AMENDMENT 3 issued June 10 2011 extends the due date from June 21 2011 to June 28 2011. See Attachment 'Amend3' for details.

View the file

Other files

File Type Posted
am_4_specs.zip ZIP file
am_4_dwgs_v3b.zip ZIP file
am_4_dwgs_v3a.zip ZIP file
am_4_dwgs_v1.zip ZIP file
am_4_dwgs_v2.zip ZIP file
g11r0101_am2.zip ZIP file
am_1_dwgs_v3c-Com-Sec-PV-CEP.zip ZIP file
am_1_dwgs_v1-G-LS-FP-C-S.zip ZIP file
am_1_dwgs_v3a-G-M-P.zip ZIP file
am_1_specs.zip ZIP file
am_1_dwgs_v2-G-A-Q-I-Si-VT.zip ZIP file
am_1_dwgs_v3b-E.zip ZIP file
LACC Ph2 PreProposal Sign in Sheet.pdf PDF
Brief HDR Phase 2 LACC Pre Proposal Site Visit.pdf PDF
Brief LACC Phase 2 Pre Proposal Site Visit.pdf PDF
WHASC Construction Impacts Jun2011.pptx PPTX presentation
SITE VISIT ACCESS NOTICE AND MAP.pdf PDF
WHASC Construction Impacts Jun2011.pptx PPTX presentation
instructions to download zipped files.txt TXT text file
IO-App C-RTA SID_CID.zip ZIP file
IO-App B-RTA Final Cut Sheet Book.zip ZIP file
IO-App A-Initial Outfitting —
dwgs-v3e-Com-Sec-CEP.zip ZIP file
dwgs-v3d-E2.zip ZIP file
dwgs-v3c-E1.zip ZIP file
dwgs-v3b-P.zip ZIP file
dwgs-v3a-G-M.zip ZIP file
dwgs-v2c-Q-I-Si-VT.zip ZIP file
dwgs-v2b-A.zip ZIP file
dwgs-v2a-G.zip ZIP file
dwgs-v1b-C-S.zip ZIP file
dwgs-v1a-G-LS-FP.zip ZIP file
g11r0101.zip ZIP file
SynopsisLACCPh2AMENDED2.pdf PDF
SynopsisLACCPh2AMENDED.doc DOC document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY OF CHANGES

SECTION 00 11 00 - STANDARD FORM (SF) 1442 AND CLIN SCHEDULE

The required response date/time has changed from 21-June-2011 02:00 PM to 28-Jun-2011 02:00 PM.

(End of Summary of Changes)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W9126G-11-R-0101 for the Lackland Ambulatory Care Center Phase 2 Construction Project is amended as follows:

a. Proposal due date is extended to June 28, 2011 at 2:00 P.M. Central Time.

b. Another Amendment is anticipated on or about June 17, 2011.

1. CONTRACT ID CODE

PAGE OF PAGES

J

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA

15C. DATE SIGNED

15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)

(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code)

X

W9126G-11-R-0101

9B. DATED (SEE ITEM 11)

15-Apr-2011

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Jun-2011

CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A19

P.O. BOX 17300

FORT WORTH TX 76102-0300

W9126G

7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

See Item 6

FACILITY CODE

EMAIL:

TEL:

File details come from the government source that posted it. Updated .