B3_Whitney-Aquilla_IDIQ_Maintenance_Bid_Schedule.xlsx

XLSX spreadsheet 54 KB Posted

Attached to
Maintenance IDIQ for USACE Lake Offices
Solicitation number
W9126G19R0047
Issued by

About this file

Bid Schedule

View the file

Other files

File Type Posted
B3_19r0047_am1_issued.pdf PDF
B3_19r0047_issued.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 (2)

THREE RIVERS MAINTENANCE IDIQ
Base Year
Facility Maintenance for Whitney/Aquilla Lakes Quote (Bid) Schedule
CLIN #Section A Campsite MaintenanceU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2018 or date of award, whichever is later, through 14 December 2019.
A001Decomposed GraniteSF1000$ -$ -
A002Concrete Wheel StopsEA30$ -$ -
A003Timber Delineators, One TierLF500$ -$ -
A004Timber Delineators, Two TierLF400$ -$ -
A005Timber Delineators, Three TierLF300$ -$ -
A006Timber Delineators, Four TierLF200$ -$ -
A007Timber Delineators, Five TierLF100$ -$ -
A008Concrete Campsite Delineators, 8 inch HeightLF150$ -$ -
A009Concrete Campsite Delineators, 16 inch HeightLF150$ -$ -
A010Concrete Campsite Delineators, 24 inch HeightLF150$ -$ -
A011Pedestal Grill InstallationEA25$ -$ -
A012Upright Grill InstallationEA25$ -$ -
A013Fire Ring and Ground Mounted Cooker InstallationEA25$ -$ -
A014Lantern Hanger Post InstallationEA25$ -$ -
A015Replace/Install 8 Foot Vinyl Coated or Aluminum Picnic TablesEA10$ -$ -

Total Section A Base Year $ - 0

CLIN #Section B Carpentry and PaintingU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2018 or date of award, whichever is later, through 14 December 2019.
B001Metal Picnic Shelter InstallationEA2$ -$ -
B002Roofing Removal (Composition and R-Panel)SF2000$ -$ -
B003Roof SheathingSF2000$ -$ -
B004Tongue and Groove DeckingSF500$ -$ -
B005Fascia BoardLF100$ -$ -
B006Composition Shingle Repair/InstallationSF500$ -$ -
B007R-Panel Repair/InstallationSF1000$ -$ -
B008Wall SheathingSF1000$ -$ -
B009Soffit SheathingSF500$ -$ -
B010Wall SidingSF1000$ -$ -
B011Plastic Laminate PanelsSF1000$ -$ -
B012Lap or "V" Grooved SidingSF500$ -$ -
B013Brick and Slump Stone Masonry-Repair/InstallationSF500$ -$ -
B014Natural Stone Masonry-Repair/InstallationSF500$ -$ -
B015Toilet Partition-SingleEA5$ -$ -
B016Toilet Partition-DoubleEA5$ -$ -
B017Toilet Partition-TripleEA5$ -$ -
B018Shower PartitionEA5$ -$ -
B019Shower/Toilet Door with PilasterEA5$ -$ -
B020Urinal PartitionEA5$ -$ -
B021Painting Metal Picnic SheltersEA30$ -$ -
B022Painting Wood-Oil Based PaintSF500$ -$ -
B023Painting Wood-Exterior Latex PaintSF500$ -$ -
B024Painting Wood-Sealer/StainSF500$ -$ -
B025Painting Wood-WaterproofingSF500$ -$ -
B026Painting Masonry-Block Sealer/FillerSF500$ -$ -
B027Painting Masonry-Oil Based PaintSF500$ -$ -
B028Painting Masonry-Exterior Latex PaintSF500$ -$ -
B029Painting Metal-Oil Based PaintSF500$ -$ -
B030Painting Metal-Latex/Enamel PaintSF500$ -$ -

Total Section B Base Year $ - 0

CLIN #Section C Paving, Road Maintenance and Site WorkU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2018 or date of award, whichever is later, through 14 December 2019.
C001Top SoilTN50$ -$ -
C002Fill MaterialTN50$ -$ -
C003Sand MaterialTN50$ -$ -
C004Aggregate Base MaterialTN50$ -$ -
C005Rip Rap Stone 3"-5"TN50$ -$ -
C006Rip Rap Stone 6"-12"TN50$ -$ -
C007Rip Rap Stone 12"-18"TN50$ -$ -
C008Culvert Installation and Replacement 15" (Low Profile)LF20$ -$ -
C009Culvert End Section 15", Pair (Low Profile)EA1$ -$ -
C010Culvert Installation and Replacement 18" (Low Profile)LF20$ -$ -
C011Culvert End Section 18", Pair (Low Profile)EA1$ -$ -
C012Culvert Installation and Replacement 24" (Low Profile)LF20$ -$ -
C013Culvert End Section 24", Pair (Low Profile)EA1$ -$ -
C014Culvert Installation and Replacement 30" (Low Profile)LF20$ -$ -
C015Culvert End Section 30", Pair (Low Profile)EA1$ -$ -
C016Culvert Installation and Replacement 36" (Low Profile)LF20$ -$ -
C017Culvert End Section 36", Pair (Low Profile)EA1$ -$ -
C018Road Boring-2" CasingLF100$ -$ -
C019Road Boring-4" CasingLF100$ -$ -
C020Road Boring-6" CasingLF100$ -$ -
C021Asphalt Paving and PatchingSY2000$ -$ -
C022Scarifying and Reshaping Base CourseSY2000$ -$ -
C023Bituminous Tack CoatSY1000$ -$ -
C024Bituminous Prime CoatSY2000$ -$ -
C025Asphalt Seal CoatingSY2000$ -$ -
C026Sealing Joints and CracksLF2000$ -$ -
C027Painting/Marking Traffic ControlLF5000$ -$ -
C0284" Concrete SlabSF1000$ -$ -
C0294" Concrete Slab with FootingsSF1000$ -$ -
C0306" Concrete SlabSF1000$ -$ -
C0316" Concrete Slab with FootingsSF1000$ -$ -
C032Concrete CurbLF500$ -$ -
C033Concrete Curb, 24" Curb and GutterLF200$ -$ -
C034Road Shoulder MaintenanceLF5000$ -$ -

Total Section C Base Year $ - 0

CLIN #Section D PlumbingU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2018 or date of award, whichever is later, through 14 December 2019.
D001Water Hydrants on 6"x6" PostEA30$ -$ -
D002Water Valve 3/4"-2"EA20$ -$ -
D003Water Valve 2 1/2"-4"EA20$ -$ -
D004Water Line Installation/Repair 3/4"-2"LF250$ -$ -
D005Water Line Installation/Repair 3/4"-2" in RockLF100$ -$ -
D006Water Line Installation/Repair 2 1/2"-4"LF250$ -$ -
D007Water Line Installation/Repair 2 1/2"-4" in RockLF100$ -$ -
D008Sewer Line Installation/Repair - 4"LF200$ -$ -
D009Sewer Line Installation/Repair - 4" in RockLF100$ -$ -
D010Commode ReplacementEA5$ -$ -
D011Urinal ReplacementEA5$ -$ -
D012Lavatory ReplacementEA5$ -$ -
D013Water Heater ReplacementEA10$ -$ -

Total Section D Base Year $ - 0

CLIN #Section E Civil Engineering ServicesU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2018 or date of award, whichever is later, through 14 December 2019.
E001Hand and Power Tools (Laborer)HR100$ -$ -
E002Dump Truck-20 tonHR100$ -$ -
E003Dump Truck-2 1/2 tonHR100$ -$ -
E004Motor Grader-12' MoldboardHR40$ -$ -
E005Bulldozer-165 HPHR40$ -$ -
E006Bulldozer-80 HPHR40$ -$ -
E007Water Tank TruckHR20$ -$ -
E008Crane-35 TonHR20$ -$ -
E009Sheepsfoot CompactorHR100$ -$ -
E010Roller/Compactor Pneumatic TiredHR100$ -$ -
E011Roller/Compactor Steel WheeledHR100$ -$ -
E012Front End Loader-Rubber TiredHR40$ -$ -
E013Tractor, Loader/Box bladeHR40$ -$ -
E014Tractor, Loader/AugerHR40$ -$ -
E015Tractor, Loader/BushhogHR40$ -$ -
E016Tractor, Side Boom BushhogHR40$ -$ -
E017Backhoe, Rubber TiredHR40$ -$ -
E018Backhoe, Trackhoe-Track TypeHR40$ -$ -
E019Tractor, Skid LoaderHR80$ -$ -
E020Ditching MachineHR40$ -$ -
E021Trencher (Rock Saw)HR20$ -$ -
E022Drill TruckHR20$ -$ -
E023Road BroomHR80$ -$ -
E024Asphalt Milling (Cold Planer Skid Loader attachment)HR20$ -$ -
E025Air CompressorHR40$ -$ -
E026WelderHR80$ -$ -
E027Vibratory Plate CompactorHR80$ -$ -
E028Water Pump-2"HR80$ -$ -
E029Water Pump-4"HR80$ -$ -
E030Water Pump-6"HR40$ -$ -
E031Washer, High PressureHR80$ -$ -
E032Chipper, Brush/LimbHR80$ -$ -
E033Concrete SawHR80$ -$ -
E034Chain SawHR80$ -$ -

Total Section E Base Year $ - 0

CLIN #Section F FencingU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2018 or date of award, whichever is later, through 14 December 2019.
F001Pipe Rail FencingLF1000$ - 0
F002Pipe Rail Fence GateEA2$ - 0
F003Guard Post and CableLF500$ - 0
F004Steel Post and CableLF500$ - 0
F005Timber Vehicle BarriersEA100$ - 0
F006Barb Wire Fencing, Steel Post, 6-WireLF1000$ - 0
F007Woven Wire and Barb Wire Fencing, Steel PostLF1000$ - 0
F008Swing Gate-4'EA5$ - 0
F009Swing Gate-10'EA5$ - 0
F010Swing Gate-12'EA5$ - 0
F011Swing Gate-14'EA5$ - 0
F012Swing Gate-16'EA5$ - 0

Total Section F Base Year $ - 0

CLIN #Section G Sign and Buoy MaintenanceU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2018 or date of award, whichever is later, through 14 December 2019.
G001Park Sign Installation-Single PostEA40$ -$ -
G002Park Sign Installation-Double PostEA40$ -$ -
G003Park Sign Replacement-Sign Only-Single PostEA100$ -$ -
G004Park Sign Replacement-Sign Only-Double PostEA100$ -$ -
G005Buoy InstallationEA10$ -$ -
G006Repair/Replace Pipeline Floating BarrierLF400$ -$ -
G007Pipeline Floating Barrier AnchorsEA20$ -$ -

Total Section G Base Year $ - 0

CLIN #Section H ElectricalU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2018 or date of award, whichever is later, through 14 December 2019.
H001Electric Line Repair/Installation, Direct BurialLF200$ -$ -
H002Electric Line Repair/Installation, Direct Burial in RockLF100$ -$ -
H003Electric Line Repair/Installation, In Conduit - 2"LF500$ -$ -
H004Electric Line Repair/Installation, In Conduit - 2" in RockLF100$ -$ -
H005Electric Line Repair/Installation, In Conduit - 4"LF500$ -$ -
H006Electric Line Repair/Installation, In Conduit - 4" in RockLF100$ -$ -
H007RV Pedestal Installation, Single UnitEA25$ -$ -
H008RV Pedestal Installation, Double UnitEA10$ -$ -
H009Meter Base InstallationEA10$ -$ -
H010Main Disconnect Panel InstallationEA10$ -$ -
H011Load Center PanelEA8$ -$ -

Total Section H Base Year $ - 0

Total Base Year Sections A-H (CLINS A001-H011) $ - 0

THREE RIVERS MAINTENANCE IDIQ
Option Year 1
Facility Maintenance for Whitney/Aquilla Lakes Quote (Bid) Schedule
CLIN #Section A Campsite MaintenanceU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2019 or date of award, whichever is later, through 14 December 2020.
A101Decomposed GraniteSF1000$ -$ -
A102Concrete Wheel StopsEA30$ -$ -
A103Timber Delineators, One TierLF500$ -$ -
A104Timber Delineators, Two TierLF400$ -$ -
A105Timber Delineators, Three TierLF300$ -$ -
A106Timber Delineators, Four TierLF200$ -$ -
A107Timber Delineators, Five TierLF100$ -$ -
A108Concrete Campsite Delineators, 8 inch HeightLF150$ -$ -
A109Concrete Campsite Delineators, 16 inch HeightLF150$ -$ -
A110Concrete Campsite Delineators, 24 inch HeightLF150$ -$ -
A111Pedestal Grill InstallationEA25$ -$ -
A112Upright Grill InstallationEA25$ -$ -
A113Fire Ring and Ground Mounted Cooker InstallationEA25$ -$ -
A114Lantern Hanger Post InstallationEA25$ -$ -
A115Replace/Install 8 Foot Vinyl Coated or Aluminum Picnic TablesEA10$ -$ -

Total Section A Option Year 1 $ - 0

CLIN #Section B Carpentry and PaintingU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2019 or date of award, whichever is later, through 14 December 2020.
B101Metal Picnic Shelter InstallationEA2$ -$ -
B102Roofing Removal (Composition and R-Panel)SF2000$ -$ -
B103Roof SheathingSF2000$ -$ -
B104Tongue and Groove DeckingSF500$ -$ -
B105Fascia BoardLF100$ -$ -
B106Composition Shingle Repair/InstallationSF500$ -$ -
B107R-Panel Repair/InstallationSF1000$ -$ -
B108Wall SheathingSF1000$ -$ -
B109Soffit SheathingSF500$ -$ -
B110Wall SidingSF1000$ -$ -
B111Plastic Laminate PanelsSF1000$ -$ -
B112Lap or "V" Grooved SidingSF500$ -$ -
B113Brick and Slump Stone Masonry-Repair/InstallationSF500$ -$ -
B114Natural Stone Masonry-Repair/InstallationSF500$ -$ -
B115Toilet Partition-SingleEA5$ -$ -
B116Toilet Partition-DoubleEA5$ -$ -
B117Toilet Partition-TripleEA5$ -$ -
B118Shower PartitionEA5$ -$ -
B119Shower/Toilet Door with PilasterEA5$ -$ -
B120Urinal PartitionEA5$ -$ -
B121Painting Metal Picnic SheltersEA30$ -$ -
B122Painting Wood-Oil Based PaintSF500$ -$ -
B123Painting Wood-Exterior Latex PaintSF500$ -$ -
B124Painting Wood-Sealer/StainSF500$ -$ -
B125Painting Wood-WaterproofingSF500$ -$ -
B126Painting Masonry-Block Sealer/FillerSF500$ -$ -
B127Painting Masonry-Oil Based PaintSF500$ -$ -
B128Painting Masonry-Exterior Latex PaintSF500$ -$ -
B129Painting Metal-Oil Based PaintSF500$ -$ -
B130Painting Metal-Latex/Enamel PaintSF500$ -$ -

Total Section B Option Year 1 $ - 0

CLIN #Section C Paving, Road Maintenance and Site WorkU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2019 or date of award, whichever is later, through 14 December 2020.
C101Top SoilTN50$ -$ -
C102Fill MaterialTN50$ -$ -
C103Sand MaterialTN50$ -$ -
C104Aggregate Base MaterialTN50$ -$ -
C105Rip Rap Stone 3"-5"TN50$ -$ -
C106Rip Rap Stone 6"-12"TN50$ -$ -
C107Rip Rap Stone 12"-18"TN50$ -$ -
C108Culvert Installation and Replacement 15" (Low Profile)LF20$ -$ -
C109Culvert End Section 15", Pair (Low Profile)EA1$ -$ -
C110Culvert Installation and Replacement 18" (Low Profile)LF20$ -$ -
C111Culvert End Section 18", Pair (Low Profile)EA1$ -$ -
C112Culvert Installation and Replacement 24" (Low Profile)LF20$ -$ -
C113Culvert End Section 24", Pair (Low Profile)EA1$ -$ -
C114Culvert Installation and Replacement 30" (Low Profile)LF20$ -$ -
C115Culvert End Section 30", Pair (Low Profile)EA1$ -$ -
C116Culvert Installation and Replacement 36" (Low Profile)20$ -$ -
C117Culvert End Section 36", Pair (Low Profile)EA1$ -$ -
C118Road Boring-2" CasingLF100$ -$ -
C119Road Boring-4" CasingLF100$ -$ -
C120Road Boring-6" CasingLF100$ -$ -
C121Asphalt Paving and PatchingSY2000$ -$ -
C122Scarifying and Reshaping Base CourseSY2000$ -$ -
C123Bituminous Tack CoatSY1000$ -$ -
C124Bituminous Prime CoatSY2000$ -$ -
C125Asphalt Seal CoatingSY2000$ -$ -
C126Sealing Joints and CracksLF2000$ -$ -
C127Painting/Marking Traffic ControlLF5000$ -$ -
C1284" Concrete SlabSF1000$ -$ -
C1294" Concrete Slab with FootingsSF1000$ -$ -
C1306" Concrete SlabSF1000$ -$ -
C1316" Concrete Slab with FootingsSF1000$ -$ -
C132Concrete CurbLF500$ -$ -
C133Concrete Curb, 24" Curb and GutterLF200$ -$ -
C134Road Shoulder MaintenanceLF5000$ -$ -

Total Section C Option Year 1 $ - 0

CLIN #Section D PlumbingU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2019 or date of award, whichever is later, through 14 December 2020.
D101Water Hydrants on 6"x6" PostEA30$ -$ -
D102Water Valve 3/4"-2"EA20$ -$ -
D103Water Valve 2 1/2"-4"EA20$ -$ -
D104Water Line Installation/Repair 3/4"-2"LF250$ -$ -
D105Water Line Installation/Repair 3/4"-2" in RockLF100$ -$ -
D106Water Line Installation/Repair 2 1/2"-4"LF250$ -$ -
D107Water Line Installation/Repair 2 1/2"-4" - in RockLF100$ -$ -
D108Sewer Line Installation/Repair - 4"LF200$ -$ -
D109Sewer Line Installation/Repair - 4" in RockLF100$ -$ -
D110Commode ReplacementEA5$ -$ -
D111Urinal ReplacementEA5$ -$ -
D112Lavatory ReplacementEA5$ -$ -
D113Water Heater ReplacementEA10$ -$ -

Total Section D Option Year 1 $ - 0

CLIN #Section E Civil Engineering ServicesU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2019 or date of award, whichever is later, through 14 December 2020.
E101Hand and Power Tools (Laborer)HR100$ -$ -
E102Dump Truck-20 tonHR100$ -$ -
E103Dump Truck-2 1/2 tonHR100$ -$ -
E104Motor Grader-12' MoldboardHR40$ -$ -
E105Bulldozer-165 HPHR40$ -$ -
E106Bulldozer-80 HPHR40$ -$ -
E107Water Tank TruckHR20$ -$ -
E108Crane-35 TonHR20$ -$ -
E109Sheepsfoot CompactorHR100$ -$ -
E110Roller/Compactor Pneumatic TiredHR100$ -$ -
E111Roller/Compactor Steel WheeledHR100$ -$ -
E112Front End Loader-Rubber TiredHR40$ -$ -
E113Tractor, Loader/Box bladeHR40$ -$ -
E114Tractor, Loader/AugerHR40$ -$ -
E115Tractor, Loader/BushhogHR40$ -$ -
E116Tractor, Side Boom BushhogHR40$ -$ -
E117Backhoe, Rubber TiredHR40$ -$ -
E118Backhoe, Trackhoe-Track TypeHR40$ -$ -
E119Tractor, Skid LoaderHR80$ -$ -
E120Ditching MachineHR40$ -$ -
E121Trencher (Rock Saw)HR20$ -$ -
E122Drill TruckHR20$ -$ -
E123Road BroomHR80$ -$ -
E124Asphalt Milling Machine (Cold Planer)HR20$ -$ -
E125Air CompressorHR40$ -$ -
E126WelderHR80$ -$ -
E127Vibratory Plate CompactorHR80$ -$ -
E128Water Pump-2"HR80$ -$ -
E129Water Pump-4"HR80$ -$ -
E130Water Pump-6"HR40$ -$ -
E131Washer, High PressureHR80$ -$ -
E132Chipper, Brush/LimbHR80$ -$ -
E133Concrete SawHR80$ -$ -
E134Chain SawHR80$ -$ -

Total Section E Option Year 1 $ - 0

CLIN #Section F FencingU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2019 or date of award, whichever is later, through 14 December 2020.
F101Pipe Rail FencingLF1000$ - 0$ - 0
F102Pipe Rail Fence GateEA2$ - 0$ - 0
F103Guard Post and CableLF500$ - 0$ - 0
F104Steel Post and CableLF500$ - 0$ - 0
F105Timber Vehicle BarriersEA100$ - 0$ - 0
F106Barb Wire Fencing, Steel Post, 6-WireLF1000$ - 0$ - 0
F107Woven Wire and Barb Wire Fencing, Steel PostLF1000$ - 0$ - 0
F108Swing Gate-4'EA5$ - 0$ - 0
F109Swing Gate-10'EA5$ - 0$ - 0
F110Swing Gate-12'EA5$ - 0$ - 0
F111Swing Gate-14'EA5$ - 0$ - 0
F112Swing Gate-16'EA5$ - 0$ - 0

Total Section F Option Year 1 $ - 0

CLIN #Section G Sign and Buoy MaintenanceU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2019 or date of award, whichever is later, through 14 December 2020.
G101Park Sign Installation-Single PostEA40$ -$ -
G102Park Sign Installation-Double PostEA40$ -$ -
G103Park Sign Replacement-Sign Only-Single PostEA100$ -$ -
G104Park Sign Replacement-Sign Only-Double PostEA100$ -$ -
G105Buoy InstallationEA10$ -$ -
G106Repair/Replace Pipeline Floating BarrierLF400$ -$ -
G107Pipeline Floating Barrier AnchorsEA20$ -$ -

Total Section G Option Year 1 $ - 0

CLIN #Section H ElectricalU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2019 or date of award, whichever is later, through 14 December 2020.
H101Electric Line Repair/Installation, Direct BurialLF200$ -$ -
H102Electric Line Repair/Installation, Direct Burial in RockLF100$ -$ -
H103Electric Line Repair/Installation, In Conduit - 2"LF500$ -$ -
H104Electric Line Repair/Installation, In Conduit - 2" in RockLF100$ -$ -
H105Electric Line Repair/Installation, In Conduit - 4"LF500$ -$ -
H106Electric Line Repair/Installation, In Conduit - 4" in RockLF100$ -$ -
H107RV Pedestal Installation, Single UnitEA25$ -$ -
H108RV Pedestal Installation, Double UnitEA10$ -$ -
H109Meter Base InstallationEA10$ -$ -
H110Main Disconnect Panel InstallationEA10$ -$ -
H111Load Center PanelEA8$ -$ -

Total Section H Option Year 1 $ - 0

Total Option Year 1 Sections A-H (CLINS A101-H111) $ - 0

THREE RIVERS MAINTENANCE IDIQ
Option Year 2
Facility Maintenance for Whitney/Aquilla Lakes Quote (Bid) Schedule
CLIN #Section A Campsite MaintenanceU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
A201Decomposed GraniteSF1000$ -$ -
A202Concrete Wheel StopsEA30$ -$ -
A203Timber Delineators, One TierLF500$ -$ -
A204Timber Delineators, Two TierLF400$ -$ -
A205Timber Delineators, Three TierLF300$ -$ -
A206Timber Delineators, Four TierLF200$ -$ -
A207Timber Delineators, Five TierLF100$ -$ -
A208Concrete Campsite Delineators, 8 inch HeightLF150$ -$ -
A209Concrete Campsite Delineators, 16 inch HeightLF150$ -$ -
A210Concrete Campsite Delineators, 24 inch HeightLF150$ -$ -
A211Pedestal Grill InstallationEA25$ -$ -
A212Upright Grill InstallationEA25$ -$ -
A213Fire Ring and Ground Mounted Cooker InstallationEA25$ -$ -
A214Lantern Hanger Post InstallationEA25$ -$ -
A215Replace/Install 8 Foot Vinyl Coated or Aluminum Picnic TablesEA10$ -$ -

Total Section A Option Year 2 $ - 0

CLIN #Section B Carpentry and PaintingU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
B201Metal Picnic Shelter InstallationEA2$ -$ -
B202Roofing Removal (Composition and R-Panel)SF2000$ -$ -
B203Roof SheathingSF2000$ -$ -
B204Tongue and Groove DeckingSF500$ -$ -
B205Fascia BoardLF100$ -$ -
B206Composition Shingle Repair/InstallationSF500$ -$ -
B207R-Panel Repair/InstallationSF1000$ -$ -
B208Wall SheathingSF1000$ -$ -
B209Soffit SheathingSF500$ -$ -
B210Wall SidingSF1000$ -$ -
B211Plastic Laminate PanelsSF1000$ -$ -
B212Lap or "V" Grooved SidingSF500$ -$ -
B213Brick and Slump Stone Masonry-Repair/InstallationSF500$ -$ -
B214Natural Stone Masonry-Repair/InstallationSF500$ -$ -
B215Toilet Partition-SingleEA5$ -$ -
B216Toilet Partition-DoubleEA5$ -$ -
B217Toilet Partition-TripleEA5$ -$ -
B218Shower PartitionEA5$ -$ -
B219Shower/Toilet Door with PilasterEA5$ -$ -
B220Urinal PartitionEA5$ -$ -
B221Painting Metal Picnic SheltersEA30$ -$ -
B222Painting Wood-Oil Based PaintSF500$ -$ -
B223Painting Wood-Exterior Latex PaintSF4$ -$ -
B224Painting Wood-Sealer/StainSF500$ -$ -
B225Painting Wood-WaterproofingSF500$ -$ -
B226Painting Masonry-Block Sealer/FillerSF500$ -$ -
B227Painting Masonry-Oil Based PaintSF500$ -$ -
B228Painting Masonry-Exterior Latex PaintSF500$ -$ -
B229Painting Metal-Oil Based PaintSF500$ -$ -
B230Painting Metal-Latex/Enamel PaintSF500$ -$ -

Total Section B Option Year 2 $ - 0

CLIN #Section C Paving, Road Maintenance and Site WorkU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
C201Top SoilTN50$ -$ -
C202Fill MaterialTN50$ -$ -
C203Sand MaterialTN50$ -$ -
C204Aggregate Base MaterialTN50$ -$ -
C205Rip Rap Stone 3"-5"TN50$ -$ -
C206Rip Rap Stone 6"-12"TN50$ -$ -
C207Rip Rap Stone 12"-18"TN50$ -$ -
C208Culvert Installation and Replacement 15" (Low Profile)LF20$ -$ -
C209Culvert End Section 15", Pair (Low Profile)EA1$ -$ -
C210Culvert Installation and Replacement 18" (Low Profile)LF20$ -$ -
C211Culvert End Section 18", Pair (Low Profile)EA1$ -$ -
C212Culvert Installation and Replacement 24" (Low Profile)LF20$ -$ -
C213Culvert End Section 24", Pair (Low Profile)EA1$ -$ -
C214Culvert Installation and Replacement 30" (Low Profile)LF20$ -$ -
C215Culvert End Section 30", Pair (Low Profile)EA1$ -$ -
C216Culvert Installation and Replacement 36" (Low Profile)20$ -$ -
C217Culvert End Section 36", Pair (Low Profile)EA1$ -$ -
C218Road Boring-2" CasingLF100$ -$ -
C219Road Boring-4" CasingLF100$ -$ -
C220Road Boring-6" CasingLF100$ -$ -
C221Asphalt Paving and PatchingSY2000$ -$ -
C222Scarifying and Reshaping Base CourseSY2000$ -$ -
C223Bituminous Tack CoatSY1000$ -$ -
C224Bituminous Prime CoatSY2000$ -$ -
C225Asphalt Seal CoatingSY2000$ -$ -
C226Sealing Joints and CracksLF2000$ -$ -
C227Painting/Marking Traffic ControlLF5000$ -$ -
C2284" Concrete SlabSF1000$ -$ -
C2294" Concrete Slab with FootingsSF1000$ -$ -
C2306" Concrete SlabSF1000$ -$ -
C2316" Concrete Slab with FootingsSF1000$ -$ -
C232Concrete CurbLF500$ -$ -
C233Concrete Curb, 24" Curb and GutterLF200$ -$ -
C234Road Shoulder MaintenanceLF5000$ -$ -

Total Section C Option Year 2 $ - 0

CLIN #Section D PlumbingU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
D201Water Hydrants on 6"x6" PostEA30$ -$ -
D202Water Valve 3/4"-2"EA20$ -$ -
D203Water Valve 2 1/2"-4"EA20$ -$ -
D204Water Line Installation/Repair 3/4"-2"LF250$ -$ -
D205Water Line Installation/Repair 3/4"-2" in RockLF100$ -$ -
D206Water Line Installation/Repair 2 1/2"-4"LF250$ -$ -
D207Water Line Installation/Repair 2 1/2"-4" in RockLF100$ -$ -
D208Sewer Line Installation/Repair - 4"LF200$ -$ -
D209Sewer Line Installation/Repair - 4" in RockLF100$ -$ -
D210Commode ReplacementEA5$ -$ -
D211Urinal ReplacementEA5$ -$ -
D212Lavatory ReplacementEA5$ -$ -
D213Water Heater ReplacementEA10$ -$ -

Total Section D Option Year 2 $ - 0

CLIN #Section E Civil Engineering ServicesU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
E201Hand and Power Tools (Laborer)HR100$ -$ -
E202Dump Truck-20 tonHR100$ -$ -
E203Dump Truck-2 1/2 tonHR100$ -$ -
E204Motor Grader-12' MoldboardHR40$ -$ -
E205Bulldozer-165 HPHR40$ -$ -
E206Bulldozer-80 HPHR40$ -$ -
E207Water Tank TruckHR20$ -$ -
E208Crane-35 TonHR20$ -$ -
E209Sheepsfoot CompactorHR100$ -$ -
E210Roller/Compactor Pneumatic TiredHR100$ -$ -
E211Roller/Compactor Steel WheeledHR100$ -$ -
E212Front End Loader-Rubber TiredHR40$ -$ -
E213Tractor, Loader/Box bladeHR40$ -$ -
E214Tractor, Loader/AugerHR40$ -$ -
E215Tractor, Loader/BushhogHR40$ -$ -
E216Tractor, Side Boom BushhogHR40$ -$ -
E217Backhoe, Rubber TiredHR40$ -$ -
E218Backhoe, Trackhoe-Track TypeHR40$ -$ -
E219Tractor, Skid LoaderHR80$ -$ -
E220Ditching MachineHR40$ -$ -
E221Trencher (Rock Saw)HR20$ -$ -
E222Drill TruckHR20$ -$ -
E223Road BroomHR80$ -$ -
E224Asphalt Milling Machine (Cold Planer)HR20$ -$ -
E225Air CompressorHR40$ -$ -
E226WelderHR80$ -$ -
E227Vibratory Plate CompactorHR80$ -$ -
E228Water Pump-2"HR80$ -$ -
E229Water Pump-4"HR80$ -$ -
E230Water Pump-6"HR40$ -$ -
E231Washer, High PressureHR80$ -$ -
E232Chipper, Brush/LimbHR80$ -$ -
E233Concrete SawHR80$ -$ -
E234Chain SawHR80$ -$ -

Total Section E Option Year 2 $ - 0

CLIN #Section F FencingU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
F201Pipe Rail FencingLF1000$ - 0$ - 0
F202Pipe Rail Fence GateEA2$ - 0$ - 0
F203Guard Post and CableLF500$ - 0$ - 0
F204Steel Post and CableLF500$ - 0$ - 0
F205Timber Vehicle BarriersEA100$ - 0$ - 0
F206Barb Wire Fencing, Steel Post, 6-WireLF1000$ - 0$ - 0
F207Woven Wire and Barb Wire Fencing, Steel PostLF1000$ - 0$ - 0
F208Swing Gate-4'EA5$ - 0$ - 0
F209Swing Gate-10'EA5$ - 0$ - 0
F210Swing Gate-12'EA5$ - 0$ - 0
F211Swing Gate-14'EA5$ - 0$ - 0
F212Swing Gate-16'EA5$ - 0$ - 0

Total Section F Option Year 2 $ - 0

CLIN #Section G Sign and Buoy MaintenanceU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
G201Park Sign Installation-Single PostEA40$ -$ -
G202Park Sign Installation-Double PostEA40$ -$ -
G203Park Sign Replacement-Sign Only-Single PostEA100$ -$ -
G204Park Sign Replacement-Sign Only-Double PostEA100$ -$ -
G205Buoy InstallationEA10$ -$ -
G206Repair/Replace Pipeline Floating BarrierLF400$ -$ -
G207Pipeline Floating Barrier AnchorsEA20$ -$ -

Total Section G Option Year 2 $ - 0

CLIN #Section H ElectricalU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
H201Electric Line Repair/Installation, Direct BurialLF200$ -$ -
H202Electric Line Repair/Installation, Direct Burial in RockLF100$ -$ -
H203Electric Line Repair/Installation, In Conduit - 2"LF500$ -$ -
H204Electric Line Repair/Installation, In Conduit - 2" in RockLF100$ -$ -
H205Electric Line Repair/Installation, In Conduit - 4"LF500$ -$ -
H206Electric Line Repair/Installation, In Conduit - 4" in RockLF100$ -$ -
H207RV Pedestal Installation, Single UnitEA25$ -$ -
H208RV Pedestal Installation, Double UnitEA10$ -$ -
H209Meter Base InstallationEA10$ -$ -
H210Main Disconnect Panel InstallationEA10$ -$ -
H211Load Center PanelEA8$ -$ -

Total Section H Option Year 2 $ - 0

Total Option Year 2 Sections A-H (CLINS A201-H211) $ - 0

THREE RIVERS MAINTENANCE IDIQ
Option Year 3
Facility Maintenance for Whitney/Aquilla Lakes Quote (Bid) Schedule
CLIN #Section A Campsite MaintenanceU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
A301Decomposed GraniteSF1000$ -$ -
A302Concrete Wheel StopsEA30$ -$ -
A303Timber Delineators, One TierLF500$ -$ -
A304Timber Delineators, Two TierLF400$ -$ -
A305Timber Delineators, Three TierLF300$ -$ -
A306Timber Delineators, Four TierLF200$ -$ -
A307Timber Delineators, Five TierLF100$ -$ -
A308Concrete Campsite Delineators, 8 inch HeightLF150$ -$ -
A309Concrete Campsite Delineators, 16 inch HeightLF150$ -$ -
A310Concrete Campsite Delineators, 24 inch HeightLF150$ -$ -
A311Pedestal Grill InstallationEA25$ -$ -
A312Upright Grill InstallationEA25$ -$ -
A313Fire Ring and Ground Mounted Cooker InstallationEA25$ - 0$ - 0
A314Lantern Hanger Post InstallationEA25$ - 0$ - 0
A315Replace/Install 8 Foot Vinyl Coated or Aluminum Picnic TablesEA10$ - 0$ - 0

Total Section A Option Year 3 $ - 0

CLIN #Section B Carpentry and PaintingU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
B301Metal Picnic Shelter InstallationEA2$ -$ -
B302Roofing Removal (Composition and R-Panel)SF2000$ -$ -
B303Roof SheathingSF2000$ -$ -
B304Tongue and Groove DeckingSF500$ -$ -
B305Fascia BoardLF100$ -$ -
B306Composition Shingle Repair/InstallationSF500$ -$ -
B307R-Panel Repair/InstallationSF1000$ -$ -
B308Wall SheathingSF1000$ -$ -
B309Soffit SheathingSF500$ -$ -
B310Wall SidingSF1000$ -$ -
B311Plastic Laminate PanelsSF1000$ -$ -
B312Lap or "V" Grooved SidingSF500$ -$ -
B313Brick and Slump Stone Masonry-Repair/InstallationSF500$ -$ -
B314Natural Stone Masonry-Repair/InstallationSF500$ -$ -
B315Toilet Partition-SingleEA5$ -$ -
B316Toilet Partition-DoubleEA5$ -$ -
B317Toilet Partition-TripleEA5$ -$ -
B318Shower PartitionEA5$ -$ -
B319Shower/Toilet Door with PilasterEA5$ -$ -
B320Urinal PartitionEA5$ -$ -
B321Painting Metal Picnic SheltersEA30$ -$ -
B322Painting Wood-Oil Based PaintSF500$ -$ -
B323Painting Wood-Exterior Latex PaintSF4$ -$ -
B324Painting Wood-Sealer/StainSF500$ -$ -
B325Painting Wood-WaterproofingSF500$ -$ -
B326Painting Masonry-Block Sealer/FillerSF500$ -$ -
B327Painting Masonry-Oil Based PaintSF500$ -$ -
B328Painting Masonry-Exterior Latex PaintSF500$ -$ -
B329Painting Metal-Oil Based PaintSF500$ -$ -
B330Painting Metal-Latex/Enamel PaintSF500$ -$ -

Total Section B Option Year 3 $ - 0

CLIN #Section C Paving, Road Maintenance and Site WorkU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
C301Top SoilTN50$ -$ -
C302Fill MaterialTN50$ -$ -
C303Sand MaterialTN50$ -$ -
C304Aggregate Base MaterialTN50$ -$ -
C305Rip Rap Stone 3"-5"TN50$ -$ -
C306Rip Rap Stone 6"-12"TN50$ -$ -
C307Rip Rap Stone 12"-18"TN50$ -$ -
C308Culvert Installation and Replacement 15" (Low Profile)LF20$ -$ -
C309Culvert End Section 15", Pair (Low Profile)EA1$ -$ -
C310Culvert Installation and Replacement 18" (Low Profile)LF20$ -$ -
C311Culvert End Section 18", Pair (Low Profile)EA1$ -$ -
C312Culvert Installation and Replacement 24" (Low Profile)LF20$ -$ -
C313Culvert End Section 24", Pair (Low Profile)EA1$ -$ -
C314Culvert Installation and Replacement 30" (Low Profile)LF20$ -$ -
C315Culvert End Section 30", Pair (Low Profile)EA1$ -$ -
C316Culvert Installation and Replacement 36" (Low Profile)20$ -$ -
C317Culvert End Section 36", Pair (Low Profile)EA1$ -$ -
C318Road Boring-2" CasingLF100$ -$ -
C319Road Boring-4" CasingLF100$ -$ -
C320Road Boring-6" CasingLF100$ -$ -
C321Asphalt Paving and PatchingSY2000$ -$ -
C322Scarifying and Reshaping Base CourseSY2000$ -$ -
C323Bituminous Tack CoatSY1000$ -$ -
C324Bituminous Prime CoatSY2000$ -$ -
C325Asphalt Seal CoatingSY2000$ -$ -
C326Sealing Joints and CracksLF2000$ -$ -
C327Painting/Marking Traffic ControlLF5000$ -$ -
C3284" Concrete SlabSF1000$ -$ -
C3294" Concrete Slab with FootingsSF1000$ -$ -
C3306" Concrete SlabSF1000$ -$ -
C3316" Concrete Slab with FootingsSF1000$ -$ -
C332Concrete CurbLF500$ -$ -
C333Concrete Curb, 24" Curb and GutterLF200$ - 0$ - 0
C334Road Shoulder MaintenanceLF5000$ - 0$ - 0

Total Section C Option Year 3 $ - 0

CLIN #Section D PlumbingU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
D301Water Hydrants on 6"x6" PostEA30$ -$ -
D302Water Valve 3/4"-2"EA20$ -$ -
D303Water Valve 2 1/2"-4"EA20$ -$ -
D304Water Line Installation/Repair 3/4"-2"LF250$ -$ -
D305Water Line Installation/Repair 3/4"-2" in RockLF100$ -$ -
D306Water Line Installation/Repair 2 1/2"-4"LF250$ -$ -
D307Water Line Installation/Repair 2 1/2"-4" in RockLF100$ -$ -
D308Sewer Line Installation/Repair - 4"LF200$ -$ -
D309Sewer Line Installation/Repair - 4" in RockLF100$ -$ -
D310Commode ReplacementEA5$ -$ -
D311Urinal ReplacementEA5$ - 0$ - 0
D312Lavatory ReplacementEA5$ - 0$ - 0
D313Water Heater ReplacementEA10$ - 0$ - 0

Total Section D Option Year 3 $ - 0

CLIN #Section E Civil Engineering ServicesU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
E301Hand and Power Tools (Laborer)HR100$ -$ -
E302Dump Truck-20 tonHR100$ -$ -
E303Dump Truck-2 1/2 tonHR100$ -$ -
E304Motor Grader-12' MoldboardHR40$ -$ -
E305Bulldozer-165 HPHR40$ -$ -
E306Bulldozer-80 HPHR40$ -$ -
E307Water Tank TruckHR20$ -$ -
E308Crane-35 TonHR20$ -$ -
E309Sheepsfoot CompactorHR100$ -$ -
E310Roller/Compactor Pneumatic TiredHR100$ -$ -
E311Roller/Compactor Steel WheeledHR100$ -$ -
E312Front End Loader-Rubber TiredHR40$ -$ -
E313Tractor, Loader/Box bladeHR40$ -$ -
E314Tractor, Loader/AugerHR40$ -$ -
E315Tractor, Loader/BushhogHR40$ -$ -
E316Tractor, Side Boom BushhogHR40$ -$ -
E317Backhoe, Rubber TiredHR40$ -$ -
E318Backhoe, Trackhoe-Track TypeHR40$ -$ -
E319Tractor, Skid LoaderHR80$ -$ -
E320Ditching MachineHR40$ -$ -
E321Trencher (Rock Saw)HR20$ -$ -
E322Drill TruckHR20$ -$ -
E323Road BroomHR80$ -$ -
E324Asphalt Milling Machine (Cold Planer)HR20$ -$ -
E325Air CompressorHR40$ -$ -
E326WelderHR80$ -$ -
E327Vibratory Plate CompactorHR80$ -$ -
E328Water Pump-2"HR80$ -$ -
E329Water Pump-4"HR80$ -$ -
E330Water Pump-6"HR40$ -$ -
E331Washer, High PressureHR80$ -$ -
E332Chipper, Brush/LimbHR80$ -$ -
E333Concrete SawHR80$ -$ -
E334Chain SawHR80$ - 0$ - 0

Total Section E Option Year 3 $ - 0

CLIN #Section F FencingU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
F301Pipe Rail FencingLF1000$ - 0$ - 0
F302Pipe Rail Fence GateEA2$ - 0$ - 0
F303Guard Post and CableLF500$ - 0$ - 0
F304Steel Post and CableLF500$ - 0$ - 0
F305Timber Vehicle BarriersEA100$ - 0$ - 0
F306Barb Wire Fencing, Steel Post, 6-WireLF1000$ - 0$ - 0
F307Woven Wire and Barb Wire Fencing, Steel PostLF1000$ - 0$ - 0
F308Swing Gate-4'EA5$ - 0$ - 0
F309Swing Gate-10'EA5$ - 0$ - 0
F310Swing Gate-12'EA5$ - 0$ - 0
F311Swing Gate-14'EA5$ - 0$ - 0
F312Swing Gate-16'EA5$ - 0$ - 0

Total Section F Option Year 3 $ - 0

CLIN #Section G Sign and Buoy MaintenanceU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
G301Park Sign Installation-Single PostEA40$ -$ -
G302Park Sign Installation-Double PostEA40$ -$ -
G303Park Sign Replacement-Sign Only-Single PostEA100$ -$ -
G304Park Sign Replacement-Sign Only-Double PostEA100$ -$ -
G305Buoy InstallationEA10$ - 0$ - 0
G306Repair/Replace Pipeline Floating BarrierLF400$ - 0$ - 0
G307Pipeline Floating Barrier AnchorsEA20$ - 0$ - 0

Total Section G Option Year 3 $ - 0

CLIN #Section H ElectricalU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
H301Electric Line Repair/Installation, Direct BurialLF200$ -$ -
H302Electric Line Repair/Installation, Direct Burial in RockLF100$ -$ -
H303Electric Line Repair/Installation, In Conduit - 2"LF500$ -$ -
H304Electric Line Repair/Installation, In Conduit - 2" in RockLF100$ -$ -
H305Electric Line Repair/Installation, In Conduit - 4"LF500$ -$ -
H306Electric Line Repair/Installation, In Conduit - 4" in RockLF100$ -$ -
H307RV Pedestal Installation, Single UnitEA25$ -$ -
H308RV Pedestal Installation, Double UnitEA10$ -$ -
H309Meter Base InstallationEA10$ - 0$ - 0
H310Main Disconnect Panel InstallationEA10$ - 0$ - 0
H311Load Center PanelEA8$ - 0$ - 0

Total Section H Option Year 3 $ - 0

Total Option Year 3 Sections A-H (CLINS A301-H311) $ - 0

THREE RIVERS MAINTENANCE IDIQ
Option Year 4
Facility Maintenance for Whitney/Aquilla Lakes Quote (Bid) Schedule
CLIN #Section A Campsite MaintenanceU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
A401Decomposed GraniteSF1000$ -$ -
A402Concrete Wheel StopsEA30$ -$ -
A403Timber Delineators, One TierLF500$ -$ -
A404Timber Delineators, Two TierLF400$ -$ -
A405Timber Delineators, Three TierLF300$ -$ -
A406Timber Delineators, Four TierLF200$ -$ -
A407Timber Delineators, Five TierLF100$ -$ -
A408Concrete Campsite Delineators, 8 inch HeightLF150$ -$ -
A409Concrete Campsite Delineators, 16 inch HeightLF150$ -$ -
A410Concrete Campsite Delineators, 24 inch HeightLF150$ -$ -
A411Pedestal Grill InstallationEA25$ - 0$ - 0
A412Upright Grill InstallationEA25$ - 0$ - 0
A413Fire Ring and Ground Mounted Cooker InstallationEA25$ - 0$ - 0
A414Lantern Hanger Post InstallationEA25$ - 0$ - 0
A415Replace/Install 8 Foot Vinyl Coated or Aluminum Picnic TablesEA10$ - 0$ - 0

Total Section A Option Year 4 $ - 0

CLIN #Section B Carpentry and PaintingU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
B401Metal Picnic Shelter InstallationEA2$ -$ -
B402Roofing Removal (Composition and R-Panel)SF2000$ -$ -
B403Roof SheathingSF2000$ -$ -
B404Tongue and Groove DeckingSF500$ -$ -
B405Fascia BoardLF100$ -$ -
B406Composition Shingle Repair/InstallationSF500$ -$ -
B407R-Panel Repair/InstallationSF1000$ -$ -
B408Wall SheathingSF1000$ -$ -
B409Soffit SheathingSF500$ -$ -
B410Wall SidingSF1000$ -$ -
B411Plastic Laminate PanelsSF1000$ -$ -
B412Lap or "V" Grooved SidingSF500$ -$ -
B413Brick and Slump Stone Masonry-Repair/InstallationSF500$ -$ -
B414Natural Stone Masonry-Repair/InstallationSF500$ -$ -
B415Toilet Partition-SingleEA5$ -$ -
B416Toilet Partition-DoubleEA5$ -$ -
B417Toilet Partition-TripleEA5$ -$ -
B418Shower PartitionEA5$ -$ -
B419Shower/Toilet Door with PilasterEA5$ -$ -
B420Urinal PartitionEA5$ -$ -
B421Painting Metal Picnic SheltersEA30$ -$ -
B422Painting Wood-Oil Based PaintSF500$ -$ -
B423Painting Wood-Exterior Latex PaintSF4$ -$ -
B424Painting Wood-Sealer/StainSF500$ -$ -
B425Painting Wood-WaterproofingSF500$ -$ -
B426Painting Masonry-Block Sealer/FillerSF500$ -$ -
B427Painting Masonry-Oil Based PaintSF500$ -$ -
B428Painting Masonry-Exterior Latex PaintSF500$ -$ -
B429Painting Metal-Oil Based PaintSF500$ - 0$ - 0
B430Painting Metal-Latex/Enamel PaintSF500$ - 0$ - 0

Total Section B Option Year 4 $ - 0

CLIN #Section C Paving, Road Maintenance and Site WorkU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
C401Top SoilTN50$ -$ -
C402Fill MaterialTN50$ -$ -
C403Sand MaterialTN50$ -$ -
C404Aggregate Base MaterialTN50$ -$ -
C405Rip Rap Stone 3"-5"TN50$ -$ -
C406Rip Rap Stone 6"-12"TN50$ -$ -
C407Rip Rap Stone 12"-18"TN50$ -$ -
C408Culvert Installation and Replacement 15" (Low Profile)LF20$ -$ -
C409Culvert End Section 15", Pair (Low Profile)EA1$ -$ -
C410Culvert Installation and Replacement 18" (Low Profile)LF20$ -$ -
C411Culvert End Section 18", Pair (Low Profile)EA1$ -$ -
C412Culvert Installation and Replacement 24" (Low Profile)LF20$ -$ -
C413Culvert End Section 24", Pair (Low Profile)EA1$ -$ -
C414Culvert Installation and Replacement 30" (Low Profile)LF20$ -$ -
C415Culvert End Section 30", Pair (Low Profile)EA1$ -$ -
C416Culvert Installation and Replacement 36" (Low Profile)20$ -$ -
C417Culvert End Section 36", Pair (Low Profile)EA1$ -$ -
C418Road Boring-2" CasingLF100$ -$ -
C419Road Boring-4" CasingLF100$ -$ -
C420Road Boring-6" CasingLF100$ -$ -
C421Asphalt Paving and PatchingSY2000$ -$ -
C422Scarifying and Reshaping Base CourseSY2000$ -$ -
C423Bituminous Tack CoatSY1000$ -$ -
C424Bituminous Prime CoatSY2000$ -$ -
C425Asphalt Seal CoatingSY2000$ -$ -
C426Sealing Joints and CracksLF2000$ -$ -
C427Painting/Marking Traffic ControlLF5000$ -$ -
C4284" Concrete SlabSF1000$ -$ -
C4294" Concrete Slab with FootingsSF1000$ -$ -
C4306" Concrete SlabSF1000$ -$ -
C4316" Concrete Slab with FootingsSF1000$ -$ -
C432Concrete CurbLF500$ -$ -
C433Concrete Curb, 24" Curb and GutterLF200$ -$ -
C434Road Shoulder MaintenanceLF5000$ -$ -

Total Section C Option Year 4 $ - 0

CLIN #Section D PlumbingU/MEstimated QuantityUnit PriceEstimated Price
Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Work Statement Technical Provisions for the period 15 December 2020 or date of award, whichever is later, through 14 December 2021.
D401Water Hydrants on 6"x6" PostEA30$ -$ -
D402Water Valve 3/4"-2"EA20$ -$ -
D403Water Valve 2 1/2"-4"EA20$ -$ -
D404Water Line Installation/Repair 3/4"-2"LF250$ -$ -
D405Water Line Installation/Repair 3/4"-2" in RockLF100$ -$ -
D406Water Line Installation/Repair 2 1/2"-4"LF250$ -$ -
D407Water Line Installation/Repair 2 1/2"-4" in RockLF100$ -$ -
D408Sewer Line Installation/Repair - 4"LF200$ -$ -
D409Sewer Line Installation/Repair - 4" in RockLF100$ -$ -
D410Commode ReplacementEA5$ -$ -
D411Urinal ReplacementEA5$ -$ -
D412Lavatory ReplacementEA5$ -$ -
D413Water Heater ReplacementEA10$ -$ -

Total Section D Option Year 4 $ - 0

CLIN #Section E Civil Engineering ServicesU/MEstimated QuantityUnit PriceEstimated Price