WHASC Construction Impacts Jun2011.pptx

PPTX presentation 3 MB Posted

Attached to
LACC Ph2 Construction Project
Solicitation number
W9126G-11-R-0101
Issued by

About this file

SITE VISIT 2nd Notice Further definition of how contractors get to site visit. Contractors ARE to drive through the 'construction gate' labeled 'Hwy 90 Gate'. The attachment titled WHASC Construction Impacts Jun2011 shows that Hwy 90 Gate is 'Closed' with a red dot however it WILL BE OPEN to contractors for the site visit only.

View the file

Other files

File Type Posted
am_4_dwgs_v1.zip ZIP file
am_4_dwgs_v3a.zip ZIP file
am_4_dwgs_v2.zip ZIP file
am_4_specs.zip ZIP file
am_4_dwgs_v3b.zip ZIP file
W9126G-11-R-0101Amend3.doc DOC document
g11r0101_am2.zip ZIP file
am_1_dwgs_v1-G-LS-FP-C-S.zip ZIP file
am_1_dwgs_v2-G-A-Q-I-Si-VT.zip ZIP file
am_1_dwgs_v3c-Com-Sec-PV-CEP.zip ZIP file
am_1_dwgs_v3a-G-M-P.zip ZIP file
am_1_specs.zip ZIP file
am_1_dwgs_v3b-E.zip ZIP file
LACC Ph2 PreProposal Sign in Sheet.pdf PDF
Brief HDR Phase 2 LACC Pre Proposal Site Visit.pdf PDF
Brief LACC Phase 2 Pre Proposal Site Visit.pdf PDF
SITE VISIT ACCESS NOTICE AND MAP.pdf PDF
WHASC Construction Impacts Jun2011.pptx PPTX presentation
instructions to download zipped files.txt TXT text file
IO-App C-RTA SID_CID.zip ZIP file
IO-App B-RTA Final Cut Sheet Book.zip ZIP file
IO-App A-Initial Outfitting —
dwgs-v3e-Com-Sec-CEP.zip ZIP file
dwgs-v3d-E2.zip ZIP file
dwgs-v3c-E1.zip ZIP file
dwgs-v3b-P.zip ZIP file
dwgs-v3a-G-M.zip ZIP file
dwgs-v2c-Q-I-Si-VT.zip ZIP file
dwgs-v2b-A.zip ZIP file
dwgs-v2a-G.zip ZIP file
dwgs-v1b-C-S.zip ZIP file
dwgs-v1a-G-LS-FP.zip ZIP file
g11r0101.zip ZIP file
SynopsisLACCPh2AMENDED2.pdf PDF
SynopsisLACCPh2AMENDED.doc DOC document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wilford Hall Main Hospital Luke Gate

Access Open

OV2

OV3

OV4

Access Closed

Avail Spaces

Military Drive

Kenly Ave North Wilford Hall Loop

N

Parking Lot Construction

Pepperell

OV5

DEDICATED

PATIENT

PARKING

MAIN ENTRANCE

URGENT

CARE

AUDITORIUM

ENTRANCE

CLINIC

ENTRANCE

Staff

OV 1/2

Bong Ave Staff Outlying Parking Lot

Bergquist Gate

New WHASC Construction Site

Total parking loss: 1454

Site Trailers & Laydown

ROAD CLOSED

Hwy 90 Gate

STAFF PARKING

Camp Bramble Parking

Develop America's Medical Airmen Today ... for Tomorrow

Providing Great Care…Building Warrior Medics image5.jpeg image6.png image7.png image1.png image2.jpeg image3.jpeg image4.png

File details come from the government source that posted it. Updated .