TECHNICAL EXHIBIT B

PROJECTED WORKLOAD DATA

This technical exhibit is a projection of the anticipated yearly workload for this requirement. It is based on historical workload data and anticipated future requirements. The projected workload data are broken out by labor category per year and does not include surge mission hours.

Projected Workload

Item
LABOR CATEGORY
WORKING HOURS

EXEMPT:

1
Senior UXO Supervisor
1,880 (1 FTE)
2
Management Analyst
1,880 (1 FTE)
TOTAL EXEMPT
3,760

NON-EXEMPT

3
UXO/EOD Tech III*
6,942
4
UXO/EOD Technician II
8,820
5
Heavy Equipment Operator
6,741
TOTAL NON-EXEMPT
22,503
TOTAL LABOR
26,263

*One (1) UXO/EOD Tech III shall be the Contractor Quality Control person

PROJECTED EQUIPMENT DATA

The following is a list of equipment typically used in the performance of this requirement that is not provided by the Government:

1 eachWet Saw (for asbestos containing motors)
1 eachGenerator / Welding Equipment
5 eachTrailer, Gooseneck
7 eachTruck 4WD 1 ton*
1 eachTruck, 550 *
1 eachBackhoe*
4 eachUtility Terrain Vehicles plus trailers
1 eachSubmunition Shredder
1 eachForklift

*Diesel fuel is not available on WSMR.