Site_Visit_SLIDES_Hood_Bldg_52019.pdf

PDF 942 KB Posted

Attached to
Phase 2 Awardees Federal contract opportunity
Solicitation number
W9126G-13-R-0017
Issued by
Department of the Army Corps of Engineers Engineering District Fort Worth

About this file

Site Visit SLIDES Fort Hood Bldg 52019

View the file

Other files for this federal contract opportunity

Other files attached to Phase 2 Awardees, newest first.
File Type Posted
Ft_Hood_SB_MATOC_Pool_of_Contractors_POC_email_info.docx DOCX document
Phase_2_Participants_Revised_1April2014.docx DOCX document
Amend_13_-_W9126G-13-R-0017.pdf PDF
Amend_12_-_W9126G-13-R-0017.pdf PDF
Amend_11_-_W9126G-13-R-0017.pdf PDF
Site_Visit_Sign_in_Sheet_Hood_Bldg_52019.pdf PDF
Amend_10_-_W9126G-13-R-0017.pdf PDF
Amend_9_W9126G-13-R-0017.pdf PDF
Phase_2_Participants_Revised_13Nov13.docx DOCX document
Seed_Task_Order_Appendices.zip ZIP file
MATOC_Appendices.zip ZIP file
am_8.pdf PDF
Phase_2_Participants.docx DOCX document
Amend_7_Ft_Hood_MATOC.doc DOC document
Amend6_Ft_Hood_MATOC.pdf PDF
Amend_5_W9126G-13-R-0017.pdf PDF
Amend_4__03Apr13.pdf PDF
Amend_3_W9126G-13-R-0017.pdf PDF
Amendment_0002_W9126G-13-R-0017.pdf PDF
Amendment_0001_W9126G-13-R-0017.pdf PDF
Solicitation_W9126G13R0017.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9126G 13 R 0017W9126G‐13‐R‐0017

Fort Hood Small Business IDIQ New

MATOC FY13

One Team: Relevant, Ready, Responsive, Reliable

Repair Youth Center Building 52019Repair Youth Center, Building 52019

• Information provided herein is not intended to add, delete, or change requirements in the solicitation.

•This presentation is provided for information only and is not a part of the solicitation or any resultant contract.

• If differences exist between this presentation and the solicitation, follow the solicitation.

• Solicitation requirements can be changed only via amendment.

Building 52019Building 52019

•Building 52019 is currently operating as a Youth Activity Center.

The intent of the RFP is to make new the major building systemsThe intent of the RFP is to make new the major building systems and update the floor plan to meet, as closely as technically feasible, the requirements of UFC 4‐740‐06 Youth Centers.

•Building 52019 is located east of the intersection of Muskogee St. and Tank Destroyer Blvd.

General Requirements ( )(Section 01 00 50.00 44)

•Duration (Design and Construction):360 days •Liquidated Damages: $316.67/day •Site personnel

•Quality Control Manager (may dual hat with y g ( y Superintendent if individual fully meets qualifications for both positions) •Site Safety and Health Officer – may be a collateral y y duty responsibility

Phasing Requirements ( )(Section 01 00 50.00 44)

•Building 52019 is currently occupied

•Building will be available for turnover to the contractor 60 days after NTP. Building will be occupied but available for environmental surveys prior to turnover.

•Building will be vacant during construction.g g

•Building must be complete, testing, etc.., no later than 360 days after NTP.360 days after NTP.

Civil/Site RenovationsCivil/Site Renovations

Civil/Site RenovationsCivil/Site Renovations

•The Contractor shall be responsible for design and i f i d f ili i i hi h ifi iconstruction of site and facilities within the specific site responsibility areas defined. Specific work shall include, but not limited to the following:

•Grading around building perimeter•Grading around building perimeter.

•Walks and ramps.

•Remove parking spaces and paving •Restriping of parking lanes.p g p g •Restriping of Fire Lanes.

•Swing gates and Bollards.

•Seal coat parking lot.

•Electric Utilities •Relocate Fire Hydrant

Th dditi l P ki i th l O ti

•The additional Parking is the only Option.

Exterior ElectricalExterior Electrical

•A new primary and secondary service shall be provided d i ll d f h f ili Th f ili i hand installed for the facility. The facility requires a three phase service to be supplied by a new pad‐mounted transformer.

•A new pad‐mounted transformer shall be provided away from the building and outside of the AT/FP setback.

•A new telecommunications service shall be provided and installed. The existing communications system consists of a 12 strand single mode fiber optic cable and a 50 pair copper cable installed within one (1) underground conduit.

ArchitecturalArchitectural

•Major portions of the Youth Center shall receive ddi i l difi i lladditional modifications to walls, structure or infrastructure intended to change their original function or programmatic requirements.

•The five primary areas that shall receive wall or structural modifications are:

1) Proscenium Stage Area

2) Kitchen Area

3) Administrative Areas)

4) Activity Areas

5) Restrooms.

ArchitecturalArchitectural

Exterior EnvelopeExterior Envelope

•Install new thermal break aluminum windows with d bl l i i h L E idouble pane glazing with Low‐E coating.

•Provide a new roof system at the upper and lower roofs comprised of a low slope membrane, rigid insulation (minimum R‐30), air and vapor barrier.

•Other than in the Gymnasium, apply a continuous 1” layer of a closed cell insulation spray foam to the underside of the roof surface, sealing all penetrations, corners, and openings.

Mechanical / PlumbingMechanical / Plumbing

•All existing mechanical equipment, piping, supports and d k h ll b dductwork shall be removed.

•The preferred system for this facility is a variable air volume system with chilled water and hot water reheat in the classroom/admin area, with a packaged rooftop unit on the gymnasium.

•The plumbing system changes include demolition of existing Men and Women’s restrooms, installing new fixtures in the remodeled Men and Women’s toilet, the addition of single Unisex bathroom, and new water heater for the facility.

Provided DocumentsProvided Documents

•Conceptual Drawings •Hazardous Material Report •As‐Built Drawings •Flow Test Results •Roof Investigation Report

Proposal InformationProposal Information

•The proposal receipt date is 13 Dec 2013, 2:00 p.m., C l TiCentral Time

•Electronic submission – AMRDEC Safe

•Award of Seed Project: Subject to available of Funds

QuestionsQuestions