TE-6_-_SOP_WAO _13-R-0001 _YPG_MTSS _10_Oct_2012.pdf

PDF 49 KB Posted

Attached to
Mission (Test) Support Services, U. S. Army Yuma Proving Ground, AZ
Solicitation number
W9124R-13-R-0001
Issued by

View the file

Other files

File Type Posted
TE-10_-_Index_Workload_History _13-R-0001 _YPG_MTSS _10_Oct_2012.pdf PDF
Attachment_6_Past_Performance_Questionnaire.doc DOC document
Attachment_5_Sample_Consent_Letter.doc DOC document
Attachment_4_Past_Performance_Specific_Relevant_Contract_Reference_Sheet.doc DOC document
Attachment_2_-_Area_Wage_Determination_-_AZ.txt TXT text file
Attachment_3_-_Area_Wage_Determination_-_AK.txt TXT text file
TE-11_-_Required_Plans_ _Reports _13-R-0001 _YPG_MTSS _10_Oct_2012.pdf PDF
TE-10_-_Item_7_(AZ)__12-R-0003 _YPG_MTSS _23_Jul_12_.pdf PDF
TE-10_-_Item_7_(AK)___12-R-0003 _YPG_MTSS _09_Oct_12.pdf PDF
TE-10_-_Item_6_Current_Manning_Level _13-R-00001 _YPG_MTSS _10_Oct_2012.pdf PDF
TE-10_-_Item_5_Productive_Hours_Worked_by_Functional_Area_13-R-0001 _YPG_MTSS _20_Dec_12.pdf PDF
TE-10_-_Item_4__Staffing_Level_by_Functional_Area _13-R-0001 _YPG_MTSS _20_Dec_12.pdf PDF
TE-10_-_Item_3_Average_Percentage_of_Workload_by_Commodity _13-R-0001 _YPG_MTSS _20_Dec12.pdf PDF
TE-10_-_Item_2_Major_Test_Programs_Supported _13-R-0001 _YPG_MTSS _10_Oct_2012.pdf PDF
TE-10_-_Item_1_Number_of_Tests_per_Year_per_Test_Center _13-R-0001 _YPG_MTSS _10_Oct_2012.pdf PDF
TE-9_-_DD254__13-R-0001 _YPG_MTSS _10_Oct_2012.pdf PDF
TE-8_-Theater_Support _13-R-0001 _YPG_MTSS _20_Sep_2012.pdf PDF
TE-7_-__Left_Blank_Intentionally _13-R-0001 _YPG_MTSS _10_Oct_2012.pdf PDF
TE-5_-_Government_Furnished_Vehicle_List _13-R-0001 _YPG_MTSS _10_Oct_2012.pdf PDF
TE-4-_PWS_Functional_Area_Status-Government_Furnished_Facilities _13-R-0001 _YPG_MTSS_15_Oct_2012.pdf PDF
TE-3_-_Government_Furnished_Property_List _13-R-0001 _YPG_MTSS_10_Oct_2012.pdf PDF
TE-2_-_Award_Fee_Criteria _13-R-0001 _YPG_MTSS_10_Oct_2012.pdf PDF
TE-1_PRS _13-R-0001 _YPG_MTSS_10_Oct_2012.pdf PDF
PWS _Rev_3 _13-R-00001 _YPG_MTSS _10_Oct_2012.pdf PDF
Draft_Solicitation.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE-6

TECHNICAL EXHIBIT 6

Work Authorization Order (WAO)

Standard Operating Procedure (SOP)

1. Purpose:

The purpose of this Standard Operating Procedure (SOP) is to outline the procedures and requirements associated with processing a Work Authorization Order (WAO) for the Mission Test Support Services (MTSS) Contract.

2. Definition of a WAO:

WAO Definition as stated in the current MTSS Contract C.5.2.2:

Work Authorization Orders. From time to time, we will issue to you a Work Authorization Order (WAO). A WAO would be used for two (2) basic categories of work: (1) development/modification of USAYPG’s hardware and software systems or studies, or (2) support of an existing civilian workforce. You may be asked to perform a particular task or produce a particular product other than the day to day mission operations (specific tasking). It may be continuous in nature (e.g. providing a person with particular skills to perform a continuing requirement) or a one-time specific purpose (e.g. designing and building an item of instrumentation, or fabrication of items or products, or develop databases or developing a specified computer program, or modify existing software requirements, or doing a study). You may be required to develop cost estimates, schedules, and formal plans with milestones for approval by us before proceeding with execution of a WAO. Each WAO will specify the product required, a process if applicable, milestones, and any related administrative requirements.

3. Appropriate and Inappropriate Uses of WAOs:

A. WAOs are appropriate to use in situations where the user has a specific requirement that is within the scope of the contract but outside the contractor’s day to day operations. If the requested work is outside of the scope of the contract, it cannot be authorized on a WAO.

Examples of Work Efforts Appropriate for WAOs:

• Special Studies

• Instrumentation interfaces (How to Interface with the RT and Radar and have them talking to each other)

• Preparing Real Time Systems to migrate from an antiquated system

• Test Director Assistance

• Development/modification of a hardware/software system

• Perform Instrumentation Studies

• Support of Full Operation of a particular contract function

B. WAO’s are not appropriate for:

• work that is part of the day to day mission of the contractor

• the sole purpose of obligating funding

• extending the life of funding

4. Information Required on a WAO:

A sample WAO is included in Appendix A.

a. WAO Number

b. Modification Number

c. Requester’s Information

d. WAO Title

e. Type of Request

- Support

- Expansion

- Full Function

- Limited Service or Product

f. Description of Service

g. Deliverables and Schedule

h. Benefit to Government

i. Impact if Not Approved

j. Specifications

k. GFE

l. Required Documents

m. Duration

n. Classification

o. Other

p. ICGE

5. Routing Procedures and Responsibilities:

Requestor

Supervisor

COR Office

Contractor

Budget Office

6. Funding of WAO’s:

Obligation/Deobligation of Funds

7. Changes in Scope of WAO:

8. Oversight Responsibilities and Review Process:

Initiator

Contractor

Resource Management

9. Procedures for Closing out a WAO:

Mission (Test) Support Services Contract, W9124R-13-C-XXXX

Work Authorization Order (WAO)

WAO# Assigned By the COR MODIFICATION # Assigned By the COR

Requesting Organization Date

POC E-Mail Phone Fax

WAO Title

1. This is a request for: �Support � Expansion � Full Functional � Limited Service or product

2. Description of Provide a short (title) and briefly describe the service or product. Example 1:

Service: (Suppport Gunners)

Assume support responsibilities for Artillery Testing IAW paragraph C.5.7 of the Range Support.

Service Contract, Example 2: (KTM-R) Design and build interface Unit for

KTM

remote operation.

3. Deliverables List and describe the products you require the contractor to provide and the & Schedule: dates you require them to be delivered (Execution Plan). This can include proposed schedules, outlines, draft documents, final documents, events, hardware, software, and any services required. (Attach additional sheets, if necessary).

4. Benefit to Government/division can continue to meet requirements for testing Government: requirements.

5. Impact if not These positions are mission essential. We are tasked with an extensive testing approved: schedule and under staffed. The long hours present a safety concern. These positions are needed, if we are expected to meet the customer’s testing requirements.

6. Specifications: Include all definable requirements here. Attach additional documentation as required. Specify hardware and software requirements. Specify acceptable quality levels for written products.

7. GFE: Government Furnished Equipment – Identify what you will provide, including tools and equipment. For products, indentify what parts, materials and services will be provided by government (if applicable).

8. Required Specify the documentation including regulations, SOP’s, Test Plans, TOPs, and

Documents: any other documentation that must be used by the contractor.

9. Duration: Required Delivery Date of expected duration of services.

10. Classification: Indicate the classification of work to be performed. The classification guide should be referenced in paragraph 6 above.

11. Other: Provide Independent Government Cost Estimate and additional information as required to fully document the requirement.

12. Funds Certified: Jono/Subjono: (Test FACS #) DATE:

REQUESTOR: Signature of Requestor DATE:

SUPERVISOR: Signature of Responsible Supervisor DATE:

COR: DATE:

CONTRACTOR ESTIMATE: DATE:

REQUESTER ACCEPTANCE OF ESTIMATE: DATE:

ADVANCE TECHNOLOGY: DATE:

COMMODITY DIRECTOR: Signature of Responsible Supervisor DATE:

RESOURCE MANAGEMENT: DATE:

COMMANDER YUMA TEST CENTER: DATE:

CONTRACTING OFFICER: DATE:

COR LEAD: DATE:

CONTRACTOR ACCEPTANCE: DATE:

BUDGET: 1142# DATE:

SAMPLE IGCE

Subject: IGCE for XXX Division Engineer Request

The goal is to hire one fully functional Test Director; however, in recognition that the goal may not be attainable.

Two 1940 labor hour cost estimates one for a fully trained/experienced applicant, and another for someone straight out of college (to be trained on site), is included.

Option: Engineer VI (DTS costs of $55,837 + Direct cost of $76,732 – a first of $132,569).

1. Total DTS Costs = are detailed below:

a. Advertising costs = $5,000

b. Bring 3 applicants to YPG for an interview ($2,000 each x 3 individuals = $6,000).

c. Provide a 30-day temporary relocation allowance ($106 per day x 30 days = $3,180).

d. Household goods move ($7,000).

e. Realtor fees for house sale (7% x $150,000 home = $10,500)

f. In processing and familiarization training ($46.00 per hour x 162 hours = $7,549).

g. During the 11 months after familiarization is complete, 20% of the Engineer’s time (356 hours x

$46.60 per hour = $16,608 is considered overhead in nature, and thus charged to DTS.

2. Total Direct Costs = are detailed below:

a. Cell phone lease ($40 per month = $480)

b. Vehicle lease ($600 registration + $900 insurance + $7.600 lease charge = $9,100)

c. Vehicle fuel (12 months x $60 per month = $720)

d. During the remaining 11 months, 80% of the Engineers time (1425 hours x $46.60 per hour =

$66,432) is charged to tests.

Option: Engineer 1 (DTS costs of $39,647 + Direct cost of $32,076 = a first year of $71,723).

1. Total DTS Costs = are detailed below:

a. Advertising costs = $1,000

b. Bring 3 applicants to YPG for an interview ($2,000 each x 3 individuals = $6,000).

c. In processing and familiarization training ($27.99 per hour x 162 hours = $4,534).

e. During the next 5 months after familiarization is complete, 100% of the Engineer’s time (810 hours x $27.99 per hour = $22,672) is charged to DTS to attain certification.

f. During the next 6 months 20% of the Engineer’s time (194 hours x $27.99 per hour = $5,441) is considered overhead and charged to DTS.

3. Total Direct Costs = are detailed below:

a. Cell phone lease ($40 per month = $480)

b. Vehicle lease ($600 registration + $900 insurance + $7.600 lease charge = $9,100)

c. Vehicle fuel (12 months x $60 per month = $720)

d. During the last 6 months, 80% of the Engineers time (778 hours x $27.99 per hour = $21,776) is charged to tests.