND
EXISTING DOOR
NEW DOOR
EXISTING WALL
NEW WALL
EXTENTS OF BRIDGE
CRANE LIMITS
FALL ARREST SYSTEM
RAILS
ABO # 9
ABO # 10
US Army Corps of
Engineers ®
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D a te
M ar k D e s c ri p ti o n
BLDG 551
R E
D R
IV
E
R A
R M
Y D
E P
O T
R R
A D
B A
N D
B R
E P
A
IR
S F
O R
T W
O R
T H
D
IS
T R
IC
T
T
A Y
L O
R S
T R
E E
T F
O R
T W
O R
T H
T
X
B E
N H
A M
D E
S
IG
N , L
LC
E
M E
R S
O N
R D
S
U
IT
E
S
T . L
O U
IS
, M
O
SEAL:
SHEET
NUMBER
D E
S
IG
N E
D B
Y
S H
E E
T S
IZ
E
A N
S I D
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
W G
B
G G
E B
E R
T
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
R E
V
Fort Worth District
A c ti o n
Tr ac ki ng
N o.
A U
G U
S T
A-106
F L O
O R
P L A
N
S E
C T
O R
A E
R D
E .U
D O
R .M
U E
L L E
R
1/8" = 1'-0"1
FLOOR PLAN - SECTOR 6
A
KEY PLAN
1 2 3 4
5 6 7 8
22 281571
E
J
N
0 8'4' 16'
1/8"=1'-0SCALE:
A
M E
N D
M E
N T
8/
/2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
A
C
D
E
F
G
H
I
J
AD200
AD200
AD200
AD200
500' - 0"
15 5 55 1 5
155555 5
4 4 4
3 3
5' - 0" 5' - 0"
B
10 10 10
GENERAL NOTES:
1. ALL FIELD MEASUREMENT VERIFICATION SHALL BE THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR. NOTIFY
ARCHITECT IMMEDIATELY OF ANY DISCREPANCY.
2. PROTECT EXISTING BUILDING ELEMENTS TO REMAIN FROM
DAMAGE.
3. REMOVE EXISTING ROOF AND ALL WOOD FRAMING DOWN TO
TOP OF EXISTING CONCRETE BEAM.
4. DEMOLISH AND REMOVE HALF WALLS OR WORK STATIONS.
FIELD VERIFY BY GENERAL CONTRACTOR.
5. DISCONNECT, COVER, THEN RECONNECT AIR TANKS AND
GROUNDED MECHANICAL EQUIPMENT DURING DEMOLITION
AND CONSTRUCTION.
6. FIELD VERIFY AND CONDUCT ANY NECESSARY PATCH WORK
TO EXISTING FLOOR.
7. REFER TO STRUCTURAL PLANS FOR ADDITIONAL INFORMATION
AND REQUIREMENTS.
LEGEND
EXISTING DOOR TO REMAIN
DOOR TO BE DEMOLISHED
EXISTING WALL TO REMAIN
WALL TO BE DEMOLISHED
DOOR TO BE DEMOLISHED
#KEYED NOTES:
1. DEMOLISH AND REMOVE EXISTING OVERHEAD COILING DOOR AND
ASSOCIATED ASSEMBLY
2. DEMOLISH AND REMOVE EXISTING HOLLOW METAL DOOR AND
ASSOCIATED ASSEMBLY
3. DEMOLISH AND REMOVE EXISTING PAVEMENT. TO BE INFILLED WITH
PAVEMENT DURING NEW CONSTRUCTION. REFER TO CIVIL DWGS FOR
EXTERIOR SITE DEMOLITION
4. EXISTING FLOOR. REFER TO STRUCTURAL DRAWINGS FOR EXTENTS OF
WORK.
5. FIELD CUT NEW OPENING IN EXISTING CLAY TILE WALL AS REQUIRED
FOR NEW DOOR
6. EXISTING AIR COMPRESSOR SPACE - NO WORK - CONTRACTOR SHALL
PROTECT EXISTING STRUCTURE DURING CONSTRUCTION
7. DEMOLISH AND REMOVE EXISTING WOOD ROOF FRAMING AND INTERIOR
WOOD COLUMNS
8. DEMOLISH AND REMOVE EXISTING FIRE WALL AND ASSOCIATED
FOUNDATIONS
9. DEMOLISH AND REMOVE EXISTING INTERIOR PAVEMENT AND SLAB-ON-
GRADE AS REQUIRED FOR NEW CONSTRUCTION. REFER TO
STRUCTURAL DRAWINGS FOR LIMITS OF INTERIOR DEMOLITION.
10. DEMOLISH AND REMOVE EXISTING BUILDING STRUCTURES AND
ADDITIONS IN THEIR ENTIRETY
11. DEMO EXISTING METAL LADDER
12. REMOVE EXISTING DOORWAY INFILLED WALL
US Army Corps of
Engineers ®
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D a te
M ar k D e s c ri p ti o n
BLDG 551
R E
D R
IV
E
R A
R M
Y D
E P
O T
R R
A D
B A
N D
B R
E P
A
IR
S F
O R
T W
O R
T H
D
IS
T R
IC
T
T
A Y
L O
R S
T R
E E
T F
O R
T W
O R
T H
T
X
B E
N H
A M
D E
S
IG
N , L
LC
E
M E
R S
O N
R D
S
U
IT
E
S
T . L
O U
IS
, M
O
SEAL:
SHEET
NUMBER
D E
S
IG
N E
D B
Y
S H
E E
T S
IZ
E
A N
S I D
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
W G
B
G G
E B
E R
T
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
R E
V
Fort Worth District
A c ti o n
Tr ac ki ng
N o.
A U
G U
S T
AD100
C O
M P
O S
IT
E
D E
M O
L
IT
IO
N
P L A
N
A E
R D
E .U
D O
R .M
U E
L L E
R
A
KEY PLAN
1 2 3 4
5 6 7 8
22 281571
E
J
3/64" = 1'-0"1
COMPOSITE PLAN - DEMOLITION
N
0 20'10' 40'
3/64"=1'-0"SCALE:
A
M E
N D
M E
N T
8/
/2
FIN. FLR.
100' - 0"
T.O.W. (EXIST)
118' - 4 1/2"
12345678910111213141516171819202122232425262728
T.O. ROOF (EXIST)
126' - 6"
13 3 3 1 2 3 3 44 2 2 21
5 5
119 9 71
FIN. FLR.
100' - 0"
T.O.W. (EXIST)
118' - 4 1/2"
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
T.O. ROOF (EXIST)
126' - 6"
103 1 3 3 3 1 1 34 43
5 5 5 5
9 9 7
FIN. FLR.
100' - 0"
T.O.W. (EXIST)
118' - 4 1/2"
A C D E F G H I J
T.O. ROOF (EXIST)
126' - 6"
133 3
B
5 5
871 1
FIN. FLR.
100' - 0"
T.O.W. (EXIST)
118' - 4 1/2"
ACDEFGHIJ
T.O. ROOF (EXIST)
126' - 6"
11 13 3 42
B
GENERAL NOTES:
1. ALL FIELD MEASUREMENT VERIFICATION SHALL BE THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR. NOTIFY
ARCHITECT IMMEDIATELY OF ANY DISCREPANCY.
2. PROTECT EXISTING BUILDING ELEMENTS TO REMAIN FROM
DAMAGE.
3. REMOVE EXISTING ROOF AND ALL WOOD FRAMING DOWN TO
TOP OF EXISTING CONCRETE BEAM.
4. DEMOLISH AND REMOVE HALF WALLS OR WORK STATIONS.
FIELD VERIFY BY GENERAL CONTRACTOR.
5. DISCONNECT, COVER, THEN RECONNECT AIR TANKS AND
GROUNDED MECHANICAL EQUIPMENT DURING DEMOLITION
AND CONSTRUCTION.
6. FIELD VERIFY AND CONDUCT ANY NECESSARY PATCH WORK
TO EXISTING FLOOR.
7. REFER TO STRUCTURAL PLANS FOR ADDITIONAL INFORMATION
AND REQUIREMENTS.
#KEYED NOTES:
1. DEMOLISH AND REMOVE EXISTING OVERHEAD COILING
DOOR AND ASSOCIATED ASSEMBLY
2. DEMOLISH AND REMOVE EXISTING HM DOOR AND
ASSOCIATED ASSEMBLY
3. FIELD CUT NEW OPENING IN EXISTING CLAY TILE (OR CMU)
WALL AS REQUIRED FOR NEW DOOR
4. DEMOLISH AND REMOVE EXISTING ROOFING SYSTEM AND
WOOD ROOF FRAMING SYSTEM
5. DEMOLISH AND REMOVE EXISTING GRADE BEAM. REFER TO
STRUCTURAL ELEVATIONS FOR LIMITS OF DEMOLITION
6. DEMO EXISTING METAL LADDER
7. DEMOLISH AND REMOVE EXISTING CLAY TILE WALL ABOVE
EXISTING CONCRETE STRUCTURE, CONTRACTOR SHALL
TAKE CARE TO RETAIN UNDAMAGED TILES FOR SPOT
REPAIR, REPLACEMENT OF EXISTING MASONRY WALLS
DURING CONSTRUCTION
8. DEMOLISH AND REMOVE EXISTING CONCRETE RAKE BEAM
9. DEMOLISH AND REMOVE TOP PORTION OF EXISTING
CONCRETE COLUMNS AT EXISTING EXPANSION JOINT
10. REMOVE EXISTING DOORWAY INFILLED WALL.
US Army Corps of
Engineers ®
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D a te
M ar k D e s c ri p ti o n
BLDG 551
R E
D R
IV
E
R A
R M
Y D
E P
O T
R R
A D
B A
N D
B R
E P
A
IR
S F
O R
T W
O R
T H
D
IS
T R
IC
T
T
A Y
L O
R S
T R
E E
T F
O R
T W
O R
T H
T
X
B E
N H
A M
D E
S
IG
N , L
LC
E
M E
R S
O N
R D
S
U
IT
E
S
T . L
O U
IS
, M
O
SEAL:
SHEET
NUMBER
D E
S
IG
N E
D B
Y
S H
E E
T S
IZ
E
A N
S I D
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
W G
B
G G
E B
E R
T
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
R E
V
Fort Worth District
A c ti o n
Tr ac ki ng
N o.
A U
G U
S T
AD200
E X
T E
R
IO
R E
L E
V A
T
IO
N S
D
E M
O L
IT
IO
N
A E
R D
E .U
D O
R .M
U E
L L E
R
3/64" = 1'-0"1
EAST ELEVATION - DEMOLITION
3/64" = 1'-0"2
WEST ELEVATION - DEMOLITION
3/64" = 1'-0"3
NORTH ELEVATION - DEMOLITION
3/64" = 1'-0"4
SOUTH ELEVATION - DEMOLITION
0 20'10' 40'
3/64"=1'-0"SCALE:
A
M E
N D
M E
N T
8/
/2
G N 100A/3P
MDPH11 MAIN SWITCHBOARD 480Y/277V, 3Ø, 4W, 2000A, 42KAIC NEMA 1 ENCLOSURE
4 SETS OF
(3#500KCMIL, 1#500KCMIL NEU, 4"C)
PLUS 4 SPARE CONDUITS.
150A/3P
2000 AF
1200 AT
UTILITY
TRANSFORMER
2 SETS OF
EMPTY 4"C
WITH PULL
STRING
100A/3P100A/3P
LH11
100A MCB
480V
400A/3P 400A/3P 200A/3P 200A/3P
PH11
400A MCB
480V
4#
0k C
M
IL
, 1 #3
G , 4
"C
LSIGM
T-PL111,
30 KVA
480∆ TO
208Y/120V
LOCATION: BUILDING 551
PL111
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C 3#
4, #1 0G
, 1 "C
PH12
400A MCB
480V 5 5
4# 1, #6
G , 1
-1 /2
"C
S P
A R
E
T-PL13,
30 KVA
480∆ TO
208Y/120V
PL13
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
T-PL15,
30 KVA
480∆ TO
208Y/120V
PL15
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
T-PL17,
30 KVA
480∆ TO
208Y/120V
PL17
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
T-PL19,
30 KVA
480∆ TO
208Y/120V
PL19
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
T-PL120,
30 KVA
480∆ TO
208Y/120V
PL120
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
T-PL122,
30 KVA
480∆ TO
208Y/120V
PL122
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
T-PL112,
30 KVA
480∆ TO
208Y/120V
PL112
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C 3#
4, #1 0G
, 1 "C
45A/3P
PH13 480Y/277V, 3Ø, 4W, 200A, 35kAIC NEMA 1 ENCLOSURE
45A/3P
200 AF
200 AT
45A/3P45A/3P 45A/3P 45A/3P 45A/3P 45A/3P 45A/3P
T-PL11,
30 KVA
480∆ TO
208Y/120V
PL11
100A MCB
208Y/120
60A
NF
3# 8, #1
0G , 3
/4 "C
S P
A R
E
S P
A R
E
T-PL14,
30 KVA
480∆ TO
208Y/120V
PL14
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
T-PL16,
30 KVA
480∆ TO
208Y/120V
PL16
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
T-PL18,
30 KVA
480∆ TO
208Y/120V
PL18
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
T-PL110,
75 KVA
480∆ TO
208Y/120V
PL110
200A MCB
208Y/120
100A
NF
4# 3/
0, #6 G
, 2 "C
3# 3, #8
G , 1
"C
T-PL121,
30 KVA
480∆ TO
208Y/120V
PL121
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
T-PL123,
30 KVA
480∆ TO
208Y/120V
PL123
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
45A/3P
PH14 480Y/277V, 3Ø, 4W, 200A, 22kAIC NEMA 1 ENCLOSURE
45A/3P
200 AF
200 AT
100A/3P45A/3P 45A/3P 45A/3P 45A/3P 45A/3P 45A/3P
T-PL12,
30 KVA
480∆ TO
208Y/120V
PL12
100A MCB
208Y/120
60A
NF
S P
A R
E
S P
A R
E
45A/3P
T-PL125,
30 KVA
480∆ TO
208Y/120V
PL125
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
3 3
45A/3P
T-PL114,
30 KVA
480∆ TO
208Y/120V
PL114
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
225A/3P 225A/3P
PH15
225A MCB
480V
PH16
225A MCB
480V
225A/3P 225A/3P
PH17
225A MCB
480V
PH19
225A MCB
480V
30A/3P
S P
D
200A
NF
3# 1/
0, #6 G
, 1 -1
/2 "C
COMPRESSOR
4# 4/
0, #4 G
, 2 -1
/2 "C
2 2 2 2 2 2 2
666 6666 66
S P
A R
E
ABO #2ABO #4ABO #2
4# 3/
0, #6 G
, 2 "C
4# 3/
0, #6 G
, 2 "C
4# 4/
0, #4 G
, 2 -1
/2 "C
3# 8, #1
0G , 3
/4 "C
3# 8, #1
0G , 3
/4 "C
3# 8, #1
0G , 3
/4 "C
3# 8, #1
0G , 3
/4 "C
3# 8, #1
0G , 3
/4 "C
3# 8, #1
0G , 3
/4 "C
3# 8, #1
0G , 3
/4 "C
3# 8, #1
0G , 3
/4 "C
3# 8, #1
0G , 3
/4 "C
3# 8, #1
0G , 3
/4 "C
3# 8, #1
0G , 3
/4 "C
3# 8, #1
0G , 3
/4 "C
3# 8, #1
0G , 3
/4 "C
3# 8, #1
0G , 3
/4 "C
ABO #10
4#
0k C
M
IL
, 1 #3
G , 4
"C
4# 4/
0, #4 G
, 2 -1
/2 "C
4# 4/
0, #4 G
, 2 -1
/2 "C
4# 1, #6
G ,1
/2
"C
4# 1, #6
G ,1
/2
"C
US Army Corps of
Engineers ®
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D a te
M ar k D e s c ri p ti o n
BLDG 551
R E
D R
IV
E
R A
R M
Y D
E P
O T
R R
A D
B A
N D
B R
E P
A
IR
S F
O R
T W
O R
T H
D
IS
T R
IC
T
T
A Y
L O
R S
T R
E E
T F
O R
T W
O R
T H
T
X
B E
N H
A M
D E
S
IG
N , L
LC
E
M E
R S
O N
R D
S
U
IT
E
S
T . L
O U
IS
, M
O
SEAL:
SHEET
NUMBER
D E
S
IG
N E
D B
Y
S H
E E
T S
IZ
E
A N
S I D
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
W G
B
G G
E B
E R
T
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
R E
V
Fort Worth District
A c ti o n
Tr ac ki ng
N o.
A U
G U
S T
E-601
O N
E -L
IN
E
D
IA
G R
A M
R .M
U R
R A
Y
R .M
U R
R A
Y
J .S
P O
S
IT
O
NTS1
ONE-LINE DIAGRAM
KEYED NOTES :X
1. NOT USED.
2. REFER TO PANEL SCHEDULES ON SHEET E-602 THRU E-608 FOR ADDITIONAL
INFORMATION.
3. INSTALL NEW SMART METER IN SWITCHBOARD OR ADJACENT TO
PANELBOARD AND CONNECT TO NEW ILON INTERFACE CONTROLLER. PROVIDE
CT’S AND HARDWARE AS REQUIRED. REFER TO SPECIFICATION 26 27 14 FOR
ADDITIONAL DETAILS. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR A
COMPLETE AND INTEGRATED INSTALLATION OF SMART METER/ILON
EQUIPMENT BACK TO THE EXISTING RRAD ENERGY MANAGEMENT SYSTEM.
THIS INCLUDES ALL TASKS OF "HARDWARE SETUP, PROGRAMMING, TESTING
AND INTEGRATION".
4. EXISTING DISCONNECT TO BE REUSED.
5. INSTALL EXISTING SQUARE D SMART METER (SALVAGED FROM DEMO)
ADJACENT TO PANELBOARD AND CONNECT TO RELOCATED ILON INTERFACE
CONTROLLER. PROVIDE NEW CT’S AND HARDWARE AS REQUIRED. REFER TO
SPECIFICATION 26 27 14 FOR ADDITIONAL DETAILS. ELECTRICAL CONTRACTOR
IS RESPONSIBLE FOR A COMPLETE AND INTEGRATED INSTALLATION OF SMART
METER/ILON EQUIPMENT BACK TO THE EXISTING RRAD ENERGY MANAGEMENT
SYSTEM. THIS INCLUDES ALL TASKS OF "HARDWARE SETUP, PROGRAMMING,
TESTING AND INTEGRATION".
6. THIS TRANSFORMER REQUIRES A MANUFACTURER'S WALL OR COLUMN
MOUNTING KIT, BASED ON CONDITIONS SHOWN ON PLANS. MOUNT BOTTOM OF
TRANSFORMER AT 10'-0" ABOVE FINISHED FLOOR.
GENERAL NOTES:
1. REFER TO DRAWING G-004 FOR COMPLETE ABO SCOPE OF WORK.
AM
E N
D M
E N T
8/
/2
LEGEND
EXISTING DOOR TO REMAIN
DOOR TO BE DEMOLISHED
EXISTING WALL TO REMAIN
WALL TO BE DEMOLISHED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
A
B
C
D
E
F
G
H
I
J
AD200
AD200
AD200
AD200
1 1
2 2
4 4 4 4
EXISTING
BREAK RM. -
NO WORK
5' - 0"
11 2 1
1 1 1
1 1 1 12 2
12 12 12
GENERAL NOTES:
1. ALL FIELD MEASUREMENT VERIFICATION SHALL BE THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR. NOTIFY
ARCHITECT IMMEDIATELY OF ANY DISCREPANCY.
2. PROTECT EXISTING BUILDING ELEMENTS FROM DAMAGE.
3. REMOVE EXISTING ROOF AND ALL WOOD FRAMING DOWN TO
EXISTING CONC. FRAME.
4. DEMOLISH AND REMOVE HALF WALLS OR WORK STATIONS.
FIELD VERIFY BY GENERAL CONTRACTOR.
5. DISCONNECT, COVER, THEN RECONNECT AIR TANKS AND
GROUNDED MECHANICAL EQUIPMENT DURING DEMOLITION
AND CONSTRUCTION.
6. FIELD VERIFY AND CONDUCT ANY NECESSARY PATCH WORK TO
EXISTING FLOOR.
7. REFER TO STRUCTURAL PLANS FOR ADDITIONAL INFORMATION
AND REQUIREMENTS.
#KEYED NOTES:
1. DEMOLISH AND REMOVE EXISTING OVERHEAD COILING DOOR AND
ASSOCIATED ASSEMBLY
2. DEMOLISH AND REMOVE EXISTING HOLLOW METAL DOOR AND
ASSOCIATED ASSEMBLY
3. DEMOLISH AND REMOVE EXISTING PAVEMENT. TO BE INFILLED WITH
PAVEMENT DURING NEW CONSTRUCTION. REFER TO CIVIL DWGS FOR
EXTERIOR SITE DEMOLITION.
4. EXISTING FLOOR. REFER TO STRUCTURAL DRAWINGS FOR EXTENTS OF
WORK.
5. FIELD CUT NEW OPENING IN EXISTING CLAY TILE WALL AS REQUIRED
FOR NEW DOOR
6. EXISTING AIR COMPRESSOR AREA - SALVAGE CANOPY STRUCTURE FOR
REINSTALLATION.
7. DEMOLISH AND REMOVE EXISTING WOOD ROOF FRAMING AND INTERIOR
WOOD COLUMNS
8. DEMOLISH AND REMOVE EXISTING FIRE WALL AND ASSOCIATED
FOUNDATIONS
9. DEMOLISH AND REMOVE EXISTING INTERIOR PAVEMENT AND SLAB-ON-
GRADE AS REQUIRED FOR NEW CONSTRUCTION. REFER TO
STRUCTURAL DRAWINGS FOR LIMITS OF INTERIOR DEMOLITION.
10. NOT USED.
11. EXISTING DOOR TO REMAIN.
12. DEMOLISH AND REMOVE EXISTING BUILDING STRUCTURES IN THEIR
ENTIRETY, INCLUDING SLAB AND FONDATIONS.
US Army Corps of
Engineers ®
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D a te
M ar k D e s c ri p ti o n
BLDG 561
R E
D R
IV
E
R A
R M
Y D
E P
O T
R R
A D
B A
N D
B R
E P
A
IR
S F
O R
T W
O R
T H
D
IS
T R
IC
T
T
A Y
L O
R S
T R
E E
T F
O R
T W
O R
T H
T
X
B E
N H
A M
D E
S
IG
N , L
LC
E
M E
R S
O N
R D
S
U
IT
E
S
T . L
O U
IS
, M
O
SEAL:
SHEET
NUMBER
D E
S
IG
N E
D B
Y
S H
E E
T S
IZ
E
A N
S I D
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
W G
B
G G
E B
E R
T
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
R E
V
Fort Worth District
A c ti o n
Tr ac ki ng
N o.
A U
G U
S T
AD100
C O
M P
O S
IT
E
D E
M O
L
IT
IO
N
P L A
N
A E
R D
E U
D O
R M
U E
L L E
R
3/64" = 1'-0"1
COMPOSITE FIRST FLOOR PLAN - DEMOLITION
N
0 20'10' 40'
3/64"=1'-0"SCALE:
A
KEY PLAN
1 2 3 4
5 6 7 8
22 281571
E
J
A
M E
N D
M E
N T
8/
/2
FIN. FLOOR.
100' - 0"
T.O.W. (EXIST)
118' - 4 1/2"
12345678910111213141516171819202122232425262728
T.O. EXISTING ROOF
126' - 6"
1 1 1 1 1 1 14 4 22 2 3 2
79 9
FIN. FLOOR.
100' - 0"
T.O.W. (EXIST)
118' - 4 1/2"
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
T.O. EXISTING ROOF
126' - 6"
2 1 14 1 1 1 1 1102 10 2 2210
22 2
FIN. FLOOR.
100' - 0"
T.O.W. (EXIST)
118' - 4 1/2"
A B C D E F G H I J
T.O. EXISTING ROOF
126' - 6"
1 1 3 1234 4 7 8
FIN. FLOOR.
100' - 0"
T.O.W. (EXIST)
118' - 4 1/2"
ABCDEFGHIJ
1 3 1 3 1 142
7 8
#KEYED NOTES:
1. DEMOLISH AND REMOVE EXISTING OVERHEAD COILING
DOOR AND ASSOCIATED ASSEMBLY
2. DEMOLISH AND REMOVE EXISTING HM DOOR AND
ASSOCIATED ASSEMBLY
3. FIELD CUT NEW OPENING IN EXISTING CLAY TILE WALL AS
REQUIRED FOR NEW DOOR
4. DEMOLISH AND REMOVE EXISTING ROOFING SYSTEM AND
WOOD ROOF FRAMING SYSTEM.
5. NO WORK - EXISTING TO REMAIN
6. DEMOLISH AND REMOVE EXISTING GRADE BEAM, REFER TO
STRUCTURAL ELEVATIONS FOR LIMITS OF DEMOLITION
7. DEMOLISH AND REMOVE EXISTING CLAY TILE WALL ABOVE
EXISTING CONCRETE STRUCTURE. CONTRACTOR SHALL
TAKE CARE TO RETAIN UNDAMAGED TILES FOR SPOT
REPAIR/REPLACEMENT OF EXISTING MASONRY WALLS
DURING CONSTRUCTION.
8. DEMOLISH AND REMOVE EXISTING CONCRETE RAKE BEAM.
9. DEMOLISH AND REMOVE TOP PORTION OF EXISTING
CONCRETE COLUMNS AT EXISTING EXPANSION JOINTS.
10. DEMOLISH AND REMOVE EXISTING BUILDING STRUCTURES
IN THEIR ENTIRETY, INCLUDES SLAB AND FOUNDATIONS.
GENERAL NOTES:
1. ALL FIELD MEASUREMENT VERIFICATION SHALL BE THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR. NOTIFY
ARCHITECT IMMEDIATELY OF ANY DISCREPANCY.
2. PROTECT EXISTING BUILDING ELEMENTS FROM DAMAGE.
3. REMOVE EXISTING ROOF AND ALL WOOD FRAMING DOWN TO
EXISTING CONC. FRAME.
4. DEMOLISH AND REMOVE HALF WALLS OR WORK STATIONS.
FIELD VERIFY BY GENERAL CONTRACTOR.
5. DISCONNECT, COVER, THEN RECONNECT AIR TANKS AND
GROUNDED MECHANICAL EQUIPMENT DURING DEMOLITION
AND CONSTRUCTION.
6. FIELD VERIFY AND CONDUCT ANY NECESSARY PATCH WORK TO
EXISTING FLOOR.
7. REFER TO STRUCTURAL PLANS FOR ADDITIONAL INFORMATION
AND REQUIREMENTS.
US Army Corps of
Engineers ®
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D a te
M ar k D e s c ri p ti o n
BLDG 561
R E
D R
IV
E
R A
R M
Y D
E P
O T
R R
A D
B A
N D
B R
E P
A
IR
S F
O R
T W
O R
T H
D
IS
T R
IC
T
T
A Y
L O
R S
T R
E E
T F
O R
T W
O R
T H
T
X
B E
N H
A M
D E
S
IG
N , L
LC
E
M E
R S
O N
R D
S
U
IT
E
S
T . L
O U
IS
, M
O
SEAL:
SHEET
NUMBER
D E
S
IG
N E
D B
Y
S H
E E
T S
IZ
E
A N
S I D
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
W G
B
G G
E B
E R
T
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
R E
V
Fort Worth District
A c ti o n
Tr ac ki ng
N o.
A U
G U
S T
AD200
E X
T E
R
IO
R E
L E
V A
T
IO
N S
D
E M
O L
IT
IO
N
A E
R D
E U
D O
R M
U E
L L E
R
3/64" = 1'-0"1
EAST ELEVATION - DEMOLITION
3/64" = 1'-0"2
WEST ELEVATION - DEMOLITION
3/64" = 1'-0"3
NORTH ELEVATION - DEMOLITION
3/64" = 1'-0"4
SOUTH ELEVATION - DEMOLITION
A
M E
N D
M E
N T
8/
/2
G N 100A/3P
MDPH11 MAIN SWITCHBOARD 480Y/277V, 3Ø, 4W, 2000A, 42kAIC NEMA 1 ENCLOSURE
4 SETS OF
(3#500KCMIL, 1#500KCMIL NEU, 4"C)
PLUS 4 SPARE CONDUITS.
100A/3P
2000 AF
1200 AT
UTILITY
TRANSFORMER
2 SETS OF
EMPTY 4"C
WITH PULL
STRING
100A/3P100A/3P
LH11
100A MCB
480V
400A/3P 400A/3P 200A/3P 200A/3P
PH11
400A MCB
480V
4#
0k C
M , 1
#3 G
, 4 "C
LSIGM
T-PL111,
75 KVA
480∆ TO
208Y/120V
LOCATION: BUILDING 561
PL111
200A MCB
208Y/120
NF
4# 3/
0, #6 G
, 2 "C
PH12
400A MCB
480V 5 5
4# 1, #8
G , 1
-1 /2
"C
S P
A R
E
S P
A R
E
T-PL13,
30 KVA
480∆ TO
208Y/120V
PL13
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C 3#
8, #1 0G
, 3 /4
"C
T-PL15,
30 KVA
480∆ TO
208Y/120V
PL15
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C 3#
8, #1 0G
, 3 /4
"C
T-PL17,
30 KVA
480∆ TO
208Y/120V
PL17
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C 3#
8, #1 0G
, 3 /4
"C
T-PL19,
30 KVA
480∆ TO
208Y/120V
PL19
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C 3#
8, #1 0G
, 3 /4
"C
T-PL120,
30 KVA
480∆ TO
208Y/120V
PL120
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
3# 8, #1
0G , 3
/4 "C
T-PL122,
30 KVA
480∆ TO
208Y/120V
PL122
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
3# 8, #1
0G , 3
/4 "C
T-PL112,
75 KVA
480∆ TO
208Y/120V
PL112
200A MCB
208Y/120
NF
45A/3P
PH13 480Y/277V, 3Ø, 4W, 200A, 35kAIC NEMA 1 ENCLOSURE
45A/3P
200 AF
200 AT
45A/3P45A/3P 45A/3P 45A/3P 45A/3P 45A/3P 45A/3P
T-PL11,
30 KVA
480∆ TO
208Y/120V
PL11
100A MCB
208Y/120
60A
NF
S P
A R
E
S P
A R
E
T-PL14,
30 KVA
480∆ TO
208Y/120V
PL14
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
T-PL16,
30 KVA
480∆ TO
208Y/120V
PL16
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
T-PL18,
30 KVA
480∆ TO
208Y/120V
PL18
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
T-PL110,
30 KVA
480∆ TO
208Y/120V
PL110
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
T-PL121,
30 KVA
480∆ TO
208Y/120V
PL121
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
T-PL123,
30 KVA
480∆ TO
208Y/120V
PL123
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
45A/3P
PH14 480Y/277V, 3Ø, 4W, 200A, 22kAIC NEMA 1 ENCLOSURE
45A/3P
200 AF
200 AT
45A/3P45A/3P 45A/3P 45A/3P 45A/3P 45A/3P 45A/3P
T-PL12,
30 KVA
480∆ TO
208Y/120V
PL12
100A MCB
208Y/120
60A
NF
S P
A R
E
S P
A R
E
T-PL125,
30 KVA
480∆ TO
208Y/120V
PL125
100A MCB
208Y/120
60A
NF
4# 1, #6
G ,1
/2
"C
3 3
3# 8, #1
0G , 3
/4 "C
45A/3P
200A/3P 225A/3P
PH15
200A MCB
480V
PH16
225A MCB
480V
225A/3P 225A/3P
PH17
225A MCB
480V
PH19
225A MCB
480V
30A/3P
S P
D
100A/3P
3# 3, #8
G , 1
-1 /4
"C
T-LL212,
75 KVA
480∆ TO
208Y/120V
LL212
225A MCB
208Y/120
NF
4# 4/
0, #2 G
, 2
/2 "C
NF
3#
0k C
M
IL
, 1 #3
G , 3
"C
M
EXISTING AIR
COMPRESSOR
4# 4/
0, #4 G
, 2 -1
/2 "C
2 2 2 2 2 2 2
666 666666
S P
A R
E
ABO #12
ABO #20
ABO #12
80A/1P
100A
2# 4, #8
G , 1
"C
WH-2
ABO #14
4# 3/
0, #6 G
, 2 "C
4# 3/
0, #6 G
, 2 "C
3# 1, #6
G , 1
-1 /2
"C
3# 8, #1
0G , 3
/4 "C
3# 8, #1
0G , 3
/4 "C
3# 8, #1
0G , 3
/4 "C
3# 8, #1
0G , 3
/4 "C
3# 8, #1
0G , 3
/4 "C
3# 8, #1
0G , 3
/4 "C
400A/3P
4# 3/
0, #6 G
, 2 "C
3# 1, #6
G , 1
-1 /2
"C 4#
3/ 0, #6
G , 2
"C 4#
0k
C M
, 1 #3
G , 4
"C
PL114
60A MCB
208Y/120
4# 6, #1
0G ,1
"C
ABO #14
4# 4/
0, #4 G
, 2 -1
/2 "C
4# 4/
0, #4 G
, 2 -1
/2 "C
4# 1, #6
G ,1
/2
"C 3#
8, #1 0G
, 3 /4
"C
4# 1, #6
G ,1
/2
"C 3#
8, #1 0G
, 3 /4
"C
US Army Corps of
Engineers ®
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D a te
M ar k D e s c ri p ti o n
BLDG 561
R E
D R
IV
E
R A
R M
Y D
E P
O T
R R
A D
B A
N D
B R
E P
A
IR
S F
O R
T W
O R
T H
D
IS
T R
IC
T
T
A Y
L O
R S
T R
E E
T F
O R
T W
O R
T H
T
X
B E
N H
A M
D E
S
IG
N , L
LC
E
M E
R S
O N
R D
S
U
IT
E
S
T . L
O U
IS
, M
O
SEAL:
SHEET
NUMBER
D E
S
IG
N E
D B
Y
S H
E E
T S
IZ
E
A N
S I D
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
W G
B
G G
E B
E R
T
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
R E
V
Fort Worth District
A c ti o n
Tr ac ki ng
N o.
A U
G U
S T
E-601
O N
E -L
IN
E
D
IA
G R
A M
R .M
U R
R A
Y
R .M
U R
R A
Y
J .S
P O
S
IT
O
NTS1
ONE-LINE DIAGRAM
KEYED NOTES :X
1. EXISTING PANEL TO BE REFED AS SHOWN..
2. REFER TO PANEL SCHEDULE ON SHEET E-602 THRU E-607 FOR ADDITIONAL
INFORMATION.
3. INSTALL NEW SMART METER IN SWITCHBOARD OR ADJACENT TO PANELBOARD
AND CONNECT TO NEW ILON INTERFACE CONTROLLER. PROVIDE CT’S AND
HARDWARE AS REQUIRED. REFER TO SPECIFICATION 26 27 14 FOR ADDITIONAL
DETAILS. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR A COMPLETE AND
INTEGRATED INSTALLATION OF SMART METER/ILON EQUIPMENT BACK TO THE
EXISTING RRAD ENERGY MANAGEMENT SYSTEM. THIS INCLUDES ALL TASKS OF
"HARDWARE SETUP, PROGRAMMING, TESTING AND INTEGRATION".
4. EXISTING DISCONNECT TO BE REUSED.
5. INSTALL EXISTING SQUARE D SMART METER (SALVAGED FROM DEMO)
ADJACENT TO PANELBOARD AND CONNECT TO RELOCATED ILON INTERFACE
CONTROLLER. PROVIDE NEW CT’S AND HARDWARE AS REQUIRED. REFER TO
SPECIFICATION 26 27 14 FOR ADDITIONAL DETAILS. ELECTRICAL CONTRACTOR
IS RESPONSIBLE FOR A COMPLETE AND INTEGRATED INSTALLATION OF SMART
METER/ILON EQUIPMENT BACK TO THE EXISTING RRAD ENERGY MANAGEMENT
SYSTEM. THIS INCLUDES ALL TASKS OF "HARDWARE SETUP, PROGRAMMING,
TESTING AND INTEGRATION".
6. THIS TRANSFORMER REQUIRES A MANUFACTURER'S WALL OR COLUMN
MOUNTING KIT, BASED ON CONDITIONS SHOWN ON PLANS. MOUNT BOTTOM OF
TRANSFORMER AT 10'-0" ABOVE FINISHED FLOOR.
GENERAL NOTES:
1. REFER TO DRAWING G-004 FOR COMPLETE ABO SCOPE OF WORK.
AM
E N
D M
E N T
8/
/2
| AMENDMENT 0001 |
| SUMMARY OF CHANGES |
| Building 551 |
| A-106 |
| AD100 |
| AD200 |
| E-601 |
| Sheets |
| E-601 - ONE-LINE DIAGRAM |
| Building 561 |
| AD100 |
| AD200 |
| E-601 |
| Sheets |
| E-601 - ONE-LINE DIAGRAM |
File details come from the government source that posted it. Updated .