B3_Whitney-Aquilla_IDIQ_Maintenance_Bid_Schedule.xlsx
XLSX spreadsheet 54 KB Posted
- Attached to
- Maintenance IDIQ for USACE Lake Offices
- Solicitation number
- W9126G19R0047
About this file
Bid Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B3_19r0047_am1_issued.pdf | ||
| B3_19r0047_issued.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 (2)
| THREE RIVERS MAINTENANCE IDIQ | |||||
| Base Year | |||||
| Facility Maintenance for Whitney/Aquilla Lakes Quote (Bid) Schedule | |||||
| CLIN # | Section A Campsite Maintenance | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2018 or date of award, whichever is later, through 14 December 2019. | |||||
| A001 | Decomposed Granite | SF | 1000 | $ - | $ - |
| A002 | Concrete Wheel Stops | EA | 30 | $ - | $ - |
| A003 | Timber Delineators, One Tier | LF | 500 | $ - | $ - |
| A004 | Timber Delineators, Two Tier | LF | 400 | $ - | $ - |
| A005 | Timber Delineators, Three Tier | LF | 300 | $ - | $ - |
| A006 | Timber Delineators, Four Tier | LF | 200 | $ - | $ - |
| A007 | Timber Delineators, Five Tier | LF | 100 | $ - | $ - |
| A008 | Concrete Campsite Delineators, 8 inch Height | LF | 150 | $ - | $ - |
| A009 | Concrete Campsite Delineators, 16 inch Height | LF | 150 | $ - | $ - |
| A010 | Concrete Campsite Delineators, 24 inch Height | LF | 150 | $ - | $ - |
| A011 | Pedestal Grill Installation | EA | 25 | $ - | $ - |
| A012 | Upright Grill Installation | EA | 25 | $ - | $ - |
| A013 | Fire Ring and Ground Mounted Cooker Installation | EA | 25 | $ - | $ - |
| A014 | Lantern Hanger Post Installation | EA | 25 | $ - | $ - |
| A015 | Replace/Install 8 Foot Vinyl Coated or Aluminum Picnic Tables | EA | 10 | $ - | $ - |
Total Section A Base Year $ - 0
| CLIN # | Section B Carpentry and Painting | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2018 or date of award, whichever is later, through 14 December 2019. | |||||
| B001 | Metal Picnic Shelter Installation | EA | 2 | $ - | $ - |
| B002 | Roofing Removal (Composition and R-Panel) | SF | 2000 | $ - | $ - |
| B003 | Roof Sheathing | SF | 2000 | $ - | $ - |
| B004 | Tongue and Groove Decking | SF | 500 | $ - | $ - |
| B005 | Fascia Board | LF | 100 | $ - | $ - |
| B006 | Composition Shingle Repair/Installation | SF | 500 | $ - | $ - |
| B007 | R-Panel Repair/Installation | SF | 1000 | $ - | $ - |
| B008 | Wall Sheathing | SF | 1000 | $ - | $ - |
| B009 | Soffit Sheathing | SF | 500 | $ - | $ - |
| B010 | Wall Siding | SF | 1000 | $ - | $ - |
| B011 | Plastic Laminate Panels | SF | 1000 | $ - | $ - |
| B012 | Lap or "V" Grooved Siding | SF | 500 | $ - | $ - |
| B013 | Brick and Slump Stone Masonry-Repair/Installation | SF | 500 | $ - | $ - |
| B014 | Natural Stone Masonry-Repair/Installation | SF | 500 | $ - | $ - |
| B015 | Toilet Partition-Single | EA | 5 | $ - | $ - |
| B016 | Toilet Partition-Double | EA | 5 | $ - | $ - |
| B017 | Toilet Partition-Triple | EA | 5 | $ - | $ - |
| B018 | Shower Partition | EA | 5 | $ - | $ - |
| B019 | Shower/Toilet Door with Pilaster | EA | 5 | $ - | $ - |
| B020 | Urinal Partition | EA | 5 | $ - | $ - |
| B021 | Painting Metal Picnic Shelters | EA | 30 | $ - | $ - |
| B022 | Painting Wood-Oil Based Paint | SF | 500 | $ - | $ - |
| B023 | Painting Wood-Exterior Latex Paint | SF | 500 | $ - | $ - |
| B024 | Painting Wood-Sealer/Stain | SF | 500 | $ - | $ - |
| B025 | Painting Wood-Waterproofing | SF | 500 | $ - | $ - |
| B026 | Painting Masonry-Block Sealer/Filler | SF | 500 | $ - | $ - |
| B027 | Painting Masonry-Oil Based Paint | SF | 500 | $ - | $ - |
| B028 | Painting Masonry-Exterior Latex Paint | SF | 500 | $ - | $ - |
| B029 | Painting Metal-Oil Based Paint | SF | 500 | $ - | $ - |
| B030 | Painting Metal-Latex/Enamel Paint | SF | 500 | $ - | $ - |
Total Section B Base Year $ - 0
| CLIN # | Section C Paving, Road Maintenance and Site Work | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2018 or date of award, whichever is later, through 14 December 2019. | |||||
| C001 | Top Soil | TN | 50 | $ - | $ - |
| C002 | Fill Material | TN | 50 | $ - | $ - |
| C003 | Sand Material | TN | 50 | $ - | $ - |
| C004 | Aggregate Base Material | TN | 50 | $ - | $ - |
| C005 | Rip Rap Stone 3"-5" | TN | 50 | $ - | $ - |
| C006 | Rip Rap Stone 6"-12" | TN | 50 | $ - | $ - |
| C007 | Rip Rap Stone 12"-18" | TN | 50 | $ - | $ - |
| C008 | Culvert Installation and Replacement 15" (Low Profile) | LF | 20 | $ - | $ - |
| C009 | Culvert End Section 15", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C010 | Culvert Installation and Replacement 18" (Low Profile) | LF | 20 | $ - | $ - |
| C011 | Culvert End Section 18", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C012 | Culvert Installation and Replacement 24" (Low Profile) | LF | 20 | $ - | $ - |
| C013 | Culvert End Section 24", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C014 | Culvert Installation and Replacement 30" (Low Profile) | LF | 20 | $ - | $ - |
| C015 | Culvert End Section 30", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C016 | Culvert Installation and Replacement 36" (Low Profile) | LF | 20 | $ - | $ - |
| C017 | Culvert End Section 36", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C018 | Road Boring-2" Casing | LF | 100 | $ - | $ - |
| C019 | Road Boring-4" Casing | LF | 100 | $ - | $ - |
| C020 | Road Boring-6" Casing | LF | 100 | $ - | $ - |
| C021 | Asphalt Paving and Patching | SY | 2000 | $ - | $ - |
| C022 | Scarifying and Reshaping Base Course | SY | 2000 | $ - | $ - |
| C023 | Bituminous Tack Coat | SY | 1000 | $ - | $ - |
| C024 | Bituminous Prime Coat | SY | 2000 | $ - | $ - |
| C025 | Asphalt Seal Coating | SY | 2000 | $ - | $ - |
| C026 | Sealing Joints and Cracks | LF | 2000 | $ - | $ - |
| C027 | Painting/Marking Traffic Control | LF | 5000 | $ - | $ - |
| C028 | 4" Concrete Slab | SF | 1000 | $ - | $ - |
| C029 | 4" Concrete Slab with Footings | SF | 1000 | $ - | $ - |
| C030 | 6" Concrete Slab | SF | 1000 | $ - | $ - |
| C031 | 6" Concrete Slab with Footings | SF | 1000 | $ - | $ - |
| C032 | Concrete Curb | LF | 500 | $ - | $ - |
| C033 | Concrete Curb, 24" Curb and Gutter | LF | 200 | $ - | $ - |
| C034 | Road Shoulder Maintenance | LF | 5000 | $ - | $ - |
Total Section C Base Year $ - 0
| CLIN # | Section D Plumbing | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2018 or date of award, whichever is later, through 14 December 2019. | |||||
| D001 | Water Hydrants on 6"x6" Post | EA | 30 | $ - | $ - |
| D002 | Water Valve 3/4"-2" | EA | 20 | $ - | $ - |
| D003 | Water Valve 2 1/2"-4" | EA | 20 | $ - | $ - |
| D004 | Water Line Installation/Repair 3/4"-2" | LF | 250 | $ - | $ - |
| D005 | Water Line Installation/Repair 3/4"-2" in Rock | LF | 100 | $ - | $ - |
| D006 | Water Line Installation/Repair 2 1/2"-4" | LF | 250 | $ - | $ - |
| D007 | Water Line Installation/Repair 2 1/2"-4" in Rock | LF | 100 | $ - | $ - |
| D008 | Sewer Line Installation/Repair - 4" | LF | 200 | $ - | $ - |
| D009 | Sewer Line Installation/Repair - 4" in Rock | LF | 100 | $ - | $ - |
| D010 | Commode Replacement | EA | 5 | $ - | $ - |
| D011 | Urinal Replacement | EA | 5 | $ - | $ - |
| D012 | Lavatory Replacement | EA | 5 | $ - | $ - |
| D013 | Water Heater Replacement | EA | 10 | $ - | $ - |
Total Section D Base Year $ - 0
| CLIN # | Section E Civil Engineering Services | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2018 or date of award, whichever is later, through 14 December 2019. | |||||
| E001 | Hand and Power Tools (Laborer) | HR | 100 | $ - | $ - |
| E002 | Dump Truck-20 ton | HR | 100 | $ - | $ - |
| E003 | Dump Truck-2 1/2 ton | HR | 100 | $ - | $ - |
| E004 | Motor Grader-12' Moldboard | HR | 40 | $ - | $ - |
| E005 | Bulldozer-165 HP | HR | 40 | $ - | $ - |
| E006 | Bulldozer-80 HP | HR | 40 | $ - | $ - |
| E007 | Water Tank Truck | HR | 20 | $ - | $ - |
| E008 | Crane-35 Ton | HR | 20 | $ - | $ - |
| E009 | Sheepsfoot Compactor | HR | 100 | $ - | $ - |
| E010 | Roller/Compactor Pneumatic Tired | HR | 100 | $ - | $ - |
| E011 | Roller/Compactor Steel Wheeled | HR | 100 | $ - | $ - |
| E012 | Front End Loader-Rubber Tired | HR | 40 | $ - | $ - |
| E013 | Tractor, Loader/Box blade | HR | 40 | $ - | $ - |
| E014 | Tractor, Loader/Auger | HR | 40 | $ - | $ - |
| E015 | Tractor, Loader/Bushhog | HR | 40 | $ - | $ - |
| E016 | Tractor, Side Boom Bushhog | HR | 40 | $ - | $ - |
| E017 | Backhoe, Rubber Tired | HR | 40 | $ - | $ - |
| E018 | Backhoe, Trackhoe-Track Type | HR | 40 | $ - | $ - |
| E019 | Tractor, Skid Loader | HR | 80 | $ - | $ - |
| E020 | Ditching Machine | HR | 40 | $ - | $ - |
| E021 | Trencher (Rock Saw) | HR | 20 | $ - | $ - |
| E022 | Drill Truck | HR | 20 | $ - | $ - |
| E023 | Road Broom | HR | 80 | $ - | $ - |
| E024 | Asphalt Milling (Cold Planer Skid Loader attachment) | HR | 20 | $ - | $ - |
| E025 | Air Compressor | HR | 40 | $ - | $ - |
| E026 | Welder | HR | 80 | $ - | $ - |
| E027 | Vibratory Plate Compactor | HR | 80 | $ - | $ - |
| E028 | Water Pump-2" | HR | 80 | $ - | $ - |
| E029 | Water Pump-4" | HR | 80 | $ - | $ - |
| E030 | Water Pump-6" | HR | 40 | $ - | $ - |
| E031 | Washer, High Pressure | HR | 80 | $ - | $ - |
| E032 | Chipper, Brush/Limb | HR | 80 | $ - | $ - |
| E033 | Concrete Saw | HR | 80 | $ - | $ - |
| E034 | Chain Saw | HR | 80 | $ - | $ - |
Total Section E Base Year $ - 0
| CLIN # | Section F Fencing | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2018 or date of award, whichever is later, through 14 December 2019. | |||||
| F001 | Pipe Rail Fencing | LF | 1000 | $ - 0 | |
| F002 | Pipe Rail Fence Gate | EA | 2 | $ - 0 | |
| F003 | Guard Post and Cable | LF | 500 | $ - 0 | |
| F004 | Steel Post and Cable | LF | 500 | $ - 0 | |
| F005 | Timber Vehicle Barriers | EA | 100 | $ - 0 | |
| F006 | Barb Wire Fencing, Steel Post, 6-Wire | LF | 1000 | $ - 0 | |
| F007 | Woven Wire and Barb Wire Fencing, Steel Post | LF | 1000 | $ - 0 | |
| F008 | Swing Gate-4' | EA | 5 | $ - 0 | |
| F009 | Swing Gate-10' | EA | 5 | $ - 0 | |
| F010 | Swing Gate-12' | EA | 5 | $ - 0 | |
| F011 | Swing Gate-14' | EA | 5 | $ - 0 | |
| F012 | Swing Gate-16' | EA | 5 | $ - 0 |
Total Section F Base Year $ - 0
| CLIN # | Section G Sign and Buoy Maintenance | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2018 or date of award, whichever is later, through 14 December 2019. | |||||
| G001 | Park Sign Installation-Single Post | EA | 40 | $ - | $ - |
| G002 | Park Sign Installation-Double Post | EA | 40 | $ - | $ - |
| G003 | Park Sign Replacement-Sign Only-Single Post | EA | 100 | $ - | $ - |
| G004 | Park Sign Replacement-Sign Only-Double Post | EA | 100 | $ - | $ - |
| G005 | Buoy Installation | EA | 10 | $ - | $ - |
| G006 | Repair/Replace Pipeline Floating Barrier | LF | 400 | $ - | $ - |
| G007 | Pipeline Floating Barrier Anchors | EA | 20 | $ - | $ - |
Total Section G Base Year $ - 0
| CLIN # | Section H Electrical | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2018 or date of award, whichever is later, through 14 December 2019. | |||||
| H001 | Electric Line Repair/Installation, Direct Burial | LF | 200 | $ - | $ - |
| H002 | Electric Line Repair/Installation, Direct Burial in Rock | LF | 100 | $ - | $ - |
| H003 | Electric Line Repair/Installation, In Conduit - 2" | LF | 500 | $ - | $ - |
| H004 | Electric Line Repair/Installation, In Conduit - 2" in Rock | LF | 100 | $ - | $ - |
| H005 | Electric Line Repair/Installation, In Conduit - 4" | LF | 500 | $ - | $ - |
| H006 | Electric Line Repair/Installation, In Conduit - 4" in Rock | LF | 100 | $ - | $ - |
| H007 | RV Pedestal Installation, Single Unit | EA | 25 | $ - | $ - |
| H008 | RV Pedestal Installation, Double Unit | EA | 10 | $ - | $ - |
| H009 | Meter Base Installation | EA | 10 | $ - | $ - |
| H010 | Main Disconnect Panel Installation | EA | 10 | $ - | $ - |
| H011 | Load Center Panel | EA | 8 | $ - | $ - |
Total Section H Base Year $ - 0
Total Base Year Sections A-H (CLINS A001-H011) $ - 0
| THREE RIVERS MAINTENANCE IDIQ |
| Option Year 1 |
| Facility Maintenance for Whitney/Aquilla Lakes Quote (Bid) Schedule |
| CLIN # | Section A Campsite Maintenance | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2019 or date of award, whichever is later, through 14 December 2020. | |||||
| A101 | Decomposed Granite | SF | 1000 | $ - | $ - |
| A102 | Concrete Wheel Stops | EA | 30 | $ - | $ - |
| A103 | Timber Delineators, One Tier | LF | 500 | $ - | $ - |
| A104 | Timber Delineators, Two Tier | LF | 400 | $ - | $ - |
| A105 | Timber Delineators, Three Tier | LF | 300 | $ - | $ - |
| A106 | Timber Delineators, Four Tier | LF | 200 | $ - | $ - |
| A107 | Timber Delineators, Five Tier | LF | 100 | $ - | $ - |
| A108 | Concrete Campsite Delineators, 8 inch Height | LF | 150 | $ - | $ - |
| A109 | Concrete Campsite Delineators, 16 inch Height | LF | 150 | $ - | $ - |
| A110 | Concrete Campsite Delineators, 24 inch Height | LF | 150 | $ - | $ - |
| A111 | Pedestal Grill Installation | EA | 25 | $ - | $ - |
| A112 | Upright Grill Installation | EA | 25 | $ - | $ - |
| A113 | Fire Ring and Ground Mounted Cooker Installation | EA | 25 | $ - | $ - |
| A114 | Lantern Hanger Post Installation | EA | 25 | $ - | $ - |
| A115 | Replace/Install 8 Foot Vinyl Coated or Aluminum Picnic Tables | EA | 10 | $ - | $ - |
Total Section A Option Year 1 $ - 0
| CLIN # | Section B Carpentry and Painting | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2019 or date of award, whichever is later, through 14 December 2020. | |||||
| B101 | Metal Picnic Shelter Installation | EA | 2 | $ - | $ - |
| B102 | Roofing Removal (Composition and R-Panel) | SF | 2000 | $ - | $ - |
| B103 | Roof Sheathing | SF | 2000 | $ - | $ - |
| B104 | Tongue and Groove Decking | SF | 500 | $ - | $ - |
| B105 | Fascia Board | LF | 100 | $ - | $ - |
| B106 | Composition Shingle Repair/Installation | SF | 500 | $ - | $ - |
| B107 | R-Panel Repair/Installation | SF | 1000 | $ - | $ - |
| B108 | Wall Sheathing | SF | 1000 | $ - | $ - |
| B109 | Soffit Sheathing | SF | 500 | $ - | $ - |
| B110 | Wall Siding | SF | 1000 | $ - | $ - |
| B111 | Plastic Laminate Panels | SF | 1000 | $ - | $ - |
| B112 | Lap or "V" Grooved Siding | SF | 500 | $ - | $ - |
| B113 | Brick and Slump Stone Masonry-Repair/Installation | SF | 500 | $ - | $ - |
| B114 | Natural Stone Masonry-Repair/Installation | SF | 500 | $ - | $ - |
| B115 | Toilet Partition-Single | EA | 5 | $ - | $ - |
| B116 | Toilet Partition-Double | EA | 5 | $ - | $ - |
| B117 | Toilet Partition-Triple | EA | 5 | $ - | $ - |
| B118 | Shower Partition | EA | 5 | $ - | $ - |
| B119 | Shower/Toilet Door with Pilaster | EA | 5 | $ - | $ - |
| B120 | Urinal Partition | EA | 5 | $ - | $ - |
| B121 | Painting Metal Picnic Shelters | EA | 30 | $ - | $ - |
| B122 | Painting Wood-Oil Based Paint | SF | 500 | $ - | $ - |
| B123 | Painting Wood-Exterior Latex Paint | SF | 500 | $ - | $ - |
| B124 | Painting Wood-Sealer/Stain | SF | 500 | $ - | $ - |
| B125 | Painting Wood-Waterproofing | SF | 500 | $ - | $ - |
| B126 | Painting Masonry-Block Sealer/Filler | SF | 500 | $ - | $ - |
| B127 | Painting Masonry-Oil Based Paint | SF | 500 | $ - | $ - |
| B128 | Painting Masonry-Exterior Latex Paint | SF | 500 | $ - | $ - |
| B129 | Painting Metal-Oil Based Paint | SF | 500 | $ - | $ - |
| B130 | Painting Metal-Latex/Enamel Paint | SF | 500 | $ - | $ - |
Total Section B Option Year 1 $ - 0
| CLIN # | Section C Paving, Road Maintenance and Site Work | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2019 or date of award, whichever is later, through 14 December 2020. | |||||
| C101 | Top Soil | TN | 50 | $ - | $ - |
| C102 | Fill Material | TN | 50 | $ - | $ - |
| C103 | Sand Material | TN | 50 | $ - | $ - |
| C104 | Aggregate Base Material | TN | 50 | $ - | $ - |
| C105 | Rip Rap Stone 3"-5" | TN | 50 | $ - | $ - |
| C106 | Rip Rap Stone 6"-12" | TN | 50 | $ - | $ - |
| C107 | Rip Rap Stone 12"-18" | TN | 50 | $ - | $ - |
| C108 | Culvert Installation and Replacement 15" (Low Profile) | LF | 20 | $ - | $ - |
| C109 | Culvert End Section 15", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C110 | Culvert Installation and Replacement 18" (Low Profile) | LF | 20 | $ - | $ - |
| C111 | Culvert End Section 18", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C112 | Culvert Installation and Replacement 24" (Low Profile) | LF | 20 | $ - | $ - |
| C113 | Culvert End Section 24", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C114 | Culvert Installation and Replacement 30" (Low Profile) | LF | 20 | $ - | $ - |
| C115 | Culvert End Section 30", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C116 | Culvert Installation and Replacement 36" (Low Profile) | 20 | $ - | $ - | |
| C117 | Culvert End Section 36", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C118 | Road Boring-2" Casing | LF | 100 | $ - | $ - |
| C119 | Road Boring-4" Casing | LF | 100 | $ - | $ - |
| C120 | Road Boring-6" Casing | LF | 100 | $ - | $ - |
| C121 | Asphalt Paving and Patching | SY | 2000 | $ - | $ - |
| C122 | Scarifying and Reshaping Base Course | SY | 2000 | $ - | $ - |
| C123 | Bituminous Tack Coat | SY | 1000 | $ - | $ - |
| C124 | Bituminous Prime Coat | SY | 2000 | $ - | $ - |
| C125 | Asphalt Seal Coating | SY | 2000 | $ - | $ - |
| C126 | Sealing Joints and Cracks | LF | 2000 | $ - | $ - |
| C127 | Painting/Marking Traffic Control | LF | 5000 | $ - | $ - |
| C128 | 4" Concrete Slab | SF | 1000 | $ - | $ - |
| C129 | 4" Concrete Slab with Footings | SF | 1000 | $ - | $ - |
| C130 | 6" Concrete Slab | SF | 1000 | $ - | $ - |
| C131 | 6" Concrete Slab with Footings | SF | 1000 | $ - | $ - |
| C132 | Concrete Curb | LF | 500 | $ - | $ - |
| C133 | Concrete Curb, 24" Curb and Gutter | LF | 200 | $ - | $ - |
| C134 | Road Shoulder Maintenance | LF | 5000 | $ - | $ - |
Total Section C Option Year 1 $ - 0
| CLIN # | Section D Plumbing | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2019 or date of award, whichever is later, through 14 December 2020. | |||||
| D101 | Water Hydrants on 6"x6" Post | EA | 30 | $ - | $ - |
| D102 | Water Valve 3/4"-2" | EA | 20 | $ - | $ - |
| D103 | Water Valve 2 1/2"-4" | EA | 20 | $ - | $ - |
| D104 | Water Line Installation/Repair 3/4"-2" | LF | 250 | $ - | $ - |
| D105 | Water Line Installation/Repair 3/4"-2" in Rock | LF | 100 | $ - | $ - |
| D106 | Water Line Installation/Repair 2 1/2"-4" | LF | 250 | $ - | $ - |
| D107 | Water Line Installation/Repair 2 1/2"-4" - in Rock | LF | 100 | $ - | $ - |
| D108 | Sewer Line Installation/Repair - 4" | LF | 200 | $ - | $ - |
| D109 | Sewer Line Installation/Repair - 4" in Rock | LF | 100 | $ - | $ - |
| D110 | Commode Replacement | EA | 5 | $ - | $ - |
| D111 | Urinal Replacement | EA | 5 | $ - | $ - |
| D112 | Lavatory Replacement | EA | 5 | $ - | $ - |
| D113 | Water Heater Replacement | EA | 10 | $ - | $ - |
Total Section D Option Year 1 $ - 0
| CLIN # | Section E Civil Engineering Services | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2019 or date of award, whichever is later, through 14 December 2020. | |||||
| E101 | Hand and Power Tools (Laborer) | HR | 100 | $ - | $ - |
| E102 | Dump Truck-20 ton | HR | 100 | $ - | $ - |
| E103 | Dump Truck-2 1/2 ton | HR | 100 | $ - | $ - |
| E104 | Motor Grader-12' Moldboard | HR | 40 | $ - | $ - |
| E105 | Bulldozer-165 HP | HR | 40 | $ - | $ - |
| E106 | Bulldozer-80 HP | HR | 40 | $ - | $ - |
| E107 | Water Tank Truck | HR | 20 | $ - | $ - |
| E108 | Crane-35 Ton | HR | 20 | $ - | $ - |
| E109 | Sheepsfoot Compactor | HR | 100 | $ - | $ - |
| E110 | Roller/Compactor Pneumatic Tired | HR | 100 | $ - | $ - |
| E111 | Roller/Compactor Steel Wheeled | HR | 100 | $ - | $ - |
| E112 | Front End Loader-Rubber Tired | HR | 40 | $ - | $ - |
| E113 | Tractor, Loader/Box blade | HR | 40 | $ - | $ - |
| E114 | Tractor, Loader/Auger | HR | 40 | $ - | $ - |
| E115 | Tractor, Loader/Bushhog | HR | 40 | $ - | $ - |
| E116 | Tractor, Side Boom Bushhog | HR | 40 | $ - | $ - |
| E117 | Backhoe, Rubber Tired | HR | 40 | $ - | $ - |
| E118 | Backhoe, Trackhoe-Track Type | HR | 40 | $ - | $ - |
| E119 | Tractor, Skid Loader | HR | 80 | $ - | $ - |
| E120 | Ditching Machine | HR | 40 | $ - | $ - |
| E121 | Trencher (Rock Saw) | HR | 20 | $ - | $ - |
| E122 | Drill Truck | HR | 20 | $ - | $ - |
| E123 | Road Broom | HR | 80 | $ - | $ - |
| E124 | Asphalt Milling Machine (Cold Planer) | HR | 20 | $ - | $ - |
| E125 | Air Compressor | HR | 40 | $ - | $ - |
| E126 | Welder | HR | 80 | $ - | $ - |
| E127 | Vibratory Plate Compactor | HR | 80 | $ - | $ - |
| E128 | Water Pump-2" | HR | 80 | $ - | $ - |
| E129 | Water Pump-4" | HR | 80 | $ - | $ - |
| E130 | Water Pump-6" | HR | 40 | $ - | $ - |
| E131 | Washer, High Pressure | HR | 80 | $ - | $ - |
| E132 | Chipper, Brush/Limb | HR | 80 | $ - | $ - |
| E133 | Concrete Saw | HR | 80 | $ - | $ - |
| E134 | Chain Saw | HR | 80 | $ - | $ - |
Total Section E Option Year 1 $ - 0
| CLIN # | Section F Fencing | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2019 or date of award, whichever is later, through 14 December 2020. | |||||
| F101 | Pipe Rail Fencing | LF | 1000 | $ - 0 | $ - 0 |
| F102 | Pipe Rail Fence Gate | EA | 2 | $ - 0 | $ - 0 |
| F103 | Guard Post and Cable | LF | 500 | $ - 0 | $ - 0 |
| F104 | Steel Post and Cable | LF | 500 | $ - 0 | $ - 0 |
| F105 | Timber Vehicle Barriers | EA | 100 | $ - 0 | $ - 0 |
| F106 | Barb Wire Fencing, Steel Post, 6-Wire | LF | 1000 | $ - 0 | $ - 0 |
| F107 | Woven Wire and Barb Wire Fencing, Steel Post | LF | 1000 | $ - 0 | $ - 0 |
| F108 | Swing Gate-4' | EA | 5 | $ - 0 | $ - 0 |
| F109 | Swing Gate-10' | EA | 5 | $ - 0 | $ - 0 |
| F110 | Swing Gate-12' | EA | 5 | $ - 0 | $ - 0 |
| F111 | Swing Gate-14' | EA | 5 | $ - 0 | $ - 0 |
| F112 | Swing Gate-16' | EA | 5 | $ - 0 | $ - 0 |
Total Section F Option Year 1 $ - 0
| CLIN # | Section G Sign and Buoy Maintenance | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2019 or date of award, whichever is later, through 14 December 2020. | |||||
| G101 | Park Sign Installation-Single Post | EA | 40 | $ - | $ - |
| G102 | Park Sign Installation-Double Post | EA | 40 | $ - | $ - |
| G103 | Park Sign Replacement-Sign Only-Single Post | EA | 100 | $ - | $ - |
| G104 | Park Sign Replacement-Sign Only-Double Post | EA | 100 | $ - | $ - |
| G105 | Buoy Installation | EA | 10 | $ - | $ - |
| G106 | Repair/Replace Pipeline Floating Barrier | LF | 400 | $ - | $ - |
| G107 | Pipeline Floating Barrier Anchors | EA | 20 | $ - | $ - |
Total Section G Option Year 1 $ - 0
| CLIN # | Section H Electrical | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2019 or date of award, whichever is later, through 14 December 2020. | |||||
| H101 | Electric Line Repair/Installation, Direct Burial | LF | 200 | $ - | $ - |
| H102 | Electric Line Repair/Installation, Direct Burial in Rock | LF | 100 | $ - | $ - |
| H103 | Electric Line Repair/Installation, In Conduit - 2" | LF | 500 | $ - | $ - |
| H104 | Electric Line Repair/Installation, In Conduit - 2" in Rock | LF | 100 | $ - | $ - |
| H105 | Electric Line Repair/Installation, In Conduit - 4" | LF | 500 | $ - | $ - |
| H106 | Electric Line Repair/Installation, In Conduit - 4" in Rock | LF | 100 | $ - | $ - |
| H107 | RV Pedestal Installation, Single Unit | EA | 25 | $ - | $ - |
| H108 | RV Pedestal Installation, Double Unit | EA | 10 | $ - | $ - |
| H109 | Meter Base Installation | EA | 10 | $ - | $ - |
| H110 | Main Disconnect Panel Installation | EA | 10 | $ - | $ - |
| H111 | Load Center Panel | EA | 8 | $ - | $ - |
Total Section H Option Year 1 $ - 0
Total Option Year 1 Sections A-H (CLINS A101-H111) $ - 0
| THREE RIVERS MAINTENANCE IDIQ |
| Option Year 2 |
| Facility Maintenance for Whitney/Aquilla Lakes Quote (Bid) Schedule |
| CLIN # | Section A Campsite Maintenance | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| A201 | Decomposed Granite | SF | 1000 | $ - | $ - |
| A202 | Concrete Wheel Stops | EA | 30 | $ - | $ - |
| A203 | Timber Delineators, One Tier | LF | 500 | $ - | $ - |
| A204 | Timber Delineators, Two Tier | LF | 400 | $ - | $ - |
| A205 | Timber Delineators, Three Tier | LF | 300 | $ - | $ - |
| A206 | Timber Delineators, Four Tier | LF | 200 | $ - | $ - |
| A207 | Timber Delineators, Five Tier | LF | 100 | $ - | $ - |
| A208 | Concrete Campsite Delineators, 8 inch Height | LF | 150 | $ - | $ - |
| A209 | Concrete Campsite Delineators, 16 inch Height | LF | 150 | $ - | $ - |
| A210 | Concrete Campsite Delineators, 24 inch Height | LF | 150 | $ - | $ - |
| A211 | Pedestal Grill Installation | EA | 25 | $ - | $ - |
| A212 | Upright Grill Installation | EA | 25 | $ - | $ - |
| A213 | Fire Ring and Ground Mounted Cooker Installation | EA | 25 | $ - | $ - |
| A214 | Lantern Hanger Post Installation | EA | 25 | $ - | $ - |
| A215 | Replace/Install 8 Foot Vinyl Coated or Aluminum Picnic Tables | EA | 10 | $ - | $ - |
Total Section A Option Year 2 $ - 0
| CLIN # | Section B Carpentry and Painting | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| B201 | Metal Picnic Shelter Installation | EA | 2 | $ - | $ - |
| B202 | Roofing Removal (Composition and R-Panel) | SF | 2000 | $ - | $ - |
| B203 | Roof Sheathing | SF | 2000 | $ - | $ - |
| B204 | Tongue and Groove Decking | SF | 500 | $ - | $ - |
| B205 | Fascia Board | LF | 100 | $ - | $ - |
| B206 | Composition Shingle Repair/Installation | SF | 500 | $ - | $ - |
| B207 | R-Panel Repair/Installation | SF | 1000 | $ - | $ - |
| B208 | Wall Sheathing | SF | 1000 | $ - | $ - |
| B209 | Soffit Sheathing | SF | 500 | $ - | $ - |
| B210 | Wall Siding | SF | 1000 | $ - | $ - |
| B211 | Plastic Laminate Panels | SF | 1000 | $ - | $ - |
| B212 | Lap or "V" Grooved Siding | SF | 500 | $ - | $ - |
| B213 | Brick and Slump Stone Masonry-Repair/Installation | SF | 500 | $ - | $ - |
| B214 | Natural Stone Masonry-Repair/Installation | SF | 500 | $ - | $ - |
| B215 | Toilet Partition-Single | EA | 5 | $ - | $ - |
| B216 | Toilet Partition-Double | EA | 5 | $ - | $ - |
| B217 | Toilet Partition-Triple | EA | 5 | $ - | $ - |
| B218 | Shower Partition | EA | 5 | $ - | $ - |
| B219 | Shower/Toilet Door with Pilaster | EA | 5 | $ - | $ - |
| B220 | Urinal Partition | EA | 5 | $ - | $ - |
| B221 | Painting Metal Picnic Shelters | EA | 30 | $ - | $ - |
| B222 | Painting Wood-Oil Based Paint | SF | 500 | $ - | $ - |
| B223 | Painting Wood-Exterior Latex Paint | SF | 4 | $ - | $ - |
| B224 | Painting Wood-Sealer/Stain | SF | 500 | $ - | $ - |
| B225 | Painting Wood-Waterproofing | SF | 500 | $ - | $ - |
| B226 | Painting Masonry-Block Sealer/Filler | SF | 500 | $ - | $ - |
| B227 | Painting Masonry-Oil Based Paint | SF | 500 | $ - | $ - |
| B228 | Painting Masonry-Exterior Latex Paint | SF | 500 | $ - | $ - |
| B229 | Painting Metal-Oil Based Paint | SF | 500 | $ - | $ - |
| B230 | Painting Metal-Latex/Enamel Paint | SF | 500 | $ - | $ - |
Total Section B Option Year 2 $ - 0
| CLIN # | Section C Paving, Road Maintenance and Site Work | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| C201 | Top Soil | TN | 50 | $ - | $ - |
| C202 | Fill Material | TN | 50 | $ - | $ - |
| C203 | Sand Material | TN | 50 | $ - | $ - |
| C204 | Aggregate Base Material | TN | 50 | $ - | $ - |
| C205 | Rip Rap Stone 3"-5" | TN | 50 | $ - | $ - |
| C206 | Rip Rap Stone 6"-12" | TN | 50 | $ - | $ - |
| C207 | Rip Rap Stone 12"-18" | TN | 50 | $ - | $ - |
| C208 | Culvert Installation and Replacement 15" (Low Profile) | LF | 20 | $ - | $ - |
| C209 | Culvert End Section 15", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C210 | Culvert Installation and Replacement 18" (Low Profile) | LF | 20 | $ - | $ - |
| C211 | Culvert End Section 18", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C212 | Culvert Installation and Replacement 24" (Low Profile) | LF | 20 | $ - | $ - |
| C213 | Culvert End Section 24", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C214 | Culvert Installation and Replacement 30" (Low Profile) | LF | 20 | $ - | $ - |
| C215 | Culvert End Section 30", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C216 | Culvert Installation and Replacement 36" (Low Profile) | 20 | $ - | $ - | |
| C217 | Culvert End Section 36", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C218 | Road Boring-2" Casing | LF | 100 | $ - | $ - |
| C219 | Road Boring-4" Casing | LF | 100 | $ - | $ - |
| C220 | Road Boring-6" Casing | LF | 100 | $ - | $ - |
| C221 | Asphalt Paving and Patching | SY | 2000 | $ - | $ - |
| C222 | Scarifying and Reshaping Base Course | SY | 2000 | $ - | $ - |
| C223 | Bituminous Tack Coat | SY | 1000 | $ - | $ - |
| C224 | Bituminous Prime Coat | SY | 2000 | $ - | $ - |
| C225 | Asphalt Seal Coating | SY | 2000 | $ - | $ - |
| C226 | Sealing Joints and Cracks | LF | 2000 | $ - | $ - |
| C227 | Painting/Marking Traffic Control | LF | 5000 | $ - | $ - |
| C228 | 4" Concrete Slab | SF | 1000 | $ - | $ - |
| C229 | 4" Concrete Slab with Footings | SF | 1000 | $ - | $ - |
| C230 | 6" Concrete Slab | SF | 1000 | $ - | $ - |
| C231 | 6" Concrete Slab with Footings | SF | 1000 | $ - | $ - |
| C232 | Concrete Curb | LF | 500 | $ - | $ - |
| C233 | Concrete Curb, 24" Curb and Gutter | LF | 200 | $ - | $ - |
| C234 | Road Shoulder Maintenance | LF | 5000 | $ - | $ - |
Total Section C Option Year 2 $ - 0
| CLIN # | Section D Plumbing | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| D201 | Water Hydrants on 6"x6" Post | EA | 30 | $ - | $ - |
| D202 | Water Valve 3/4"-2" | EA | 20 | $ - | $ - |
| D203 | Water Valve 2 1/2"-4" | EA | 20 | $ - | $ - |
| D204 | Water Line Installation/Repair 3/4"-2" | LF | 250 | $ - | $ - |
| D205 | Water Line Installation/Repair 3/4"-2" in Rock | LF | 100 | $ - | $ - |
| D206 | Water Line Installation/Repair 2 1/2"-4" | LF | 250 | $ - | $ - |
| D207 | Water Line Installation/Repair 2 1/2"-4" in Rock | LF | 100 | $ - | $ - |
| D208 | Sewer Line Installation/Repair - 4" | LF | 200 | $ - | $ - |
| D209 | Sewer Line Installation/Repair - 4" in Rock | LF | 100 | $ - | $ - |
| D210 | Commode Replacement | EA | 5 | $ - | $ - |
| D211 | Urinal Replacement | EA | 5 | $ - | $ - |
| D212 | Lavatory Replacement | EA | 5 | $ - | $ - |
| D213 | Water Heater Replacement | EA | 10 | $ - | $ - |
Total Section D Option Year 2 $ - 0
| CLIN # | Section E Civil Engineering Services | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| E201 | Hand and Power Tools (Laborer) | HR | 100 | $ - | $ - |
| E202 | Dump Truck-20 ton | HR | 100 | $ - | $ - |
| E203 | Dump Truck-2 1/2 ton | HR | 100 | $ - | $ - |
| E204 | Motor Grader-12' Moldboard | HR | 40 | $ - | $ - |
| E205 | Bulldozer-165 HP | HR | 40 | $ - | $ - |
| E206 | Bulldozer-80 HP | HR | 40 | $ - | $ - |
| E207 | Water Tank Truck | HR | 20 | $ - | $ - |
| E208 | Crane-35 Ton | HR | 20 | $ - | $ - |
| E209 | Sheepsfoot Compactor | HR | 100 | $ - | $ - |
| E210 | Roller/Compactor Pneumatic Tired | HR | 100 | $ - | $ - |
| E211 | Roller/Compactor Steel Wheeled | HR | 100 | $ - | $ - |
| E212 | Front End Loader-Rubber Tired | HR | 40 | $ - | $ - |
| E213 | Tractor, Loader/Box blade | HR | 40 | $ - | $ - |
| E214 | Tractor, Loader/Auger | HR | 40 | $ - | $ - |
| E215 | Tractor, Loader/Bushhog | HR | 40 | $ - | $ - |
| E216 | Tractor, Side Boom Bushhog | HR | 40 | $ - | $ - |
| E217 | Backhoe, Rubber Tired | HR | 40 | $ - | $ - |
| E218 | Backhoe, Trackhoe-Track Type | HR | 40 | $ - | $ - |
| E219 | Tractor, Skid Loader | HR | 80 | $ - | $ - |
| E220 | Ditching Machine | HR | 40 | $ - | $ - |
| E221 | Trencher (Rock Saw) | HR | 20 | $ - | $ - |
| E222 | Drill Truck | HR | 20 | $ - | $ - |
| E223 | Road Broom | HR | 80 | $ - | $ - |
| E224 | Asphalt Milling Machine (Cold Planer) | HR | 20 | $ - | $ - |
| E225 | Air Compressor | HR | 40 | $ - | $ - |
| E226 | Welder | HR | 80 | $ - | $ - |
| E227 | Vibratory Plate Compactor | HR | 80 | $ - | $ - |
| E228 | Water Pump-2" | HR | 80 | $ - | $ - |
| E229 | Water Pump-4" | HR | 80 | $ - | $ - |
| E230 | Water Pump-6" | HR | 40 | $ - | $ - |
| E231 | Washer, High Pressure | HR | 80 | $ - | $ - |
| E232 | Chipper, Brush/Limb | HR | 80 | $ - | $ - |
| E233 | Concrete Saw | HR | 80 | $ - | $ - |
| E234 | Chain Saw | HR | 80 | $ - | $ - |
Total Section E Option Year 2 $ - 0
| CLIN # | Section F Fencing | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| F201 | Pipe Rail Fencing | LF | 1000 | $ - 0 | $ - 0 |
| F202 | Pipe Rail Fence Gate | EA | 2 | $ - 0 | $ - 0 |
| F203 | Guard Post and Cable | LF | 500 | $ - 0 | $ - 0 |
| F204 | Steel Post and Cable | LF | 500 | $ - 0 | $ - 0 |
| F205 | Timber Vehicle Barriers | EA | 100 | $ - 0 | $ - 0 |
| F206 | Barb Wire Fencing, Steel Post, 6-Wire | LF | 1000 | $ - 0 | $ - 0 |
| F207 | Woven Wire and Barb Wire Fencing, Steel Post | LF | 1000 | $ - 0 | $ - 0 |
| F208 | Swing Gate-4' | EA | 5 | $ - 0 | $ - 0 |
| F209 | Swing Gate-10' | EA | 5 | $ - 0 | $ - 0 |
| F210 | Swing Gate-12' | EA | 5 | $ - 0 | $ - 0 |
| F211 | Swing Gate-14' | EA | 5 | $ - 0 | $ - 0 |
| F212 | Swing Gate-16' | EA | 5 | $ - 0 | $ - 0 |
Total Section F Option Year 2 $ - 0
| CLIN # | Section G Sign and Buoy Maintenance | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| G201 | Park Sign Installation-Single Post | EA | 40 | $ - | $ - |
| G202 | Park Sign Installation-Double Post | EA | 40 | $ - | $ - |
| G203 | Park Sign Replacement-Sign Only-Single Post | EA | 100 | $ - | $ - |
| G204 | Park Sign Replacement-Sign Only-Double Post | EA | 100 | $ - | $ - |
| G205 | Buoy Installation | EA | 10 | $ - | $ - |
| G206 | Repair/Replace Pipeline Floating Barrier | LF | 400 | $ - | $ - |
| G207 | Pipeline Floating Barrier Anchors | EA | 20 | $ - | $ - |
Total Section G Option Year 2 $ - 0
| CLIN # | Section H Electrical | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| H201 | Electric Line Repair/Installation, Direct Burial | LF | 200 | $ - | $ - |
| H202 | Electric Line Repair/Installation, Direct Burial in Rock | LF | 100 | $ - | $ - |
| H203 | Electric Line Repair/Installation, In Conduit - 2" | LF | 500 | $ - | $ - |
| H204 | Electric Line Repair/Installation, In Conduit - 2" in Rock | LF | 100 | $ - | $ - |
| H205 | Electric Line Repair/Installation, In Conduit - 4" | LF | 500 | $ - | $ - |
| H206 | Electric Line Repair/Installation, In Conduit - 4" in Rock | LF | 100 | $ - | $ - |
| H207 | RV Pedestal Installation, Single Unit | EA | 25 | $ - | $ - |
| H208 | RV Pedestal Installation, Double Unit | EA | 10 | $ - | $ - |
| H209 | Meter Base Installation | EA | 10 | $ - | $ - |
| H210 | Main Disconnect Panel Installation | EA | 10 | $ - | $ - |
| H211 | Load Center Panel | EA | 8 | $ - | $ - |
Total Section H Option Year 2 $ - 0
Total Option Year 2 Sections A-H (CLINS A201-H211) $ - 0
| THREE RIVERS MAINTENANCE IDIQ |
| Option Year 3 |
| Facility Maintenance for Whitney/Aquilla Lakes Quote (Bid) Schedule |
| CLIN # | Section A Campsite Maintenance | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| A301 | Decomposed Granite | SF | 1000 | $ - | $ - |
| A302 | Concrete Wheel Stops | EA | 30 | $ - | $ - |
| A303 | Timber Delineators, One Tier | LF | 500 | $ - | $ - |
| A304 | Timber Delineators, Two Tier | LF | 400 | $ - | $ - |
| A305 | Timber Delineators, Three Tier | LF | 300 | $ - | $ - |
| A306 | Timber Delineators, Four Tier | LF | 200 | $ - | $ - |
| A307 | Timber Delineators, Five Tier | LF | 100 | $ - | $ - |
| A308 | Concrete Campsite Delineators, 8 inch Height | LF | 150 | $ - | $ - |
| A309 | Concrete Campsite Delineators, 16 inch Height | LF | 150 | $ - | $ - |
| A310 | Concrete Campsite Delineators, 24 inch Height | LF | 150 | $ - | $ - |
| A311 | Pedestal Grill Installation | EA | 25 | $ - | $ - |
| A312 | Upright Grill Installation | EA | 25 | $ - | $ - |
| A313 | Fire Ring and Ground Mounted Cooker Installation | EA | 25 | $ - 0 | $ - 0 |
| A314 | Lantern Hanger Post Installation | EA | 25 | $ - 0 | $ - 0 |
| A315 | Replace/Install 8 Foot Vinyl Coated or Aluminum Picnic Tables | EA | 10 | $ - 0 | $ - 0 |
Total Section A Option Year 3 $ - 0
| CLIN # | Section B Carpentry and Painting | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| B301 | Metal Picnic Shelter Installation | EA | 2 | $ - | $ - |
| B302 | Roofing Removal (Composition and R-Panel) | SF | 2000 | $ - | $ - |
| B303 | Roof Sheathing | SF | 2000 | $ - | $ - |
| B304 | Tongue and Groove Decking | SF | 500 | $ - | $ - |
| B305 | Fascia Board | LF | 100 | $ - | $ - |
| B306 | Composition Shingle Repair/Installation | SF | 500 | $ - | $ - |
| B307 | R-Panel Repair/Installation | SF | 1000 | $ - | $ - |
| B308 | Wall Sheathing | SF | 1000 | $ - | $ - |
| B309 | Soffit Sheathing | SF | 500 | $ - | $ - |
| B310 | Wall Siding | SF | 1000 | $ - | $ - |
| B311 | Plastic Laminate Panels | SF | 1000 | $ - | $ - |
| B312 | Lap or "V" Grooved Siding | SF | 500 | $ - | $ - |
| B313 | Brick and Slump Stone Masonry-Repair/Installation | SF | 500 | $ - | $ - |
| B314 | Natural Stone Masonry-Repair/Installation | SF | 500 | $ - | $ - |
| B315 | Toilet Partition-Single | EA | 5 | $ - | $ - |
| B316 | Toilet Partition-Double | EA | 5 | $ - | $ - |
| B317 | Toilet Partition-Triple | EA | 5 | $ - | $ - |
| B318 | Shower Partition | EA | 5 | $ - | $ - |
| B319 | Shower/Toilet Door with Pilaster | EA | 5 | $ - | $ - |
| B320 | Urinal Partition | EA | 5 | $ - | $ - |
| B321 | Painting Metal Picnic Shelters | EA | 30 | $ - | $ - |
| B322 | Painting Wood-Oil Based Paint | SF | 500 | $ - | $ - |
| B323 | Painting Wood-Exterior Latex Paint | SF | 4 | $ - | $ - |
| B324 | Painting Wood-Sealer/Stain | SF | 500 | $ - | $ - |
| B325 | Painting Wood-Waterproofing | SF | 500 | $ - | $ - |
| B326 | Painting Masonry-Block Sealer/Filler | SF | 500 | $ - | $ - |
| B327 | Painting Masonry-Oil Based Paint | SF | 500 | $ - | $ - |
| B328 | Painting Masonry-Exterior Latex Paint | SF | 500 | $ - | $ - |
| B329 | Painting Metal-Oil Based Paint | SF | 500 | $ - | $ - |
| B330 | Painting Metal-Latex/Enamel Paint | SF | 500 | $ - | $ - |
Total Section B Option Year 3 $ - 0
| CLIN # | Section C Paving, Road Maintenance and Site Work | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| C301 | Top Soil | TN | 50 | $ - | $ - |
| C302 | Fill Material | TN | 50 | $ - | $ - |
| C303 | Sand Material | TN | 50 | $ - | $ - |
| C304 | Aggregate Base Material | TN | 50 | $ - | $ - |
| C305 | Rip Rap Stone 3"-5" | TN | 50 | $ - | $ - |
| C306 | Rip Rap Stone 6"-12" | TN | 50 | $ - | $ - |
| C307 | Rip Rap Stone 12"-18" | TN | 50 | $ - | $ - |
| C308 | Culvert Installation and Replacement 15" (Low Profile) | LF | 20 | $ - | $ - |
| C309 | Culvert End Section 15", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C310 | Culvert Installation and Replacement 18" (Low Profile) | LF | 20 | $ - | $ - |
| C311 | Culvert End Section 18", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C312 | Culvert Installation and Replacement 24" (Low Profile) | LF | 20 | $ - | $ - |
| C313 | Culvert End Section 24", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C314 | Culvert Installation and Replacement 30" (Low Profile) | LF | 20 | $ - | $ - |
| C315 | Culvert End Section 30", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C316 | Culvert Installation and Replacement 36" (Low Profile) | 20 | $ - | $ - | |
| C317 | Culvert End Section 36", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C318 | Road Boring-2" Casing | LF | 100 | $ - | $ - |
| C319 | Road Boring-4" Casing | LF | 100 | $ - | $ - |
| C320 | Road Boring-6" Casing | LF | 100 | $ - | $ - |
| C321 | Asphalt Paving and Patching | SY | 2000 | $ - | $ - |
| C322 | Scarifying and Reshaping Base Course | SY | 2000 | $ - | $ - |
| C323 | Bituminous Tack Coat | SY | 1000 | $ - | $ - |
| C324 | Bituminous Prime Coat | SY | 2000 | $ - | $ - |
| C325 | Asphalt Seal Coating | SY | 2000 | $ - | $ - |
| C326 | Sealing Joints and Cracks | LF | 2000 | $ - | $ - |
| C327 | Painting/Marking Traffic Control | LF | 5000 | $ - | $ - |
| C328 | 4" Concrete Slab | SF | 1000 | $ - | $ - |
| C329 | 4" Concrete Slab with Footings | SF | 1000 | $ - | $ - |
| C330 | 6" Concrete Slab | SF | 1000 | $ - | $ - |
| C331 | 6" Concrete Slab with Footings | SF | 1000 | $ - | $ - |
| C332 | Concrete Curb | LF | 500 | $ - | $ - |
| C333 | Concrete Curb, 24" Curb and Gutter | LF | 200 | $ - 0 | $ - 0 |
| C334 | Road Shoulder Maintenance | LF | 5000 | $ - 0 | $ - 0 |
Total Section C Option Year 3 $ - 0
| CLIN # | Section D Plumbing | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| D301 | Water Hydrants on 6"x6" Post | EA | 30 | $ - | $ - |
| D302 | Water Valve 3/4"-2" | EA | 20 | $ - | $ - |
| D303 | Water Valve 2 1/2"-4" | EA | 20 | $ - | $ - |
| D304 | Water Line Installation/Repair 3/4"-2" | LF | 250 | $ - | $ - |
| D305 | Water Line Installation/Repair 3/4"-2" in Rock | LF | 100 | $ - | $ - |
| D306 | Water Line Installation/Repair 2 1/2"-4" | LF | 250 | $ - | $ - |
| D307 | Water Line Installation/Repair 2 1/2"-4" in Rock | LF | 100 | $ - | $ - |
| D308 | Sewer Line Installation/Repair - 4" | LF | 200 | $ - | $ - |
| D309 | Sewer Line Installation/Repair - 4" in Rock | LF | 100 | $ - | $ - |
| D310 | Commode Replacement | EA | 5 | $ - | $ - |
| D311 | Urinal Replacement | EA | 5 | $ - 0 | $ - 0 |
| D312 | Lavatory Replacement | EA | 5 | $ - 0 | $ - 0 |
| D313 | Water Heater Replacement | EA | 10 | $ - 0 | $ - 0 |
Total Section D Option Year 3 $ - 0
| CLIN # | Section E Civil Engineering Services | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| E301 | Hand and Power Tools (Laborer) | HR | 100 | $ - | $ - |
| E302 | Dump Truck-20 ton | HR | 100 | $ - | $ - |
| E303 | Dump Truck-2 1/2 ton | HR | 100 | $ - | $ - |
| E304 | Motor Grader-12' Moldboard | HR | 40 | $ - | $ - |
| E305 | Bulldozer-165 HP | HR | 40 | $ - | $ - |
| E306 | Bulldozer-80 HP | HR | 40 | $ - | $ - |
| E307 | Water Tank Truck | HR | 20 | $ - | $ - |
| E308 | Crane-35 Ton | HR | 20 | $ - | $ - |
| E309 | Sheepsfoot Compactor | HR | 100 | $ - | $ - |
| E310 | Roller/Compactor Pneumatic Tired | HR | 100 | $ - | $ - |
| E311 | Roller/Compactor Steel Wheeled | HR | 100 | $ - | $ - |
| E312 | Front End Loader-Rubber Tired | HR | 40 | $ - | $ - |
| E313 | Tractor, Loader/Box blade | HR | 40 | $ - | $ - |
| E314 | Tractor, Loader/Auger | HR | 40 | $ - | $ - |
| E315 | Tractor, Loader/Bushhog | HR | 40 | $ - | $ - |
| E316 | Tractor, Side Boom Bushhog | HR | 40 | $ - | $ - |
| E317 | Backhoe, Rubber Tired | HR | 40 | $ - | $ - |
| E318 | Backhoe, Trackhoe-Track Type | HR | 40 | $ - | $ - |
| E319 | Tractor, Skid Loader | HR | 80 | $ - | $ - |
| E320 | Ditching Machine | HR | 40 | $ - | $ - |
| E321 | Trencher (Rock Saw) | HR | 20 | $ - | $ - |
| E322 | Drill Truck | HR | 20 | $ - | $ - |
| E323 | Road Broom | HR | 80 | $ - | $ - |
| E324 | Asphalt Milling Machine (Cold Planer) | HR | 20 | $ - | $ - |
| E325 | Air Compressor | HR | 40 | $ - | $ - |
| E326 | Welder | HR | 80 | $ - | $ - |
| E327 | Vibratory Plate Compactor | HR | 80 | $ - | $ - |
| E328 | Water Pump-2" | HR | 80 | $ - | $ - |
| E329 | Water Pump-4" | HR | 80 | $ - | $ - |
| E330 | Water Pump-6" | HR | 40 | $ - | $ - |
| E331 | Washer, High Pressure | HR | 80 | $ - | $ - |
| E332 | Chipper, Brush/Limb | HR | 80 | $ - | $ - |
| E333 | Concrete Saw | HR | 80 | $ - | $ - |
| E334 | Chain Saw | HR | 80 | $ - 0 | $ - 0 |
Total Section E Option Year 3 $ - 0
| CLIN # | Section F Fencing | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| F301 | Pipe Rail Fencing | LF | 1000 | $ - 0 | $ - 0 |
| F302 | Pipe Rail Fence Gate | EA | 2 | $ - 0 | $ - 0 |
| F303 | Guard Post and Cable | LF | 500 | $ - 0 | $ - 0 |
| F304 | Steel Post and Cable | LF | 500 | $ - 0 | $ - 0 |
| F305 | Timber Vehicle Barriers | EA | 100 | $ - 0 | $ - 0 |
| F306 | Barb Wire Fencing, Steel Post, 6-Wire | LF | 1000 | $ - 0 | $ - 0 |
| F307 | Woven Wire and Barb Wire Fencing, Steel Post | LF | 1000 | $ - 0 | $ - 0 |
| F308 | Swing Gate-4' | EA | 5 | $ - 0 | $ - 0 |
| F309 | Swing Gate-10' | EA | 5 | $ - 0 | $ - 0 |
| F310 | Swing Gate-12' | EA | 5 | $ - 0 | $ - 0 |
| F311 | Swing Gate-14' | EA | 5 | $ - 0 | $ - 0 |
| F312 | Swing Gate-16' | EA | 5 | $ - 0 | $ - 0 |
Total Section F Option Year 3 $ - 0
| CLIN # | Section G Sign and Buoy Maintenance | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| G301 | Park Sign Installation-Single Post | EA | 40 | $ - | $ - |
| G302 | Park Sign Installation-Double Post | EA | 40 | $ - | $ - |
| G303 | Park Sign Replacement-Sign Only-Single Post | EA | 100 | $ - | $ - |
| G304 | Park Sign Replacement-Sign Only-Double Post | EA | 100 | $ - | $ - |
| G305 | Buoy Installation | EA | 10 | $ - 0 | $ - 0 |
| G306 | Repair/Replace Pipeline Floating Barrier | LF | 400 | $ - 0 | $ - 0 |
| G307 | Pipeline Floating Barrier Anchors | EA | 20 | $ - 0 | $ - 0 |
Total Section G Option Year 3 $ - 0
| CLIN # | Section H Electrical | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| H301 | Electric Line Repair/Installation, Direct Burial | LF | 200 | $ - | $ - |
| H302 | Electric Line Repair/Installation, Direct Burial in Rock | LF | 100 | $ - | $ - |
| H303 | Electric Line Repair/Installation, In Conduit - 2" | LF | 500 | $ - | $ - |
| H304 | Electric Line Repair/Installation, In Conduit - 2" in Rock | LF | 100 | $ - | $ - |
| H305 | Electric Line Repair/Installation, In Conduit - 4" | LF | 500 | $ - | $ - |
| H306 | Electric Line Repair/Installation, In Conduit - 4" in Rock | LF | 100 | $ - | $ - |
| H307 | RV Pedestal Installation, Single Unit | EA | 25 | $ - | $ - |
| H308 | RV Pedestal Installation, Double Unit | EA | 10 | $ - | $ - |
| H309 | Meter Base Installation | EA | 10 | $ - 0 | $ - 0 |
| H310 | Main Disconnect Panel Installation | EA | 10 | $ - 0 | $ - 0 |
| H311 | Load Center Panel | EA | 8 | $ - 0 | $ - 0 |
Total Section H Option Year 3 $ - 0
Total Option Year 3 Sections A-H (CLINS A301-H311) $ - 0
| THREE RIVERS MAINTENANCE IDIQ |
| Option Year 4 |
| Facility Maintenance for Whitney/Aquilla Lakes Quote (Bid) Schedule |
| CLIN # | Section A Campsite Maintenance | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| A401 | Decomposed Granite | SF | 1000 | $ - | $ - |
| A402 | Concrete Wheel Stops | EA | 30 | $ - | $ - |
| A403 | Timber Delineators, One Tier | LF | 500 | $ - | $ - |
| A404 | Timber Delineators, Two Tier | LF | 400 | $ - | $ - |
| A405 | Timber Delineators, Three Tier | LF | 300 | $ - | $ - |
| A406 | Timber Delineators, Four Tier | LF | 200 | $ - | $ - |
| A407 | Timber Delineators, Five Tier | LF | 100 | $ - | $ - |
| A408 | Concrete Campsite Delineators, 8 inch Height | LF | 150 | $ - | $ - |
| A409 | Concrete Campsite Delineators, 16 inch Height | LF | 150 | $ - | $ - |
| A410 | Concrete Campsite Delineators, 24 inch Height | LF | 150 | $ - | $ - |
| A411 | Pedestal Grill Installation | EA | 25 | $ - 0 | $ - 0 |
| A412 | Upright Grill Installation | EA | 25 | $ - 0 | $ - 0 |
| A413 | Fire Ring and Ground Mounted Cooker Installation | EA | 25 | $ - 0 | $ - 0 |
| A414 | Lantern Hanger Post Installation | EA | 25 | $ - 0 | $ - 0 |
| A415 | Replace/Install 8 Foot Vinyl Coated or Aluminum Picnic Tables | EA | 10 | $ - 0 | $ - 0 |
Total Section A Option Year 4 $ - 0
| CLIN # | Section B Carpentry and Painting | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| B401 | Metal Picnic Shelter Installation | EA | 2 | $ - | $ - |
| B402 | Roofing Removal (Composition and R-Panel) | SF | 2000 | $ - | $ - |
| B403 | Roof Sheathing | SF | 2000 | $ - | $ - |
| B404 | Tongue and Groove Decking | SF | 500 | $ - | $ - |
| B405 | Fascia Board | LF | 100 | $ - | $ - |
| B406 | Composition Shingle Repair/Installation | SF | 500 | $ - | $ - |
| B407 | R-Panel Repair/Installation | SF | 1000 | $ - | $ - |
| B408 | Wall Sheathing | SF | 1000 | $ - | $ - |
| B409 | Soffit Sheathing | SF | 500 | $ - | $ - |
| B410 | Wall Siding | SF | 1000 | $ - | $ - |
| B411 | Plastic Laminate Panels | SF | 1000 | $ - | $ - |
| B412 | Lap or "V" Grooved Siding | SF | 500 | $ - | $ - |
| B413 | Brick and Slump Stone Masonry-Repair/Installation | SF | 500 | $ - | $ - |
| B414 | Natural Stone Masonry-Repair/Installation | SF | 500 | $ - | $ - |
| B415 | Toilet Partition-Single | EA | 5 | $ - | $ - |
| B416 | Toilet Partition-Double | EA | 5 | $ - | $ - |
| B417 | Toilet Partition-Triple | EA | 5 | $ - | $ - |
| B418 | Shower Partition | EA | 5 | $ - | $ - |
| B419 | Shower/Toilet Door with Pilaster | EA | 5 | $ - | $ - |
| B420 | Urinal Partition | EA | 5 | $ - | $ - |
| B421 | Painting Metal Picnic Shelters | EA | 30 | $ - | $ - |
| B422 | Painting Wood-Oil Based Paint | SF | 500 | $ - | $ - |
| B423 | Painting Wood-Exterior Latex Paint | SF | 4 | $ - | $ - |
| B424 | Painting Wood-Sealer/Stain | SF | 500 | $ - | $ - |
| B425 | Painting Wood-Waterproofing | SF | 500 | $ - | $ - |
| B426 | Painting Masonry-Block Sealer/Filler | SF | 500 | $ - | $ - |
| B427 | Painting Masonry-Oil Based Paint | SF | 500 | $ - | $ - |
| B428 | Painting Masonry-Exterior Latex Paint | SF | 500 | $ - | $ - |
| B429 | Painting Metal-Oil Based Paint | SF | 500 | $ - 0 | $ - 0 |
| B430 | Painting Metal-Latex/Enamel Paint | SF | 500 | $ - 0 | $ - 0 |
Total Section B Option Year 4 $ - 0
| CLIN # | Section C Paving, Road Maintenance and Site Work | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| C401 | Top Soil | TN | 50 | $ - | $ - |
| C402 | Fill Material | TN | 50 | $ - | $ - |
| C403 | Sand Material | TN | 50 | $ - | $ - |
| C404 | Aggregate Base Material | TN | 50 | $ - | $ - |
| C405 | Rip Rap Stone 3"-5" | TN | 50 | $ - | $ - |
| C406 | Rip Rap Stone 6"-12" | TN | 50 | $ - | $ - |
| C407 | Rip Rap Stone 12"-18" | TN | 50 | $ - | $ - |
| C408 | Culvert Installation and Replacement 15" (Low Profile) | LF | 20 | $ - | $ - |
| C409 | Culvert End Section 15", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C410 | Culvert Installation and Replacement 18" (Low Profile) | LF | 20 | $ - | $ - |
| C411 | Culvert End Section 18", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C412 | Culvert Installation and Replacement 24" (Low Profile) | LF | 20 | $ - | $ - |
| C413 | Culvert End Section 24", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C414 | Culvert Installation and Replacement 30" (Low Profile) | LF | 20 | $ - | $ - |
| C415 | Culvert End Section 30", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C416 | Culvert Installation and Replacement 36" (Low Profile) | 20 | $ - | $ - | |
| C417 | Culvert End Section 36", Pair (Low Profile) | EA | 1 | $ - | $ - |
| C418 | Road Boring-2" Casing | LF | 100 | $ - | $ - |
| C419 | Road Boring-4" Casing | LF | 100 | $ - | $ - |
| C420 | Road Boring-6" Casing | LF | 100 | $ - | $ - |
| C421 | Asphalt Paving and Patching | SY | 2000 | $ - | $ - |
| C422 | Scarifying and Reshaping Base Course | SY | 2000 | $ - | $ - |
| C423 | Bituminous Tack Coat | SY | 1000 | $ - | $ - |
| C424 | Bituminous Prime Coat | SY | 2000 | $ - | $ - |
| C425 | Asphalt Seal Coating | SY | 2000 | $ - | $ - |
| C426 | Sealing Joints and Cracks | LF | 2000 | $ - | $ - |
| C427 | Painting/Marking Traffic Control | LF | 5000 | $ - | $ - |
| C428 | 4" Concrete Slab | SF | 1000 | $ - | $ - |
| C429 | 4" Concrete Slab with Footings | SF | 1000 | $ - | $ - |
| C430 | 6" Concrete Slab | SF | 1000 | $ - | $ - |
| C431 | 6" Concrete Slab with Footings | SF | 1000 | $ - | $ - |
| C432 | Concrete Curb | LF | 500 | $ - | $ - |
| C433 | Concrete Curb, 24" Curb and Gutter | LF | 200 | $ - | $ - |
| C434 | Road Shoulder Maintenance | LF | 5000 | $ - | $ - |
Total Section C Option Year 4 $ - 0
| CLIN # | Section D Plumbing | U/M | Estimated Quantity | Unit Price | Estimated Price |
| Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021. | |||||
| D401 | Water Hydrants on 6"x6" Post | EA | 30 | $ - | $ - |
| D402 | Water Valve 3/4"-2" | EA | 20 | $ - | $ - |
| D403 | Water Valve 2 1/2"-4" | EA | 20 | $ - | $ - |
| D404 | Water Line Installation/Repair 3/4"-2" | LF | 250 | $ - | $ - |
| D405 | Water Line Installation/Repair 3/4"-2" in Rock | LF | 100 | $ - | $ - |
| D406 | Water Line Installation/Repair 2 1/2"-4" | LF | 250 | $ - | $ - |
| D407 | Water Line Installation/Repair 2 1/2"-4" in Rock | LF | 100 | $ - | $ - |
| D408 | Sewer Line Installation/Repair - 4" | LF | 200 | $ - | $ - |
| D409 | Sewer Line Installation/Repair - 4" in Rock | LF | 100 | $ - | $ - |
| D410 | Commode Replacement | EA | 5 | $ - | $ - |
| D411 | Urinal Replacement | EA | 5 | $ - | $ - |
| D412 | Lavatory Replacement | EA | 5 | $ - | $ - |
| D413 | Water Heater Replacement | EA | 10 | $ - | $ - |
Total Section D Option Year 4 $ - 0
| CLIN # | Section E Civil Engineering Services | U/M | Estimated Quantity | Unit Price | Estimated Price |