W45VAK61419915 088910

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Unrestricted Procurement for Houston Ship Channel, Texas in Chambers County, Texas, Houston Ship Channel at Bayport Flare, Oyster Mitigation is hereby amended as follow s:

Continued on Page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W9126G17B0013

X 9B. DATED (SEE ITEM 11)

14-Jul-2017

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

2000 FORT POINT ROAD

GALVESTON TX 77550-1229

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

M3ODXMAN

Text Box

M3ODXMAN

Text Box 05-Sep-2017

W9126G17B0013

A0004-2

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. The specifications for Solicitation No. W9126G17B0013, Houston Ship Channel, Texas, Houston Ship Channel at Bayport Flare in Chambers County, Texas, Oyster Mitigation, are hereby amended as follows:

THE PROPOSAL DUE DATE IS HEREBY RESCHEDULED FOR 15 SEP 2017 AT 2:00 P.M.

CDT.

a) Specifications.

(1) SECTION 00 21 00, INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS –

The enclosed SECTION 00 21 00, entitled INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS, supersedes that issued with this Solicitation.

(2) SECTION 35 32 16.10 45, REEF PAD CONSTRUCTION – The enclosed SECTION 35 32

16.10 45, entitled REEF PAD CONSTRUCTION, supersedes that issued with this Solicitation

b) Drawings.

(1) DRAWING C-102 – Edits:

(a) Delete text “NOTE: SHOULD THE AVERAGE SETTLEMENT EXPERIENCED

DURING CONSTRUCTION EXCEED 9-INCHES, IMMEDIATELY NOTIFY

THE GOVERNMENT. THE GOVERNMENT WILL EVALUATE THE

CONDITIONS AND MAKE A DETERMINATION OF HOW TO PROCEED.”

(b) Delete text “NOTE: CONTRACTOR SHALL ASSUME AVERAGE

SETTLEMENTS OF APPROXIMATELY 9 INCHES DURING PLACEMENT

OF REEF PAD MATERIAL” and the associated dimension.

(2) DRAWING G-101 – Edit:

Drawing G-101 delete line from Index of Drawings Table referencing DRAWING

NOS. C-301 – C-306, REEF CROSS SECTIONS.

(3) DRAWING NOS. C-301 – C-306, REEF CROSS SECTIONS – Delete DRAWING NOS. C-

301 – C-306, REEF CROSS SECTIONS.

2. This amendment shall be attached to and become a part of the solicitation.

2 Encls.

1. SECTION 00 21 00, INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

2. SECTION 35 32 16.10 45, REEF PAD CONSTRUCTION

SWG FILE NO.:HSC 401-554 SOLICITATION NO.:W9126G17B0013

Section 00 21 00 - Page 1

(TO ACCOMPANY AMENDMENT NO. 0004 TO SOLICITATION NO. W9126G17B0013)

Section 00 21 00 - Instructions, Conditions and Notices to Offerors

1.1 ESTIMATED CONSTRUCTION PRICE RANGE (APR 1985) (FAR 36.204)

The estimated price range of the proposed construction is between $1,000,000 and $5,000,000.

1.2 AVAILABILITY OF PLANS AND SPECIFICATIONS ON THE FEDERAL BUSINESS

OPPORTUNITIES WEBSITE ((FBO)

After solicitation issuance, contractors may register to be placed on a plan holders list, view and/or download this solicitation and all amendments at the following internet addresses:

http://www.fbo.gov/

Plans and specifications will not be available in paper format or on compact disc. It is the offeror’s responsibility to monitor the FBO website daily (using the above links) for amendments to the solicitation. You must be registered in the System for Award Management (SAM) to receive a government contract award. You may register with SAM at https://www.sam.gov

1.3 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (18 MAR 2013) (UAI

31.105-100)

In accordance with FAR 31.105(d)(2)(i)(b), equipment ownership and operating cost shall be determined using EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule.

1.4 PREAWARD INFORMATION CONSTRUCTION (CESWG-CT)

The apparent Low bidder shall, upon request of the Contracting Officer, furnish a statement within 2 working days after Bid Opening, of whether he is now or has ever been engaged in any work similar to that covered by the specifications herein, the dollar value thereof, the year in which such work was performed, and the manner of its execution, and giving such information as will tend to show the bidder's ability to prosecute the required work.

The "such other information" referred to above shall include but is not limited to the following:

(a) The name and address of the office or firm under which such similar work was performed.

(b) A list of key personnel available for the instant project and their qualifications.

(c) A copy of bidder's last year's financial statement, including the names of banks or other financial institutions with which the bidder conducts business. Such statement will be confidential.

(d) Business Financial Condition Evaluation. The evaluation factors listed below shall be prepared by the contractor's certified public accountant.

(1) Liquidity

- Current Ratio __________________

- Quick Ratio __________________

(2) Leverage -Debit/Net Worth __________________

(3) Operating Efficiency

Section 00 21 00 - Page 2

- Return On Assets __________________

- Asset Turnover __________________

(4) Profitability

- % Return On Equity __________________

- % Return On Sales __________________

(e) A list of present commitments, including the dollar value thereof, and name of office under which the work is being performed.

(f) If bidder is a Large Business, a Sub-Contracting Plan, if required, must be submitted within 2 working days after Bid Opening.

1.5 BIDDER'S QUALIFICATIONS (CESWG-CT)

Before a bid is considered for award, the bidder may be requested by the Government to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial resources, and plant available to be used in performing the work.

1.6 CAUTIONS & REMINDERS TO BIDDERS (CESWG-CT)

All information required by the terms of the Invitation must be furnished.

MISTAKES OR OMISSIONS CAN BE COSTLY. Important items for you to check are included in but not limited to, those listed below. This checklist is furnished only to assist you in submitting a proper bid. Check as you read.

Have you acknowledged all amendments?

Have you completed SECTION 00 45 00, REPRESENTATIONS &

CERTIFICATIONS portion of the bid package?

Is your bid properly signed?

If a bid guarantee is required, is it included with your bid? (A late bid guarantee is treated the same as a late bid).

Is your bid guarantee in the proper amount? Bid guarantee shall be in the amount of 20 percent of the amount of the bid, or $3 million, whichever is less.

If your bid guarantee is in the form of a bid bond, is the bond properly signed by both the bidder and surety and are all required seals affixed?

Is the name in which you submitted the bid the same on your bid as on your bid bond?

If required have you entered a unit price for each bid item?

(The Invitation will specifically state when this is necessary).

Are decimals in unit prices in the proper places? Are your figures legible?

Are the extensions of your unit prices, and your total bid price correct?

Are all erasures or corrections initialed by the person signing the bid?

I have not restricted my bid by altering the provisions of the Invitation.

Is the envelope containing your bid properly identified that it is a sealed bid and does it contain the correct invitation number and bid opening time?

Will your bid arrive on time? Late hand-carried bids will not be considered. Late mailed bids may be considered if sent by Registered or Certified Mail; if late receipt was due to delay in

Section 00 21 00 - Page 3 mails, or if specific requirements have been met. (See the portion of the Invitation pertaining to "Late Bids and Modifications or Withdrawals").

REMINDER TO BIDDERS

REMINDER #1 - Acknowledge all Amendments on the reverse side of SF 1442, Item 19, Solicitation, Offer, and Award.

REMINDER #2 - The Contracting Officer signing this contract is the Primary Contracting Officer. However, any Contracting Officer assigned to the Galveston District/Fort Worth District may take formal action. See Section entitled "Specific Project Requirements".

1.7 SPECIAL INSTRUCTIONS PERTAINING TO ELECTRONIC BID SUBMISSION:

Bids and a copy of the SF24 Bid Bond must be delivered via the AMRDEC website, not later than the due date and time indicated on this amendment.

No hand carried bids or amendments to bids will be accepted.

Original copies of the Bid Bond shall be submitted to USACE, Galveston District, ATTN: Lucille Smith, 2000 Fort Point Road, Galveston, Texas 77550- 1229 (2) calendar days after the bid due date.

SENDING FILES:

The AMRDEC SAFE application can be accessed via https://safe.amrdec.army.mil/safe.

• Proceed as Guest - Select this option if you do not have a CAC.

After selecting one of the options above, the page will be redirected to the package upload form. Fill in all the required input fields:

• Your Name - Your name;

• Your Email address - Your email address;

• Confirm Your Email Address - Re-enter your email address;

• Description of File(s) - Enter a description for the package; including solicitation number and bid opening date/time.

• File(s) - Click the "Browse" button to select your file(s). You may add up to 25 files per package, so long as the total file size does not exceed 2GB;

• Deletion Date - Select a date for the package to be deleted from SAFE.

The maximum (which is also the default) is two weeks (14 days) from today;

• Provide an email address to give access to - Enter ALL of the following email addresses here and click "Add"”

• curtis.cole@usace.army.mil

• maria.e.rodriguez@usace.army.mil

• lucille.r.smith@usace.army.mil mailto:curtis.cole@usace.army.mil mailto:maria.e.rodriguez@usace.army.mil mailto:lucille.r.smith@usace.army.mil

Section 00 21 00 - Page 4

• traci.d.robicheaux@usace.army.mil

• Grant access to these people - This is the list of people you have granted access to the package. To remove a recipient, highlight their name and click the "Remove" button;

• Caveats - Default is "None";

• Encrypt email message when possible - Attempt to encrypt the package's notification email to each recipient;

• Notify me when files are downloaded - You (the sender) will receive a notification via email when a recipient downloads the package;

• Require CAC for pickup – Require the recipient to be logged in with a valid US DoD-issued CAC to download the file(s). Recipients without a CAC will not be able to download the package.

Clicking the "Submit" button will upload the files and submit the package.

Guest users will need to check their email to verify their email address before the recipients will be notified.

Special Instructions Pertaining to Hand-Carried Bids/Offers is superseded by Special Instructions Pertaining to Electronic Bid Submission via electric commerce as stated above.

1.8 BIDDER INQUIRY – PROJNET

1. Prospective Offerors should submit questions concerning this solicitation via Bidder Inquiry in ProjNet at www.projnet.org/projnet .

A. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into the system. To self-register, go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your email address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

***Please Note: Offerors shall only submit one question per inquiry.

Inquiries containing multiple questions may be rejected.

B. From this page, you may view all bidder inquiries or add inquiry.

C. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

D. The Solicitation Number is: W9126G-17-B-0013

The Bidder Inquiry Key is: GTJ32H-R3TTZ8

2. The Bidder Inquiry System will be unavailable for new inquires fifteen

(15) calendar days prior to offer submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.

mailto:traci.d.robicheaux@usace.army.mil http://www.projnet.org/projnet

Section 00 21 00 - Page 5

3. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

4. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

5. Offers will be publicly opened at the date/time stated in the solicitation.

1.9 DAVIS-BACON ACT (CESWG-CT)

Paragraph entitled DAVIS-BACON ACT of (CONTRACT CLAUSES - Section 00 72 00, FAR 52.222-6) is applicable to this solicitation. Wage Rates will be incorporated by amendment, if they are not included in this solicitation.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2016 52.204-18 Commercial and Government Entity Code

Maintenance

JUL 2016

52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and

Withdrawals of Bids

NOV 1999

52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-

Construction

AUG 1996

52.214-34 Submission Of Offers In The English Language

APR 1991

52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.217-5 Evaluation Of Options JUL 1990 52.232-14 Notice Of Availability Of Progress

Payments Exclusively For Small Business Concerns

APR 1984

52.232-38 Submission of Electronic Funds Transfer Information with Offer

JUL 2013

CLAUSES INCORPORATED BY FULL TEXT

52.214-15 PERIOD FOR ACCEPTANCE OF BIDS (APR 1984)

In compliance with the solicitation, the bidder agrees, if this bid is accepted within 60 calendar days from the date specified in the solicitation for receipt of bids, to furnish any or all items upon which prices are bid at the price set opposite each item, delivered at the designated point(s), within the time specified in the Schedule.

Section 00 21 00 - Page 6

(End of clause)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed Price contract resulting from this solicitation.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

Chambers County 27.4%

6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of

Section 00 21 00 - Page 7

$10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Non-SMSA Chambers County, Texas.

52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY

2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at

FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR

Section 00 21 00 - Page 8

52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from the Contracting Officer, US Army Corps of Engineers, Fort Worth District, PO Box 1229, Galveston, Texas 77553-1229, submitting the protest at SWF-protest@usace.army.mil .

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Name: Mr. Brandon Smolinsky Address: US Army Corps of Engineers, Houston Resident Office, 2000 Fort Point Road, Galveston, Texas 77553-1229 Telephone: 409-766-3103 mailto:SWF-protest@usace.army.mil mailto:SWF-protest@usace.army.mil

Section 00 21 00 - Page 9

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text.

Upon request, the Contracting Officer will make their full text available.

The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.

In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/ http://farsite.hill.af.mil/

SWG FILE NO.:HSC 401-554 SOLICITATION NO.: W9126G17B0013

SECTION TABLE OF CONTENTS

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 32 16.10 45

REEF PAD CONSTRUCTION

PART 1 GENERAL

1.1 SUMMARY

1.2 MEASUREMENT AND PAYMENT

1.3 ORDER OF WORK

1.4 REFERENCES

1.5 SUBMITTALS

1.6 QUALITY CONTROL

1.6.1 General

1.6.2 Sources

1.6.3 Quality Testing

1.6.4 Gradation Testing

1.6.5 Quarry Operations

1.6.6 Daily Records

1.6.6.1 Barge Placement Measurements

1.6.6.2 Fore and Aft Displacements

1.6.6.3 Barge Displacement Tables

1.6.6.4 Repairs and Additions

1.6.6.5 Determination of Weights

PART 2 PRODUCTS

2.1 REEF PAD MATERIAL

2.1.1 Material Options

2.1.2 Crushed Limestone

2.1.3 Crushed Concrete

2.1.4 River Rock

2.1.5 Gradation

2.1.6 Inspection

2.2 REEF PAD FOUNDATION MATERIAL

PART 3 EXECUTION

3.1 CONSTRUCTION METHODS AND EQUIPMENT

3.2 PREPARATION

3.2.1 Base Preparation

3.2.2 Pre-Construction Hazard Survey

3.3 REEF PAD CONSTRUCTION

3.3.1 Material Placement

3.3.2 Misplaced Materials

3.3.3 Surveys

3.4 ACCEPTANCE

3.5 CORRECTIVE ACTIONS

-- End of Section Table of Contents --

SECTION 35 32 16.10 45 Page 1

35 32 16.10 45

REEF PAD CONSTRUCTION

AMENDMENT NO. 0004

PART 1 GENERAL

1.1 SUMMARY

The work includes furnishing materials, labor, and equipment for construction of reef pad (oyster reef) in accordance with these specifications and applicable drawings.

1.2 MEASUREMENT AND PAYMENT

Measurement and payment for reef pad construction will be paid for in accordance with provisions of SECTION 01 22 00.10 MEASUREMENT AND PAYMENT.

1.3 ORDER OF WORK

The sequence of construction shall be determined by the Contractor except as stated within these specifications or on the drawings. Construction shall be continuous from start to finish with no appreciable shut-down periods.

1.4 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C127 (2015) Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Coarse Aggregate

ASTM C136/C136M (2014) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates

ASTM C535 (2016) Standard Test Method for Resistance to Degradation of Large-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine

ASTM C702/C702M (2011) Reducing Samples of Aggregate to Testing Size

ASTM D75/D75M (2014) Standard Practice for Sampling Aggregates

ASTM D3740 (2012a) Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction

SECTION 35 32 16.10 45 Page 2

ASTM E329 (2014a) Standard Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction

Texas Department of Transportation (TxDOT)

TxDOT Item 247 Flexible Base

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with the SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Reef Pad Placement Plan Reef Pad Material Type (crushed limestone, crushed concrete, or river rock)

Prior to commencement of construction, submit a Reef Pad Placement Plan describing the planned sequence, placement method, material source, and surveying methodology for the work.

SD-06 Test Reports

Gradation Reef Pad Material Quality

SD-07 Certificates

Certificates of Compliance from testing laboratory attesting that the materials meet specification requirements.

Materials Testing Center Qualifications. Submit a copy of the documents, provided by the Materials Testing Center (MTC) at ERDC, that validates that the laboratory is qualified to perform the required tests. The individual tests shall be listed for which the validation covers along with the date of the inspection.

SD-11 Closeout Submittals

Pre-Construction Hazard Survey Final Survey Drawings

1.6 QUALITY CONTROL

1.6.1 General

All reef pad material shall be durable material as approved by the Contracting Officer. Reef pad material shall be of a suitable quality to ensure permanence in the structure and in the environment in which it is to be used. It shall be free from cracks, blast fractures, bedding, seams and other defects that would tend to increase its deterioration from natural causes. The reef pad material shall be clean and adequately free from all foreign matter. Any foreign material adhering to or combined with the reef

SECTION 35 32 16.10 45 Page 3 pad material as a result of stockpiling shall be removed prior to placement.

1.6.2 Sources

Before reef pad material is produced from a source for completion of the work, the source of reef pad material shall be approved by the Contracting Officer. Approval of a reef pad material source shall not be construed as a waiver of the right of the Government to require the Contractor to furnish reef pad material that complies as specified herein. Materials produced from localized areas, zones, or strata will be rejected when these materials do not comply as specified herein.

a. Source Documentation: Authorization of proposed reef pad material source will be based on prior test results and service records. The Contracting Officer may elect to use either past USACE test results or a combination of service records along with USACE approved test results from other agencies or private laboratories. A service record is considered acceptable if reef pad material from the proposed source has remained sound and functional after at least 10 years of exposure on a project similar to the one to be constructed under this contract.

b. Acceptance of Materials: During the contract period, both prior to and after materials are delivered to the job site, visual inspections and measurements of the reef pad material may be performed by the Contracting Officer. If the Contracting Officer, during the inspections, finds that the reef pad material quality, gradation or weights of reef pad material being furnished are not as specified or are questionable, re-sampling and re-testing by the Contractor shall be required. Sampling of the delivered reef pad material for re-testing and the manner in which the re-testing is to be performed shall be as directed by the Contracting Officer. This additional sampling and testing shall be performed at the Contractor's expense when test results indicate that the materials do not meet specified requirements. Any material rejected shall be removed or disposed of as specified and at the Contractor's expense.

1.6.3 Quality Testing

Contractor's quality assurance testing shall be performed by a qualified testing laboratory meeting the requirements of ASTM D3740 and ASTM E329, and qualified by USACE Materials Testing Center (MTC). At least 15 calendar days in advance of shipment of reef pad material to the work site, a copy of quality test results shall be furnished. Samples to be tested shall be selected by the Contractor, unless otherwise directed by the Government if present. The Government reserves the right to perform independent testing. Costs for this additional sampling and testing shall be at the Contractor's expense.

At least one set of quality tests shall be performed of reef pad material.

Periodic tests for specific gravity and gradation shall be performed by the Contractor for each 10,000 cubic yards of reef pad material shipped. Not less than 3 sets of specific gravity and gradation tests shall be performed for each reef pad material type. Sampling of the reef pad material shall be performed in accordance with ASTM D75/D75M and ASTM C702/C702M.

1.6.4 Gradation Testing

Perform a gradation test or tests on the reef pad material at the quarry.

Notify the Contracting Officer not less than 3 days in advance of each

SECTION 35 32 16.10 45 Page 4 test. At least one gradation test(s) shall be performed per 10,000 cubic yards of each size for each reef pad material type placed, but not less than 3 tests shall be performed for each reef pad material type. At least 15 calendar days in advance of shipment of reef pad material to the work site, a copy of initial gradation test results shall be furnished.

1.6.5 Quarry Operations

Conduct quarry operations in a manner to produce stone conforming to the requirements specified; this may involve selective quarrying, handling, processing, blending, and loading as necessary.

1.6.6 Daily Records

Contractor's daily activity reports shall include barge displacement measurements and associated calculations as documentation of the volume and/or tonnage of reef pad material placed each day. This information shall be provided for use by Contracting Officer and shall not serve as the basis for payment.

1.6.6.1 Barge Placement Measurements

The barge shall be gaged at an approved protected location near the site.

For this purpose each barge shall be fitted by the Contractor at its expense, with gages graduated either to inches or tenths of a foot, located either inside or outside of the hull as directed and attached solidly to the hull itself. These gages shall be located two near each end of the vessel on opposite sides and two additional gages amid ship if deemed necessary by the Contracting Officer. If located inside the hull, provision shall be made for the free passage of the outside water to a transparent tube placed or capable of being placed, in contact with the gage. If located outside upon wooden hulls, the gages shall be protected by solid fenders or recessed into the planking, or if upon steel hulls, the gage marks may be placed directly on the plates and identified by punch marks. Gages shall be placed so that their zeros are below water when the vessel is in its normal trim, light, and free from water. In lieu of the gages in the interior of the barge, the Contractor may at its discretion, provide an equal number of wells for determining the amount of the load.

These wells shall be located as specified for interior gages and shall be constructed as approved.

1.6.6.2 Fore and Aft Displacements

Fore and aft displacements, due to load, shall not differ more than 10 percent from their mean for the determination of tonnage of each barge load of stone ready for placement. In determining the tonnage of a cargo, the change in gage readings due to discharge of the cargo shall be used.

1.6.6.3 Barge Displacement Tables

The barges shall be fitted for the work sufficiently ahead of the time fixed for commencement to enable the Contracting Officer to measure them accurately before beginning work. The Contractor shall at its expense place barges in dry dock for measurement and furnish materials and facilities for taking the necessary measurements for preparing barge displacement tables. The Contractor shall pump the water from the barges when so requested but no pumping of a barge shall be done between the time it is gaged loaded and light to determine the amount of barge load.

SECTION 35 32 16.10 45 Page 5

1.6.6.4 Repairs and Additions

Repairs and additions made to the barges during the progress of the work shall be promptly reported to the Contracting Officer. During the progress of the work, when the Contracting Officer deems it advisable or necessary, each barge shall be re-measured at the expense of the Contractor and under the supervision of the Contracting Officer. No barge shall be used which is not in a seaworthy condition or which leaks excessively. The barges used shall be so constructed that when loaded they do not bend or warp so that the gages are unreliable. Each barge load shall contain only one type of material.

1.6.6.5 Determination of Weights

The gages shall be read in calm water conditions which will allow accurate determination of weights. Locations of the gage readings shall be approved in advance. To determine the load, measurements will be taken immediately before a barge starts for its point of unloading and immediately after it returns from that point. The gages will be read by the Contracting Officer and the Contractor is invited to be present when the readings are taken.

Disagreements on the part of the Contractor as to the weight of material will be submitted in writing within 10 days of their occurrence. To ensure the use of the proper weight of surrounding water in calculating the weight of material from the barge gage readings, hydrometer measurements will be made along side each barge when it is gaged loaded and light. Other methods of measurement may be used when approved.

PART 2 PRODUCTS

2.1 REEF PAD MATERIAL

2.1.1 Material Options

At Contractor's option, crushed limestone, concrete riprap (crushed concrete), or river rock may be utilized.

2.1.2 Crushed Limestone

Crushed limestone shall have a minimum unit weight of 140 PCF (AM#4), maximum unit weight of 165 PCF,and an absorption no greater than 3(AM#4)5 percent. The unit weight shall be reported based on the apparent specific gravity determined in accordance with ASTM C127. Crushed limestone shall have a maximum abrasion loss of 40 percent in accordance with ASTM C535.

2.1.3 Crushed Concrete

Concrete shall comply with the requirements of TxDOT Item 247 (Flexible Base), have a minimum unit weight of 140 pounds per cubic foot (based on apparent specific gravity), and comply with the gradation requirements stated below. If concrete is recycled, any rebar shall be cut flush with exposed surfaces of concrete unit. All concrete shall be clean and free of chemical contaminants. Provide test reports showing conformance of concrete riprap with TxDOT Item 247 requirements.

2.1.4 River Rock

River rock shall consist of natural fragments of rock and meet the requirements stated for crushed limestone.

SECTION 35 32 16.10 45 Page 6

2.1.5 Gradation

Reef pad material shall be well graded. The gradation shall conform to the table below when tested following the procedures stated in ASTM C136/C136M:

TABLE 1 - GRADATION REQUIREMENTS FOR REEF PAD

MATERIAL

SIEVE SIZE, INCH % PASSING

3 100

1/2 0-5

2.1.6 Inspection

The Government will conduct inspections as necessary, at its discretion.

2.2 REEF PAD FOUNDATION MATERIAL

Limited sampling and testing of foundation materials at the reef pad locations has been performed. Results of these are provided in the drawings. (AM#4)The core borings indicate soft foundation conditions.

Bidders are strongly advised to examine the boring data shown and visit the site to confirm site conditions prior to preparing their bid.

PART 3 EXECUTION

3.1 CONSTRUCTION METHODS AND EQUIPMENT

Contractor shall select materials, methods, and equipment to construct the reef pads within the specified locations and to the specified dimensions.

Contractor shall submit reef pad placement plan, sequence, and equipment for Government review prior to construction.

3.2 PREPARATION

3.2.1 Base Preparation

The surface to receive the reef pad material shall be free of debris and obstructions.

3.2.2 Pre-Construction Hazard Survey

Prior to commencing construction activities, a magnetometer survey shall be performed over the entire work area to search for uncharted pipelines and/or other anomalies below the existing bay bottom. Survey passes shall be no further apart than the spacing of hydrographic surveying transects shown on the drawings.

3.3 REEF PAD CONSTRUCTION

3.3.1 Material Placement

Reef pad material shall be placed within the limits indicated on the drawings. Reef pad material shall be placed, spread, and evenly distributed in such a manner that produces a relatively uniform surface within the limits specified on the drawings. Material shall be placed by

SECTION 35 32 16.10 45 Page 7 clamshell or other suitable equipment. Material shall be placed on the bay bottom.

3.3.2 Misplaced Materials

If any reef pad material is deposited elsewhere than in places designated or approved, Contractor shall remove such misplaced material and redeposit it where directed at his expense.

3.3.3 Surveys

a. General: Contractor shall provide initial and final hydrographic surveys, as described below, for measurement and acceptance of the reef pads. Plan-view and cross section plots showing initial and final lines and grades shall accompany monthly payment requisitions. Survey data shall also be provided in a digital format approved by the Contracting Officer. All survey shots shall be referenced to the project datums shown on the drawings. All survey plots submitted to the Contracting Officer shall bear the seal of a professional land surveyor registered in the State of Texas.

b. Survey Notification: The Contracting Officer shall be notified at least 3 days prior to all surveys performed by the Contractor so that he may have the opportunity to accompany the survey crew and observe the work.

c. Survey Transects: Required survey transect locations for the initial survey and final survey are shown on the drawings. Shot spacing along these transects shall not exceed 10 feet.

d. Transducer frequency: Transducer frequency shall be documented on survey drawings. Transducer frequency shall not vary between initial and final survey.

e. Initial Survey: Lines and grade of the reef pad subgrade shall be surveyed by Contractor and submitted to Contracting Officer prior to placement of reef pad material.

f. Daily Surveys: Daily surveys shall be performed to ensure Reef Pads are being constructed to the required dimensions as work progresses.

g. Final Survey: Upon completion of placement of reef pad material, lines and grades of the reef pad shall be surveyed to provide verification that reef pad was constructed as shown on the drawings. Final survey submittal shall include a complete set of final survey drawings showing the constructed condition of the entire project. Cross-section plots shall show grades from initial survey and final survey for verification that reef pad thickness (as measured above existing grade) requirements shown on drawings have been met.

3.4 ACCEPTANCE

Acceptance of reef pads shall be based on Government's review of survey data and compliance with the locations and dimensions specified on the drawings.

3.5 CORRECTIVE ACTIONS

Thickness of reef pad, as measured above existing grade as shown on the

SECTION 35 32 16.10 45 Page 8 drawings, shall comply with the minimum and maximum dimensions stated on the drawings. If thickness is less than the minimum thickness specified on the drawings, additional material shall be added (AM#4)at the Contractor's expense, and reef pad shall be re-surveyed. If thickness is greater than the maximum thickness specified on the drawings, material redistribution or removal shall be performed, as directed by Contracting Officer, to bring non-compliant portions of reef pad within specified thickness range, and reef pad shall be re-surveyed. No dragging or raking of reef pad shall be performed without prior approval by Contracting Officer.

-- End of Section --

SECTION 35 32 16.10 45 Page 9

SF-30_Amend-0004_W9126G17B0013
Amend 0004 page-2
00 21 00
Bids and a copy of the SF24 Bid Bond must be delivered via the AMRDEC website, not later than the due date and time indicated on this amendment. No hand carried bids or amendments to bids will be accepted.
curtis.cole@usace.army.mil
35 32 16.10 45
35 32 16.10 45 - REEF PAD CONSTRUCTION
35 32 16.10 45 - REEF PAD CONSTRUCTION
PART 1 GENERAL
1.1 SUMMARY
1.2 MEASUREMENT AND PAYMENT
1.3 ORDER OF WORK
1.4 REFERENCES
1.5 SUBMITTALS
1.6 QUALITY CONTROL
1.6.1 General
1.6.2 Sources
1.6.3 Quality Testing
1.6.4 Gradation Testing
1.6.5 Quarry Operations
1.6.6 Daily Records
1.6.6.1 Barge Placement Measurements
1.6.6.2 Fore and Aft Displacements
1.6.6.3 Barge Displacement Tables
1.6.6.4 Repairs and Additions
1.6.6.5 Determination of Weights
PART 2 PRODUCTS
2.1 REEF PAD MATERIAL
2.1.1 Material Options
2.1.2 Crushed Limestone
2.1.3 Crushed Concrete
2.1.4 River Rock
2.1.5 Gradation
2.1.6 Inspection

2.2 REEF PAD FOUNDATION MATERIAL

PART 3 EXECUTION
3.1 CONSTRUCTION METHODS AND EQUIPMENT
3.2 PREPARATION
3.2.1 Base Preparation
3.2.2 Pre-Construction Hazard Survey
3.3 REEF PAD CONSTRUCTION
3.3.1 Material Placement
3.3.2 Misplaced Materials
3.3.3 Surveys
3.4 ACCEPTANCE
3.5 CORRECTIVE ACTIONS