U.S. Army Corps of Engineers Fort Worth District is issuing the 2nd amendment for the solicitation W9126G-15-R-0066- Sam Rayburn Powerhouse Inverter/Battery System Replacement Sam Rayburn Reservoir TX. This incorporates additional drawing(s) and changes the solicitation point of contact.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to incorporate an additional Draw ing into the Solicitation documents and to change the Contracting POC in Section 00 21 00. See the follow ing pages for details and attachments for the Draw ing. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G-15-R-0066

X 9B. DATED (SEE ITEM 11)

28-Oct-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0002

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Nov-2015

CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAYLOR ST, RM 2A17

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9126G-15-R-0066

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION SF30 - CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 11 00 - STANDARD FORM (SF) 1442 AND CLIN SCHEDULE

The Issued By organization has changed from

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A17

FORT WORTH TX 76102-0300

to

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAYLOR ST, RM 2A17

FORT WORTH TX 76102-0300

SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

The following have been added by full text:

INSTRUCT TO OFFERER- AMND 02

SECTION 00 21 00

INSTRUCTIONS TO OFFERORS

<Amend 02>

1. The offeror shall submit an offer for the furnishing of all labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract to include all attachments thereto.

2. The Government intends to evaluate proposals and award without discussions. The Government reserves the right to conduct discussions if the Contracting Officer determines them to be necessary.

3. MAGNITUDE OF PROJECT: Between $500,000 and $1,000,000.

4. PROPOSAL EXPENSE AND PREAWARD COSTS: The Government will not pay any costs incurred in the preparation and submission of the initial and/or any subsequent proposals.

5. PERIOD OF PERFORMANCE: 180 Days from date of Notice to Proceed

6. INQUIRIES

a. General question or comments relative to these documents should be submitted via e-mail to:

<Amend 02> Elizabeth Kelley Email: Elizabeth.J.Kelley2@usace.army.mil Phone: 817-886-1044

b. Bidder Inquiry: Technical questions relating to proposal procedures or bonds are to be submitted via ProjNet at www.projnet.org/projnet.

c. The Bidder Inquiry Key is: ECBKVM – A444JP The Project ID/Number is: 404744 / Title: Sam Rayburn Powerhouse Inverter/Battery System Replacement

d. To submit and review bid inquiry items, bidders will need to be a current registered user or self register into the system. To self-register, go to the aforementioned web page and click on the BID tab. Select Bidder

Inquiry, select agency USACE, enter the Bidder Inquiry Key for this solicitation, your email address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click “continue.”

*** Please Note: Offerors shall only submit one question per inquiry. Inquiries containing multiple questions may be rejected.

e. From this page, you may view all bidder inquiries or add an inquiry.

Include the solicitation number, project title and location of project with your questions. Note that due to the highly constricted schedule and firm contract award dates for this requirement, inquiries MUST be received by this office not later than 5 business days prior to the proposal due date.

f. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

g. The Bidder Inquiry System will be unavailable for new inquires 5 business days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.

h. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

i. The call center operates weekdays from 8 A.M. to 5 P.M. U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

7. PROVISIONS

52.225-10 Notice of Buy American Act Requirement—Construction Materials (Feb 2009) - by reference

FAR 52.228-1 Bid Guarantee (Sep 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds --

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3M whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

IMPORTANT NOTES:

When the penal sum is expressed as a percentage, a maximum dollar limitation may be stated.

If there are option line items on the CLIN Schedule, the term "bid price" is hereby defined as the total bid not to include any amount for line items designated as "options".

Standard Form (SF) 24 shall be used for the bid bond.

Corporate sureties utilized must appear on the list contained in the Department of Treasury Circular 570 titled "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and Acceptable Reinsuring Companies."

<Amend 01> 52.236-27 SITE VISIT- Alternate I (Feb 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit is scheduled for:

Date: 5 November 2015

Time: 08:00am

Location: Sam Rayburn Lake Office

7696 RR 255 West

Jasper, TX 75951

NOTE: All participants must submit the following information to Robin.G.Prince@usace.army.mil :

1) Name of Firm/Company (Prime and any Sub-contractors)

2) Number and Names (first and last) of individuals who will be attending the Site Visit

This information must be submitted to the above email address no later than 4:00PM on 4 November 2015.

(c) Participants will meet at the Sam Rayburn Lake Office site for a meeting then will travel to the site.

POC – Thomas Webb Program Manager – Kenneth Carnley

USACE - OD-PW-SR USACE – CESWF-OD-TM

(409) 384-5292 Office (817) 886-1456 Office 7696 RR 255 W 819 Taylor St.

Jasper, TX 75951 Ft. Worth, TX 76102

IMPORTANT NOTES: (1) Remarks and explanations addressed during the conference shall not qualify or alter terms and conditions of this RFP. (2) The terms and conditions of the solicitation remain unchanged unless the solicitation is formally amended in writing.

52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address: http://farsite.hill.af.mil

52.216-1 Type of Contract (APR 1984)

The Government contemplates award of a Firm-Fixed Price Contract resulting from this solicitation.

The following have been deleted:

INSTRUCT TO OFFERER - AMND 01

INSTRUCTIONS TO OFFEROR

(End of Summary of Changes)

CHKDDRAWNDESCRIPTIONREV

SCALE

DRAWN

CHECKED

SUBMITTED

APPROVED

DRAWING NUMBER

FILE NAME SHEET NUMBER

UNITED STATES DEPARTMENT OF ENERGY

SOUTHWESTERN POWER ADMINISTRATION

TULSA, OKLAHOMA

Reference Old drawing number:

B o r d e r n a m e

S iz e

A

A S

L x

135-33-E572.1

SAM RAYBURN DAM

CABLE TRAY SYSTEM

TURBINE ROOM

N.T.S.

ADDED TWO CABLE TRAYS,

BARRIERS & DROPOUTS AT U/S WALL

05/63

05/63

L a s t

E d it e d

:1

:5

L s t

F il e

N m e

P e g a s u s

D r a w in g s

D a m

F a c il it ie s

S a m

R a y b u r n

B F

B r e a k e r

R e p la c e m e n t

S c o t t

H o ll a n d

E .1 .d w g b r ia n .j o h n s o n

G

2 3 4 5 6 7 8 9 10 11

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

G

F

E

D

C

B

A

10 11

DATED:

INV. NO.

SHEET NO.

SEQUENCE

NO.

CHECKED BY:

DESIGNED BY:

DRAWN BY:

U.S. ARMY ENGINEER DISTRICT, FORT WORTH

CORPS OF ENGINEERS

FORT WORTH, TEXAS

SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION

MICROSTATION DRAWING FILE:

REFERENCE DRAWINGS:

SAM RAYBURN DAM AND RESERVOIR

ANGELINA RIVER, TEXAS

DX-72 RECORDER & STATION

SWITCHBOARD

PANEL-4F-WIRING DIAGRAM

sana11f688.dgn

2JUN98 FINAL AS-BUILT

8AUG99 TRANSFERED TO CADD

NA11F688

HAB/AS

11f688

FOR INFORMATION ONLY

2 3 4 5 6 7 8 9 10 11

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

G

F

E

D

C

B

A

10 11

DATED:

INV. NO.

SHEET NO.

SEQUENCE

NO.

CHECKED BY:

DESIGNED BY:

DRAWN BY:

U.S. ARMY ENGINEER DISTRICT, FORT WORTH

CORPS OF ENGINEERS

FORT WORTH, TEXAS

SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION

MICROSTATION DRAWING FILE:

REFERENCE DRAWINGS:

SAM RAYBURN DAM AND RESERVOIR

ANGELINA RIVER, TEXAS

DX-72 RECORDER & STATION

SWITCHBOARD

PANEL -5F-WIRING DIAGRAM

sana11f689.dgn

HAB/A.S.

2JUN98 FINAL AS-BUILT

8AUG99

NA11F689

TRANSFERED TO CADD

11f689

NOTE:

ALL PANEL WIRING SHALL BE NEMA

ITEM NO.8, DESIGNATION TA, NO.12

AWG. SIZE, EXCEPT AS NOTED.

HINGE WIRE SHALL BE 1NEMA ITEM 9

DESIGNATION TA, NO.12 AWG SIZE.

FINAL AS-BUILT 2 JUNE 1998

G

2 3 4 5 6 7 8 9 10 11

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

G

F

E

D

C

B

A

10 11

DATED:

INV. NO.

SHEET NO.

SEQUENCE

NO.

CHECKED BY:

DESIGNED BY:

DRAWN BY:

U.S. ARMY ENGINEER DISTRICT, FORT WORTH

CORPS OF ENGINEERS

FORT WORTH, TEXAS

SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION

MICROSTATION DRAWING FILE:

REFERENCE DRAWINGS:

SAM RAYBURN DAM AND RESERVOIR

ANGELINA RIVER, TEXAS

KRW

NA-11-F-690-5

DX-72 RECORDER & STATION SWITCHBOARD

PANEL 6F-WIRING DIAGRAM

srna11f690

11F690

NOTE: 1/4 "X2" COPPER-MAIN BUS & RISERS

1/8 "X7/8" COPPER-EH BKR.CONN.

1/4 "X1" COPPER-EH BKR.CROSS STRAP

ALL PANEL WIRING SHALL BE NEMA

ITEM NO.8, DESIGNATION TA, NO.12

AWG SIZE EXCEPT AS NOTED

KRW

WESTINGHOUSE

DX-72 RECORDER & STATION SWITCHBOARD

PANAL 4R WIRING DIAGRAM

NOTE:

ALL PANEL WIRING SHALL BE NEMA

ITEM NO.8, DESIGNATION TA, NO.12 AWG

SIZE, EXCEPT AS NOTED.

NOTE: 1/4 "X2" COPPER-MAIN BUS & RISERS

1/8 "X7/8" COPPER-EH BKR.CONN.

1/4 "X1" COPPER-EH BKR.CROSS-STRAP

1/8 "X1" COPPER-JA BKR.CONN.

G

2 3 4 5 6 7 8 9 10 11

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

G

F

E

D

C

B

A

10 11

DATED:

INV. NO.

SHEET NO.

SEQUENCE

NO.

CHECKED BY:

DESIGNED BY:

DRAWN BY:

U.S. ARMY ENGINEER DISTRICT, FORT WORTH

CORPS OF ENGINEERS

FORT WORTH, TEXAS

SYM. D.O. NO. ACTION DATE

DATEONNO.H, TEXASR DISTRICT, FORT WORTH

MICROSTATION DRAWING FILE:

REFERENCE DRAWINGS:

SAM RAYBURN DAM AND RESERVOIR

ANGELINA RIVER, TEXAS

srna11f694.dgn

11F694

NA11F695

1/8 "X7/8" COPPER-EH BKR.CONNECTION

1/4 "X1" COPPER-EH BKR.CROSS-STRAP

ALL PANEL WIRING SHALL BE NEMA

ITEM NO.8, DESIGNATION TA, NO.12

AWG SIZE, EXCEPT AS NOTED

WESTINGHOUSE

KRW

DX-72 RECORDER & STATION SWITCH BOARD

PANEL 5R-WIRING DIAGRAM

FINAL AS-BUILT 2 JUNE 1998

G

2 3 4 5 6 7 8 9 10 11

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

G

F

E

D

C

B

A

10 11

DATED:

INV. NO.

SHEET NO.

SEQUENCE

NO.

CHECKED BY:

DESIGNED BY:

DRAWN BY:

U.S. ARMY ENGINEER DISTRICT, FORT WORTH

CORPS OF ENGINEERS

FORT WORTH, TEXAS

SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION

MICROSTATION DRAWING FILE:

REFERENCE DRAWINGS:

SAM RAYBURN DAM AND RESERVOIR

ANGELINA RIVER, TEXAS

srna11f695.dgn

11f695

1/8 "X7/8" COPPER-EH BKR.CONN.

1/4 "X1" COPPER-EH BKR.CROSS STRAP

ALL PANEL WIRING SHALL BE NEMA

ITEM NO.8, DESIGNATION TA, NO.12

AWG SIZE EXCEPT AS NOTED

KRW

WESTINGHOUSE

DX-72 RECORDER & STATION SWITCHBOARD

PANAL 6R WIRING DIAGRAM

FINAL AS-BUILT 2 JUNE 1998

G

2 3 4 5 6 7 8 9 10 11

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

G

F

E

D

C

B

A

10 11

DATED:

INV. NO.

SHEET NO.

SEQUENCE

NO.

CHECKED BY:

DESIGNED BY:

DRAWN BY:

U.S. ARMY ENGINEER DISTRICT, FORT WORTH

CORPS OF ENGINEERS

FORT WORTH, TEXAS

SYM.

SYM. WORTH, TEXASR DISTRICT, FORT WORTH

SAM RAYBURN DAM AND RESERVOIR

ANGELINA RIVER, TEXAS

11F696 srna11f696.dgn

2-3-00 ADDED TO CADD DGN FILE

O

T E

D O

N O

T S

P L

C E

W I R

E S

1 2 3 4 5 6 7 8 9

T T

R

NA-11-F-697

C O

N T

D

O N

P N

L

R

D W

G N

A F

T L

1 2 3 4 5 6 7 8 9

L

L

L

L

L

L

L

L

L

R

R

R

R

R

L

B P

L

B N

A

T

A

T T

N A

A

R

R

R

R

CUST. ORD. NO. DS-41-443 CIV ENG-64-140

3MAR.00 ENTERED INTO CADD

WESTINGHOUSE

srna11f697.dgn

G

2 3 4 5 6 7 8 9 10 11

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

G

F

E

D

C

B

A

10 11

DATED:

INV. NO.

SHEET NO.

SEQUENCE

NO.

CHECKED BY:

DESIGNED BY:

DRAWN BY:

U.S. ARMY ENGINEER DISTRICT, FORT WORTH

CORPS OF ENGINEERS

FORT WORTH, TEXAS

SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION

MICROSTATION DRAWING FILE:

REFERENCE DRAWINGS:

SAM RAYBURN DAM AND RESERVOIR

ANGELINA RIVER, TEXAS

C.M.BLANTON

3MAR.00

DX-72 RECORDER & STATION SWITCHBOARD

PANEL 7R - WIRING DIAGRAM

X

Y

Y

X

E F

X

E F

Y

Y

Y

X

Y

X

Y

X

Y

Y

Y

X

X

X

X Y

Y

556633

S U

P Y

-C H

G

S U

P Y

-C H

G

E

V

V

A C

T U

A T

O R

C A

B

U N

I T

C L

O C

K

U N

IT

R

E G

U L

A T

O R

C A

B

IN

E T

R

F O

R E

X H

A U

S T

F A

N S

5 5

X Y

X

Y

6 6

6 6

C O

N T

R O

L R

M

C L

O C

K R

E C

E P

T

S U

P E

R

IN

T E

N D

O F

F

IC

E C

L O

C K

M A

IN

T

E N

A N

C E

S H

H O

P C

L O

C K

T U

R B

IN

E

R M

A N

D G

E N

W A

L L

C L

O C

K S

P .B

O

N C

O N

S O

L E

V I A

C O

N T

T

R A

N S

F

V

V

V

V

V

S S

P

S S

1 1

A

A N

N U

N

R E

L A

Y

C A

B

IN

E T

P A

N E

L

F P

A N

E L

R

P A

N E

L

F P

A N

E L

R

X

-1

Y

-1

X

-1

Y

-1

X

Y

A S

X -2

A S

Y -2

X

Y

X

Y

T L

T

T L

T

H L

T

H L

T

X

-1

Y

X

Y

S S

P

S S

M A

IN

C

O N

T R

.P N

L

F

C L

O C

K

D W

G .N

A F

G N

G N

-8

G

G

G

G

G

G

G

G

G

G

S S

P

S S

G

G

P A

N E

L

R

R .V

V

O

E S

S E

N T

I A

L A

,C

D I S

T R

I B

U T

I O

N

B K

R

P

A

U N

I T

T E

M P

R

E C

P

A

U N

I T

T E

M P

R

E C

X Y

S S

P

S S

P

X

L

Y

L

X

-T L

Y

-T L

P

A

S T

A T

IO

N

L O

A D

R E

C

P A

T E

L E

P H

O N

E

B A

T T

E

L I M

P

A

D I E

S E

L G

E N

B A

T T

C

H A

R G

E R

X

-T L

Y

-T L

V

V

T E

L B

A T

T

E L

IM

D I E

S E

L G

E N

B A

T T

C

H A

R G

E R

X 4 Y

Y

X

T L

S

S P

T L

S

S

L

S

S P

L

S

S

S

S P

S

S

H L

T

-T L

H L

T

-T L

P

A

H E

A D

W A

T E

R

L E

V E

L I

N D

I C

X

Y

P

A

C O

D E

C A

L L

E Q

U

IP

T

V

C O

D E

C A

L L

E Q

U

IP

T

P

A

A U

T O

S

Y N

C H

S P

E E

D M

A T

C H

E R

A S

X -T

L

A S

Y -T

L

R

R

V

P

A

U N

I T

S E

L S

Y N

S

V

A C

M A

I N

B U

S M

A I N

C O

N T

R

B D

P

N L

.8 F

S

E L

S Y

N

D W

G

N A

F

B K

R

P

A

U N

I T

S E

L S

Y N

S

R

R

V

M

A I N

C O

N T

R

B .D

P

N L

F

S

E L

S N

D W

G .N

A F

X Y

X Y

X Y

S S

P

B K

R

P

A

U N

I T

F L

O W

R E

C

S S

X

Y

P

A

U N

I T

F L

O W

R E

C

X T

L

Y T

L

P

A

V O

L T

A

R

C O

R D

E R

X T

L

Y T

L

P

A

R E

G U

L A

T O

R C

A B

E X

H A

U S

T F

A N

S

E F

Y -7

L

E F

X -7

L

P

A

T A

L L

W A

T E

R

L E

V E

L I

N D

I C

T L

T T

L

T L

T T

L

S

S P

S

S

S

S P

S

S

P

A

R A

D

IO

X

Y V

R A

D I O

E Q

U I P

T

X

L

Y

L

P

A

S P

A R

E

P

A

S P

A R

E

P

A

U N

I T

D O

M E

L

IG

H T 2 V

X

Y

S S

P

S S

X Y

S S

P

B K

R

P

A

U N

I T

D O

M E

L

IG

H T

S S

X

Y

G

E N

D O

M E

L

IG

H T

G

E N

D O

M E

L

IG

H T

M A

IN

C

O N

T R

O L

B D

P N

L

F

D

W G

N A

F

M A

I N

C O

N T

R O

L B

D P

N L

B

F

D W

G N

A F

V

X Y

X Y V

S S

P

S S

B K

R

P

A

U N

I T

R O

T A

T

IO

N

S

IG

N A

L C

O U

P L

U N

I T

A C

T U

A T

O R

C A

B

V

X Y

P

A

U N

I T

R O

T A

T

IO

N

S

IG

N A

L C

O U

P L

U N

I T

A C

T U

A T

O R

C A

B

X Y

P

A

C L

O S

E D

C K

T T

V

+ G A

T

IN

E R

C O

M

S S

S S

P

/C

V

J A

P C

P

A

E N

T R

A N

C E

D O

O R

R E

L E

A S

E

P

A

J A

P C

R

W J

A P

C

L Y

L X

P

A

S P

A R

E

P

A

T E

L E

M E

T E

R

IN

G

E Q

U

IP

M E

N T

V

X

Y

L I N

E S

T E

L E

M E

T E

R

IN

G

C A

B

IN

E T

V

F O

R G

U L

F S

T A

T E

R T

U S

P

C O

M M

E R

C

IA

L

T E

L E

M E

T E

R

IN

G

E Q

U

IP

M E

N T

P

A

S T

A T

IO

N

C L

O C

K S

(M A

IN

C

O N

T

B O

A R

D A

N D

A C

T U

A T

O R

C A

B

X

L

Y

L

S

S P

S

S

X

L

Y

L

P

A

S T

A T

IO

N

C L

O C

K S

X

L

Y

L

S

S P

S

S

X Y

G

G

B K

R

P

A

E M

E R

G E

N C

Y

S U

P P

L Y

A .C

.B

G

G

S

S P

S

S

V

C O

M M

O N

D I S

T C

T R

V

IN

V E

R T

E R

S E

T G

E N

G

T

G T

G

T

G

T

E S

S E

N T

I A

L C

I R

C U

I T

E M

E R

G A

N D

N O

R M

A L

C O

N T

A C

T O

R S

G

T

G

G

G

T

G

E M

E R

M

E C

H

IN

T

L K

N

O R

M A

L

G

E

F

E

N

T -G

T G

T -G

T -G

T S

S P

T S

S

T -G

G T

E G

Y E

G X

E N

X E

N Y

G

G

G

G

G

G

G N

-8

G

B U

S

G

B U

S

G

G R

D B

U S

P A

N E

L

R

G

G

B U

S

C .T

/5

A

T -G

N

G

N -T

G N

-9

/0

C A

B L

E

C A

B L

E T

O L

E A

V E

T O

P P

N L

R

E N

T E

R T

O P

O F

F

N O

T E

E Q

U I P

T

L O

C A

T E

D O

R

A R

O F

P A

N E

L

M R

F A

S .0

R E

M O

V E

D

T R

A N

S F

T H

E R

M A

L R

E L

T R

A N

S F

T

H E

R M

A L

A

R F

A

R E

A

A

D D

E D

N E

W W

I R

E T

O G

A R

E A

B

M

A

R E

V

IS

IO

N

S M

A D

E

IN

A

C C

O R

D A

N C

E

W I T

H C

O I T

S

M A

R K

E D

C O

N

R E

S E

R V

E D

P E

R F

I E

L D

C H

A N

G E

M A

R K

E D

R U

C T

E

C O

N N

S

E T

B K

R W

H E

R E

A S

S H

O W

N

T A

L L

E D

E X

H A

U S

T F

A N

S

R E

G U

L A

T O

R C

A B

IN

E

T S

B

R E

A K

E R

A R

E A

U

S E

D

V

A C

P O

W E

R

1 2 3 4 5

C H

A N

G E

NA11F697

Rayburn - Battery Inverter - Reference Drawings.pdf
E503.1-OABSROW362.TIF
E521.3-OABSROW378A.TIF
E522.1-ABSROW379.TIF
E524.1-ABSROW381.TIF
E540.2-OABSROW387-HDC-Updated-2006.TIF
E545-ABSROW392.TIF
E546.1-ABSROW393.TIF
E570.1-OABSROW403.TIF
E571.3-ABSROW404.TIF
E573.3-ABSROW406A.TIF
E574.2-ABSROW407.TIF
E574A.1-ABSROW407A.TIF
E575-ABSROW408.TIF
E584.5-OABSROW414.TIF
E586.1-OABSROW416.TIF
E588.3-OABSROW418.TIF
E591.5-OABSROW421.TIF
E592.3-OABSROW422.TIF
E597.6-ABSROW427.TIF
0.2 SRELECPP1.tif
6.3 SRELECPP7.TIF
7.3 SRELECPP8.tif
8.2 SRELECPP9.tif
9 SRELECPP10.tif
11.3 SRELECPP12.tif
15.3 SRELECPP16.tif
17.3 SRELECPP18.tif
18.3 SRELECPP19.tif
19.3 SRELECPP20.tif
27.2 SRELECPP28.tif
30.1 SRELECPP31.tif
38.2 SRELECPP39.tif
52.2 SRELECPP53.tif
53.3 SRELECPP54.tif
55.3 SRELECPP56.tif
60.3 SRELECPP61.tif
61.3 SRELECPP62.tif
62.3 SRELECPP63.tif
SRP-5.3-Civil Drawings.pdf
C45.1-ABSROW43.TIF
C49.2-ABSROW47.TIF
C143-OABSROW129B.TIF

File details come from the government source that posted it. Updated .