Brief LACC Phase 2 Pre Proposal Site Visit.pdf
PDF 523 KB Posted
- Attached to
- LACC Ph2 Construction Project
- Solicitation number
- W9126G-11-R-0101
About this file
LACC Phase2 Pre-Proposal Site Visit Brief
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lackland Ambulatory Care Center Phase 2 ConstructionPhase 2 Construction
Pre‐Proposal Site Visit
1 June 2011
Solicitation Number: W9126G‐11‐R‐0101
US Army Corps of Engineers
Agenda of Engineers
Fort Worth District
• Administrative/IntroductionsAdministrative/Introductions
• Purpose j i i• Project Description
• Site Visit
• Post Site Visit Meeting
• Points of ContactPoints of Contact
• Closing
Administrative/Introductions of Engineers
Fort Worth District
• Bathroom/BreakroomBathroom/Breakroom
• Safety
Si i Sh• Sign‐in Sheet
• Around the Room
– Name, Company, & Title
Purpose of Engineers
Fort Worth District
• The purpose of the pre‐proposal site visit is to p p p p p familiarize bidders with the scope of work and the existing site conditions.
D t B S it i t d ti• Due to Base Security requirements and time constraints, this scheduled pre‐proposal site visit will be the only one offered. Individual requests for sitey q visits will not be granted.
• Questions/Requests for Information (RFIs) must be entered into the ProjNet (DrChecks) Contractor RFIentered into the ProjNet (DrChecks) Contractor RFI system for responses.
• Comments from Contracting Officer, Mr. John Rodgers.Comments from Contracting Officer, Mr. John Rodgers.
Project Description of Engineers
Fort Worth District
• The scope of the project requires the p p j q construction of an approximately 298,747 square foot replacement hospital Ambulatory Care Center Phase 2 at Lackland Air Force BaseCare Center Phase 2 at Lackland Air Force Base in San Antonio, TX.
• The construction contract will be procured through a design/bid/build (D‐B‐B) one step request for proposal (RFP) process with full and open competition using FAR Part 15open competition using FAR Part 15.
• The contract will be Firm‐Fixed Price (FFP).
• Designer of Record (HDR) Presentation.g ( )
Site Visit of Engineers
Fort Worth District
Phase 1 You Are
Phase 1
Phase 2
Fence
Here x
Post Site Visit Meeting of Engineers
Fort Worth District
• Reminder: Requests for Information (RFIs)Reminder: Requests for Information (RFIs) generated from the pre‐proposal site visit must be entered into the ProjNet (DrChecks)must be entered into the ProjNet (DrChecks) Contractor RFI system for responses.
• General Questions• General Questions
Points of Contact of Engineers
Fort Worth District
Primary Point of Contact:
Ali Marshall, Contract Specialist Alisa.Marshall@usace.army.mil
Secondary Point of Contact:
John H Rodgers, i ffiContracting Officer john.h.rodgers@usace.army.mil
C t ti Offi AddContracting Office Address:
Attn: CESWF‐CT PO Box 17300 Fort Worth Texas 76102 0300Fort Worth, Texas 76102‐0300
Closing of Engineers
Fort Worth District
Thank You for participating in today’sThank You for participating in today s
Pre‐Proposal Site Visit
BE SAFEBE SAFE
GOOD LUCK
File details come from the government source that posted it. Updated .